Issue date | Title | Topic | |
---|---|---|---|
ML23284A425 | 11 October 2023 | 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report; Commitment Summary Report; and Update to the Fire Protection Report | Shutdown Margin Anticipated operational occurrence Temporary Modification Incorporated by reference FLEX Fuel cladding |
IR 05000327/2021005 | 18 August 2021 | Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2021005 and 05000328/2021005 | Cyber Security Exemption Request Power-Operated Valves Coronavirus |
ML19156A261 | 5 June 2019 | 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report and Commitment Summary Report | Safe Shutdown Boric Acid Operator Manual Action Temporary Modification FLEX |
ML17278A759 | 5 October 2017 | Soarca Sequoyah Updated Draft Executive Summary | Earthquake |
ML15336A940 | 26 November 2015 | Submittal of 10 CFR 50.46 Combined Annual and 30-Day Report | |
ML15321A454 | 13 November 2015 | Submittal of 10 CFR 71.95 Report on the 8-120B Cask | |
CNL-15-106, 3, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information | 8 July 2015 | 3, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information | |
ML15156A389 | 28 April 2015 | LTR-SGMP-15-25 Np, Response to NRC Request for Additional Information on the Design Features of the Sequoyah, Unit 2, Replacement Steam Generators. | |
ML14325A069 | 17 November 2014 | CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report | Safe Shutdown Stroke time Temporary Modification Power change |
ML14259A338 | 12 September 2014 | Plant(Sqn) - NPDES Permit No. TN0026450 - Discharge Monitoring Report(Dmr) for August 2014 | |
CNL-14-130, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear Plant | 28 August 2014 | Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear Plant | Spent Fuel Pool Instrumentation |
CNL-14-033, Second Six-Month Status Report and Revised Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses Re Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 5 March 2014 | Second Six-Month Status Report and Revised Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses Re Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | Boric Acid High winds Shutdown Margin Ultimate heat sink Safe Shutdown Earthquake Operating Basis Earthquake Emergency Lighting FLEX Severe Accident Management Guideline Earthquake |
ML14016A039 | 6 February 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
CNL-14-013, Highlights of Improvements to the Sequoyah Nuclear Plant IPEEE Seismic Analysis Results and Supplemental Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)Regarding... | 31 January 2014 | Highlights of Improvements to the Sequoyah Nuclear Plant IPEEE Seismic Analysis Results and Supplemental Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)Regarding... | Safe Shutdown Unanalyzed Condition Fukushima Dai-Ichi Earthquake Scaffolding |
CNL-13-117, 10 CFR 50.46 - Combined Annual and 30-Day Report | 18 November 2013 | 10 CFR 50.46 - Combined Annual and 30-Day Report | |
ML13298A031 | 22 October 2013 | SQN Femp Energy and Ghg Reporting Tool: Results Summary Fy 2008 - Fy 2012 Listed in Letter from TVA, Dated Sep 20, 2013, in Response to RAI 6.a.i.9 (7 Pages) | |
ML13294A430 | 26 September 2013 | Fukushima Near-Term Task Force Recommendation 2.3: Seismic Response Report, Revision 1 | Safe Shutdown Unanalyzed Condition Boric Acid Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Finite Element Analysis Design basis earthquake Large early release frequency Earthquake Maintenance Rule Program Scaffolding |
ML13144A576 | 22 May 2013 | Watt Bar, Units 1 & 2, Report of Drug Testing Error in Accordance with 10 CFR 26.719(c)(1) | |
ML13080A073 | 12 March 2013 | Extension Request Regarding the Flooding Hazard Reevaluation Report Required by NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation.. | Fukushima Dai-Ichi Earthquake |
ML12335A340 | 27 November 2012 | Tennessee Valley Authority - Fleet Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Flooding Walkdown Results of Recommendation 2.3 of the Near-Term Task Force Review of | Safe Shutdown Unanalyzed Condition Safe Shutdown Earthquake Internal Flooding Hydrostatic Operating Basis Earthquake Fukushima Dai-Ichi Design basis earthquake Earthquake Scaffolding |
ML12240A174 | 18 September 2012 | Review of the 2011 Refueling Outage Steam Generator Tube Inservice Inspection Reports | |
ML120720356 | 21 February 2012 | Initial Exam 2012-301 Final Administrative JPMs | Boric Acid Shutdown Margin Reactor Vessel Water Level Met Tower Job Performance Measure |
ML11356A244 | 16 December 2011 | Revisions to the Technical Requirements Manual and Units 1 and 2 Technical Specification Bases | Boric Acid Shutdown Margin Incorporated by reference B.5.b Mitigating Strategies |
ML11356A233 | 16 December 2011 | 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report | |
ML11320A004 | 14 November 2011 | Enclosure 2 Sequoyah Units 1 & 2, Response to Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) | |
ML11213A124 | 26 July 2011 | Information Needs | B.5.b Mitigating Strategies |
ML11165A006 | 10 June 2011 | NPDES Permit No. TN0026450 - Alternative Thermal Limit Study Plan | |
ML110340058 | 31 January 2011 | 2010 Biocide/Corrosion Treatment Plan (B/Ctp) Annual Report - NPDES Permit No. TN0026450 | |
ML110050282 | 30 June 2010 | EPRI Groundwater Assessment for Tva'S Sequoyah Nuclear Plant - Assessment Final Report | Chernobyl |
ML110050288 | 22 June 2010 | Investigation of Tritium Releases to Groundwater | Boric Acid Offsite Dose Calculation Manual Anticipated operational occurrence Earthquake |
ML101460115 | 21 May 2010 | Commitment Summary Report | |
NEI 99-04, Sequoyah Units 1 & 2, Commitment Summary Report | 21 May 2010 | Sequoyah Units 1 & 2, Commitment Summary Report | |
ML101930417 | 6 May 2010 | Tritium Database Report | Offsite Dose Calculation Manual Hydrostatic |
ML12171A189 | 31 March 2010 | Integrated Resource Plan, Tva'S Environmental & Energy Future | Open House |
ML090340106 | 27 January 2009 | NPDES Permit No. TN0026450 - Application for Renewal, WR2009-1-45-151, Section 4.0 Through Interceptor System Interim Monitoring and Trial Closure | Grab sample |
ML073040011 | 26 October 2007 | Pressurizer Weld Overlay Examination Results to Relief Request G-RR-1 | Weld Overlay |
ML071560604 | 5 June 2007 | Commitment Summary Report for Period of June 1, 2005 to February 28, 2007 | |
ML060740605 | 2 March 2006 | Unit 2 Cycle 13 (U2C13) - 12-Month Steam Generator (SG) Inspection Report | |
ML060720430 | 1 March 2006 | March 1, 2006 Public Meeting Slides for Proposed Generic Letter Post-Fire Safe-Shutdown Circuit Analysis Spurious Actuations. | Hot Short Safe Shutdown Significance Determination Process Thermoset Exemption Request Fire Protection Program Backfit |
ML062620427 | 25 January 2006 | American Society of Mechanical Engineers Section XI Code Relief Request - Snubber Examination and Testing | Earthquake |
ML053410236 | 17 November 2005 | 10 CFR 50.59, and 10 CFR 72.48 Changes, Tests, & Experiments Summary Report | Tornado Missile Tornado Missile Protection |
ML072700849 | 31 January 2005 | Caldon Experience in Nuclear Feedwater Flow Measurement | Power change |
ML042680412 | 21 September 2004 | Final Exercise Report - Sequoyah Nuclear Power Plant, June 23, 2004 | |
ML040680369 | 20 April 2004 | Summary of Conference Call, Enclosure 2 - NRC Staff Initial Questions & TVA Responses | |
ML040680360 | 20 April 2004 | Summary of Conference Calls, Enclosure 1 | |
ML040620449 | 26 February 2004 | Fitness-for-Duty (FFD) Program Performance Data for July - December 2003 | Fitness for Duty |
ML031990400 | 10 July 2003 | Emergency Response Data System Data Point Library Update | Reactor Vessel Water Level Met Tower |
ML031890474 | 10 July 2003 | Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-for-Duty Enhancements for Nuclear Security Force Personnel for Browns Ferry, S | Enforcement Discretion |
ML030030119 | 31 December 2002 | Control Room Habitability Analysis for Design Basis Accidents - Tritium Production | |
ML023220113 | 15 November 2002 | Units 1 and 2 - 10CFR 50.59, Changes, Tests and Experiments Summary Report | Safe Shutdown Boric Acid Post Accident Monitoring |