Line 3: |
Line 3: |
| | issue date = 07/25/2013 | | | issue date = 07/25/2013 |
| | title = IR 05000275-13-004, and 05000323-13-004, Diablo Canyon Power - Notification of NRC Triennial Heat Sink Performance Inspection | | | title = IR 05000275-13-004, and 05000323-13-004, Diablo Canyon Power - Notification of NRC Triennial Heat Sink Performance Inspection |
| | author name = Farnholtz T R | | | author name = Farnholtz T |
| | author affiliation = NRC/RGN-IV/DRS/EB-1 | | | author affiliation = NRC/RGN-IV/DRS/EB-1 |
| | addressee name = Halpin E D | | | addressee name = Halpin E |
| | addressee affiliation = Pacific Gas & Electric Co | | | addressee affiliation = Pacific Gas & Electric Co |
| | docket = 05000275, 05000323 | | | docket = 05000275, 05000323 |
Line 14: |
Line 14: |
| | page count = 6 | | | page count = 6 |
| }} | | }} |
| See also: [[followed by::IR 05000275/2013004]] | | See also: [[see also::IR 05000275/2013004]] |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:July 25, 2013 | | {{#Wiki_filter:UNITE D S TATE S |
| Mr. Edward D. Halpin
| | NUC LEAR RE GULATOR Y C OMMI S SI ON |
| Senior Vice President and | | R E G IO N I V |
| Chief Nuclear Officer | | 1600 EAST LAMAR BLVD |
| | AR L I NGTON , TEXAS 7 601 1- 4511 |
| | July 25, 2013 |
| | Mr. Edward D. Halpin |
| | Senior Vice President and |
| | Chief Nuclear Officer |
| | Pacific Gas and Electric Company |
| | Diablo Canyon Power Plant |
| | P.O. Box 56, Mail Code 104/6 |
| | Avila Beach, CA 93424 |
| | SUBJECT: DIABLO CANYON POWER PLANT - NOTIFICATION OF NRC TRIENNIAL |
| | HEAT SINK PERFORMANCE INSPECTION (05000275/2013004 AND |
| | 05000323/2013004) AND REQUEST FOR INFORMATION |
| | Dear Mr. Halpin |
| | The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV |
| | staff will conduct a triennial heat sink performance inspection at your Diablo Canyon Power |
| | Plant. The inspection will be comprised of two reactor inspectors from the NRC Region IV |
| | office. The inspection will be conducted in accordance with NRC Inspection Procedure |
| | 71111.07, "Heat Sink Performance." |
| | The schedule for the inspection is as follows: |
| | Onsite Inspection Dates: September 9 - 12, 2013 |
| | Experience has shown that this inspection is resource intensive both for the NRC inspectors |
| | and your staff. In order to minimize the impact to your onsite resources and to ensure a |
| | productive inspection, we have enclosed a request for documents needed for this inspection. |
| | Please note that the documents are requested to be provided by August 26, 2013. We request, |
| | that during the onsite inspection week, you ensure that copies of analyses, evaluations, or |
| | documentation regarding the implementation and maintenance of your heat exchanger program |
| | are available. Of specific interest are those documents that establish that your heat exchanger |
| | program satisfies NRC regulatory requirements and conforms to applicable NRC guidance. |
| | Also, appropriate personnel knowledgeable of safety-related heat exchangers should be |
| | available to support the inspector at the site during the inspection. |
|
| |
|
| Pacific Gas and Electric Company
| | E. Halpin -2- |
| Diablo Canyon Power Plant | | We have discussed the schedule for this inspection activity with your staff and understand that |
| | our regulatory contact for this inspection will be Mike McCoy of your licensing organization. If |
| | there are any questions about this inspection or the material requested, please contact the |
| | inspectors, Wayne Sifre, at 817-200-1193 or by e-mail at Wayne.Sifre@nrc.gov, or Christie Hale |
| | at 650-479-5434 or e-mail at Christie.Hale@nrc.gov. |
| | This letter does not contain new or amended information collection requirements subject to |
| | the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection |
| | requirements were approved by the Office of Management and Budget, control |
| | number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to |
| | respond to, a request for information or an information collection requirement unless the |
| | requesting document displays a currently valid Office of Management and Budget control |
| | number. |
| | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its |
| | enclosure will be available electronically for public inspection in the NRC Public Document |
| | Room or from the Publicly Available Records (PARS) component of NRC's document system |
| | (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading- |
| | rm/adams.html (the Public Electronic Reading Room). |
| | Sincerely, |
| | /RA/ |
| | Thomas R. Farnholtz, Chief |
| | Engineering Branch 1 |
| | Division of Reactor Safety |
| | Docket Nos.: 05000275, 05000323 |
| | License Nos.: DPR-80; DPR-82 |
| | Enclosure: Triennial Heat Sink Performance Inspection Request for Information |
| | cc: Electronic Distribution for Diablo Canyon Power Plant |
|
| |
|
| P.O. Box 56, Mail Code 104/6
| |
| Avila Beach, CA 93424
| |
| SUBJECT: DIABLO CANYON POWER PLANT - NOTIFICATION OF NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION (05000275/2013004
| |
| AND 05000323/2013004)
| |
| AND REQUEST FOR INFORMATION
| |
|
| |
| Dear Mr. Halpin
| |
|
| |
|
| The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV staff will conduct a triennial heat sink performance inspection at your Diablo Canyon Power | | ML13206A189 |
| Plant. The inspection will be comprised of two reactor inspectors from the NRC Region IV office. The inspection will be conducted in accordance with NRC Inspection Procedure
| | SUNSI Review Complete Non-Sensitive Publicly Available |
| | | Initials: WCS Sensitive Non-Publicly Available |
| 71111.07, "Heat Sink Performance." The schedule for the inspection is as follows:
| | SRI:EB1 RI:EB1 C:EB1 |
| | | WSifre CHale TFarnholtz |
|
| | /RA/ /RA/ /RA/ |
| Onsite Inspection Dates: September 9 - 12, 2013
| | 7/24/13 7/25/13 7/25/13 |
| Experience has shown that this
| | |
| inspection is resource intens
| | Request for Information |
| ive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
| | Triennial Heat Sink Performance Inspection |
| Please note that the documents are requested to
| | Diablo Canyon Power Plant |
| be provided by August 26, 2013. We request, that during the onsite inspection week, you ensure that copies of analyses, evaluations, or
| | Inspection Report: 05000275/2013004, 05000323/2013004 |
| documentation regarding the implementation and m
| | Inspection Dates: September 9 - 12, 2013 |
| aintenance of your heat exchanger program are available. Of specific interest are those documents that establish that your heat exchanger
| | Inspection Procedure: IP 71111.07, Triennial Heat Sink Performance |
| program satisfies NRC regulatory requirement
| | Inspectors: Wayne Sifre, Senior Reactor Inspector |
| s and conforms to applicable NRC guidance. Also, appropriate personnel knowledgeable of safety-related heat exchangers should be
| | Christie Hale, Reactor Inspector |
| available to support the inspector at the site during the inspection.
| |
| | |
| UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
| |
| E. Halpin - 2 -
| |
| We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be Mike McCoy of your licensing organization. If | |
| there are any questions about this inspection or the material requested, please contact the
| |
| inspectors, Wayne Sifre, at 817-200-1193
| |
| or by e-mail at Wayne.Sifre@nrc.gov, or Christie Hale at 650-479-5434 or e-mail at Christie.Hale@nrc.gov.
| |
| | |
| This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
| |
| requirements were approved by the Offi
| |
| ce of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
| |
| respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control
| |
| number.
| |
|
| |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
| |
| | |
| enclosure will be available electr
| |
| onically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
| |
| rm/adams.html (the Public Electronic Reading Room).
| |
| Sincerely,
| |
| /RA/ Thomas R. Farnholtz, Chief
| |
| Engineering Branch 1
| |
| Division of Reactor Safety
| |
|
| |
|
| |
| Docket Nos.: 05000275, 05000323
| |
| License Nos.: DPR-80; DPR-82
| |
| | |
| Enclosure: Triennial Heat Sink Performance Inspection Request for Information
| |
|
| |
| cc: Electronic Distribution for Diablo Canyon Power Plant
| |
| | |
|
| |
| | |
| | |
| ML13206A189
| |
| SUNSI Review Complete Initials: WCS Non-Sensitive
| |
| Sensitive Publicly Available Non-Publicly Available SRI:EB1 RI:EB1 C:EB1 WSifre CHale TFarnholtz /RA/ /RA/ /RA/ 7/24/13 7/25/13 7/25/13
| |
|
| |
| - 1 - Enclosure
| |
| Request for Information
| |
| Triennial Heat Sink Performance Inspection Diablo Canyon Power Plant | |
|
| |
| Inspection Report: 05000275/2013004, 05000323/2013004 | |
| | |
|
| |
| Inspection Dates: September 9 - 12, 2013 | |
| | |
| Inspection Procedure: IP 71111.07, Triennial "Heat Sink Performance"
| |
|
| |
| Inspectors: Wayne Sifre, Senior Reactor Inspector | |
| Christie Hale, Reactor Inspector
| |
|
| |
| Information Requested for the In-Office Preparation Week | | Information Requested for the In-Office Preparation Week |
| The following information should be sent to the Region IV office in hard copy or electronic
| | The following information should be sent to the Region IV office in hard copy or electronic |
| | | format (Certrec IMS preferred), to the attention of Wayne Sifre, by August 26, 2013. The |
| format (Certrec IMS preferred), to the attention of Wayne Sifre, by August 26, 2013. The inspector will select specific items from t | | inspector will select specific items from the information requested below and then request from |
| he information requested below and then request from your staff additional documents needed during the onsite inspection week. Also, we request that you categorize the documents in your response with the numbered list below. Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead inspector as soon as possible.
| | your staff additional documents needed during the onsite inspection week. Also, we request |
|
| | that you categorize the documents in your response with the numbered list below. Please |
| The following heat exchangers/heat sinks have been selected for inspection: | | provide requested documentation electronically if possible. If requested documents are large |
| | | and only hard copy formats are available, please inform the inspector, and provide subject |
| * Residual Heat Removal Heat Exchangers (RHR HX 2-1, RHR HX 2-2)
| | documentation during the first day of the onsite inspection. If you have any questions regarding |
| * Safety Injection Pump Lube Oil and Seal Water Coolers (2-2, 2-2A/B, 2-1, 2-1A/B)
| | this information request, please call the lead inspector as soon as possible. |
| * Spent Fuel Pit Heat Exchanger (HX 2-1)
| | The following heat exchangers/heat sinks have been selected for inspection: |
| * Component Cooling Water (CCW HX 2-1, CCW HX 2-2)
| | * Residual Heat Removal Heat Exchangers (RHR HX 2-1, RHR HX 2-2) |
| For all Generic Letter 89-13 exchangers
| | * Safety Injection Pump Lube Oil and Seal Water Coolers (2-2, 2-2A/B, 2-1, 2-1A/B) |
| : 1. List of corrective action program documents (with a short description) associated with Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat
| | * Spent Fuel Pit Heat Exchanger (HX 2-1) |
| | | * Component Cooling Water (CCW HX 2-1, CCW HX 2-2) |
| exchanger cavitation, or heat exchanger testing, in the previous three years | | For all Generic Letter 89-13 exchangers: |
| 2. System health report(s) and maintenance rule system notebooks for all the Generic
| | 1. List of corrective action program documents (with a short description) associated with |
| Letter 89-13 heat exchangers | | Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat |
| 3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the
| | exchanger cavitation, or heat exchanger testing, in the previous three years |
| previous three years | | 2. System health report(s) and maintenance rule system notebooks for all the Generic |
| 4. Copies of any procedures developed to implement the recommendations of Generic Letter 89-13, e.g., the Generic Letter 89-13 Heat Exchanger Program description
| | Letter 89-13 heat exchangers |
| | 3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the |
| | previous three years |
| | 4. Copies of any procedures developed to implement the recommendations of Generic |
| | Letter 89-13, e.g., the Generic Letter 89-13 Heat Exchanger Program description |
| | 5. Copies of any commitments to the Generic Letter 89-13 program |
| | -1- Enclosure |
|
| |
|
| 5. Copies of any commitments to the Generic Letter 89-13 program
| | For the specific heat exchangers selected: |
| - 2 - Enclosure
| | Testing Documents |
| For the specific heat exchangers selected:
| | 6. Copies of the two most recent completed tests confirming thermal performance for those |
| Testing Documents
| | heat exchangers which are performance tested |
| 6. Copies of the two most recent completed tests confirming thermal performance for those heat exchangers which are performance tested
| | 7. Instrument uncertainties of the instruments used during testing |
| 7. Instrument uncertainties of the instruments used during testing
| | 8. Copy of any operability determinations or other documentation of degradation |
| 8. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the
| | associated with the heat exchangers or the systems that support the operation for the |
| selected heat exchangers | | selected heat exchangers |
| 9. Documents that show the as-found results are recorded, evaluated, and appropriately dispositioned such that the as-left condition is acceptable
| | 9. Documents that show the as-found results are recorded, evaluated, and appropriately |
| Cleaning Documents
| | dispositioned such that the as-left condition is acceptable |
| 10. The cleaning and inspection maintenance schedule for each heat exchanger for the next
| | Cleaning Documents |
| five years | | 10. The cleaning and inspection maintenance schedule for each heat exchanger for the next |
| 11. Copy of the document describing the inspection results for the last two cleaning and inspection activities completed on each heat exchanger
| | five years |
| 12. Cleaning procedures with acceptance criteria for the selected heat exchangers
| | 11. Copy of the document describing the inspection results for the last two cleaning and |
| 13. Copies of the documents that verify the structural integrity of the heat exchanger, e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results
| | inspection activities completed on each heat exchanger |
| 14. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers
| | 12. Cleaning procedures with acceptance criteria for the selected heat exchangers |
| Design Documents
| | 13. Copies of the documents that verify the structural integrity of the heat exchanger, e.g., |
| 15. Copies of the design basis documents and updated final safety analysis report pages for the selected heat exchangers
| | eddy current summary sheets, ultrasonic testing results, and visual inspection results |
| 16. Provide a list of calculations with a description which currently apply to each heat
| | 14. Copies of those documents that describe the methods taken to control water chemistry |
| exchanger | | in the heat exchangers |
| 17. Copies of vendor data sheets and design basis data for the selected heat exchangers
| | Design Documents |
| 18. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers
| | 15. Copies of the design basis documents and updated final safety analysis report pages for |
| 19. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test
| | the selected heat exchangers |
| acceptance criteria) | | 16. Provide a list of calculations with a description which currently apply to each heat |
| 20. Copy of the calculations or documents which evaluate the potential for water hammer or excessive tube vibration in the heat exchanger or associated piping
| | exchanger |
|
| | 17. Copies of vendor data sheets and design basis data for the selected heat exchangers |
| - 3 - Enclosure
| | 18. Copy of the calculation which establishes the limiting (maximum) design basis heat load |
| 21. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number
| | which is required to be removed by each of these heat exchangers |
| of tubes which can be plugged in each heat exchanger
| | 19. Copy of the calculation which correlates surveillance testing results from these heat |
| 22. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger
| | exchangers with design basis heat removal capability (e.g., basis for surveillance test |
| For the ultimate heat sink or safety-related service water system:
| | acceptance criteria) |
| 23. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable)
| | 20. Copy of the calculations or documents which evaluate the potential for water hammer or |
| 24. Copies of calculations and surveillances that determine the ultimate heat sink reservoir capacity and heat transfer capability (if applicable)
| | excessive tube vibration in the heat exchanger or associated piping |
| 25. Copies of any design changes performed on the ultimate heat sink or safety-related service water system
| | -2- Enclosure |
| 26. Copies of procedures for a loss of ultimate heat sink or safety-related service water system 27. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells, debris, etc.) and aquatic life
| |
| 28. Copies of inspections and/or maintenance related to preventing biotic fouling
| |
| 29. Copies of procedures and/or test results to survey or monitor interface valves between the safety-related section of the service water system and the nonsafety related section
| |
| 30. Copy of the most recent service water flow balance test results, both as-found and as-
| |
| left 31. History of any thru-wall pipe leaks on the safety-related service water system
| |
|
| |
|
| |
| Inspector Contact Information:
| |
|
| |
| Wayne C. Sifre Christie Hale
| |
| Senior Reactor Inspector Reactor Inspector
| |
| 817-200-1193 650-479-5434
| |
| Wayne.Sifre@nrc.gov Christie.Hale@nrc.gov
| |
|
| |
| Mailing Address:
| |
|
| |
|
|
| | 21. Copy of the document which identifies the current number of tubes in service for each |
| U.S. NRC, Region IV Attn: Wayne C. Sifre | | heat exchanger and the supporting calculation which establishes the maximum number |
| 1600 East Lamar Blvd.
| | of tubes which can be plugged in each heat exchanger |
| | 22. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes |
| | which are identified in each heat exchanger |
| | For the ultimate heat sink or safety-related service water system: |
| | 23. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable) |
| | 24. Copies of calculations and surveillances that determine the ultimate heat sink reservoir |
| | capacity and heat transfer capability (if applicable) |
| | 25. Copies of any design changes performed on the ultimate heat sink or safety-related |
| | service water system |
| | 26. Copies of procedures for a loss of ultimate heat sink or safety-related service water |
| | system |
| | 27. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells, |
| | debris, etc.) and aquatic life |
| | 28. Copies of inspections and/or maintenance related to preventing biotic fouling |
| | 29. Copies of procedures and/or test results to survey or monitor interface valves between |
| | the safety-related section of the service water system and the nonsafety related section |
| | 30. Copy of the most recent service water flow balance test results, both as-found and as- |
| | left |
| | 31. History of any thru-wall pipe leaks on the safety-related service water system |
| | Inspector Contact Information: |
| | Wayne C. Sifre Christie Hale |
| | Senior Reactor Inspector Reactor Inspector |
| | 817-200-1193 650-479-5434 |
| | Wayne.Sifre@nrc.gov Christie.Hale@nrc.gov |
| | Mailing Address: |
| | U.S. NRC, Region IV |
| | Attn: Wayne C. Sifre |
| | 1600 East Lamar Blvd. |
| Arlington, TX 76011-4511 | | Arlington, TX 76011-4511 |
| | -3- Enclosure |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24302A2622024-11-0101 November 2024 Letter to CA SHPO Regarding DCPP Dseis ML24302A2612024-11-0101 November 2024 Letter to Achp Re DCPP Dseis ML24275A0622024-10-30030 October 2024 NRC to NMFS Request Initiate Formal Endangered Species Act Consultation and Abbreviated Essential Fish Habitat for Proposed License Renewal of DCP Plant Units 1, 2 ML24269A0122024-10-29029 October 2024 OEDO-24-00083 2.206 Petition Diablo Canyon Seismic CDF - Response to Petitioner Letter ML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 IR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 ML24277A0292024-10-18018 October 2024 NRC to Fws Req. for Concurrence W. Endangered Species Act Determinations for Diablo Canyon Power Plant Units 1,2, ISFSI Proposed License Renewals in San Luis Obispo Co., CA DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 ML24240A0222024-09-20020 September 2024 Letter to A. Peck Environmental Impact Statement Scoping Summary Report for Diablo Canyon Nuclear Power Plant Units 1 and 2 ML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20243012024-08-26026 August 2024 NRC Examination Report 05000275/2024301; 05000323/2024301 IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 ML24190A0812024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application 05000323/LER-2024-001, LCO 3.0.3 Completion Time Limits2024-05-17017 May 2024 LCO 3.0.3 Completion Time Limits DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage ML24127A2042024-05-0202 May 2024 02May2024 Ltr - California Coastal Commission to Pg&E, Coastal Development Permit Needed for Pg&E’S Proposed Relicensing of Diablo Canyon Nuclear Power Plant DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report L-24-004, Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007)2024-04-30030 April 2024 Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007) DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report 2024-09-09
[Table view] Category:Inspection Plan
MONTHYEARIR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) ML24135A1562024-05-13013 May 2024 July 2024 Emergency Preparedness Exercise Inspection - Request for Information ML24114A2032024-04-22022 April 2024 Request for Information for EP Program and Performance Indicator Verification Inspection (Wolf Creek Nuclear Generating Station) Inspection Report 05000482/2024003 ML24065A3662024-03-0404 March 2024 Notification of Site Inspection for License Renewal and Request for Information Inspection (05000323/2024011) IR 05000275/20230062024-02-28028 February 2024 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2023006 and 05000323/2023006) ML23249A2782023-09-0606 September 2023 Inservice Inspection Request for Information IR 05000275/20230052023-08-22022 August 2023 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2023005 and 05000323/2023005) - Mid Cycle Letter IR 05000275/20220062023-03-0101 March 2023 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2022006 and 05000323/2022006) ML23005A1732023-01-0909 January 2023 Notification of Commercial Grade Dedication Inspection IR 05000275/20220052022-08-23023 August 2022 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2022005 and 05000323/2022005) ML22194A8872022-07-11011 July 2022 September 2022 Emergency Preparedness Exercise Inspection - Request for Information Email ML22068A2312022-03-17017 March 2022 Notification of NRC Design Bases Assurance Inspection (Team) 05000275/2022011 and 05000323/2022011 and Initial Request for Information IR 05000275/20210062022-03-0202 March 2022 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2021006 and 05000323/2021006) ML22019A0412021-12-29029 December 2021 RFI ML21230A3902021-09-0101 September 2021 DC Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21229A2242021-08-17017 August 2021 Notification of NRC Triennial Heat Exchanger/Heat Sink Performance Inspection (05000275/2021004 and 05000323/2021004) and Request for Information ML21130A3642021-06-21021 June 2021 DC 2021401 Information Request ML21069A2102021-03-12012 March 2021 Notification of Inspection (NRC Inspection Report 05000275/2021002, 05000323/2021002) and Request for Information IR 05000275/20200062021-03-0303 March 2021 DC 2020 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 & 2 (Report 05000275/2020006 & 05000323/2020006) ML21061A3302021-02-25025 February 2021 Request for Information: Diablo Canyon Power Plant, Dated January 6, 2021; IR 05000275/323/2021-001 Occupational Radiation Safety Inspection - 2, 4 ML20301A2212020-10-27027 October 2020 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000275/2021010 and 05000323/2021010) and Request for Information IR 05000275/20200052020-09-0101 September 2020 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2020005 and 05000323/2020005) ML20280A5432020-06-0303 June 2020 DC 2020 PIR Request for Information ML20055E1082020-03-0303 March 2020 DC 2019006 Annual Assessment Letter IR 05000275/20190052019-08-30030 August 2019 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2, Report 05000275/2019005 and 05000323/2019005 IR 05000275/20180062019-03-0404 March 2019 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2018006 and 05000323/2018006) ML19043A9452019-02-20020 February 2019 Notification of Inspection (NRC Inspection Report 05000275/2019002, 05000323/2019002 and Request for Information IR 05000275/20180052018-08-31031 August 2018 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2018005 and 05000323/2018005) IR 05000275/20170062018-03-0101 March 2018 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2017006 and 05000323/2017006) ML17243A3022017-08-28028 August 2017 Updated Non-Public Security Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 IR 05000275/20170052017-08-28028 August 2017 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2017005 and 05000323/2017005) IR 05000275/20160062017-03-0101 March 2017 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2016006 and 05000323/2016006) ML17037D1232017-02-0606 February 2017 Notification of Inspection (NRC Inspection Report 05000275/2017002; 05000323/2017002) and Request for Information IR 05000275/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (NRC Physical Security Inspection Report Number 05000275/2016401 and 05000323/201640) IR 05000275/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2016005 and 05000323/2016005) ML16239A2532016-08-31031 August 2016 Mid-Cycle Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2016005 and 05000323/2016005) IR 05000275/20150062016-03-0202 March 2016 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2015006 and 05000323/2015006) IR 05000275/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (NRC Physical Security Inspection Report Number 05000275/2015401 and 05000323/2015401) IR 05000275/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2015005 and 05000323/2015005) IR 05000275/20140012015-03-0404 March 2015 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2, (Report 05000275/2014001 and 05000323/2014001) IR 05000275/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (NRC Physical Security Inspection Report Number 05000275/2014402 and 05000323/2014402) IR 05000275/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2014006 and 05000323/2014006) IR 05000275/20130012014-03-0404 March 2014 IR 05000275-13-001 & 05000323-13-001, 02/12/2014, Diablo Canyon, Unit 1 & 2, Annual Assessment Inspection Plan ML13246A2882013-09-0303 September 2013 Midcycle Assessment Letter 2013 ML13206A1892013-07-25025 July 2013 IR 05000275-13-004, and 05000323-13-004, Diablo Canyon Power - Notification of NRC Triennial Heat Sink Performance Inspection IR 05000275/20128012013-03-0404 March 2013 Annual Assessment Letter for Diablo Canyon Power Plant Units 1 & 2 (IR 05000275-12-801 and 05000323-12-801) ML13032A3142013-02-0101 February 2013 IR 05000275-13-007, 05000323-13-007, on 05/20/2013, Diablo Canyon - Notification of NRC Component Design Bases Inspection and Initial RAI IR 05000275/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - Diablo Canyon Power Plant (05000275/2012006, 05000323/2012006) IR 05000275/20120012012-03-0505 March 2012 Annual Assessment Letter for Diablo Canyon Power Plant - Units 1 and 2 (Report 05000275/2012001 and 05000323/2012001) ML1124401692011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - Diablo Canyon Power Plant - Units 1 and 2 2024-08-22
[Table view] |
See also: IR 05000275/2013004
Text
UNITE D S TATE S
NUC LEAR RE GULATOR Y C OMMI S SI ON
R E G IO N I V
1600 EAST LAMAR BLVD
AR L I NGTON , TEXAS 7 601 1- 4511
July 25, 2013
Mr. Edward D. Halpin
Senior Vice President and
Chief Nuclear Officer
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6
Avila Beach, CA 93424
SUBJECT: DIABLO CANYON POWER PLANT - NOTIFICATION OF NRC TRIENNIAL
HEAT SINK PERFORMANCE INSPECTION (05000275/2013004 AND
05000323/2013004) AND REQUEST FOR INFORMATION
Dear Mr. Halpin
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV
staff will conduct a triennial heat sink performance inspection at your Diablo Canyon Power
Plant. The inspection will be comprised of two reactor inspectors from the NRC Region IV
office. The inspection will be conducted in accordance with NRC Inspection Procedure
71111.07, "Heat Sink Performance."
The schedule for the inspection is as follows:
Onsite Inspection Dates: September 9 - 12, 2013
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by August 26, 2013. We request,
that during the onsite inspection week, you ensure that copies of analyses, evaluations, or
documentation regarding the implementation and maintenance of your heat exchanger program
are available. Of specific interest are those documents that establish that your heat exchanger
program satisfies NRC regulatory requirements and conforms to applicable NRC guidance.
Also, appropriate personnel knowledgeable of safety-related heat exchangers should be
available to support the inspector at the site during the inspection.
E. Halpin -2-
We have discussed the schedule for this inspection activity with your staff and understand that
our regulatory contact for this inspection will be Mike McCoy of your licensing organization. If
there are any questions about this inspection or the material requested, please contact the
inspectors, Wayne Sifre, at 817-200-1193 or by e-mail at Wayne.Sifre@nrc.gov, or Christie Hale
at 650-479-5434 or e-mail at Christie.Hale@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos.: 05000275, 05000323
License Nos.: DPR-80; DPR-82
Enclosure: Triennial Heat Sink Performance Inspection Request for Information
cc: Electronic Distribution for Diablo Canyon Power Plant
ML13206A189
SUNSI Review Complete Non-Sensitive Publicly Available
Initials: WCS Sensitive Non-Publicly Available
SRI:EB1 RI:EB1 C:EB1
WSifre CHale TFarnholtz
/RA/ /RA/ /RA/
7/24/13 7/25/13 7/25/13
Request for Information
Triennial Heat Sink Performance Inspection
Diablo Canyon Power Plant
Inspection Report: 05000275/2013004, 05000323/2013004
Inspection Dates: September 9 - 12, 2013
Inspection Procedure: IP 71111.07, Triennial Heat Sink Performance
Inspectors: Wayne Sifre, Senior Reactor Inspector
Christie Hale, Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (Certrec IMS preferred), to the attention of Wayne Sifre, by August 26, 2013. The
inspector will select specific items from the information requested below and then request from
your staff additional documents needed during the onsite inspection week. Also, we request
that you categorize the documents in your response with the numbered list below. Please
provide requested documentation electronically if possible. If requested documents are large
and only hard copy formats are available, please inform the inspector, and provide subject
documentation during the first day of the onsite inspection. If you have any questions regarding
this information request, please call the lead inspector as soon as possible.
The following heat exchangers/heat sinks have been selected for inspection:
- Safety Injection Pump Lube Oil and Seal Water Coolers (2-2, 2-2A/B, 2-1, 2-1A/B)
- Spent Fuel Pit Heat Exchanger (HX 2-1)
For all Generic Letter 89-13 exchangers:
1. List of corrective action program documents (with a short description) associated with
Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat
exchanger cavitation, or heat exchanger testing, in the previous three years
2. System health report(s) and maintenance rule system notebooks for all the Generic
Letter 89-13 heat exchangers
3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the
previous three years
4. Copies of any procedures developed to implement the recommendations of Generic
Letter 89-13, e.g., the Generic Letter 89-13 Heat Exchanger Program description
5. Copies of any commitments to the Generic Letter 89-13 program
-1- Enclosure
For the specific heat exchangers selected:
Testing Documents
6. Copies of the two most recent completed tests confirming thermal performance for those
heat exchangers which are performance tested
7. Instrument uncertainties of the instruments used during testing
8. Copy of any operability determinations or other documentation of degradation
associated with the heat exchangers or the systems that support the operation for the
selected heat exchangers
9. Documents that show the as-found results are recorded, evaluated, and appropriately
dispositioned such that the as-left condition is acceptable
Cleaning Documents
10. The cleaning and inspection maintenance schedule for each heat exchanger for the next
five years
11. Copy of the document describing the inspection results for the last two cleaning and
inspection activities completed on each heat exchanger
12. Cleaning procedures with acceptance criteria for the selected heat exchangers
13. Copies of the documents that verify the structural integrity of the heat exchanger, e.g.,
eddy current summary sheets, ultrasonic testing results, and visual inspection results
14. Copies of those documents that describe the methods taken to control water chemistry
in the heat exchangers
Design Documents
15. Copies of the design basis documents and updated final safety analysis report pages for
the selected heat exchangers
16. Provide a list of calculations with a description which currently apply to each heat
exchanger
17. Copies of vendor data sheets and design basis data for the selected heat exchangers
18. Copy of the calculation which establishes the limiting (maximum) design basis heat load
which is required to be removed by each of these heat exchangers
19. Copy of the calculation which correlates surveillance testing results from these heat
exchangers with design basis heat removal capability (e.g., basis for surveillance test
acceptance criteria)
20. Copy of the calculations or documents which evaluate the potential for water hammer or
excessive tube vibration in the heat exchanger or associated piping
-2- Enclosure
21. Copy of the document which identifies the current number of tubes in service for each
heat exchanger and the supporting calculation which establishes the maximum number
of tubes which can be plugged in each heat exchanger
22. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes
which are identified in each heat exchanger
For the ultimate heat sink or safety-related service water system:
23. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable)
24. Copies of calculations and surveillances that determine the ultimate heat sink reservoir
capacity and heat transfer capability (if applicable)
25. Copies of any design changes performed on the ultimate heat sink or safety-related
service water system
26. Copies of procedures for a loss of ultimate heat sink or safety-related service water
system
27. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells,
debris, etc.) and aquatic life
28. Copies of inspections and/or maintenance related to preventing biotic fouling
29. Copies of procedures and/or test results to survey or monitor interface valves between
the safety-related section of the service water system and the nonsafety related section
30. Copy of the most recent service water flow balance test results, both as-found and as-
left
31. History of any thru-wall pipe leaks on the safety-related service water system
Inspector Contact Information:
Wayne C. Sifre Christie Hale
Senior Reactor Inspector Reactor Inspector
817-200-1193 650-479-5434
Wayne.Sifre@nrc.gov Christie.Hale@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Wayne C. Sifre
1600 East Lamar Blvd.
Arlington, TX 76011-4511
-3- Enclosure