MONTHYEARIR 07200015/20244012024-10-30030 October 2024 NRC Independent Spent Fuel Storage Installation Security Inspection Report No. 07200015/2024401 ML24303A2822024-10-29029 October 2024 License Termination Plan Supplemental Submittal for Technical Bases Documents ML24284A1972024-10-10010 October 2024 Cover Letter Oyster Creek, License Termination Plan Acceptance Review ML24269A0462024-10-0404 October 2024 Cover Letter for Oyster Creek Nuclear Generating Station, License Amendment Request, License Termination Plan, Acceptance Review Request for Additional Information ML24274A0822024-09-25025 September 2024 Independent Spent Fuel Storage Installation Security Plan, Training Qualification Plan, Safeguards Contingency Plan, Revisions 1 and 2 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000219/20240022024-09-0505 September 2024 – NRC Inspection Report 05000219/2024002 and 07200015/2024001 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24214A0372024-08-0101 August 2024 License Amendment Request to Revise Renewed Facility Operating License to Add License Condition 2.C.(18) to Include License Termination Plan Requirements ML24179A1842024-07-23023 July 2024 June 20, 2024, Clarification Call on Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000219/20240012024-05-14014 May 2024 Decommissioning Intl, LLC Oyster Creek Nuclear Generating Station - NRC Inspection Report No. 05000219/2024001 ML24120A0412024-04-29029 April 2024 Annual Radioactive Environmental Operating Report for 2023 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24120A0402024-04-29029 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24094A2142024-04-19019 April 2024 Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24089A2492024-03-29029 March 2024 Reply to Notice of Violation EA-2024-024 ML24085A7902024-03-28028 March 2024 – Preapplication Readiness Assessment of the License Termination Plan ML24081A2882024-03-21021 March 2024 Request Preliminary Review and Feedback on Chapter 6 of the Draft License Termination Plan ML24046A1242024-02-29029 February 2024 – NRC Inspection Report 05000219/2023003 ML24033A3272024-02-0202 February 2024 Request Preliminary Review and Feedback on Chapter 5 of the Draft License Termination Plan ML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 – NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report – January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 – NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 – NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 – NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages 2024-09-05
[Table view] Category:Safety Evaluation
MONTHYEARML21119A0632021-06-25025 June 2021 Safety Evaluation Report ISFSI Only Tech Specs ML21119A0622021-06-25025 June 2021 Letter to A. Sterdis Re Oyster Creek Issuance of Amendment to Revise Permanently Defueled Tech Specs ML19179A2052019-09-18018 September 2019 Safety Evaluation Report Oyster Creek Amendment No. 298 Issuance of License Amendment for Removal of Cyber Security Plan Requirements ML19095A4572019-06-20020 June 2019 License Transfer SER ML19095A8732019-06-11011 June 2019 Letter, Exemption from the Effective Date of Exemptions from Certain Emergency Planning Requirements, Change of Adiabatic Heat-up Calculation ML19098A2582019-06-11011 June 2019 Issuance of Amendment No. 296, Change to the Effective and Implementation Dates of License Amendment for Emergency Plan and Emergency Action Level Scheme Based on Adiabatic Calculation ML18227A3382018-10-26026 October 2018 Issuance of Amendment No. 295, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML18221A4002018-10-17017 October 2018 Issuance of Amendment No. 294, Revise the Site Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MG0160; L-2017-LLA-0307) ML18220A9802018-10-16016 October 2018 Letter and Safety Evaluation, Exemption from Portions of 10 CFR 50.47 and Appendix E to 10 CFR 50 to Reduce Emergency Planning Requirements Consistent with Permanently Defueled Condition (CAC MG0153; EPID L-2017-LLE-0020) ML18226A3302018-09-28028 September 2018 Review of Update to Spent Fuel Management Plan ML18165A1362018-06-27027 June 2018 Independent Spent Fuel Storage Installation - Review and Acceptance of Changes Decommissioning Quality Assurance Program ML17356A2132018-03-0707 March 2018 Issuance of Amendment No. 293, Revise the Site Emergency Plan for On-Shift and Emergency Response Organization Staffing for Permanently Defueled Condition (CAC No. MF9352; L-2017-LLA-0177) ML17289A2222017-12-22022 December 2017 Issuance of Amendment No. 292, Request to Revise Cyber Security Plan Implementation Schedule for Milestone 8 and Associated License Condition (CAC No. MF9550; EPID L-2017-LLA-0193) ML17163A3552017-08-31031 August 2017 Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) ML17170A0132017-06-26026 June 2017 Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548) ML17067A0422017-06-23023 June 2017 Issuance of Amendment No. 291, Request to Delete Decommissioning Trust Provisions in License Conditions 3.F Through 3.K of the Renewed Facility Operating License ML17150A0912017-06-0505 June 2017 Fleet - Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques (CAC Nos. MF8763-MF8782 and MF9395) ML16235A4132017-03-0707 March 2017 Issuance of Amendment No. 290, Changes to Administrative Controls Section of the Technical Specifications No Longer Applicable to Facility in Permanently Defueled Condition ML16222A7872016-09-0606 September 2016 Unit 1; and Quad Cities Nuclear Power Station, Units 1 and 2 - Review of Certified Fuel Handler Training and Retraining Program ML16230A2372016-09-0606 September 2016 Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) ML16131A7502016-07-0606 July 2016 Staff Assessment Preliminary Decommissioning Cost Estimate and Spent Fuel Management Program (Cac. No. MF5577) ML15245A3462015-09-15015 September 2015 Review of Physical Security Plan, Revision 13 ML15153A2822015-07-30030 July 2015 Issuance of Amendments Revising the Completion Date for Milestone 8 of the Cyber Security Plan (TAC Nos. MF4728, MF4729, MF4730, MF4731, MF4732, MF4733, MF4734, MF4735, MF4736, MF4737, MF4738, MF4739, MF4740 ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) ML15097A1532015-05-0101 May 2015 Fourth 10-Year Interval Inservice Inspection Program Plan Requests for Relief and R-45 (TAC Nos. MF3406 and MF3407) ML15040A7212015-04-0303 April 2015 Issuance of Amendment to Revise Technical Specification for the Snubber Surveillance Requirements ML14329A6252015-03-30030 March 2015 Issuance of Amendment Regarding Reactor Building Vital Area Access Control ML14295A3002015-01-29029 January 2015 Issuance of Amendments Regarding Adoption of Technical Specifications Task Force Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. ML14226A9402014-12-24024 December 2014 Issuance of Amendments Regarding the Emergency Plan Definition of Annual Training (TAC Nos. MF3003, MF3004, MF3005, MF3006, MF3007, MF3008.. ML14175B5932014-07-31031 July 2014 Proposed Alternative to Utilize Code Case N-786, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping Section XI Division1 ML14008A3502014-05-27027 May 2014 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement... ML14100A3592014-04-30030 April 2014 Peach Bottom... Proposed Alternative to Utilize Code Case N-649, Alternative Requirements for IWE-5240 Visual Examination Section XI ML13175A1112013-08-0707 August 2013 Relief from the Requirements of the ASME Code, Relief Request No. I5R-06 ML13175A1252013-08-0606 August 2013 Relief from the Requirements of the ASME Code, Relief Request No. I5R-07 ML13169A0622013-08-0505 August 2013 Relief from the Requirements of the ASME Code, Relief Request No. I5R-01 ML13175A1002013-08-0505 August 2013 Relief from the Requirements of the ASME Code, Relief Request No. I5R-02 ML13079A3722013-06-20020 June 2013 Issuance of Amendments Staff Qualifications Education and Experience Eligibility Requirments for Licensed Operators (ME9047) ML13092A4012013-04-18018 April 2013 Relief from the Requirements of the ASME Code, Relief Request No. l5R-01 for Expanded Applicability for Use of ASME Code Case N-661-1 ML12145A7032012-06-14014 June 2012 Relief Request to Extend the Fourth Inservice Inspection Interval ML12121A6372012-05-10010 May 2012 Request to Use Code Case N-789 ML1208202662012-03-29029 March 2012 Request to Use Later Edition of Code for Listed Plants ML1200503502012-01-24024 January 2012 Relief from the Requirements of the ASME Code, Relief Request No. VR-02 for Fifth Inservice Testing Interval ML1118613412011-08-10010 August 2011 Issuance of License Amendments Regarding Exelon Cyber Security Plan ML1116500972011-06-30030 June 2011 Fleet - Approval of Change from Emergency Action Level Scheme Based on NEI 99-01, Revision 4, to NEI 99-01, Revision 5 ML1113101532011-06-28028 June 2011 Issuance of Amendment Changes to Appendix B, Environmental Technical Specifications ML1111701942011-06-16016 June 2011 Issuance of Amendment Elimination of Daily Testing of an Operable Emergency Diesel Generator ML1024305512010-10-18018 October 2010 Issuance of Amendment Secondary Containment Boundary Definition During Shutdown Conditions ML1019301722010-09-27027 September 2010 Issuance of Amendment Relocation of Surveillance Requirement Frequencies to a Licensee Controlled Document Based on TSTF-425, Revision 3 ML0925305612009-10-22022 October 2009 Issuance of Amendment Control Rod Drive System Rod Notch Testing Frequency ML0925200392009-09-15015 September 2009 Relief Request for Alternative Examination for Reactor Pressure Vessel Circumferential Shell Welds 2021-06-25
[Table view] Category:Security Plan
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 15, 2015 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
OYSTER CREEK NUCLEAR GENERATING STATION -REVIEW OF PHYSICAL SECURITY PLAN, REVISION 13
Dear Mr. Hanson:
By letter dated June 30, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15190A354), Exelon Generation Company, LLC (Exelon or the licensee) submitted the Oyster Creek Nuclear Generating Station (OCNGS) Physical Security Plan (PSP), which also included the Training and Qualification Plan and Safeguards Contingency Plan, Revision 13, to the U.S. Nuclear Regulatory Commission (NRG) under the provisions of Title 10 of the Code of Federal Regulations (1 O CFR) Part 50, "Domestic Licensing of Production and Utilization Facilities," Section 50.54, "Conditions of licenses,"
paragraph (p)(2). The enclosure to the letter dated June 30, 2015, contains Safeguards Information that is protected under 10 CFR 73.21 and is withheld from public access pursuant to the requirements of 10 CFR 9.17.
By letter dated March 30, 2015 (ADAMS Accession No. ML14329A625), the NRG issued Amendment No. 285 to Renewed Facility Operating License No. DPR-16 for OCNGS in response to Exelon's application dated December 19, 2013 (ADAMS Accession No. ML13358A245), as supplemented by letters dated January 31, 2014, and November 3, 2014 (ADAMS Accession Nos. ML14035A264 and ML14309A615, respectively). Amendment No. 285 approved the proposed Security Plan changes to implement an "alternative measure" for satisfying applicable requirements of 10 CFR 73.55 related to controlling vital area access for certain portions of the reactor building at OCNGS. The letter dated June 30, 2015, implements an approved alternative measure as indicated in Amendment No. 285.
The NRG staff compared the changes made in the OCNGS PSP, Revision 13, against the previous Revision 12. Based on this review, the NRG staff identified additional clarification areas to be considered for future PSP changes per 10 CFR 50.54(p). These areas are clarifications and administrative changes in nature with regard to identification of security tasks and roles and responsibilities of operator and radiological protection staff to be included in the appropriate sections of the PSP.
On August 19, 2015, the NRG staff conducted a discussion with the licensee pertaining to inclusion of the above areas in future OCNGS PSP revisions.
B. Hanson A copy of the related NRG staff evaluation of the OGNGS PSP, Revision 13, is also enclosed.
The NRG staff did not identify any technical issues that warrant followup action at this time.
If you have questions, please contact me at 301-415-3100 or John.Lamb@nrc.gov .
. Lamb, Senior Project Manager Pia t icensing Branch 1-2 Div on of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-219
Enclosure:
NRG Staff Evaluation cc w/
Enclosure:
Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 STAFF EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION FOR RENEWED FACILITY OPERATING LICENSE NO. DPR-16 REGARDING PHYSICAL SECURITY PLAN, REVISION 13 EXELON GENERATION COMPANY, LLC OYSTER CREEK NUCLEAR GENERATING STATION DOCKET NO. 50-219
1.0 INTRODUCTION
By letter dated June 30, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15190A354), Exelon Generation Company, LLC (Exelon or the licensee) submitted the Oyster Creek Nuclear Generating Station (OCNGS) Physical Security Plan (PSP), which also included the Training and Qualification Plan (T&QP) and Safeguards Contingency Plan (SCP), Revision 13, to the U.S. Nuclear Regulatory Commission (NRC) under the provisions of Title 1O of the Code of Federal Regulations (10 CFR) Part 50, "Domestic Licensing of Production and Utilization Facilities," Section 50.54, "Conditions of License,"
paragraph (p)(2). The enclosure to the letter dated June 30, 2015, contains Safeguards Information that is protected under 10 CFR 73.21 and is withheld from public access pursuant to the requirements of 10 CFR 9.17.
By letter dated March 30, 2015 (ADAMS Accession No. ML14329A625), the NRC issued Amendment No. 285 to Renewed Facility Operating License No. DPR-16 for OCNGS in response to Exelon's application dated December 19, 2013 (ADAMS Accession No. ML13358A245), as supplemented by letters dated January 31, 2014, and November 3, 2014 (ADAMS Accession Nos. ML14035A264 and ML14309A615, respectively). Amendment No. 285 approved the proposed Security Plan changes to implement an "alternative measure" for satisfying applicable requirements of 10 CFR 73.55 related to controlling vital area access for certain portions of the reactor building at OCNGS. The letter dated June 30, 2015, implements an approved alternative measure as indicated in Amendment No. 285.
The NRC staff review of the licensee's PSP was conducted, consistent with the applicable requirements of 10 CFR Part 73, as well as the guidance contained within the Office of Nuclear Security and Incident Response (NSIR) Procedure UC 800, "Security Review Procedure for 10 CFR 50.54(p)(2)," and the NRC-endorsed Nuclear Energy Institute 03-12, Revision 7, template for security plans, as appropriate.
Enclosure
2.0 REGULATORY EVALUATION
Pursuant to 10 CFR 50.54(p)(2):
The licensee may make changes to the plans referenced in paragraph (p)(1) of this section, without prior Commission approval if the changes do not decrease the safeguards effectiveness of the plan. The.licensee shall maintain records of changes to the plans madewithout prior Commission approval for a period of ..
3 years from the date of the change, and shall submit, as specified in § 50.4 or
§ 52.3 of this chapter, a report containing a description of each change within 2 months after the change is made.
The NRC staff review consisted of determining whether the licensee appropriately implemented an NRG-approved alternative measure that meets the same performance objectives specified in 10 CFR 73.55(b) and that the implementation of these changes under 10 CFR 50.54(p) did not decrease the safeguards effectiveness of the Commission-approved PSP.
3.0 TECHNICAL EVALUATION
The NRC staff evaluated these changes consistent with the regulatory and technical basis for an alternative measure that was discussed in the NRC letter dated March 30, 2015. The NRC staff compared Exelon's proposed changes in the OCNGS PSP, Revision 13 to the proposed changes in Amendment No. 285. In addition, the NRC staff compared the changes made in the OCNGS PSP, Revision 13, against the previous Revision 12, and noted that OCNGS PSP, Revision 13, contained 11 changes for OCNGS as stated in the "Table of Changes for Security Plan Change Submittal" of the PSP.
The licensee implemented changes to the PSP T&QP and the SCP. Specifically, Exelon made changes to (1) the insider mitigation program; (2) security badges; (3) security measures related to the access of the Reactor Building (RB); (4) Owner Control Area (OCA) surveillance; (5) security tours in the RB; and (6) T&QP: protocols and personnel training.
As part of the review, the NRC staff identified additional areas to be considered for future OCNGS PSP revisions per 10 CFR 50.54(p). These areas are clarifications and administrative in nature with regard to identification of security tasks and roles and responsibilities of operators and radiological protection staff to be included in the appropriate section of the OCNGS PSP.
These areas do not impact the overall assessment of the NRC staff's finding of the proposed OCNGS PSP, Revision 13. On August 19, 2015, the NRC staff conducted a discussion with the licensee pertaining to inclusion of the above areas in future OCNGS PSP revisions.
Based on the NRC staff evaluation of the licensee's implementation of Amendment No. 285, the NRC staff finds that these changes are consistent with the NRC staff findings in Amendment No. 285.
4.0 CONCLUSION
The NRC staff determined that Exelon properly concluded that the reported changes to the OCNGS PSP, Revision 13, did not result in a decrease in safeguards effectiveness; the NRC staff recommends no further regulatory actions at this time. The effectiveness of the implementation of OCNGS PSP, Revision 13, is subject to future NRC review and inspection.
Principal Contributor: Meagan Parker, NSIR Date: September 15, 2015
B. Hanson A copy of the related NRC staff evaluation of the OCNGS PSP, Revision 13, is also enclosed.
The NRC staff did not identify any technical issues that warrant followup action at this time.
If you have questions, please contact me at 301-415-3100 or John.Lamb@nrc.gov.
Sincerely, IRA/
John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-219
Enclosure:
NRC Staff Evaluation
cc w/
Enclosure:
Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDorlDpr Resource RidsRgn1 MailCenter Resource RidsRgn1 MailCenter Resource RidsNrrDorlLpl1-2 Resource RidsNrrLALRonewicz Resource DDiec, NSIR RidsACRS_MailCTR Resource LPL 1-2 R/F APatel, R-1 ADimitriadis, R-1 EAndrews, R-1 JCherubini, R-1 MParker, NSIR RidsNsirDsp Resource ADAMS A ccess1on No.: ML15245A346 *b1y memo OFFICE LPL 1-2/PM LPL 1-2/LA NSIR/BC* LPL 1-2/BC LPL 1-2/PM NAME JLamb LRonewicz DHuyck DBroaddus JLamb (REnnis for)