Issuance of Amendments Staff Qualifications Education and Experience Eligibility Requirments for Licensed Operators (ME9047)
ML13079A372
Person / Time
Site: Dresden, Peach Bottom, Oyster Creek, Byron, Braidwood, Limerick, Clinton, Quad Cities, LaSalle
Issue date: 06/20/2013
From: Joel Wiebe
Division of Operating Reactor Licensing
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Joel Wiebe, NRR/DORL 415-6606
References
TAC ME9047, TAC ME9048, TAC ME9049, TAC ME9050, TAC ME9051, TAC ME9052, TAC ME9053, TAC ME9054, TAC ME9055, TAC ME9056, TAC ME9057, TAC ME9058, TAC ME9059, TAC ME9060, TAC ME9061, TAC ME9062, TAC ME9063
Download: ML13079A372 (82)


Text

Mr. Michael J. Pacilio Senior Vice President UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 20, 2013 Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2; BYRON STATION, UNIT NOS. 1 AND 2; CLINTON POWER STATION, UNIT NO.1; DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3; LASALLE COUNTY STATION, UNITS 1 AND 2; LIMERICK GENERATING STATION, UNITS 1 AND 2; OYSTER CREEK NUCLEAR GENERATING STATION; PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3; QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2; AND THREE MILE ISLAND NUCLEAR STATION, UNIT 1 -

ISSUANCE OF AMENDMENTS RE: STAFF QUALIFICATIONS EDUCATION AND EXPERIENCE ELIGIBILITY REQUIREMENTS FOR LICENSED OPERATORS (TAC NOS. ME9047, ME9048, ME9049, ME9050, ME9051, ME9052, ME9053, ME9054, ME9055, ME9056, ME9057, ME9058, ME9059, ME9060, ME9061, ME9062 AND ME9063)

Dear Mr. Pacilio:

The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 173 to Facility Operating License No. NPF-72 and Amendment No. 173 to Facility Operating License No. NPF-77 for the Braidwood Station, Units 1 and 2, respectively, and Amendment No. 180 to Facility Operating License No. NPF-37 and Amendment No. 180 to Facility Operating License No. NPF-66 for the Byron Station, Unit Nos. 1 and 2, respectively, and Amendment No. 200 to Facility Operating License No. NPF-62 for the Clinton Power Station, Unit No. 1, and Amendment No. 240 to Renewed Facility Operating License No. DPR-19 and Amendment No. 233 to Renewed Facility Operating License No. DPR-25 for Dresden Nuclear Power Station, Units 2 and 3, respectively, and Amendment No. 206 to Facility Operating License No.

NPF-11 and Amendment No. 193 to Facility Operating License No. NPF-18 for the LaSalle County Station, Units 1 and 2, respectively, and Amendment No. 210 to Facility Operating License No. NPF-39 and Amendment No. 171 to Facility Operating License No. NPF-85 for the Limerick Generating Station, Units 1 and 2, respectively, and Amendment No. 281 to Renewed Facility Operating License No. DPR-16 for the Oyster Creek Nuclear Generating Station, and Amendment No. 289 to Renewed Facility Operating License No. DPR-44 and Amendment No. 292 to Renewed Facility Operating License No. DPR-56 for the Peach Bottom Atornic Power Station, Units 2 and 3, respectively, and Amendment No. 251 to Renewed Facility Operating License No. DPR-29 and Amendment No. 246 to Renewed Facility Operating License No. DPR-30 for the Quad Cities Nuclear Power Station, Units 1 and 2, respectively, and Amendment No. 280 to Renewed Facility Operating Lic.:ense No DPR-50 for the Three Mile Island Nuclear Station, Unit 1. The amendments are in response to your application dated July 6, 2012.

A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.

Docket Nos. STN 50-456, STN 50-457, Sincerely, 00)cJk oel S. Wiebe, Senior Project Manager ant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation STN 50-454, STN 50-455, 50-461, 50-237, 50-249, 50-373, 50-374, 50-352, 50-353, 50-219, 50-277, 50-278, 50-254, 50-265, and 50-289

Enclosures:

1.

Amendment No. 173 to NPF-72

2.

Amendment No. 173 to NPF-77

3.

Amendment No. 180 to NPF-37

4.

Amendment No. 180 to NPF-66

5.

Amendment No. 200 to DPR-62

6.

Amendment No. 240 to DPR-19

7.

Amendment No. 233 to DPR-25

8.

Amendment No. 206 to NPF-11

9.

Amendment No. 193 to NPF-18

10. Amendment No. 210 to NPF-39
11. Amendment No. 171 to NPF-85 12 Amendment No. 281 to DPR-16
13. Amendment No. 289 to DPR-44
14. Amendment No. 292 to DPR-56
15. Amendment No. 251 to DPR-29
16. Amendment No. 246 to DPR-30
17. Amendment No. 280 to DPR-50
18. Safety Evaluation cc w/encls: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-Q001 EXELON GENERATION COMPANY LLC DOCKET NO. STN 50-456 BRAIDWOOD STATION UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 173 License No. NPF-72

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC (the licensee) dated July 6, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-72 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 173 and the Environmental Protection Plan contained in Appendix 8, both of which are attached hereto, are hereby incorporated into the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.

Attachment:

Changes to the Facility Operating License Date of Issuance: June 20, 2013 FOR THE NUCLEAR REGULATORY COMMISSION Jeremy S. Bowen, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 EXELON GENERATION COMPANY, LLC DOCKET NO. STN 50-457 BRAIDWOOD STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 173 License No. NPF-77

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that A.

The application for amendment by Exelon Generation Company, LLC (the licensee) dated July 6, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-77 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 173 and the Environmental Protection Plan contained in Appendix 8, both of which are attached to License No. NPF-72, dated July 2, 1987, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.

Attachment:

Changes to the Facility Operating License Date of Issuance: june 20, 2013 FOR THE NUCLEAR REGULATORY COMMISSION Jeremy S. Bowen, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

A IT ACHMENT TO LICENSE AMENDMENT NOS. 173 AND 173 FACILITY OPERATING LICENSE NOS. NPF-72 AND NPF-77 DOCKET NOS. STN 50-456 AND STN 50-457 Replace the following pages of the Facility Operating Licenses with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove License NPF-72 Page 3 License NPF-77 Page 3 TSs 5.3-1 License NPF-72 Page 3 License NPF-77 Page 3 TSs 5.3-1 (3)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

The license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of 3586.6 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein and other items identified in Attachment 1 to this license. The items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.

(2)

Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 173 and the Environmental Protection Plan contained in Appendix 8, both of which are attached hereto, are hereby incorporated into the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3)

Emergency Planning In the event that the NRC finds that the lack of progress in completion of the procedures in the Federal Emergency Management Agency's final rule, 44 CFR Part 350, is an indication that a major substantive problem exists in achieving or maintaining an adequate state of emergency preparedness, the provision of 10 CFR Section 50.54(s)(2) will apply.

Amendment No. 173 material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Exelon Generation Company, LLC pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Exelon Generation Company, LLC pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

The license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of 3586.6 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein and other items identified in Attachment 1 to this license. The items identified in to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.

(2)

Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 173 and the Environmental Protection Plan contained in Appendix B, both of which are attached to License No. NPF*72, dated July 2, 1987, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3)

Emergency Planning In the event that the NRC finds that the lack of progress in completion of the procedures in the Federal Emergency Management Agency's final rule, 44 CFR Part 350, is an indication that a major substantive problem exists in achieving or maintaining an adequate state of emergency preparedness, the provision of 10 CFR Section 50.54(s)(2) will apply.

Amendment No. 173

5.0 ADMINISTRATIVE CONTROLS 5.3 Facility Staff Qualifications Facility Staff Qualifications 5.3 5.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971, with the following exceptions:

1) either the senior health physics supervisor or lead health physicist, shall meet or exceed the qualifications for "Radiation Protection Manager" in Regulatory Guide 1.8, September 1975, and
2) the licensed operators who shall comply only with the requirements of 10 CFR 55.

BRAIDWOOD - UNITS 1 & 2 5.3-1 Amendment 173

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC DOCKET NO. STN 50-454 BYRON STATION UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 180 License No. NPF-37

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A The application for amendment by Exelon Generation Company, LLC (the licensee) dated July 6, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-37 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 180 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.

Attachment:

Changes to the Facility Operating License Date of Issuance: June 20, 2013 FOR THE NUCLEAR REGULATORY COMMISSION

(

Jeremy S. Bowen, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC DOCKET NO. STN 50-455 BYRON STATION UNIT NO.2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 180 License No. NPF~66

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC (the licensee) dated July 6, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-66 is hereby amended to read as follows:

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A (NUREG-1113), as revised through Amendment No. 180 and the Environmental Protection Plan contained in Appendix B, both of which were attached to License No. NPF-37, dated February 14, 1985, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.

Attachment:

Changes to the Facility Operating License Date of Issuance: June 20, 2013 FOR THE NUCLEAR REGULATORY COMMISSION Jeremy S. Bowen, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

ATTACHMENT TO LICENSE AMENDMENT NOS. 180 AND 180 FACILITY OPERATING LICENSE NOS. NPF-37 AND NPF-66 DOCKET NOS. STN 50-454 AND STN 50-455 Replace the following pages of the Facility Operating Licenses with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove License NPF-37 Page 3 License NPF-66 Page 3 TSs 5.3-1 License NPF-37 Page 3 License NPF-66 Page 3 TSs 5.3-1 (4)

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of 3586.6 megawatts thermal (100 percent power) in accordance with the conditions specified herein.

(2)

Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 180 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3)

Deleted.

(4)

Deleted.

(5)

Deleted.

(6)

The license shall implement and maintain in effect all provisions of the approved fire protection program as described in the licensee's Fire Protection Report, and as approved in the SER dated February 1987 through Supplement No. 8, subject to the following provision:

The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

Amendment No. 180 (3)

Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of 3586.6 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.

(2)

Technical Specifications The Technical Specifications contained in Appendix A (NUREG-1113), as revised through Amendment No. 180 and the Environmental Protection Plan contained in Appendix B, both of which were attached to License No. NPF-37, dated February 14, 1985, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3)

Deleted.

(4)

Deleted.

(5)

Deleted.

Amendment No.180

5.0 ADMINISTRATIVE CONTROLS 5.3 Facility Staff Qualifications Facility Staff Qualifications 5.3 5.3.1 Each member of the facility staff shall rreet or exceed the minimum qualifications of ANSI N18.1-1971, with the following exceptions:

1) either the senior health physics supervisor or lead health physicist, shall meet or exceed the qual ifi cations for "Radiation Protection Manager" in Regulatory Guide 1.8, September 1975, and
2) the licensed operators who shall comply only with the requirements of 10 CFR 55.

BYRON -UNITS 1 & 2 5.3-I Amendment 180

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY LLC DOCKET NO. 50-461 CLINTON POWER STATION UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 200 License No. NPF-62

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC (the licensee) dated July 6, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-62 is hereby amended to read as follows:

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 200, are hereby incorporated into this license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.

Attachment:

Changes to the Facility Operating License Date of Issuance: June 20, 2013 FOR THE NUCLEAR REGULA TORY COMMISSION Jeremy S. Bowen, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

ATIACHMENT TO LICENSE AMENDMENT NO. 200 FACILITY OPERATING LICENSE NO. NPF-62 DOCKET NO. 50-461 Replace the following pages of the Facility Operating License with the enclosed pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove License NPF-62 Page 3 TSs 5.0-5 License NPF-62 Page 3 TSs 5.0-5 (4)

Exelon Generation Company, pursuant to the Act and to 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. Mechanical disassembly of the GE14i isotope test assemblies containing Cobalt-50 is not considered separation: and (7)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, to intentionally produce, possess, receive, transfer, and use Cobalt-50.

C.

This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels not in excess of 3473 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 200 are hereby incorporated into this license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Amendment No. 200

5.0 ADr--:INISTRA~TVE CO~'l'kOL-'0 5.3 Unit Staff Q~alifications

..1nlt Staff Qual ifi:::atior.s 5.3
5. 3.1 Each membe.:::- of the "J:-Ji t staff shall meet or exceed the minimum q~alifications of ANSI/ANS 3.1-1978, with the fo:!owing exception:

the lice:Jsed ope~at_c:>rs who shall comply only with the requirements

f

~0 CF? 55.

c;;,INTON

5. 0-5 Arr.er.drr.ent

~o. 200

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY LLC DOCKET NO. 50-237 DRESDEN NUCLEAR POWER STATION UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 240 License No. DPR-19

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC (the licensee) dated July 6, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-1 9 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 240, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Jeremy S. Bowen, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Renewed Facility Operating License Date of Issuance: June 20, 2013

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 EXELON GENERATION COMPANY LLC DOCKET NO. 50-249 DRESDEN NUCLEAR POWER STATION UNIT 3 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 233 License No. DPR-25

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC (the licensee) dated July 6, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License No. DPR-25 is hereby amended to read as follows:

B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 233, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Jeremy S. Bowen, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Renewed Facility Operating License Date of Issuance:

June 20, 2013

A TI ACHMENT TO LICENSE AMENDMENT NOS. 240 AND 233 FACILITY OPERATING LICENSE NOS. DPR-19 AND DPR-25 DOCKET NOS. 50-237 AND 50-249 Replace the following pages of the Facility Operating Licenses with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove License DPR-19 Page 3 License DPR-25 Page 4 TSs 5.3-1 License DPR-19 Page 3 License DPR-25 Page4 TSs 5.3-1 (2)

Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear materials as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report, as supplemented and amended; (3)

Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct special nuclear materials as may be produced by the operation of the facility.

C.

This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2957 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 240, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

(3)

Operation in the coastdown mode is permitted to 40% power.

Renewed License No. DPR-19 Amendment No. 240

f.

Surveillance Requirement 4.9.A.1 0- Diesel Storage Tank Cleaning (Unit 3 and Unit 2/3 only)

Each of the above Surveillance Requirements shall be successfully demonstrated prior to entering into MODE 2 on the first plant startup following the fourteenth refueling outage (D3R14).

3.

This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Sections 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

A.

Maximum Power Level The licensee is authorized to operate the facility at steady state power levels not in excess of 2957 megawatts (thermal), except that the licensee shall not operate the facility at power levels in excess of five (5) megawatts (thermal), until satisfactory completion of modifications and final testing of the station output transformer, the auto-depressurization interlock, and the feedwater system, as described in the licensee's telegrams; dated February 26,1971, have been verified in writing by the Commission.

B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 233, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

C.

Reports The licensee shall make certain reports in accordance with the requirements of the Technical Specifications.

D.

Records The licensee shall keep facility operating records in accordance with the requirements of the Technical Specifications.

E.

Restrictions Operation in the coastdown mode is permitted to 40% power.

Renewed License No. DPR-25 Amendment No. 233

5.0 ADMINISTRAT!V[ CONTROLS 5.3 Unit Staff Qualifications Unit Staff Qualifications 5.3 5.3.1 Each member of t~c unit staff sha!! meet or exceed the minimum qualifications of ANSI Nl8.1-1971, with the following exceptions:

1} the radiat~on protection manager shall meet or exceed the qualifications for Radiation Protection Manager in Regulatory Guide 1.8, Septewber 1975, and 2) the licensed operators who shall comply only with the requirements of 10 CFR 55.

Dresden 2 and 3 Amendment No. 240/233

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY LLC DOCKET NO. 50-373 LASALLE COUNTY STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 206 License No. NPF-11

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A The application for amendment by Exelon Generation Company, LLC (the licensee) dated July 6, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission:

C.

There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-11 is hereby amended to read as follows:

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 206, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.

Attachment:

Changes to the Facility Operating License Date of Issuance:

June 20, 2013 FOR THE NUCLEAR REGULATORY COMMISSION Jeremy S. Bowen, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC DOCKET NO. 50-374 LASALLE COUNTY STATION UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 193 License No. NPF-18

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC (the licensee) dated July 6, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-18 is hereby amended to read as follows:

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 193, and the Environmental Protection Plan contained in Appendix 8, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.

Attachment:

Changes to the Facility Operating License Date of Issuance: June 20, 2013 FOR THE NUCLEAR REGULA TORY COMMISSION Jeremy S. Bowen, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

ATIACHMENT TO LICENSE AMENDMENT NOS. 206 AND 193 FACILITY OPERATING LICENSE NOS. NPF-11 AND NPF-18 DOCKET NOS. 50-373 AND 50-374 Replace the following pages of the Facility Operating Licenses with the enclosed pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove License NPF-11 Page 3 License NPF-18 Page 3 TSs 5.3-1 License NPF-11 Page 3 License NPF-18 Page 3 TSs 5.3-1 License No. NF-11 (4)

Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of LaSalle County Station, Units 1 and 2 and such Class B and Class C low-level radioactive waste as may be produced by the operation of Braidwood Station, Units 1 and 2, Byron Station, Units 1 and 2, and Clinton Power Station, Unit 1.

C.

This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

Am. 198 09/16/10 Am. 194 08/28/09 Am. 194 08/28/09 Am. 194 08/28/09 Am. 194 08/28/09 Am.194 08/28/09

( 1)

Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3546 megawatts thermal).

(2)

Technical Specifications and Environmental Protection Plan (3)

(4)

(5)

(6)

(7)

The Technical Specifications contained in Appendix A, as revised through Amendment No. 206, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

DELETED DELETED DELETED DELETED DELETED Amendment No. 206 License No. NPF-18 (5)

Pursuant to the Act and 10 CFR Parts 30, 40, and 70 possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of LaSalle County Station, Units 1 and 2, and such Class 8 and Class C low-level radioactive waste as may be produced by the operation of Braidwood Station, Units 1 and 2, Byron Station, Units 1 and 2, and Clinton Power Station, Unit 1.

C.

This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

Am. 181 08/28/09 Am. 181 08/28/09 Am. 181 08/28/09 Am. 181 08/28/09 Am. 181 08/28/09 Am. 181 08/28/09 Am. 181 08/28/09 (1)

Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3546 megawatts thermal). Items in shall be completed as specified. Attachment 1 is hereby incorporated into this license.

(2)

Technical Specifications and Environmental Protection Plan (3)

(4)

(5)

(6)

(7)

(8)

(9)

The Technical Specifications contained in Appendix A, as revised through Amendment No. 193, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

DELETED DELETED DELETED DELETED DELETED DELETED DELETE Amendment No. 193

5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications Unit Staff Qualifications

5. 3 5.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971, with the following exceptions:

ll the r*ac!iation protection manager shall meet the requirements of

radiation protection manager in Regulatory Guide 1.8, September 1975, and 2) the licensed operators who shall comply only with the requirements of 10 CFR 55.

Also, the ANSI N18.1-1971 qualification requirements for "radiation protection technician" may be met by either of the following alternatives:

a.

Individuals who have completed the radiation protection technician training program and have accrued one year of working experience in the specialty; or

b.

Individuals who have completed the radiation protection technician training program, but have not yet accrued one year of working experience in the specialty, who are supervised by on*shift radiation protection supervision who meet the requirements of ANSI NlB.l-1971, Section 4.3.2 or Section 4.4.4.

LaSalle I and 2 5.3-1 Amendment No. 206/193

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC DOCKET NO. 50-352 LIMERICK GENERATING STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 210 License No. NPF-39

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC (the licensee) dated July 6, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facilrty Operating License No. NPF-39 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 210, are hereby incorporated into this license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.

Attachment Changes to the Facility Operating License Date of issuance:

June 20, 2013 FOR THE NUCLEAR REGULATORY COMMISSION Jeremy S. Bowen, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

ATIACHMENT TO LICENSE AMENDMENT NO. 210 FACILITY OPERATING LICENSE NO. NPF-39 DOCKET NO. 50-352 Replace the following pages of the Facility Operating License with the enclosed pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove License NPF-39 Page 3 TSs 6-6 License NPF-39 Page 3 TSs 6-6 (3)

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source or special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility, and to receive and possess, but not separate, such source, byproduct, and special nuclear materials as contained in the fuel assemblies and fuel channels from the Shoreham Nuclear Power Station.

C.

This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.0. below) and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels not in excess of 3515 megawatts thermal (100% rated power) in accordance with the conditions specified herein and in Attachment 1 to this license. The items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.

(2)

Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 210, are hereby incorporated into this license.

Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Amendment No. 210

ADM IN! STRAJ l VLCillJJROLS 6.?.3 DflEH~. The informat;on from '.:his section is located in the UFSAR.

G.?.4 SHirT TECHNICAL ADVISOR 6.2.4.1 The Shift Technical Advisor shall provide advisory technical support to Shift Supervision in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to safe operation of the unit.

The Shift Technical Advisor shall meet the qualifications specified by the 1985 NRC Policy Statement on Engineering Expertise on Shift.

6.3 UNIT STAFF QUALIFICATIONS 6.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of 1\\NSl/ANS 3.1,1978 for comparable positions, except for the Manager-Radiation Protection who sha II meet or exccc>d the qual i fi cations of Regula tory Guide 1. 8, September 1975, and the licrnsed operators who shall comply only with the requirements of 10CFR55.

LIMERICK - UNIT 1 Amendment No. -+/--G, J-§., ~. -&4, %, 210 Corrected by better dated October 17, 1995

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 EXELON GENERATION COMPANY, LLC DOCKET NO. 50-353 LIMERICK GENERATING STATION UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 171 License No. NPF-85

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A The application for amendment by Exelon Generation Company, LLC (the licensee) dated July 6, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-85 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 171, are hereby incorporated into this license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.

Attachment:

Changes to the Facility Operating License Date of Issuance:

June 20, 2013 FOR THE NUCLEAR REGULATORY COMMISSION Jeremy S. Bowen, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

ATIACHMENT TO LICENSE AMENDMENT NO. 171 FACILITY OPERATING LICENSE NO. NPF-85 DOCKET NO. 50-353 Replace the following pages of the Facility Operating License with the enclosed pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove License NPF-85 Page 3 TSs 6-6 License NPF-85 Page 3 TSs 6-6 (4)

Pursuant to the Act and 10 CFR Parts 30,40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility, and to receive and possess, but not separate, such source, byproduct, and special nuclear materials as contained in the fuel assemblies and fuel channels from the Shoreham Nuclear Power Station.

C.

This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.0. below) and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels of 3515 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.

(2)

Technical Specifications The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 171, are hereby incorporated into this license.

Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3)

Fire Protection (Section 9.5, SSER-2, -4r Exelon Generation Company shall implement and maintain in effect all provisions of the approved Fire Protection Program as described in the Updated Final Safety Analysis Report for the facility, and as approved in the NRC Safety Evaluation Report dated August 1983 through Supplement 9, dated August 1989, and Safety Evaluation dated November 20, 1995, subject to the following provision:

The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

  • The parenthetical notation following the title of license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.

Amendment No. 171

ADtj_j__N l)TRA_~ I VL (ON TROiS_

~

DELETED.

The information from lhis section is located in the UFSI\\R.

6.?.4 SHiFT TECHNICAL ADVISOR 6.2.4.1 The Shift Technical Advisor shall provide advisory technical support to Shift Supervision in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to safe operation of the unit.

The Shift Technical Advisor shall meet the qualifications specified by the 1985 NRC Policy Statement on Engineering Expertise on Shift.

6.3 UNIT STAFF QUALIFICATIONS 6.3.1 Each member of unit staff shall meet or exceed the minimum qualifications of 1\\NSI/ANS 3.1-1978 for comparable positions, except for the Manager-Radiation Protection who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975, and the licensed operators who shal 1 comply only with the requirements of 10CFR55.

L!MERICK - UNIT Z Amendment No. J, JG, Jg, ~. 171 Corrected ~y letter dated October 17, 1995

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY LLC DOCKET NO. 50-219 OYSTER CREEK NUCLEAR GENERATING STATION AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 281 Renewed License No. DPR-16

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC (the licensee) dated July 6, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-16 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 281, are hereby incorporated in the license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Jeremy S. Bowen, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Renewed Facility Operating License Date of Issuance: June 20, 2013

ATTACHMENT TO LICENSE AMENDMENT NO. 281 RENEWED FACILITY OPERATING LICENSE NO. DPR-16 DOCKET NO. 50-219 Replace the following pages of the Renewed Facility Operating License with the enclosed pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Renewed License DPR-16 Page 3 TSs 6.2a Renewed License DPR-16 Page 3 TSs 6.2a (3)

Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source, or special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess and use in amounts as required any byproduct source, or special nuclear materials without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate such byproduct, source, or special nuclear materials as may be produced by the operation of the facility.

C.

This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level Exelon Generation Company is authorized to operate the facility at steady-state power levels not in excess of 1930 megawatts (thermal) (100 percent rated power) in accordance with the conditions specified herein.

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.281, are hereby incorporated in the license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.

(3)

Fire Protection Exelon Generation Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Report dated March 3, 1978, and supplements thereto, subject to the following provision:

The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

Renewed License No. DPR-16 Amendment No. 281

j.

The Senior Manager-Operations or an Operations Manager, and the Shift Manager require Senior Reactor Operators licenses. The licensed Nuclear Plant Operators require a Reactor Operators license.

6.2.2.3 Individuals who train the operating staff and those who carry out the health physics and quality assurance function shall have sufficient organizational freedom to be independent of operational pressures, however, they may report to the appropriate manager on site.

6.3 Facility Staff Qualifications 6.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANSIIANS 3.1 of 1978 for comparable positions unless otherwise noted in the Technical Specifications, with the following exceptions: 1) the licensed operators who shall comply only with the requirements of 10 CFR 55, and 2) technicians and maintenance personnel who do not meet ANSl/ANS 3.1 of 1978, Section 4.5, are permitted to perform work for which qualification has been demonstrated.

6.3.2 The management position responsible for radiological controls shall meet or exceed the qualifications of Regulatory Guide 1.8 (Rev. 1-R, 9/75). Each other member of the radiation protection organization for which there is a comparable position described in ANSI N18.1-1971 shall meet or exceed the minimum qualifications specified therein, or in the case of radiation protection technicians, they shall have at least one year's continuous experience in applied radiation protection work in a nuclear facility dealing with radiological problems similar to those encountered in nuclear power stations and shall have been certified by the management position responsible for radiological controls as qualified to perform assigned functions. This certification must be based on an NRC approved, documented program consisting of classroom training with appropriate examinations and documented positive findings by responsible supervision that the individual has demonstrated his ability to perform each specified procedure and assigned function with an understanding of its basis and purpose.

6.3.3 The Shift Technical Advisors shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, response and analysis of the plant for transients and accidents.

OYSTER CREEK 6-2a Amendment No.. 1J4,203,220,226,232, 267,274, 281

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY LLC PSEG NUCLEAR LLC DOCKET NO. 50-277 PEACH BOITOM ATOMIC POWER STATION UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 289 Renewed License No. DPR-44

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company and PS, LLC and PSEG Nuclear LLC, (the licensees) dated July 6, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR*44 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 289, are hereby incorporated in the license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Jeremy S. Bowen, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Renewed Facility Operating License Date of Issuance: June 20, 2013

ATIACHMENT TO LICENSE AMENDMENT NO. 289 RENEWED FACILITY OPERATING LICENSE NO. DPR-44 DOCKET NO. 50-277 Replace the following pages of the Renewed Facility Operating License with the enclosed pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove License DPR-44 Page 3 TSs 5.0-5 License DPR-44 Page 3 TSs 5.0-5

Page 3 (5)

Exe!on Generation Company, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not to separate, such byproduct and special nuclear materia! as may be produced by operation of the facility, and such Class B and Class C !ow-level radioactive waste as may be produced by the operation of Limerick Generating Station, Units 1 and 2.

C.

This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter!: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 of Part 50, and Section 70.32 of Part 70; all applicable provisions of the Act and the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:

(1)

Maximum Power Level Exe!on Generation Company is authorized to operate the Peach Bottom Atomic Power Station, Unit 2, at steady state reactor core power levels not in excess of 3514 megawatts thermaL (2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 289, are hereby incorporated in the license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.

(3)

Physical Protection Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, submitted by tetter dated May 17, 2006, is entitled: "Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 3." The set contains Safeguards Information protected under 10 CFR 73.21.

Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The Exelon Generation Company CSP was approved by License Amendment No 283 (4)

Fire Protection The Exelon Generation Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility, and as approved in the NRC Safety Evaluation Report {SER) dated May 23, 1979, and Supplements dated August 14, September 15, October 10 and November 24, 1980, and in the NRC SERs dated September 16, 1993, and August 24, 1994, subject to the following provision:

1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.

Renewed License No. DPR-44 Revised by letter dated October 28, 2004 Revised by letter dated May 29, 2007 Amendment No. 289

5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications Unit Staff Qualifications 5.3 5.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANSI NlB.l-1971 for comparable positions described in the UFSAR, with the following exceptions:

ll the Manager-Radiation Protection shall meet or exceed the qualifications of Regulatory Guide l.B, September 1975, and 2) the licensed operators who shall comply only with the requirements of 10 CFR 55.

~.3.!

For the purpose of 10 CFR 55.4, a licensed Senior Reactor Operator (SROl and a l1censed Reactor Operator (ROJ are those individuals who, in addi!ion to ~eeting the requirements of TS 5.3.1, perform the functions descr1oed in 10 CFR 50.54(m).

PBAPS UNIT ?

5.0-5 Amendment No. 289

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 EXELON GENERATION COMPANY, LLC PSEG NUCLEAR LLC DOCKET NO. 50-276 PEACH BOTIOM ATOMIC POWER STATION UNIT 3 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 292 Renewed License No. DPR-56

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A The application for amendment by Exelon Generation Company, LLC and PSEG Nuclear LLC (the licensees) dated July 6, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C. (2) of Facility Operating License No. DPR-56 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 292, are hereby incorporated in the license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Jeremy S. Bowen, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Attachment Changes to the Renewed Facility Operating License Date of Issuance: June 20, 2013

A IT ACHMENT TO LICENSE AMENDMENT NO. 292 RENEWED FACILITY OPERATING LICENSE NO. DPR-56 DOCKET NO. 50-278 Replace the following pages of the Facility Operating License with the enclosed pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove License DPR-56 Page 3 TSs 5.0-5 License DPR-56 Page 3 TSs 5.0-5

(5)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not to separate, such byproduct and special nuclear material as may be produced by operation of the facility, and such Class B and Class C low-level radioactive waste as may be produced by the operation of Limerick Generating Station, Units 1 and 2.

C.

This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter 1: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 of Part 50, and Section 70.32 of Part 70; all applicable provisions of the Act and the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:

(1)

Maximum Power Level Exelon Generation Company is authorized to operate the Peach Bottom Atomic Power Station, Unit No. 3, at steady state reactor core power levels not in excess of 3514 megawatts thermal.

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 292, are hereby incorporated in the license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.

(3)

Physical Protection Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans2, submitted by letter dated May 17, 2006, is entitled: "Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 3." The set contains Safeguards Information protected under 10 CFR 73.21.

Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP),

including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Exelon Generation Company CSP was approved by License Amendment No. 283.

1 Licensed power level was revised by Amendment No. 250, dated November 22, 2002, and will be implemented following the 141h refueling outage currently scheduled for Fall2003.

2 The training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan Renewed License No. DPR-56 Revised by letter dated October 28, 2004 Revised by letter dated November 5, 2004 Revised by letter dated May 29, 2007 Amendment No. 292 Page 3

5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications Unit Staff Qualifications

5. 3 5.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANSI NlB.l-1971 for comparable positions described in the UFSAR, with the following exceptions:

ll the Manager-Radiation Protection shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975, and 2J the licensed operators who shall comply only with the requirements of 10 CFR 55.

S.3.2 For the purpose of 10 CFR 55.4, a licensed Senior Reactor Operator

!SROJ and a licensed Reactor Operator !ROJ are those individuals who, in addition to meeting the requirements of TS 5.3.1, perform the functions described in 10 CFR 50.54(m).

PI3/\\P~ UN IT 3

5. 0. s Amendment No. 292

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555..0001 EXELON GENERATION COMPANY LLC MIDAMERICAN ENERGY COMPANY DOCKET NO. 50-254 QUAD CITIES NUCLEAR POWER STATION UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 251 Renewed License No. DPR-29

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC (the licensee) dated July 6, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License No. OPR-29 is hereby amended to read as follows:

B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 251, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.

FOR THE NUCLEAR REGULA TORY COMMISSION Jeremy S. Bowen, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Renewed Facility Operating License Date of Issuance:

June 20, 2013

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY LLC AND MIDAMERICAN ENERGY COMPANY DOCKET NO.S0-265 QUAD CITIES NUCLEAR POWER STATION UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 246 Renewed License No. DPR-30

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC (the licensee) dated July 6, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities wilt be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License No. DPR-30 is hereby amended to read as follows:

B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 246, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Jeremy S. Bowen, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Renewed Facility Operating License Date of Issuance:

June 20, 2013

ATIACHMENT TO LICENSE AMENDMENT NOS. 251 AND 246 RENEWED FACILITY OPERATING LICENSES NOS. DPR-29 AND DPR-30 DOCKET NOS. 50-254 AND 50-265 Replace the following pages of the Facility Operating Licenses with the attached pages. The revised pages are identified by number and contain marginal lines indicating the areas of change.

Remove License DPR-29 Page4 License DPR-30 Page 4 TSs 5.3-1 License DPR-29 Page4 License DPR-30 Page4 TSs 5.3-1 B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 251, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

C.

The licensee shall maintain the commitments made in response to the March 14, 1983, NUREG-0737 Order, subject to the following provision:

The licensee may make changes to commitments made in response to the March 14, 1983, NUREG-0737 Order without prior approval of the Commission as long as the change would be permitted without NRC approval, pursuant to the requirements of 10 CFR 50.59. Consistent with this regulation, if the change results in an Unreviewed Safety Question, a license amendment shall be submitted to the NRC staff for review and approval prior to implementation of the change.

D.

Equalizer Valve Restriction Three of the four valves in the equalizer piping between the recirculation loops shall be closed at all times during reactor operation with one bypass valve open to allow for thermal expansion of water.

E.

The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined sets of plans 1, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Quad Cities Nuclear Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 2," submitted by letter dated May 17, 2006.

Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The Exelon Generation Company CSP was approved by License Amendment No. 249.

F.

The licensee shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Reports dated July 27, 1979, with supplements dated November 5, 1980, and 1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.

Renewed License No. OPR-29 Amendment No. 251 B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 246, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

C.

The license shall maintain the commitments made in response to the March 14, 1983, NUREG-0737 Order, subject to the following provision:

The licensee may make changes to commitments made in response to the March 14, 1983, NUREG-0737 Order without prior approval of the Commission as long as the change would be permitted without NRC approval, pursuant to the requirements of 10 CFR 50.59. Consistent with this regulation, if the change results in an Unreviewed Safety Question, a license amendment shall be submitted to the NRC staff for review and approval prior to implementation of the change.

D.

Equalizer Valve Restriction Three of the four valves in the equalizer piping between the recirculation loops shall be closed at all times during reactor operation with one bypass valve open to allow for thermal expansion of water.

E.

The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans 1, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Quad Cities Nuclear Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 2," submitted by letter dated May 17,2006.

Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP),

including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Exelon Generation Company CSP was approved by License Amendment No. 244.

F.

The licensee shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Reports dated July 27, 1979 with supplements dated 1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.

Renewed License No. DPR-30 Amendment No. 246

5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications Unit Staff Qualifications 5.3 5.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971, with the following exceptions:

ll the radiation protection manager or lead radiation protection technician who shall meet or exceed the qualifications for "Radiation Protection Manager" in Regulator-y Guide 1.8, September 1975, and 2) the I icensed operators who shall comply only with the requirements of 10 CFR 55.

Quad Cities 1 and 2 Amendment No.2Sl/246

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 EXELON GENERATION COMPANY, LLC DOCKET NO. 50-289 THREE MILE ISLAND NUCLEAR STATION UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 280 Renewed License No. DPR-50

1.

The U.S. Nuclear Regulatory Commission (the Commission or NRC) has found that:

A The application for amendment by Exelon Generation Company, LLC (the licensee) dated July 6, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.c.(2) of Facility Operating License No. DPR-50 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 280, are hereby incorporated in the license. The Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Jeremy S. Bowen, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Renewed Facility Operating License Date of Issuance: June 20, 2013

ATIACHMENT TO LICENSE AMENDMENT NO. 280 RENEWED FACILITY OPERATING LICENSE NO. DPR-50 DOCKET NO. 50-289 Replace the following pages of the Renewed Facility Operating License with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove License DPR-50 Page 4 TSs 6-3 License DPR-50 Page4 TSs 6-3 (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 280, are hereby incorporated in the license. The Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.

(3) Physical Protection Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans 1, submitted by letter dated May 17, 2006, is entitled: "Three Mile Island Nuclear Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 3." The set contains Safeguards Information protected under 10 CFR 73.21.

Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Exelon Generation Company CSP was approved by License Amendment No. 275.

(4) Fire Protection Exelon Generation Company shall implement and maintain in effect all provisions of the Fire Protection Program as described in the Updated FSAR for TMI-1.

Changes may be made to the Fire Protection Program without prior approval by the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire. Temporary changes to specific fire protection features which may be necessary to accomplish maintenance or modifications are acceptable provided that interim compensate measures are implemented.

(5) The licensee shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:

a.

Identification of a sampling schedule for the critical parameters and control points for these parameters;

b.

Identification of the procedures used to measure the values of the critical parameters;

c.

Identification of process sampling points;

d. Procedure for the recording and management of data; 1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.

Amendment No. 280 Renewed Operating License No. DPR-50

6.3 UNIT STAFF QUALIFICATIONS 6.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANS1/ANS 3.1 of 1978 for comparable positions unless otherwise noted in the Technical Specifications, with the following exceptions: 1) the licensed operators who shall comply only with the requirements of 10 CFR 55, and 2) individuals who do not meet ANSI/ANS 3.1 of 1978, Section 4.5, are not considered technicians or maintenance personnel for purposes of determining qualifications but are permitted to periorm work for which qualification has been demonstrated.

6.3.2 The management position responsible for radiological controls shall meet or exceed the qualifications of Regulatory Guide 1.8 of 1977. Each radiological controls technician/supervisor shall meet or exceed the qualifications of AN SI-N 18.1-1971, paragraph 4.5.2/4.3.2, or be formally qualified through an NRC approved TMI-1 Radiation Controls training program. All radiological controls technicians will be qualified through training and examination in each area or specific task related to their radiological controls functions prior to their performance of those tasks.

6.3.3 The Shift Technical Advisors shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in unit design, response and analysis of transients and accidents.

6.4 TRAINING 6.4.1 A training program for the Fire Brigade shall be maintained and shall meet or exceed the requirements of Section 600 of the NFPA Code.

6.5 DELETED 6-3

{Pages 6-4 through 6-8 deleted)

Amendment Nos. 11,:l2,J2,aa,77,64,92,99,126,129,1 J1,1 J2,1 J9,141,149,1 89,171,179,198,196, 207,212,216,239,241,252, 265, 269,280

\\.~s>.ll REGv1.

UNITED STATES

--~**

,o,.

~

0 0

~

,eo

~'7

~0 NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 173 TO FACILITY OPERATING LICENSE NO. NPF-72, AMENDMENT NO. 173 TO FACILITY OPERATING LICENSE NO. NPF-77, AMENDMENT NO. 180 TO FACILITY OPERATING LICENSE NO. NPF-37, AMENDMENT NO. 180 TO FACILITY OPERATING LICENSE NO. NPF-66, AMENDMENT NO. 200 TO FACILITY OPERATING LICENSE NO. NPF-62, AMENDMENT NO. 240 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-19, AMENDMENT NO. 233 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-25, AMENDMENT NO. 206 TO FACILITY OPERATING LICENSE NO. NPF-11.

AMENDMENT NO. 193 TO FACILITY OPERATING LICENSE NO. NPF-18, AMENDMENT NO. 210 TO FACILITY OPERATING LICENSE NO. NPF-39, AMENDMENT NO. 171 TO FACILITY OPERATING LICENSE NO. NPF-85, AMENDMENT NO. 281 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-16, AMENDMENT NO. 289 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-44, AMENDMENT NO. 292 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-56, AMENDMENT NO. 251 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-29, AMENDMENT NO. 246 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-30, AMENDMENT NO. 280 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-50 EXELON GENERATION COMPANY LLC BRAIDWOOD STATION UNITS 1 AND 2 BYRON STATION UNIT NOS. 1 AND 2 CLINTON POWER STATION UNIT NO. 1 Enclosure

DRESDEN NUCLEAR POWER STATION UNITS 2 AND 3 LASALLE COUNTY STATION UNITS 1 AND 2 LIMERICK GENERATING STATION UNITS 1 AND 2 OYSTER CREEK NUCLEAR GENERATING STATION PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 QUAD CITIES NUCLEAR POWER STATION UNITS 1 AND 2 THREE MILE ISLAND STATION UNIT 1 DOCKET NOS. STN 50-456 STN 50-457 STN 50-454 STN 50-455 50-461,50-237,50-249,50-373,50-374,50-352,50-353,50-219, 50-277 50-278 50-254 50-265 AND 50-289

1.0 INTRODUCTION

By letter dated July 6, 2012 (Agencywide Document Access and Management System (ADAMS) Accession No. ML12202A034), Exelon Generation Company (EGG), requested changes to the technical specifications (TSs) Section 5.3.1/6.3.1, for the above Exelon Generating Stations. The current requirement specifies that operator license applicant's education and experience eligibility requirements and changes thereto shall be reviewed and approved by the U.S. Nuclear Regulatory Commission (NRC or Commission) and described in an applicable station training procedure. The proposed amendment would revise TS 5.3.1/6.3.1, "Unit (Facility) Staff Qualifications," to remove operator license applicant education and experience requirements and add the requirement that licensed operators shall comply with Title 10 of the Code of Federal Regulations Part 55 (1 0 CFR 55).

2.0 REGULATORY EVALUATION

In March 1985, the NRC issued the Commission Policy Statement on training and qualification of nuclear power plant personnel which endorsed the training accreditation process and the National Academy for Nuclear Training (NANT) guidelines. In Generic Letter 87-07, "Information Transmittal of Final Rulemaking for Revisions to Operator Licensing-10 CFR 55 and Conforming Amendments," dated March 19, 1987, and in NUREG-1262, "Answers to Questions at Public Meetings Regarding Implementation of Title 10, Code of Federal Regulations, Part 55 on Operators' Licenses," published November 1987, the NRC indicated it would accept a facility's licensed operator training program if the facility certified in writing that the program was accredited and based on a systems approach to training (SAT). This certification would supersede the requirements of ANSI N18.1-1971, "Selection and Training of Nuclear Power Plant Personnel," and ANSI/ANS-3.1-1978, "Selection and Training of Nuclear Power Plant Personnel." Facility licensees were advised to submit a request to the NRC for an administrative change to their licensing documents to conform to their accredited program status.

In January 1992, the NRC published its proposed rule 10 CFR 50.120, "Training and Qualification of Nuclear Power Plant Personnel." The proposed rule stated that, if adopted, the rule would supersede the Commission's Policy Statement on training and qualification of nuclear power plant personnel and would not result in any change to accredited programs. The Commission concluded that accredited programs, implemented consistent with industry objectives and criteria, would be in compliance with this regulation.

In April1993, the NRC published its final rule on training and qualification of nuclear power plant personnel. The rule requires nuclear power plant licensees to establish, implement, and maintain SAT-based training programs for nine non-licensed positions. Accreditation of these nine training programs is an acceptable means of meeting the requirements of 10 CFR 50.120.

In January 2001, the NRC published NRC Regulatory Issue Summary (RIS) 2001-01, "Eligibility of Operator License Applicants," to familiarize licensees with the NRC's current guidelines for the qualification and training of reactor operator and senior operator license applicants. RIS 2001-01 acknowledged that 10 CFR 55.31(a)(4) allows the NRC to accept an application for an operator's license if the facility licensee certifies that the applicant has successfully completed a Commission-approved training program that is based on a SAT. In addition, RIS 2001-01 stated that: (1) a training program would be considered approved by the NRC when it receives or renews accreditation from the National Nuclear Accrediting Board (NNAB); (2) accreditation of operator training programs suggests that facilities are implementing the education and experience guidelines endorsed by the NNAB; (3) NANT guidelines for education and experience outline acceptable methods for implementing the Commission's regulations; and (4) the staff encourages all facility licensees to review their requirements and commitments related to licensed operator and senior operator education and experience, and to update their documentation (e.g., final safety analysis report, TSs, and training program descriptions) to enhance consistency and minimize confusion.

3.0 TECHNICAL EVALUATION

The licensee has proposed to revise TS 5.3.1/6.3.1, "Unit (Facility) Staff Qualifications," to remove operator license applicant education and experience requirements and add the requirement that licensed operators shall comply with 10 CFR 55. The licensee states in its letter dated July 6, 2012, that EGG's education and experience requirements for operator license applicants are administratively controlled through each station's updated final safety analysis report. The letter also states that the licensed operator training programs are based on an SAT and are accredited by the NANT. Since 10 CFR 55.31(a)(4) allows the NRC to accept an application for an operator's license if the facility licensee certifies that the applicant has successfully completed a Commission-approved training program, that is based on an SAT in lieu of providing details of the applicant's education and experience, this change meets the 10 CFR 55.31 (a)(4) requirements to apply for an operator's license and ensures the facility licensee maintains administrative controls that assure the operation of the facility in a safe manner by properly qualified licensed operators.

The staff reviewed the licensees request for compliance with the requirement in 10 CFR 50.120 and 10 CFR Part 55. As explained in 2001*01. "Eligibility of Operator License Applicants," 10 CFR 55.31(a)(4) provides that the NRC may accept an application for an operator's license if the facility licensee certifies that the applicant has successfully completed a Commission-approved training program that is based on an SAT, in lieu of providing details of the applicant's education and experience. The licensee's revision is consistent with 10 CFR 50.120 and Part 55 and does not adversely affect nuclear safety or plant operations. Therefore, the staff concludes that the proposed changes toTS 5.3.1/6.3.1 are acceptable.

4.0 STATE CONSULTATION

In accordance with the Commission's regulations, the Illinois, Pennsylvania, and New Jersey State officials were notified of the proposed issuance of the amendment. The State officials had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

The amendments change the requirements with respect toTS administrative controls associated with eligibility of licensed operators. As such, the amendments relate to recordkeeping, reporting, or administrative procedures or requirements. Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(1 O)(ii). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: S. Currie Date of issuance:

June 20, 2013