IR 05000275/2004006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{IR-Nav| site = 05000275 | year = 2004 | report number = 006 | url = https://www.nrc.gov/reactors/operating/oversight/reports/diab_2004006.pdf }}
{{Adams
| number = ML042440528
| issue date = 08/30/2004
| title = IR 05000275-04-006; 05000323-04-006; on 06/14/2004-08/12/2004; Diablo Canyon Nuclear Power Plant, Units 1 and 2; Biennial Baseline Inspection of the Identification and Resolution of Problems
| author name = Smith L
| author affiliation = NRC/RGN-IV/DRS
| addressee name = Rueger G
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| license number = DPR-080, DPR-082
| contact person =
| document report number = IR-04-006
| document type = Inspection Report, Letter
| page count = 34
}}
 
{{IR-Nav| site = 05000275 | year = 2004 | report number = 006 }}
 
=Text=
{{#Wiki_filter:
}}

Latest revision as of 16:28, 16 March 2020

IR 05000275-04-006; 05000323-04-006; on 06/14/2004-08/12/2004; Diablo Canyon Nuclear Power Plant, Units 1 and 2; Biennial Baseline Inspection of the Identification and Resolution of Problems
ML042440528
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/30/2004
From: Laura Smith
Division of Reactor Safety IV
To: Rueger G
Pacific Gas & Electric Co
References
IR-04-006
Download: ML042440528 (34)


Text