| number = ML071010040 | | number = ML071010040 | ||
| issue date = 04/10/2007 | | issue date = 04/10/2007 | ||
| title = | | title = Summary of Annual Assessment Meeting with FPL Energy Seabrook, LLC | ||
| author name = Krohn P | | author name = Krohn P | ||
| author affiliation = NRC/RGN-I/DRP/PB6 | | author affiliation = NRC/RGN-I/DRP/PB6 | ||
| addressee name = | | addressee name = | ||
Line 9: | Line 9: | ||
| docket = 05000443 | | docket = 05000443 | ||
| license number = NPF-086 | | license number = NPF-086 | ||
| contact person = Krohn P | | contact person = Krohn P, RI/DRP/PB6/610-337-5120 | ||
| document type = Meeting Summary | | document type = Meeting Summary | ||
| page count = 2 | | page count = 2 | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:April 10, 2007 MEETING | ||
==SUMMARY== | |||
LICENSEE: FPL ENERGY SEABROOK, LLC FACILITY: SEABROOK STATION | |||
==SUBJECT:== | |||
==SUMMARY== | |||
OF MARCH 29, 2007 ANNUAL ASSESSMENT MEETING WITH FPL ENERGY SEABROOK On March 29, 2007, at 6:30 p.m., an Annual Assessment Meeting was conducted at the Inn of Hampton, Hampton, NH, between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC (Seabrook). The NRC requested the meeting with Seabrook management to discuss the NRCs assessment of the safety performance of the Seabrook nuclear power plant for calendar year 2006. | |||
The NRC presented and discussed its assessment of the safety performance of Seabrook Unit 1 for the period between January 1 through December 31, 2006. The NRC presentation included a discussion of the Reactor Oversight Process, general background on the plant, 2006 performance assessment results, and an overview of calendar year 2007 planned inspections. | |||
As part of this annual assessment meeting, Seabrook presented an overview of their initiatives in the areas of human performance and engineering. | |||
The public observed this meeting and was offered the opportunity to communicate with the NRC regarding Seabrooks performance and the role of the agency in ensuring safe plant operations. At the end of the meeting between the NRC and Seabrook, the NRC answered questions from the public which included the status of dissimilar metal pressurizer weld inspections, security issues that occurred during 2005, use and distribution of potassium iodide tablets, and some additional detail on selected 2006 NRC findings. The meeting notice with attaches meeting agenda can be located in ADAMS Accession No. ML070720415. The slides can be found at ADAMS Accession No. ML071000208. | |||
Sincerely, | |||
/RA Barry Norris for/ | |||
Paul Krohn, Chief Projects Branch 6 Division of Reactor Projects | |||
2 Distribution: | |||
P. Krohn, DRP B. Norris, DRP G. Dentel, DRP S. Shaffer, DRP S. Nelson, DRP E. Huang. DRP E. Miller, DRP A. Burritt, DRP V. Nevses, NRR SUNSI Review Complete: __PGK_____ | |||
DOCUMENT NAME: G:\DRP\BRANCH 6\Meeting Notice and Summary\ROP5 Seabrook Meeting Summary.wpd After declaring this document An Official Agency Record it will be released to the Public. | |||
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME A. Burritt/AB P. Krohn/BN for DATE 04/10/07 04/10/07 OFFICIAL RECORD COPY}} |
Latest revision as of 13:54, 7 December 2019
ML071010040 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 04/10/2007 |
From: | Paul Krohn NRC/RGN-I/DRP/PB6 |
To: | |
Krohn P, RI/DRP/PB6/610-337-5120 | |
References | |
Download: ML071010040 (2) | |
Text
April 10, 2007 MEETING
SUMMARY
LICENSEE: FPL ENERGY SEABROOK, LLC FACILITY: SEABROOK STATION
SUBJECT:
SUMMARY
OF MARCH 29, 2007 ANNUAL ASSESSMENT MEETING WITH FPL ENERGY SEABROOK On March 29, 2007, at 6:30 p.m., an Annual Assessment Meeting was conducted at the Inn of Hampton, Hampton, NH, between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC (Seabrook). The NRC requested the meeting with Seabrook management to discuss the NRCs assessment of the safety performance of the Seabrook nuclear power plant for calendar year 2006.
The NRC presented and discussed its assessment of the safety performance of Seabrook Unit 1 for the period between January 1 through December 31, 2006. The NRC presentation included a discussion of the Reactor Oversight Process, general background on the plant, 2006 performance assessment results, and an overview of calendar year 2007 planned inspections.
As part of this annual assessment meeting, Seabrook presented an overview of their initiatives in the areas of human performance and engineering.
The public observed this meeting and was offered the opportunity to communicate with the NRC regarding Seabrooks performance and the role of the agency in ensuring safe plant operations. At the end of the meeting between the NRC and Seabrook, the NRC answered questions from the public which included the status of dissimilar metal pressurizer weld inspections, security issues that occurred during 2005, use and distribution of potassium iodide tablets, and some additional detail on selected 2006 NRC findings. The meeting notice with attaches meeting agenda can be located in ADAMS Accession No. ML070720415. The slides can be found at ADAMS Accession No. ML071000208.
Sincerely,
/RA Barry Norris for/
Paul Krohn, Chief Projects Branch 6 Division of Reactor Projects
2 Distribution:
P. Krohn, DRP B. Norris, DRP G. Dentel, DRP S. Shaffer, DRP S. Nelson, DRP E. Huang. DRP E. Miller, DRP A. Burritt, DRP V. Nevses, NRR SUNSI Review Complete: __PGK_____
DOCUMENT NAME: G:\DRP\BRANCH 6\Meeting Notice and Summary\ROP5 Seabrook Meeting Summary.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME A. Burritt/AB P. Krohn/BN for DATE 04/10/07 04/10/07 OFFICIAL RECORD COPY