| number = ML071100237
| number = ML071100237
| issue date = 07/27/2007
| issue date = 07/27/2007
| title = Oyster Creek Nuclear Generating Station, License Amendment, Issuance of Amendment Request to Change Technical Specification Definition of Channel Calibration, Channel Check, and Channel Test (TAC No. MD3133)
| title = License Amendment, Issuance of Amendment Request to Change Technical Specification Definition of Channel Calibration, Channel Check, and Channel Test
| author name = Miller G E
| author name = Miller G
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-2
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-2
| addressee name = Crane C M
| addressee name = Crane C
| addressee affiliation = AmerGen Energy Co, LLC
| addressee affiliation = AmerGen Energy Co, LLC
| docket = 05000219
| docket = 05000219
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:July 27, 2007Mr. Christopher M. CranePresident and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
{{#Wiki_filter:July 27, 2007 Mr. Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
OYSTER CREEK NUCLEAR GENERATING STATION - ISSUANCE OF           AMENDMENT RE: REQUEST TO CHANGE TECHNICAL SPECIFICATION DEFINITION OF CHANNEL CALIBRATION, CHANNEL CHECK, AND CHANNEL TEST (TAC NO. MD3133)
OYSTER CREEK NUCLEAR GENERATING STATION - ISSUANCE OF AMENDMENT RE: REQUEST TO CHANGE TECHNICAL SPECIFICATION DEFINITION OF CHANNEL CALIBRATION, CHANNEL CHECK, AND CHANNEL TEST (TAC NO. MD3133)


==Dear Mr. Crane:==
==Dear Mr. Crane:==


The Commission has issued the enclosed Amendment No. 263 to Facility Operating LicenseNo. DPR-16 for the Oyster Creek Nuclear Generating Station (Oyster Creek), in response to your application dated September 28, 2006. The amendment revises the Oyster Creek Technical Specification definition of ChannelCalibration, Channel Check, and Channel Test consistent with NUREG-1433, Revision 3.0, "Standard Technical Specifications General Electric Plants, BWR/4 Specifications," dated June2004. A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included inthe Commission's biweekly Federal Register notice. Sincerely,/ra/G. Edward Miller, Project ManagerPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-219
The Commission has issued the enclosed Amendment No. 263 to Facility Operating License No. DPR-16 for the Oyster Creek Nuclear Generating Station (Oyster Creek), in response to your application dated September 28, 2006.
The amendment revises the Oyster Creek Technical Specification definition of Channel Calibration, Channel Check, and Channel Test consistent with NUREG-1433, Revision 3.0, Standard Technical Specifications General Electric Plants, BWR/4 Specifications, dated June 2004.
A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions biweekly Federal Register notice.
Sincerely,
                                              /ra/
G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-219


==Enclosure:==
==Enclosure:==
: 1. Amendment No. 263 to DPR-16
: 1. Amendment No. 263 to DPR-16
: 2. Safety Evaluationcc w/encls: See next page July 27, 2007Mr. Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
: 2. Safety Evaluation cc w/encls: See next page
 
July 27, 2007 Mr. Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
OYSTER CREEK NUCLEAR GENERATING STATION - ISSUANCE OF           AMENDMENT RE: REQUEST TO CHANGE TECHNICAL SPECIFICATION DEFINITION OF CHANNEL CALIBRATION, CHANNEL CHECK, AND CHANNEL TEST (TAC NO. MD3133)
OYSTER CREEK NUCLEAR GENERATING STATION - ISSUANCE OF AMENDMENT RE: REQUEST TO CHANGE TECHNICAL SPECIFICATION DEFINITION OF CHANNEL CALIBRATION, CHANNEL CHECK, AND CHANNEL TEST (TAC NO. MD3133)


==Dear Mr. Crane:==
==Dear Mr. Crane:==


The Commission has issued the enclosed Amendment No. 263 to Facility Operating LicenseNo. DPR-16 for the Oyster Creek Nuclear Generating Station (Oyster Creek), in response to your application dated September 28, 2006. The amendment revises the Oyster Creek Technical Specification definition of ChannelCalibration, Channel Check, and Channel Test consistent with NUREG-1433, Revision 3.0, "Standard Technical Specifications General Electric Plants, BWR/4 Specifications," dated June2004. A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included inthe Commission's biweekly Federal Register notice. Sincerely,/ra/G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-219
The Commission has issued the enclosed Amendment No. 263 to Facility Operating License No. DPR-16 for the Oyster Creek Nuclear Generating Station (Oyster Creek), in response to your application dated September 28, 2006.
The amendment revises the Oyster Creek Technical Specification definition of Channel Calibration, Channel Check, and Channel Test consistent with NUREG-1433, Revision 3.0, Standard Technical Specifications General Electric Plants, BWR/4 Specifications, dated June 2004.
A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions biweekly Federal Register notice.
Sincerely,
                                                      /ra/
G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-219


==Enclosure:==
==Enclosure:==
: 1. Amendment No. 263 to DPR-16
: 1. Amendment No. 263 to DPR-16
: 2. Safety Evaluationcc w/encls: See next page DISTRIBUTION
: 2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
:PUBLICRidsOgcRpRidsNrrDorlDpr LPLI-2 R/FRidsNrrDorlLpl1-2(HChernoff)GHill (2)
PUBLIC                        RidsOgcRp                            RidsNrrDorlDpr LPLI-2 R/F                    RidsNrrDorlLpl1-2(HChernoff)         GHill (2)
TKobetzRidsNrrPMGMillerRidsNrrLAMOBrien RidsAcrsAcnwMailCenterMHamm, NRR CSchulten, NRRRidsRgn1MailCenter(GMatakas)Package Accession Number: ML0711002472Amendment Accession Number: ML0711002397TS(s) Accession Number: ML072130293OFFICELPLI-2/PMLPLI-2/LADIRS/ITSB/BCOGCLPLI-2/BCNAMEGEMillerMO'BrienTKobetzMYoungHChernoff(w/comments)DATE5/10/075/3/076/5/077/16/077/27/07OFFICIAL RECORD COPY
TKobetz                      RidsNrrPMGMiller                      RidsNrrLAMOBrien RidsAcrsAcnwMailCenter        MHamm, NRR CSchulten, NRR                RidsRgn1MailCenter(GMatakas)
Package Accession Number: ML0711002472 Amendment Accession Number: ML0711002397 TS(s) Accession Number: ML072130293 OFFICE LPLI-2/PM        LPLI-2/LA      DIRS/ITSB/BC            OGC                LPLI-2/BC NAME  GEMiller          MOBrien        TKobetz                MYoung            HChernoff (w/comments)
DATE  5/10/07          5/3/07          6/5/07                  7/16/07            7/27/07 OFFICIAL RECORD COPY


AMERGEN ENERGY COMPANY, LLC DOCKET NO. 50-219OYSTER CREEK NUCLEAR GENERATING STATIONAMENDMENT TO FACILITY OPERATING LICENSEAmendment No. 263License No. DPR-161.The Nuclear Regulatory Commission (the Commission) has found that:A.The application for amendment by AmerGen Energy Company, LLC, (thelicensee), dated September 28, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I;B.The facility will operate in conformity with the application, the provisions of theAct, and the rules and regulations of the Commission;C.There is reasonable assurance: (i) that the activities authorized by thisamendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations;D.The issuance of this amendment will not be inimical to the common defense andsecurity or to the health and safety of the public; and E.The issuance of this amendment is in accordance with 10 CFR Part 51 of theCommission's regulations and all applicable requirements have been satisfied. 2.Accordingly, the Facility Operating License is amended by changes to the TechnicalSpecifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-16 is hereby amended to read as follows.(2)Technical SpecificationsThe Technical Specifications contained in Appendices A and B, as revisedthrough Amendment No. 263, are hereby incorporated in the license. AmerGen Energy Company, LLC, shall operate the facility in accordance with the Technical Specifications. 3.This license amendment is effective as of the date of its issuance and shall beimplemented within 60 days of the date of issuance.FOR THE NUCLEAR REGULATORY COMMISSION/ra/Harold K. Chernoff, ChiefPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
AMERGEN ENERGY COMPANY, LLC DOCKET NO. 50-219 OYSTER CREEK NUCLEAR GENERATING STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 263 License No. DPR-16
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by AmerGen Energy Company, LLC, (the licensee), dated September 28, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
: 2. Accordingly, the Facility Operating License is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-16 is hereby amended to read as follows.
(2)     Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 263, are hereby incorporated in the license. AmerGen Energy Company, LLC, shall operate the facility in accordance with the Technical Specifications.
: 3. This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
                                              /ra/
Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


==Attachment:==
==Attachment:==
Changes to the License and Technical SpecificationsDate of Issuance: July 27, 2007 ATTACHMENT TO LICENSE AMENDMENT NO. 263 FACILITY OPERATING LICENSE NO. DPR-16DOCKET NO. 50-219Replace page 3 of Facility Operating License No. DPR-16 with the attached revised page 3. The revised page is identified by amendment number and contains a marginal line indicatingthe area of change.Replace the following pages of the Technical Specifications with the attached pages. Therevised pages are identified by amendment number and contain marginal lines indicating theareas of change. RemoveInsert1.0-41.0-43.1-193.1-19 4.1-94.1-9 4.3-24.3-2 4.4-14.4-1 4.12-14.12-1 4.12-24.12-2 4.13-14.13-1 4.13-24.13-2 4.15-24.15-2 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATIONRELATED TO AMENDMENT NO. 263TO FACILITY OPERATING LICENSE NO. DPR-16AMERGEN ENERGY COMPANY, LCCOYSTER CREEK NUCLEAR GENERATING STATIONDOCKET NO. 50-21


==91.0INTRODUCTION==
Changes to the License and Technical Specifications Date of Issuance: July 27, 2007
By application dated September 28, 2006, AmerGen Energy Company, LLC (AmerGen or thelicensee) requested changes to the Facility Operating License for the Oyster Creek Nuclear Generating Station (Oyster Creek). The proposed amendment would revise the Oyster Creek Technical Specification (TS) definition for Channel Calibration, Channel Check, and ChannelTest consistent with NUREG-1433, Revision 3.0, "Standard Technical Specifications General Electric Plants, BWR/4 Specifications," June 2004. The proposed changes to the current definitions of Channel Calibration, Channel Check, andChannel Test in Section 1.19 of the Oyster Creek TSs will apply to all instrument functions in the TSs, including Reactor Protection System (RPS) instruments. The proposed changes would allow for overlapping or sequential testing of all instrumentation channels. Among other things, this manner of testing would minimize the time the RPS would be in a half-scram condition during surveillance testing, thereby minimizing the chance of a full scram due to spurious half scram signals from the opposite channel.
 
ATTACHMENT TO LICENSE AMENDMENT NO. 263 FACILITY OPERATING LICENSE NO. DPR-16 DOCKET NO. 50-219 Replace page 3 of Facility Operating License No. DPR-16 with the attached revised page 3.
The revised page is identified by amendment number and contains a marginal line indicating the area of change.
Replace the following pages of the Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove                              Insert 1.0-4                                1.0-4 3.1-19                              3.1-19 4.1-9                                4.1-9 4.3-2                                4.3-2 4.4-1                                4.4-1 4.12-1                              4.12-1 4.12-2                              4.12-2 4.13-1                              4.13-1 4.13-2                              4.13-2 4.15-2                              4.15-2
 
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 263 TO FACILITY OPERATING LICENSE NO. DPR-16 AMERGEN ENERGY COMPANY, LCC OYSTER CREEK NUCLEAR GENERATING STATION DOCKET NO. 50-219
 
==1.0    INTRODUCTION==
 
By application dated September 28, 2006, AmerGen Energy Company, LLC (AmerGen or the licensee) requested changes to the Facility Operating License for the Oyster Creek Nuclear Generating Station (Oyster Creek). The proposed amendment would revise the Oyster Creek Technical Specification (TS) definition for Channel Calibration, Channel Check, and Channel Test consistent with NUREG-1433, Revision 3.0, Standard Technical Specifications General Electric Plants, BWR/4 Specifications, June 2004.
The proposed changes to the current definitions of Channel Calibration, Channel Check, and Channel Test in Section 1.19 of the Oyster Creek TSs will apply to all instrument functions in the TSs, including Reactor Protection System (RPS) instruments. The proposed changes would allow for overlapping or sequential testing of all instrumentation channels. Among other things, this manner of testing would minimize the time the RPS would be in a half-scram condition during surveillance testing, thereby minimizing the chance of a full scram due to spurious half scram signals from the opposite channel.
 
==2.0    REGULATORY EVALUATION==
 
The licensee identified the applicable regulatory requirements in Section 5.2 of Attachment 1 of its submittal. The criteria against which the Nuclear Regulatory Commission (NRC) staff evaluated the proposed change are Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix A, General Design Criterion (GDC) 21, Protection System Reliability and Testability, and 10 CFR 50.55a(h), Protection and safety systems.
GDC 21 states as follows:
The protection system shall be designed for high functional reliability and inservice testability commensurate with the safety functions to be performed.
 
Redundancy and independence designed into the protection system shall be sufficient to assure that (1) no single failure results in loss of the protection function and (2) removal from service of any component or channel does not result in loss of the required minimum redundancy unless the acceptable reliability of operation of the protection system can be otherwise demonstrated.
The protection system shall be designed to permit periodic testing of its functioning when the reactor is in operation, including a capability to test channels independently to determine failures and losses of redundance that may have occurred.
Since Oyster Creek was designed, built, and began operation prior to the codification of the GDCs, they were not a part of the original design basis for the plant. However, the Updated Final Safety Analysis Report (UFSAR) was subsequently revised to describe conformance with the GDC, including GDC 21.
Further, 10 CFR 50.55a(h) lists the codes and standards that licensees must adhere to with regard to protection and safety systems. Currently, this regulation endorses Institute of Electrical and Electronics Engineers (IEEE) Standard 603, 1991 edition, including the correction sheet dated January 30, 1995. For those nuclear power plants whose construction permits were issued after January 1, 1971, but before May 13, 1999, the regulation requires that plant protection systems must meet either IEEE Standard 279 or IEEE 603, 1991 edition, including the correction sheet dated January 30, 1995. For nuclear power plants with construction permits issued before January 1, 1971, protection systems must be consistent with their licensing bases.
Although the Oyster Creek construction permit was issued prior to January 1, 1971, and the issuance of IEEE 279, the licensing basis as described in the Oyster Creek UFSAR has since been updated to reflect IEEE 279 as the design basis for Oyster Creek.
 
==3.0    TECHNICAL EVALUATION==
 
3.1    Description of Proposed Change 3.1.1  Channel Check The proposed change would revise the definition of Channel Check from:
A qualitative determination of acceptable operability by observation of channel behavior during operation. This determination shall include, where possible, comparison of the channel with other independent channels measuring the same variable to:
A CHANNEL CHECK shall be the qualitative assessment, by observation, of channel behavior during operation. This determination shall include, where possible, comparison of the channel indication and status to other indications or status derived from independent instrument channels measuring the same parameter.
 
3.1.2    Channel Test The proposed change would rename a Channel Test as a Channel Functional Test and revise the definition from:
Injection of a simulated signal into the channel to verify its proper response including where applicable, alarm and/or trip initiating action.
to:
A CHANNEL FUNCTIONAL TEST shall be the injection of a simulated or actual signal into the channel as close to the sensor as practicable to verify OPERABILITY of all devices in the channel required for channel OPERABILITY.
The CHANNEL FUNCTIONAL TEST may be performed by means of any series of sequential, overlapping, or total channel steps.
3.1.3    Channel Calibration The proposed change would revise the definition of Channel Calibration from:
Adjustment of channel output such that it responds, with acceptable range and accuracy to known values or the parameter which the channel measures.
Calibration shall encompass the entire channel, including equipment actuation, alarm or trip.
to:
A CHANNEL CALIBRATION shall be the adjustment as necessary, of the channel output such that it responds within the necessary range and accuracy to known values of the parameter that the channel monitors. The CHANNEL CALIBRATION shall encompass all devices in the channel required for channel OPERABILITY and the CHANNEL FUNCTIONAL TEST. Calibration of instrument channels with resistance temperature detector (RTD) or thermocouple sensors may consist of an inplace qualitative assessment of sensor behavior and normal calibration of the remaining adjustable devices in the channel. The CHANNEL CALIBRATION may be performed by means of any series of sequential, overlapping, or total channel steps.
3.2.1    Evaluation of Proposed Definition Changes In its application, AmerGen stated that the Oyster Creek TSs were reviewed for all sections referencing and/or using the instrument terms check, test, functional test, and calibrate/calibration in the context of using the proposed definitions of Channel Check, Channel Calibration, and Channel Functional Test. Further, AmerGen stated that the differences resulting from the proposed definitions were consistent with the existing TS definitions for checking, testing, and calibrating instrument channels while allowing for alternate and improved testing methodologies and maintaining the performance requirements of the instrumentation and associated surveillance frequencies.


==2.0REGULATORY EVALUATION==
The NRC staff reviewed the impact of the proposed definition revisions to confirm the licensees assertion that the proposed revision will allow flexibility in testing methodologies, while continuing to verify the operability of the instrument channels. The NRC staff finds that the proposed changes will allow for performing overlapping or sequential testing that will continue to test the entire channel, consistent with IEEE 279. Further, the proposed amendment does not modify the time intervals for Surveillance Requirements (SRs), required action times for failure to meet Limiting Conditions for Operation, or Limiting Safety System Settings.
The licensee identified the applicable regulatory requirements in Section 5.2 of Attachment 1 ofits submittal. The criteria against which the Nuclear Regulatory Commission (NRC) staff evaluated the proposed change are Title 10 of the Code of Federal Regulations (10 CFR), Part50, Appendix A, General Design Criterion (GDC) 21, "Protection System Reliability and Testability," and 10 CFR 50.55a(h), "Protection and safety systems."  GDC 21 states as follows:  The protection system shall be designed for high functional reliability andinservice testability commensurate with the safety functions to be performed. Redundancy and independence designed into the protection system shall besufficient to assure that (1) no single failure results in loss of the protection function and (2) removal from service of any component or channel does not result in loss of the required minimum redundancy unless the acceptable reliability of operation of the protection system can be otherwise demonstrated.
Therefore, the proposed change will continue to meet the design-basis standard of IEEE 279 for Oyster Creek .
The protection system shall be designed to permit periodic testing of its functioning when the reactor is in operation, including a capability to test channels independently to determine failures and losses of redundance that may have occurred. Since Oyster Creek was designed, built, and began operation prior to the codification of theGDCs, they were not a part of the original design basis for the plant. However, the Updated Final Safety Analysis Report (UFSAR) was subsequently revised to describe conformance with the GDC, including GDC 21. Further, 10 CFR 50.55a(h) lists the codes and standards that licensees must adhere to withregard to protection and safety systems. Currently, this regulation endorses Institute of Electrical and Electronics Engineers (IEEE) Standard 603, 1991 edition, including the correctionsheet dated January 30, 1995. For those nuclear power plants whose construction permits were issued after January 1, 1971, but before May 13, 1999, the regulation requires that plant protection systems must meet either IEEE Standard 279 or IEEE 603, 1991 edition, including the correction sheet dated January 30, 1995. For nuclear power plants with construction permits issued before January 1, 1971, protection systems must be consistent with their licensing bases. Although the Oyster Creek construction permit was issued prior to January 1, 1971, and theissuance of IEEE 279, the licensing basis as described in the Oyster Creek UFSAR has since been updated to reflect IEEE 279 as the design basis for Oyster Creek.
Additionally, AmerGen stated that complying with the current Oyster Creek TS definitions of Channel Calibration, Channel Check, and Channel Test for the RPS requires placing the RPS in a half-scram condition during some SR testing. This situation creates a condition where a full-scram would occur while the reactor is at power and within operating limits if the opposite channel of the RPS received a spurious scram signal. By implementing the proposed definitions, overlapping or sequential testing of the RPS channels would be permissible, thus minimizing the time a half-scram condition exists during testing. Minimizing this time reduces the likelihood of a spurious scram at power, improving the reliability of the RPS.
Given that the proposed changes will continue to meet the design-basis standard of IEEE 279, while improving the reliability of the RPS, the NRC staff finds the proposed change acceptable.
3.2.2    Update of Wording in Associated Specifications Revising the definitions of Channel Check, Channel calibration, and Channel functional Test also necessitates updating those sections of the TSs that reference the terms. The NRC staff reviewed the current Oyster Creek TSs and the proposed revisions and finds that the licensee appropriately identified those areas in the TSs needing revision and has proposed changes to these areas consistent with the definition changes discussed above. Therefore, the NRC staff finds the proposed revisions to be acceptable.


==3.0TECHNICAL EVALUATION==
==4.0      STATE CONSULTATION==
3.1Description of Proposed Change 3.1.1Channel Check The proposed change would revise the definition of Channel Check from:  A qualitative determination of acceptable operability by observation of channelbehavior during operation. This determination shall include, where possible, comparison of the channel with other independent channels measuring the same variableto:  A CHANNEL CHECK shall be the qualitative assessment, by observation, ofchannel behavior during operation. This determination shall include, where possible, comparison of the channel indication and status to other indications orstatus derived from independent instrument channels measuring the same parameter. 3.1.2Channel TestThe proposed change would rename a Channel Test as a Channel Functional Test and revisethe definition from:  Injection of a simulated signal into the channel to verify its proper responseincluding where applicable, alarm and/or trip initiating action.to:  A CHANNEL FUNCTIONAL TEST shall be the injection of a simulated or actualsignal into the channel as close to the sensor as practicable to verify OPERABILITY of all devices in the channel required for channel OPERABILITY.
The CHANNEL FUNCTIONAL TEST may be performed by means of any series of sequential, overlapping, or total channel steps. 3.1.3Channel Calibration The proposed change would revise the definition of Channel Calibration from:  Adjustment of channel output such that it responds, with acceptable range andaccuracy to known values or the parameter which the channel measures.
Calibration shall encompass the entire channel, including equipment actuation, alarm or trip. to:  A CHANNEL CALIBRATION shall be the adjustment as necessary, of thechannel output such that it responds within the necessary range and accuracy to known values of the parameter that the channel monitors. The CHANNEL CALIBRATION shall encompass all devices in the channel required for channel OPERABILITY and the CHANNEL FUNCTIONAL TEST. Calibration of instrument channels with resistance temperature detector (RTD) or thermocouple sensors may consist of an inplace qualitative assessment of sensor behavior and normal calibration of the remaining adjustable devices in the channel. The CHANNEL CALIBRATION may be performed by means of any series of sequential, overlapping, or total channel steps. 3.2.1Evaluation of Proposed Definition Changes In its application, AmerGen stated that the Oyster Creek TSs were reviewed for all sectionsreferencing and/or using the instrument terms check, test, functional test, and calibrate/calibration in the context of using the proposed definitions of Channel Check, Channel Calibration, and Channel Functional Test. Further, AmerGen stated that the differences resulting from the proposed definitions were consistent with the existing TS definitions for checking, testing, and calibrating instrument channels while allowing for alternate and improved testing methodologies and maintaining the performance requirements of the instrumentation and associated surveillance frequencies. The NRC staff reviewed the impact of the proposed definition revisions to confirm the licensee'sassertion that the proposed revision will allow flexibility in testing methodologies, while continuing to verify the operability of the instrument channels. The NRC staff finds that the proposed changes will allow for performing overlapping or sequential testing that will continue to test the entire channel, consistent with IEEE 279. Further, the proposed amendment does not modify the time intervals for Surveillance Requirements (SRs), required action times for failure to meet Limiting Conditions for Operation, or Limiting Safety System Settings.
Therefore, the proposed change will continue to meet the design-basis standard of IEEE 279 for Oyster Creek . Additionally, AmerGen stated that complying with the current Oyster Creek TS definitions ofChannel Calibration, Channel Check, and Channel Test for the RPS requires placing the RPSin a half-scram condition during some SR testing. This situation creates a condition where a full-scram would occur while the reactor is at power and within operating limits if the opposite channel of the RPS received a spurious scram signal. By implementing the proposed definitions, overlapping or sequential testing of the RPS channels would be permissible, thus minimizing the time a half-scram condition exists during testing. Minimizing this time reduces the likelihood of a spurious scram at power, improving the reliability of the RPS. Given that the proposed changes will continue to meet the design-basis standard of IEEE 279,while improving the reliability of the RPS, the NRC staff finds the proposed change acceptable. 3.2.2Update of Wording in Associated Specifications Revising the definitions of Channel Check, Channel calibration, and Channel functional Testalso necessitates updating those sections of the TSs that reference the terms. The NRC staff reviewed the current Oyster Creek TSs and the proposed revisions and finds that the licensee appropriately identified those areas in the TSs needing revision and has proposed changes to these areas consistent with the definition changes discussed above. Therefore, the NRC staff finds the proposed revisions to be acceptable. 


==4.0STATE CONSULTATION==
In accordance with the Commissions regulations, the New Jersey State official was notified of the proposed issuance of the amendment. The State official had no comments.
In accordance with the Commission's regulations, the New Jersey State official was notified ofthe proposed issuance of the amendment. The State official had no comments.


==5.0ENVIRONMENTAL CONSIDERATION==
==5.0      ENVIRONMENTAL CONSIDERATION==
This amendment changes a requirement with respect to installation or use of a facilitycomponent located within the restricted area as defined in 10 CFR Part 20 and changes SRs.
The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluent that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (71 FR 67392). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment. 


==6.0CONCLUSION==
This amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes SRs.
The Commission has concluded, based on the considerations discussed above, that:  (1) thereis reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. Principal Contributors:  M. Hamm, G. E. Miller Date: July 27, 2007 Oyster Creek Nuclear Generating StationSite Vice President - Oyster Creek  Nuclear Generating Station AmerGen Energy Company, LLC P.O. Box 388 Forked River, NJ  08731Senior Vice President  of Operations AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348Kathryn M. Sutton, EsquireMorgan, Lewis, & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC  20004Kent Tosch, ChiefNew Jersey Department of Environmental Protection Bureau of Nuclear Engineering
The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluent that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (71 FR 67392). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.


CN 415 Trenton, NJ  08625Vice President - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555Regional Administrator, Region IU.S. Nuclear Regulatory Commission
==6.0    CONCLUSION==


475 Allendale Road King of Prussia, PA  19406-1415Mayor of Lacey Township818 West Lacey Road Forked River, NJ  08731Senior Resident InspectorU.S. Nuclear Regulatory Commission P.O. Box 445 Forked River, NJ  08731Director - Licensing and Regulatory AffairsAmerGen Energy Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA  19348Manager Licensing - Oyster CreekExelon Generation Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA  19348Regulatory Assurance Manager  Oyster Creek AmerGen Energy Company, LLC P.O. Box 388 Forked River, NJ 08731Assistant General CounselAmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA  19348Ron Bellamy, Region IU.S. Nuclear Regulatory Commission
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: M. Hamm, G. E. Miller Date: July 27, 2007


475 Allendale Road King of Prussia, PA 19406-1415Correspondence Control DeskAmerGen Energy Company, LLC 200 Exelon Way, KSA 1--1 Kennett Square, PA 19348Oyster Creek Nuclear Generating StationPlant Manager AmerGen Energy Company, LLC P.O. Box 388 Forked River, NJ 08731}}
Oyster Creek Nuclear Generating Station Site Vice President - Oyster Creek      Director - Licensing and Regulatory Affairs Nuclear Generating Station            AmerGen Energy Company, LLC AmerGen Energy Company, LLC            Correspondence Control P.O. Box 388                            P.O. Box 160 Forked River, NJ 08731                  Kennett Square, PA 19348 Senior Vice President of                Manager Licensing - Oyster Creek Operations                            Exelon Generation Company, LLC AmerGen Energy Company, LLC            Correspondence Control 200 Exelon Way, KSA 3-N                P.O. Box 160 Kennett Square, PA 19348                Kennett Square, PA 19348 Kathryn M. Sutton, Esquire              Regulatory Assurance Manager Morgan, Lewis, & Bockius LLP            Oyster Creek 1111 Pennsylvania Avenue, NW            AmerGen Energy Company, LLC Washington, DC 20004                    P.O. Box 388 Forked River, NJ 08731 Kent Tosch, Chief New Jersey Department of                Assistant General Counsel Environmental Protection              AmerGen Energy Company, LLC Bureau of Nuclear Engineering          200 Exelon Way CN 415                                  Kennett Square, PA 19348 Trenton, NJ 08625 Ron Bellamy, Region I Vice President - Licensing and          U.S. Nuclear Regulatory Commission Regulatory Affairs                    475 Allendale Road AmerGen Energy Company, LLC            King of Prussia, PA 19406-1415 4300 Winfield Road Warrenville, IL 60555                  Correspondence Control Desk AmerGen Energy Company, LLC Regional Administrator, Region I        200 Exelon Way, KSA 1--1 U.S. Nuclear Regulatory Commission      Kennett Square, PA 19348 475 Allendale Road King of Prussia, PA 19406-1415          Oyster Creek Nuclear Generating Station Plant Manager Mayor of Lacey Township                AmerGen Energy Company, LLC 818 West Lacey Road                    P.O. Box 388 Forked River, NJ 08731                  Forked River, NJ 08731 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 445 Forked River, NJ 08731}}

Latest revision as of 08:12, 23 November 2019

License Amendment, Issuance of Amendment Request to Change Technical Specification Definition of Channel Calibration, Channel Check, and Channel Test
ML071100237
Person / Time
Site: Oyster Creek
Issue date: 07/27/2007
From: Geoffrey Miller
NRC/NRR/ADRO/DORL/LPLI-2
To: Crane C
AmerGen Energy Co
Miller G, NRR/DORL, 415-2481
Shared Package
ML071100242 List:
References
TAC MD3133
Download: ML071100237 (11)


Text

July 27, 2007 Mr. Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

OYSTER CREEK NUCLEAR GENERATING STATION - ISSUANCE OF AMENDMENT RE: REQUEST TO CHANGE TECHNICAL SPECIFICATION DEFINITION OF CHANNEL CALIBRATION, CHANNEL CHECK, AND CHANNEL TEST (TAC NO. MD3133)

Dear Mr. Crane:

The Commission has issued the enclosed Amendment No. 263 to Facility Operating License No. DPR-16 for the Oyster Creek Nuclear Generating Station (Oyster Creek), in response to your application dated September 28, 2006.

The amendment revises the Oyster Creek Technical Specification definition of Channel Calibration, Channel Check, and Channel Test consistent with NUREG-1433, Revision 3.0, Standard Technical Specifications General Electric Plants, BWR/4 Specifications, dated June 2004.

A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions biweekly Federal Register notice.

Sincerely,

/ra/

G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-219

Enclosure:

1. Amendment No. 263 to DPR-16
2. Safety Evaluation cc w/encls: See next page

July 27, 2007 Mr. Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

OYSTER CREEK NUCLEAR GENERATING STATION - ISSUANCE OF AMENDMENT RE: REQUEST TO CHANGE TECHNICAL SPECIFICATION DEFINITION OF CHANNEL CALIBRATION, CHANNEL CHECK, AND CHANNEL TEST (TAC NO. MD3133)

Dear Mr. Crane:

The Commission has issued the enclosed Amendment No. 263 to Facility Operating License No. DPR-16 for the Oyster Creek Nuclear Generating Station (Oyster Creek), in response to your application dated September 28, 2006.

The amendment revises the Oyster Creek Technical Specification definition of Channel Calibration, Channel Check, and Channel Test consistent with NUREG-1433, Revision 3.0, Standard Technical Specifications General Electric Plants, BWR/4 Specifications, dated June 2004.

A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions biweekly Federal Register notice.

Sincerely,

/ra/

G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-219

Enclosure:

1. Amendment No. 263 to DPR-16
2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:

PUBLIC RidsOgcRp RidsNrrDorlDpr LPLI-2 R/F RidsNrrDorlLpl1-2(HChernoff) GHill (2)

TKobetz RidsNrrPMGMiller RidsNrrLAMOBrien RidsAcrsAcnwMailCenter MHamm, NRR CSchulten, NRR RidsRgn1MailCenter(GMatakas)

Package Accession Number: ML0711002472 Amendment Accession Number: ML0711002397 TS(s) Accession Number: ML072130293 OFFICE LPLI-2/PM LPLI-2/LA DIRS/ITSB/BC OGC LPLI-2/BC NAME GEMiller MOBrien TKobetz MYoung HChernoff (w/comments)

DATE 5/10/07 5/3/07 6/5/07 7/16/07 7/27/07 OFFICIAL RECORD COPY

AMERGEN ENERGY COMPANY, LLC DOCKET NO. 50-219 OYSTER CREEK NUCLEAR GENERATING STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 263 License No. DPR-16

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by AmerGen Energy Company, LLC, (the licensee), dated September 28, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2. Accordingly, the Facility Operating License is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-16 is hereby amended to read as follows.

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 263, are hereby incorporated in the license. AmerGen Energy Company, LLC, shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/ra/

Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the License and Technical Specifications Date of Issuance: July 27, 2007

ATTACHMENT TO LICENSE AMENDMENT NO. 263 FACILITY OPERATING LICENSE NO. DPR-16 DOCKET NO. 50-219 Replace page 3 of Facility Operating License No. DPR-16 with the attached revised page 3.

The revised page is identified by amendment number and contains a marginal line indicating the area of change.

Replace the following pages of the Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert 1.0-4 1.0-4 3.1-19 3.1-19 4.1-9 4.1-9 4.3-2 4.3-2 4.4-1 4.4-1 4.12-1 4.12-1 4.12-2 4.12-2 4.13-1 4.13-1 4.13-2 4.13-2 4.15-2 4.15-2

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 263 TO FACILITY OPERATING LICENSE NO. DPR-16 AMERGEN ENERGY COMPANY, LCC OYSTER CREEK NUCLEAR GENERATING STATION DOCKET NO. 50-219

1.0 INTRODUCTION

By application dated September 28, 2006, AmerGen Energy Company, LLC (AmerGen or the licensee) requested changes to the Facility Operating License for the Oyster Creek Nuclear Generating Station (Oyster Creek). The proposed amendment would revise the Oyster Creek Technical Specification (TS) definition for Channel Calibration, Channel Check, and Channel Test consistent with NUREG-1433, Revision 3.0, Standard Technical Specifications General Electric Plants, BWR/4 Specifications, June 2004.

The proposed changes to the current definitions of Channel Calibration, Channel Check, and Channel Test in Section 1.19 of the Oyster Creek TSs will apply to all instrument functions in the TSs, including Reactor Protection System (RPS) instruments. The proposed changes would allow for overlapping or sequential testing of all instrumentation channels. Among other things, this manner of testing would minimize the time the RPS would be in a half-scram condition during surveillance testing, thereby minimizing the chance of a full scram due to spurious half scram signals from the opposite channel.

2.0 REGULATORY EVALUATION

The licensee identified the applicable regulatory requirements in Section 5.2 of Attachment 1 of its submittal. The criteria against which the Nuclear Regulatory Commission (NRC) staff evaluated the proposed change are Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix A, General Design Criterion (GDC) 21, Protection System Reliability and Testability, and 10 CFR 50.55a(h), Protection and safety systems.

GDC 21 states as follows:

The protection system shall be designed for high functional reliability and inservice testability commensurate with the safety functions to be performed.

Redundancy and independence designed into the protection system shall be sufficient to assure that (1) no single failure results in loss of the protection function and (2) removal from service of any component or channel does not result in loss of the required minimum redundancy unless the acceptable reliability of operation of the protection system can be otherwise demonstrated.

The protection system shall be designed to permit periodic testing of its functioning when the reactor is in operation, including a capability to test channels independently to determine failures and losses of redundance that may have occurred.

Since Oyster Creek was designed, built, and began operation prior to the codification of the GDCs, they were not a part of the original design basis for the plant. However, the Updated Final Safety Analysis Report (UFSAR) was subsequently revised to describe conformance with the GDC, including GDC 21.

Further, 10 CFR 50.55a(h) lists the codes and standards that licensees must adhere to with regard to protection and safety systems. Currently, this regulation endorses Institute of Electrical and Electronics Engineers (IEEE) Standard 603, 1991 edition, including the correction sheet dated January 30, 1995. For those nuclear power plants whose construction permits were issued after January 1, 1971, but before May 13, 1999, the regulation requires that plant protection systems must meet either IEEE Standard 279 or IEEE 603, 1991 edition, including the correction sheet dated January 30, 1995. For nuclear power plants with construction permits issued before January 1, 1971, protection systems must be consistent with their licensing bases.

Although the Oyster Creek construction permit was issued prior to January 1, 1971, and the issuance of IEEE 279, the licensing basis as described in the Oyster Creek UFSAR has since been updated to reflect IEEE 279 as the design basis for Oyster Creek.

3.0 TECHNICAL EVALUATION

3.1 Description of Proposed Change 3.1.1 Channel Check The proposed change would revise the definition of Channel Check from:

A qualitative determination of acceptable operability by observation of channel behavior during operation. This determination shall include, where possible, comparison of the channel with other independent channels measuring the same variable to:

A CHANNEL CHECK shall be the qualitative assessment, by observation, of channel behavior during operation. This determination shall include, where possible, comparison of the channel indication and status to other indications or status derived from independent instrument channels measuring the same parameter.

3.1.2 Channel Test The proposed change would rename a Channel Test as a Channel Functional Test and revise the definition from:

Injection of a simulated signal into the channel to verify its proper response including where applicable, alarm and/or trip initiating action.

to:

A CHANNEL FUNCTIONAL TEST shall be the injection of a simulated or actual signal into the channel as close to the sensor as practicable to verify OPERABILITY of all devices in the channel required for channel OPERABILITY.

The CHANNEL FUNCTIONAL TEST may be performed by means of any series of sequential, overlapping, or total channel steps.

3.1.3 Channel Calibration The proposed change would revise the definition of Channel Calibration from:

Adjustment of channel output such that it responds, with acceptable range and accuracy to known values or the parameter which the channel measures.

Calibration shall encompass the entire channel, including equipment actuation, alarm or trip.

to:

A CHANNEL CALIBRATION shall be the adjustment as necessary, of the channel output such that it responds within the necessary range and accuracy to known values of the parameter that the channel monitors. The CHANNEL CALIBRATION shall encompass all devices in the channel required for channel OPERABILITY and the CHANNEL FUNCTIONAL TEST. Calibration of instrument channels with resistance temperature detector (RTD) or thermocouple sensors may consist of an inplace qualitative assessment of sensor behavior and normal calibration of the remaining adjustable devices in the channel. The CHANNEL CALIBRATION may be performed by means of any series of sequential, overlapping, or total channel steps.

3.2.1 Evaluation of Proposed Definition Changes In its application, AmerGen stated that the Oyster Creek TSs were reviewed for all sections referencing and/or using the instrument terms check, test, functional test, and calibrate/calibration in the context of using the proposed definitions of Channel Check, Channel Calibration, and Channel Functional Test. Further, AmerGen stated that the differences resulting from the proposed definitions were consistent with the existing TS definitions for checking, testing, and calibrating instrument channels while allowing for alternate and improved testing methodologies and maintaining the performance requirements of the instrumentation and associated surveillance frequencies.

The NRC staff reviewed the impact of the proposed definition revisions to confirm the licensees assertion that the proposed revision will allow flexibility in testing methodologies, while continuing to verify the operability of the instrument channels. The NRC staff finds that the proposed changes will allow for performing overlapping or sequential testing that will continue to test the entire channel, consistent with IEEE 279. Further, the proposed amendment does not modify the time intervals for Surveillance Requirements (SRs), required action times for failure to meet Limiting Conditions for Operation, or Limiting Safety System Settings.

Therefore, the proposed change will continue to meet the design-basis standard of IEEE 279 for Oyster Creek .

Additionally, AmerGen stated that complying with the current Oyster Creek TS definitions of Channel Calibration, Channel Check, and Channel Test for the RPS requires placing the RPS in a half-scram condition during some SR testing. This situation creates a condition where a full-scram would occur while the reactor is at power and within operating limits if the opposite channel of the RPS received a spurious scram signal. By implementing the proposed definitions, overlapping or sequential testing of the RPS channels would be permissible, thus minimizing the time a half-scram condition exists during testing. Minimizing this time reduces the likelihood of a spurious scram at power, improving the reliability of the RPS.

Given that the proposed changes will continue to meet the design-basis standard of IEEE 279, while improving the reliability of the RPS, the NRC staff finds the proposed change acceptable.

3.2.2 Update of Wording in Associated Specifications Revising the definitions of Channel Check, Channel calibration, and Channel functional Test also necessitates updating those sections of the TSs that reference the terms. The NRC staff reviewed the current Oyster Creek TSs and the proposed revisions and finds that the licensee appropriately identified those areas in the TSs needing revision and has proposed changes to these areas consistent with the definition changes discussed above. Therefore, the NRC staff finds the proposed revisions to be acceptable.

4.0 STATE CONSULTATION

In accordance with the Commissions regulations, the New Jersey State official was notified of the proposed issuance of the amendment. The State official had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

This amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes SRs.

The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluent that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (71 FR 67392). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributors: M. Hamm, G. E. Miller Date: July 27, 2007

Oyster Creek Nuclear Generating Station Site Vice President - Oyster Creek Director - Licensing and Regulatory Affairs Nuclear Generating Station AmerGen Energy Company, LLC AmerGen Energy Company, LLC Correspondence Control P.O. Box 388 P.O. Box 160 Forked River, NJ 08731 Kennett Square, PA 19348 Senior Vice President of Manager Licensing - Oyster Creek Operations Exelon Generation Company, LLC AmerGen Energy Company, LLC Correspondence Control 200 Exelon Way, KSA 3-N P.O. Box 160 Kennett Square, PA 19348 Kennett Square, PA 19348 Kathryn M. Sutton, Esquire Regulatory Assurance Manager Morgan, Lewis, & Bockius LLP Oyster Creek 1111 Pennsylvania Avenue, NW AmerGen Energy Company, LLC Washington, DC 20004 P.O. Box 388 Forked River, NJ 08731 Kent Tosch, Chief New Jersey Department of Assistant General Counsel Environmental Protection AmerGen Energy Company, LLC Bureau of Nuclear Engineering 200 Exelon Way CN 415 Kennett Square, PA 19348 Trenton, NJ 08625 Ron Bellamy, Region I Vice President - Licensing and U.S. Nuclear Regulatory Commission Regulatory Affairs 475 Allendale Road AmerGen Energy Company, LLC King of Prussia, PA 19406-1415 4300 Winfield Road Warrenville, IL 60555 Correspondence Control Desk AmerGen Energy Company, LLC Regional Administrator, Region I 200 Exelon Way, KSA 1--1 U.S. Nuclear Regulatory Commission Kennett Square, PA 19348 475 Allendale Road King of Prussia, PA 19406-1415 Oyster Creek Nuclear Generating Station Plant Manager Mayor of Lacey Township AmerGen Energy Company, LLC 818 West Lacey Road P.O. Box 388 Forked River, NJ 08731 Forked River, NJ 08731 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 445 Forked River, NJ 08731