| issue date = 07/25/2013
| issue date = 07/25/2013
| title = IR 05000275-13-004, and 05000323-13-004, Diablo Canyon Power - Notification of NRC Triennial Heat Sink Performance Inspection
| title = IR 05000275-13-004, and 05000323-13-004, Diablo Canyon Power - Notification of NRC Triennial Heat Sink Performance Inspection
| author name = Farnholtz T R
| author name = Farnholtz T
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1
| addressee name = Halpin E D
| addressee name = Halpin E
| addressee affiliation = Pacific Gas & Electric Co
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 14: Line 14:
| page count = 6
| page count = 6
}}
}}
See also: [[followed by::IR 05000275/2013004]]
See also: [[see also::IR 05000275/2013004]]


=Text=
=Text=
{{#Wiki_filter:July 25, 2013  
{{#Wiki_filter:UNITE D S TATE S
  Mr. Edward D. Halpin  
                                  NUC LEAR RE GULATOR Y C OMMI S SI ON
Senior Vice President and  
                                                    R E G IO N I V
   Chief Nuclear Officer  
                                                1600 EAST LAMAR BLVD
                                          AR L I NGTON , TEXAS 7 601 1- 4511
                                                  July 25, 2013
Mr. Edward D. Halpin
Senior Vice President and
   Chief Nuclear Officer
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6
Avila Beach, CA 93424
SUBJECT:        DIABLO CANYON POWER PLANT - NOTIFICATION OF NRC TRIENNIAL
                HEAT SINK PERFORMANCE INSPECTION (05000275/2013004 AND
                05000323/2013004) AND REQUEST FOR INFORMATION
Dear Mr. Halpin
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV
staff will conduct a triennial heat sink performance inspection at your Diablo Canyon Power
Plant. The inspection will be comprised of two reactor inspectors from the NRC Region IV
office. The inspection will be conducted in accordance with NRC Inspection Procedure
71111.07, "Heat Sink Performance."
The schedule for the inspection is as follows:
Onsite Inspection Dates: September 9 - 12, 2013
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by August 26, 2013. We request,
that during the onsite inspection week, you ensure that copies of analyses, evaluations, or
documentation regarding the implementation and maintenance of your heat exchanger program
are available. Of specific interest are those documents that establish that your heat exchanger
program satisfies NRC regulatory requirements and conforms to applicable NRC guidance.
Also, appropriate personnel knowledgeable of safety-related heat exchangers should be
available to support the inspector at the site during the inspection.


Pacific Gas and Electric Company
E. Halpin                                    -2-
Diablo Canyon Power Plant  
We have discussed the schedule for this inspection activity with your staff and understand that
our regulatory contact for this inspection will be Mike McCoy of your licensing organization. If
there are any questions about this inspection or the material requested, please contact the
inspectors, Wayne Sifre, at 817-200-1193 or by e-mail at Wayne.Sifre@nrc.gov, or Christie Hale
at 650-479-5434 or e-mail at Christie.Hale@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
                                                Sincerely,
                                                /RA/
                                                Thomas R. Farnholtz, Chief
                                                Engineering Branch 1
                                                Division of Reactor Safety
Docket Nos.: 05000275, 05000323
License Nos.: DPR-80; DPR-82
Enclosure: Triennial Heat Sink Performance Inspection Request for Information
cc: Electronic Distribution for Diablo Canyon Power Plant


P.O. Box 56, Mail Code 104/6
Avila Beach, CA  93424
  SUBJECT: DIABLO CANYON POWER PLANT - NOTIFICATION OF NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION (05000275/2013004
AND 05000323/2013004)
AND REQUEST FOR INFORMATION
Dear Mr. Halpin


  The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV staff will conduct a triennial heat sink performance inspection at your Diablo Canyon Power
  ML13206A189
Plant.  The inspection will be comprised of two reactor inspectors from the NRC Region IV office.  The inspection will be conducted in accordance with NRC Inspection Procedure
    SUNSI Review Complete   Non-Sensitive          Publicly Available
 
Initials: WCS               Sensitive             Non-Publicly Available
71111.07, "Heat Sink Performance."  The schedule for the inspection is as follows:
SRI:EB1                   RI:EB1                 C:EB1
 
WSifre                   CHale                 TFarnholtz
/RA/                     /RA/                   /RA/
Onsite Inspection Dates:  September 9 - 12, 2013
7/24/13                   7/25/13               7/25/13
  Experience has shown that this
                           
inspection is resource intens
                                      Request for Information
ive both for the NRC inspectors and your staff.  In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. 
                          Triennial Heat Sink Performance Inspection
Please note that the documents are requested to
                                    Diablo Canyon Power Plant
be provided by August 26, 2013.  We request, that during the onsite inspection week, you ensure that copies of analyses, evaluations, or
Inspection Report:               05000275/2013004, 05000323/2013004
documentation regarding the implementation and m
Inspection Dates:               September 9 - 12, 2013
aintenance of your heat exchanger program are available.  Of specific interest are those documents that establish that your heat exchanger
Inspection Procedure:           IP 71111.07, Triennial Heat Sink Performance
program satisfies NRC regulatory requirement
Inspectors:                     Wayne Sifre, Senior Reactor Inspector
s and conforms to applicable NRC guidance.  Also, appropriate personnel knowledgeable of safety-related heat exchangers should be
                                Christie Hale, Reactor Inspector
available to support the inspector at the site during the inspection.
 
  UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
E. Halpin  - 2 -
   We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be Mike McCoy of your licensing organization.  If
there are any questions about this inspection or the material requested, please contact the
inspectors, Wayne Sifre, at 817-200-1193
or by e-mail at Wayne.Sifre@nrc.gov, or Christie Hale at 650-479-5434 or e-mail at Christie.Hale@nrc.gov. 
 
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection
requirements were approved by the Offi
ce of Management and Budget, control number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
 
enclosure will be available electr
onically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely, 
/RA/  Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos.:  05000275, 05000323
License Nos.:  DPR-80; DPR-82
 
Enclosure:  Triennial Heat Sink Performance Inspection Request for Information
cc:  Electronic Distribution for Diablo Canyon Power Plant
 
 
 
 
  ML13206A189
  SUNSI Review Complete Initials: WCS Non-Sensitive
Sensitive Publicly Available  Non-Publicly Available SRI:EB1 RI:EB1 C:EB1 WSifre CHale TFarnholtz /RA/ /RA/ /RA/ 7/24/13 7/25/13 7/25/13  
 
  - 1 - Enclosure
Request for Information  
Triennial Heat Sink Performance Inspection Diablo Canyon Power Plant  
 
Inspection Report:   05000275/2013004, 05000323/2013004
 
Inspection Dates: September 9 - 12, 2013  
 
Inspection Procedure: IP 71111.07, Triennial "Heat Sink Performance
Inspectors:   Wayne Sifre, Senior Reactor Inspector  
    Christie Hale, Reactor Inspector
 
Information Requested for the In-Office Preparation Week
Information Requested for the In-Office Preparation Week
  The following information should be sent to the Region IV office in hard copy or electronic  
The following information should be sent to the Region IV office in hard copy or electronic
 
format (Certrec IMS preferred), to the attention of Wayne Sifre, by August 26, 2013. The
format (Certrec IMS preferred), to the attention of Wayne Sifre, by August 26, 2013. The inspector will select specific items from t
inspector will select specific items from the information requested below and then request from
he information requested below and then request from your staff additional documents needed during the onsite inspection week. Also, we request that you categorize the documents in your response with the numbered list below. Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead inspector as soon as possible.  
your staff additional documents needed during the onsite inspection week. Also, we request
 
that you categorize the documents in your response with the numbered list below. Please
The following heat exchangers/heat sinks have been selected for inspection:  
provide requested documentation electronically if possible. If requested documents are large
 
and only hard copy formats are available, please inform the inspector, and provide subject
* Residual Heat Removal Heat Exchangers (RHR HX 2-1, RHR HX 2-2)  
documentation during the first day of the onsite inspection. If you have any questions regarding
* Safety Injection Pump Lube Oil and Seal Water Coolers (2-2, 2-2A/B, 2-1, 2-1A/B)  
this information request, please call the lead inspector as soon as possible.
* Spent Fuel Pit Heat Exchanger (HX 2-1)  
The following heat exchangers/heat sinks have been selected for inspection:
* Component Cooling Water (CCW HX 2-1, CCW HX 2-2)  
    *   Residual Heat Removal Heat Exchangers (RHR HX 2-1, RHR HX 2-2)
For all Generic Letter 89-13 exchangers
    *   Safety Injection Pump Lube Oil and Seal Water Coolers (2-2, 2-2A/B, 2-1, 2-1A/B)
1. List of corrective action program documents (with a short description) associated with Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat  
    *   Spent Fuel Pit Heat Exchanger (HX 2-1)
 
    *   Component Cooling Water (CCW HX 2-1, CCW HX 2-2)
exchanger cavitation, or heat exchanger testing, in the previous three years  
For all Generic Letter 89-13 exchangers:
2. System health report(s) and maintenance rule system notebooks for all the Generic  
    1. List of corrective action program documents (with a short description) associated with
Letter 89-13 heat exchangers
        Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat
3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the  
        exchanger cavitation, or heat exchanger testing, in the previous three years
previous three years
    2. System health report(s) and maintenance rule system notebooks for all the Generic
4. Copies of any procedures developed to implement the recommendations of Generic Letter 89-13, e.g., the Generic Letter 89-13 Heat Exchanger Program description
        Letter 89-13 heat exchangers
    3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the
        previous three years
    4. Copies of any procedures developed to implement the recommendations of Generic
        Letter 89-13, e.g., the Generic Letter 89-13 Heat Exchanger Program description
    5. Copies of any commitments to the Generic Letter 89-13 program
                                                  -1-                                    Enclosure


5. Copies of any commitments to the Generic Letter 89-13 program 
For the specific heat exchangers selected:
  - 2 - Enclosure
  Testing Documents
  For the specific heat exchangers selected:  
  6. Copies of the two most recent completed tests confirming thermal performance for those
Testing Documents
      heat exchangers which are performance tested
  6. Copies of the two most recent completed tests confirming thermal performance for those heat exchangers which are performance tested
  7. Instrument uncertainties of the instruments used during testing
7. Instrument uncertainties of the instruments used during testing  
  8. Copy of any operability determinations or other documentation of degradation
8. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the  
      associated with the heat exchangers or the systems that support the operation for the
selected heat exchangers
      selected heat exchangers
9. Documents that show the as-found results are recorded, evaluated, and appropriately dispositioned such that the as-left condition is acceptable  
  9. Documents that show the as-found results are recorded, evaluated, and appropriately
Cleaning Documents
      dispositioned such that the as-left condition is acceptable
  10. The cleaning and inspection maintenance schedule for each heat exchanger for the next  
  Cleaning Documents
five years
  10. The cleaning and inspection maintenance schedule for each heat exchanger for the next
11. Copy of the document describing the inspection results for the last two cleaning and inspection activities completed on each heat exchanger
      five years
12. Cleaning procedures with acceptance criteria for the selected heat exchangers  
  11. Copy of the document describing the inspection results for the last two cleaning and
13. Copies of the documents that verify the structural integrity of the heat exchanger, e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results
      inspection activities completed on each heat exchanger
14. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers
  12. Cleaning procedures with acceptance criteria for the selected heat exchangers
Design Documents
  13. Copies of the documents that verify the structural integrity of the heat exchanger, e.g.,
  15. Copies of the design basis documents and updated final safety analysis report pages for the selected heat exchangers
      eddy current summary sheets, ultrasonic testing results, and visual inspection results
16. Provide a list of calculations with a description which currently apply to each heat  
  14. Copies of those documents that describe the methods taken to control water chemistry
exchanger
      in the heat exchangers
17. Copies of vendor data sheets and design basis data for the selected heat exchangers
  Design Documents
18. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers
  15. Copies of the design basis documents and updated final safety analysis report pages for
19. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test  
      the selected heat exchangers
acceptance criteria)  
  16. Provide a list of calculations with a description which currently apply to each heat
20. Copy of the calculations or documents which evaluate the potential for water hammer or excessive tube vibration in the heat exchanger or associated piping
      exchanger
 
  17. Copies of vendor data sheets and design basis data for the selected heat exchangers
  - 3 - Enclosure
  18. Copy of the calculation which establishes the limiting (maximum) design basis heat load
21. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number
      which is required to be removed by each of these heat exchangers
of tubes which can be plugged in each heat exchanger 
  19. Copy of the calculation which correlates surveillance testing results from these heat
22. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger
      exchangers with design basis heat removal capability (e.g., basis for surveillance test
  For the ultimate heat sink or safety-related service water system: 
      acceptance criteria)
23. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable)
  20. Copy of the calculations or documents which evaluate the potential for water hammer or
24. Copies of calculations and surveillances that determine the ultimate heat sink reservoir capacity and heat transfer capability (if applicable)
      excessive tube vibration in the heat exchanger or associated piping
25. Copies of any design changes performed on the ultimate heat sink or safety-related service water system 
                                                -2-                                     Enclosure
26. Copies of procedures for a loss of ultimate heat sink or safety-related service water system  27. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells, debris, etc.) and aquatic life
28. Copies of inspections and/or maintenance related to preventing biotic fouling 
29. Copies of procedures and/or test results to survey or monitor interface valves between the safety-related section of the service water system and the nonsafety related section 
30. Copy of the most recent service water flow balance test results, both as-found and as-
left  31. History of any thru-wall pipe leaks on the safety-related service water system 
Inspector Contact Information:
Wayne C. Sifre  Christie Hale
Senior Reactor Inspector  Reactor Inspector
817-200-1193    650-479-5434
Wayne.Sifre@nrc.gov  Christie.Hale@nrc.gov
 
Mailing Address:


    21. Copy of the document which identifies the current number of tubes in service for each
U.S. NRC, Region IV Attn: Wayne C. Sifre
        heat exchanger and the supporting calculation which establishes the maximum number
1600 East Lamar Blvd.  
        of tubes which can be plugged in each heat exchanger
    22. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes
        which are identified in each heat exchanger
For the ultimate heat sink or safety-related service water system:
    23. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable)
    24. Copies of calculations and surveillances that determine the ultimate heat sink reservoir
        capacity and heat transfer capability (if applicable)
    25. Copies of any design changes performed on the ultimate heat sink or safety-related
        service water system
    26. Copies of procedures for a loss of ultimate heat sink or safety-related service water
        system
    27. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells,
        debris, etc.) and aquatic life
    28. Copies of inspections and/or maintenance related to preventing biotic fouling
    29. Copies of procedures and/or test results to survey or monitor interface valves between
        the safety-related section of the service water system and the nonsafety related section
    30. Copy of the most recent service water flow balance test results, both as-found and as-
        left
    31. History of any thru-wall pipe leaks on the safety-related service water system
Inspector Contact Information:
Wayne C. Sifre                        Christie Hale
Senior Reactor Inspector              Reactor Inspector
817-200-1193                          650-479-5434
Wayne.Sifre@nrc.gov                    Christie.Hale@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Wayne C. Sifre
1600 East Lamar Blvd.
Arlington, TX 76011-4511
Arlington, TX 76011-4511
                                                -3-                                      Enclosure
}}
}}

Latest revision as of 15:35, 4 November 2019

IR 05000275-13-004, and 05000323-13-004, Diablo Canyon Power - Notification of NRC Triennial Heat Sink Performance Inspection
ML13206A189
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/25/2013
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Halpin E
Pacific Gas & Electric Co
References
IR-13-004
Download: ML13206A189 (6)


See also: IR 05000275/2013004

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L I NGTON , TEXAS 7 601 1- 4511

July 25, 2013

Mr. Edward D. Halpin

Senior Vice President and

Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON POWER PLANT - NOTIFICATION OF NRC TRIENNIAL

HEAT SINK PERFORMANCE INSPECTION (05000275/2013004 AND

05000323/2013004) AND REQUEST FOR INFORMATION

Dear Mr. Halpin

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV

staff will conduct a triennial heat sink performance inspection at your Diablo Canyon Power

Plant. The inspection will be comprised of two reactor inspectors from the NRC Region IV

office. The inspection will be conducted in accordance with NRC Inspection Procedure 71111.07, "Heat Sink Performance."

The schedule for the inspection is as follows:

Onsite Inspection Dates: September 9 - 12, 2013

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by August 26, 2013. We request,

that during the onsite inspection week, you ensure that copies of analyses, evaluations, or

documentation regarding the implementation and maintenance of your heat exchanger program

are available. Of specific interest are those documents that establish that your heat exchanger

program satisfies NRC regulatory requirements and conforms to applicable NRC guidance.

Also, appropriate personnel knowledgeable of safety-related heat exchangers should be

available to support the inspector at the site during the inspection.

E. Halpin -2-

We have discussed the schedule for this inspection activity with your staff and understand that

our regulatory contact for this inspection will be Mike McCoy of your licensing organization. If

there are any questions about this inspection or the material requested, please contact the

inspectors, Wayne Sifre, at 817-200-1193 or by e-mail at Wayne.Sifre@nrc.gov, or Christie Hale

at 650-479-5434 or e-mail at Christie.Hale@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 05000275, 05000323

License Nos.: DPR-80; DPR-82

Enclosure: Triennial Heat Sink Performance Inspection Request for Information

cc: Electronic Distribution for Diablo Canyon Power Plant

ML13206A189

SUNSI Review Complete Non-Sensitive Publicly Available

Initials: WCS Sensitive Non-Publicly Available

SRI:EB1 RI:EB1 C:EB1

WSifre CHale TFarnholtz

/RA/ /RA/ /RA/

7/24/13 7/25/13 7/25/13

Request for Information

Triennial Heat Sink Performance Inspection

Diablo Canyon Power Plant

Inspection Report: 05000275/2013004, 05000323/2013004

Inspection Dates: September 9 - 12, 2013

Inspection Procedure: IP 71111.07, Triennial Heat Sink Performance

Inspectors: Wayne Sifre, Senior Reactor Inspector

Christie Hale, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (Certrec IMS preferred), to the attention of Wayne Sifre, by August 26, 2013. The

inspector will select specific items from the information requested below and then request from

your staff additional documents needed during the onsite inspection week. Also, we request

that you categorize the documents in your response with the numbered list below. Please

provide requested documentation electronically if possible. If requested documents are large

and only hard copy formats are available, please inform the inspector, and provide subject

documentation during the first day of the onsite inspection. If you have any questions regarding

this information request, please call the lead inspector as soon as possible.

The following heat exchangers/heat sinks have been selected for inspection:

  • Safety Injection Pump Lube Oil and Seal Water Coolers (2-2, 2-2A/B, 2-1, 2-1A/B)
  • Spent Fuel Pit Heat Exchanger (HX 2-1)

For all Generic Letter 89-13 exchangers:

1. List of corrective action program documents (with a short description) associated with

Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat

exchanger cavitation, or heat exchanger testing, in the previous three years

2. System health report(s) and maintenance rule system notebooks for all the Generic

Letter 89-13 heat exchangers

3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the

previous three years

4. Copies of any procedures developed to implement the recommendations of Generic

Letter 89-13, e.g., the Generic Letter 89-13 Heat Exchanger Program description

5. Copies of any commitments to the Generic Letter 89-13 program

-1- Enclosure

For the specific heat exchangers selected:

Testing Documents

6. Copies of the two most recent completed tests confirming thermal performance for those

heat exchangers which are performance tested

7. Instrument uncertainties of the instruments used during testing

8. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation for the

selected heat exchangers

9. Documents that show the as-found results are recorded, evaluated, and appropriately

dispositioned such that the as-left condition is acceptable

Cleaning Documents

10. The cleaning and inspection maintenance schedule for each heat exchanger for the next

five years

11. Copy of the document describing the inspection results for the last two cleaning and

inspection activities completed on each heat exchanger

12. Cleaning procedures with acceptance criteria for the selected heat exchangers

13. Copies of the documents that verify the structural integrity of the heat exchanger, e.g.,

eddy current summary sheets, ultrasonic testing results, and visual inspection results

14. Copies of those documents that describe the methods taken to control water chemistry

in the heat exchangers

Design Documents

15. Copies of the design basis documents and updated final safety analysis report pages for

the selected heat exchangers

16. Provide a list of calculations with a description which currently apply to each heat

exchanger

17. Copies of vendor data sheets and design basis data for the selected heat exchangers

18. Copy of the calculation which establishes the limiting (maximum) design basis heat load

which is required to be removed by each of these heat exchangers

19. Copy of the calculation which correlates surveillance testing results from these heat

exchangers with design basis heat removal capability (e.g., basis for surveillance test

acceptance criteria)

20. Copy of the calculations or documents which evaluate the potential for water hammer or

excessive tube vibration in the heat exchanger or associated piping

-2- Enclosure

21. Copy of the document which identifies the current number of tubes in service for each

heat exchanger and the supporting calculation which establishes the maximum number

of tubes which can be plugged in each heat exchanger

22. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes

which are identified in each heat exchanger

For the ultimate heat sink or safety-related service water system:

23. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable)

24. Copies of calculations and surveillances that determine the ultimate heat sink reservoir

capacity and heat transfer capability (if applicable)

25. Copies of any design changes performed on the ultimate heat sink or safety-related

service water system

26. Copies of procedures for a loss of ultimate heat sink or safety-related service water

system

27. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells,

debris, etc.) and aquatic life

28. Copies of inspections and/or maintenance related to preventing biotic fouling

29. Copies of procedures and/or test results to survey or monitor interface valves between

the safety-related section of the service water system and the nonsafety related section

30. Copy of the most recent service water flow balance test results, both as-found and as-

left

31. History of any thru-wall pipe leaks on the safety-related service water system

Inspector Contact Information:

Wayne C. Sifre Christie Hale

Senior Reactor Inspector Reactor Inspector

817-200-1193 650-479-5434

Wayne.Sifre@nrc.gov Christie.Hale@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Wayne C. Sifre

1600 East Lamar Blvd.

Arlington, TX 76011-4511

-3- Enclosure