ML17319B655: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:PMP EPP INDEX 1 j INDIANA 5 i4lICHIGAN POWER COMPANY DONALD C.COOK NUCLm<'R PLANT P AN MANA PR indev Identification Number Ti tie Revision No.And Oat C oRFi2n ts PNP 2080 EPP.001 Emergency Plan Activation and Condition Classification Revision 3 10-12-82 EPP.002 Unusual Event EPP.OO Alert EPP.OO Site Emergency EPP:00 General Emergency EPP.006 Initial Dose Assessment (Gaseous)CANCELLED 10-29-81 CANCELLED 10-29-81 CANCELLED 10-29-81 CANCELLED 10-29-81 Revilion 3 8-27-82 EPP.007 Initial Release Assessments (Liquid)Revision 0 4-1-81 TP-1,2-23-82 Exp NA EPP.OO EPP.009 Initiating Manning of Emer-gency Response Facilities 8 Calling Off-Duty Personnel Fire Emergency Guidelines Revision 3 10-12-82 Revision 1 6-15-82 EPP.010 Toxic Gas Release Guidelines Revision 1 6-2-82 EPP.011 Natural Emergency Guidelines Revision 0 4-1-81 QEPP.01 Initial Off-Site Notificatioq Pevision 2'0-19-82 82iiii0557 82ii0i PDR ADQCK 050003i5 F PDR Rav na-.a lOQ-Q.
{{#Wiki_filter:PMP EPP   INDEX 1
j INDIANA 5 i4lICHIGAN POWER COMPANY DONALD C. COOK NUCLm<'R PLANT P AN   MANA     PR indev Identification                 Ti tie Revision No.         C oRFi2n ts Number                                            And Oat PNP 2080 EPP.001 Emergency Plan Activation           Revision  3 and Condition Classification       10-12-82 EPP.002 Unusual Event                     CANCELLED 10-29-81 EPP.OO  Alert                              CANCELLED 10-29-81 EPP.OO  Site  Emergency                  CANCELLED 10-29-81 EPP:00  General  Emergency                CANCELLED 10-29-81 EPP.006 Initial  Dose Assessment          Revilion   3 (Gaseous)                          8-27-82 EPP.007 Initial   Release Assessments     Revision 0   TP-1,2-23-82 Exp     NA (Liquid)                          4-1-81 EPP.OO   Initiating Manning of Emer-       Revision  3 gency Response Facilities         10-12-82 8 Calling Off-Duty Personnel EPP.009 Fire Emergency Guidelines         Revision 1 6-15-82 EPP.010 Toxic Gas Release   Guidelines   Revision 1 6-2-82 EPP.011 Natural Emergency     Guidelines   Revision 0 4-1-81 EPP.01   Initial Off-Site Notificatioq     Pevision   2
                                                              '0-19-82 Q
82iiii0557 82ii0i                                                                         lOQ-Q.
PDR ADQCK 050003i5                                                         Rav   na-.a F                PDR


1~INDIANA 8I MICHIGAN ELECTRIC COMPANY DONALD C COOK NUCLEAR PLANT PROCEDURE COVER SHEET Pzooed,e No PMP 2080 EPP.012 Revision No.2 INITIAL OFF-S ITE NOTIFICATIONS SCOPE OF REVISION Rev.1: Incorporated Temporary Sheets.Revised Exhibit A and B.Rev.2: Incorporated temporary sheet.Established a goal of reporting Unusual Events within fifteen (15)minutes.9'IGNATURES ORIGINAL Rev.S G.PREPARED BY QUALITY ASSURANCE REVIPiV INTERFACING DEPARTMENT HEAD CONCURRENCE DEPARTMENT HEAD APPROVAL PLANT NUCLEAR SAFEIY COMhKTEE PLANT MANAGER APPROVAL DATE OF ISSUE N.A.N.A.3-31-81'f q1 8-/o--/'I-Q,  
1                                   ~
INDIANA 8ICOMPANY  MICHIGAN ELECTRIC DONALD C COOK NUCLEAR PLANT PROCEDURE COVER SHEET Pzooed,e No PMP 2080 EPP.012 Revision No. 2 INITIAL OFF-S ITE NOTIFICATIONS SCOPE OF REVISION Rev. 1: Incorporated Temporary Sheets. Revised Exhibit   A and B.
Rev. 2: Incorporated temporary sheet. Established   a goal of reporting   Unusual Events within fifteen (15) minutes.
9
  'IGNATURES ORIGINAL                                     Rev. S PREPARED BY QUALITY ASSURANCE REVIPiV INTERFACING DEPARTMENT HEAD CONCURRENCE               N.A.
DEPARTMENT HEAD APPROVAL                       N.A.
PLANT NUCLEAR SAFEIY COMhKTEE PLANT MANAGER APPROVAL DATE OF ISSUE                 3-31-81     'f q1   8-/o--/'I- Q, G  .


~~p PMP 2080 EPP.012 LIST OF EFFECTIVE PAGES Pa e Number Page 1 of 3 Page 2 of 3 EXHIBIT A Page 3 of 3 EXHIBIT B Revision Number And Date Revision 2, 10-19-82 Revision 2, 10-19-82 Revision 2, 10-19-82 Page 1 of 1 Revision 2~10"19-82 0 PMP 2080 EPP.012 INDIANA 6 MICHIGAN ELECTRIC COMPANY DONALD C.COOK NUCLEAR PLANT 1.0 OB JECTIVE This procedure provides guidance to the Plant Manager or Shift Super-visor regarding initial informat'ion supplied to off-site support groups.This information is to be supplied upon declaration of an Unusual Event, Alert, Site Emergency, or General Emergency condition.
~ ~ p PMP 2080 EPP.012 LIST OF EFFECTIVE PAGES Pa e Number                           Revision Number And Date Page 1 of 3                           Revision 2, 10-19-82 Page 2 of 3 EXHIBIT A                  Revision 2, 10-19-82 Page 3 of 3 EXHIBIT B                  Revision 2, 10-19-82 Page 1 of   1 Revision   2~ 10"19-82


===2.0 RESPONS'IBILITIES===
0 PMP  2080 EPP.012 INDIANA 6 MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT
2.1 The Plant Manager is responsible for the accomplishment of initial off-site notifications to individuals or agencies specified in this procedure.
: 1. 0 OBJECTIVE This procedure provides guidance to the Plant Manager or Shift Super-visor regarding initial informat'ion supplied to off-site support groups.
2.2 The Shift Supervisor is responsible for the initial notifications to individuals or agencies specified in this procedure if: a.In the Shift Supervisor's judgement, the Plant Manager will be unable to complete the notifications in a time-ly manner, or b.The Shift.Supervisor is delegated this responsibility by the Plant Manager.3.0 LIMITATIONS
This information is to be supplied upon declaration of an Unusual Event, Alert, Site  Emergency,    or General Emergency condition.
2.0 RESPONS'IBILITIES 2.1   The Plant Manager is responsible for the accomplishment of initial off-site notifications to individuals or     agencies specified in this procedure.
2.2   The Shift Supervisor is responsible for the initial notifications to individuals or agencies specified in this procedure if:
: a. In the Shift Supervisor's judgement, the Plant Manager will be   unable to complete the notifications in a time-ly manner, or
: b. The Shift. Supervisor is delegated this responsibility by the Plant Manager.
3.0 LIMITATIONS 3.1  Initial notification    to the Berrien County Sheriff's Department and the Michigan    State Police of an Unusual Event is expected to be completed    within fifteen {15) minutes of event classification.
J 3.2  Initial notifications    to the Michigan State Police and the Berrien County  Sheriffs Department shall be immediate upon classification of an Alert, Site Emergency or General Emergency Condition and no-tification of the NRC. and appropriate AEP personnel.
4.0  INSTRUCTIONS 4.1  Upon  declaration of an Unusual Event, Alert, Site Emergency or General Emergency the Plant Manager or SS shall provide all immediately available information from EXHIBIT A, 'ACCIDENT INFORMATION REPORTING DATA SHEET, to those listed on EXHIBIT B, INITIAL OFF-SITE NOTIFICATION LIST.
NOTE:      EXHIBIT A  AND EXHIBIT B SHOULD BE COMPLETED AND ROUTED TO THE PLANT MANAGER'S OFFICE UPON EVENT CLOSE-OUT.
NOTE:      PHONE NUMBERS FOR ALL PERSONNEL ARE CONTAINED    IN APPENDIX A OF THESE EMERGENCY PLAN PROCEDURES.
NOTE:      IF PUBLIC AFFAIRS AND NRC AGREE A NEWS RELEASE IS TO BE MADE, THE NUCLEAR CENTER WILL PROVIDE THE RELEASE TO THE MICHIGAN STATE POLICE, THE BERRIEN COUNTY SHERIFF'S DEPARTMENT AND THE NEWS  MEDIA.
Page 1 of  3 Revision 2,


===3.1 Initial===
o PMP 2080 EPP.012 EXHIBIT A ACCIDENT INFORMATION REPORTING DATA SHEET D.C. Cook  Unit            Date                  Time  Classified Classification Description of Event Release  Involved:      Yes          No.          Estimated Duration (Time)
notification to the Berrien County Sheriff's Department and the Michigan State Police of an Unusual Event is expected to be completed within fifteen{15)minutes of event classification.
Release Rate                Ci/sec Noble  Gas                Height:  Ground Level Wind Speed  (mph)                          Wind  Direction (From) bT                C    Pascal Category                  Precipitation Site Boundary  Dose Rate                    Projected                  Measured Injured Personnel                        Radioactively Contaminated Recommended  Off-Site   Emergency   Protective Actions Off-Site Support  Requested    and Type Prognosis For Termination Or Worsening Prepared By                                    SS/OSEC Page 2  of 3 Revision 2,
J 3.2 Initial notifications to the Michigan State Police and the Berrien County Sheriffs Department shall be immediate upon classification of an Alert, Site Emergency or General Emergency Condition and no-tification of the NRC.and appropriate AEP personnel.


==4.0 INSTRUCTIONS==
ly E
4.1 Upon declaration of an Unusual Event, Alert, Site Emergency or General Emergency the Plant Manager or SS shall provide all immediately available information from EXHIBIT A,'ACCIDENT INFORMATION REPORTING DATA SHEET, to those listed on EXHIBIT B, INITIAL OFF-SITE NOTIFICATION LIST.NOTE: NOTE: NOTE: EXHIBIT A AND EXHIBIT B SHOULD BE COMPLETED AND ROUTED TO THE PLANT MANAGER'S OFFICE UPON EVENT CLOSE-OUT.
 
PHONE NUMBERS FOR ALL PERSONNEL ARE CONTAINED IN APPENDIX A OF THESE EMERGENCY PLAN PROCEDURES.
PMP 2080 EPP.012 EXHIBIT B INITIAL OFF-SITE NOTIFICATION LIST Event Classification:   Unusual Event Alert Site Emergency General Emergency Event Closed-Out Event  Notification        Or Upgraded Initials/Time          Initials/Time Berrien County Sheriff's Department REQUEST CALL BACK VERIFICATION Michigan State Police, Benton Harbor REQUEST CALL BACK VERIFICATION Assistant V.P. and Chief Nuclear Engineer Alternate: Assistant Chief Nuclear Engineer Alternate: Executive V,P. - Construction and New York Engineering Executive Assistant to the IRMECo President Alternate: ISMECo President.
IF PUBLIC AFFAIRS AND NRC AGREE A NEWS RELEASE IS TO BE MADE, THE NUCLEAR CENTER WILL PROVIDE THE RELEASE TO THE MICHIGAN STATE POLICE, THE BERRIEN COUNTY SHERIFF'S DEPARTMENT AND THE NEWS MEDIA.Page 1 of 3 Revision 2, o
Alternate: IGHECo V.P.
PMP 2080 EPP.012 EXHIBIT A ACCIDENT INFORMATION REPORTING DATA SHEET D.C.Cook Unit Date Time Classified Classification Description of Event Release Involved: Yes No.Estimated Duration (Time)Release Rate Ci/sec Noble Wind Speed (mph)bT C Pascal Category Site Boundary Dose Rate Projected Gas Height: Ground Level Wind Direction (From)Precipitation Measured Injured Personnel Radioactively Contaminated Recommended Off-Site Emergency Protective Actions Off-Site Support Requested and Type Prognosis For Termination Or Worsening Prepared By SS/OSEC Page 2 of 3 Revision 2, ly E PMP 2080 EPP.012 EXHIBIT B INITIAL OFF-SITE NOTIFICATION LIST Event Classification:
NRC Resident Inspector Alternate: Assistant NRC Resident Inspector NRC Region III/Washington Energy Information Center Manager Alternate: Public Affairs Director Alternate: Information Services Manager
Unusual Event Alert Site Emergency General Emergency Event Notification Initials/Time Event Closed-Out Or Upgraded Initials/Time Berrien County Sheriff's Department REQUEST CALL BACK VERIFICATION Michigan State Police, Benton Harbor REQUEST CALL BACK VERIFICATION Assistant V.P.and Chief Nuclear Engineer Alternate:
*Optional For Unusual Event Page 3 of 3 Revision 2,}}
Assistant Chief Nuclear Engineer Alternate:
Executive V,P.-Construction and New York Engineering Executive Assistant to the IRMECo President Alternate:
ISMECo President.
Alternate:
IGHECo V.P.NRC Resident Inspector Alternate:
Assistant NRC Resident Inspector NRC Region III/Washington Energy Information Center Manager Alternate:
Public Affairs Director Alternate:
Information Services Manager*Optional For Unusual Event Page 3 of 3 Revision 2,}}

Latest revision as of 07:34, 29 October 2019

Public Version of Revision 2 to Emergency Plan Implementing Procedure PMP 2080 EPP.012, Initial Offsite Notifications. Procedure Index Encl
ML17319B655
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/20/1982
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17319B653 List:
References
PMP-2080-EPP.01, PMP-2080-EPP.1, NUDOCS 8211110557
Download: ML17319B655 (10)


Text

PMP EPP INDEX 1

j INDIANA 5 i4lICHIGAN POWER COMPANY DONALD C. COOK NUCLm<'R PLANT P AN MANA PR indev Identification Ti tie Revision No. C oRFi2n ts Number And Oat PNP 2080 EPP.001 Emergency Plan Activation Revision 3 and Condition Classification 10-12-82 EPP.002 Unusual Event CANCELLED 10-29-81 EPP.OO Alert CANCELLED 10-29-81 EPP.OO Site Emergency CANCELLED 10-29-81 EPP:00 General Emergency CANCELLED 10-29-81 EPP.006 Initial Dose Assessment Revilion 3 (Gaseous) 8-27-82 EPP.007 Initial Release Assessments Revision 0 TP-1,2-23-82 Exp NA (Liquid) 4-1-81 EPP.OO Initiating Manning of Emer- Revision 3 gency Response Facilities 10-12-82 8 Calling Off-Duty Personnel EPP.009 Fire Emergency Guidelines Revision 1 6-15-82 EPP.010 Toxic Gas Release Guidelines Revision 1 6-2-82 EPP.011 Natural Emergency Guidelines Revision 0 4-1-81 EPP.01 Initial Off-Site Notificatioq Pevision 2

'0-19-82 Q

82iiii0557 82ii0i lOQ-Q.

PDR ADQCK 050003i5 Rav na-.a F PDR

1 ~

INDIANA 8ICOMPANY MICHIGAN ELECTRIC DONALD C COOK NUCLEAR PLANT PROCEDURE COVER SHEET Pzooed,e No PMP 2080 EPP.012 Revision No. 2 INITIAL OFF-S ITE NOTIFICATIONS SCOPE OF REVISION Rev. 1: Incorporated Temporary Sheets. Revised Exhibit A and B.

Rev. 2: Incorporated temporary sheet. Established a goal of reporting Unusual Events within fifteen (15) minutes.

9

'IGNATURES ORIGINAL Rev. S PREPARED BY QUALITY ASSURANCE REVIPiV INTERFACING DEPARTMENT HEAD CONCURRENCE N.A.

DEPARTMENT HEAD APPROVAL N.A.

PLANT NUCLEAR SAFEIY COMhKTEE PLANT MANAGER APPROVAL DATE OF ISSUE 3-31-81 'f q1 8-/o--/'I- Q, G .

~ ~ p PMP 2080 EPP.012 LIST OF EFFECTIVE PAGES Pa e Number Revision Number And Date Page 1 of 3 Revision 2, 10-19-82 Page 2 of 3 EXHIBIT A Revision 2, 10-19-82 Page 3 of 3 EXHIBIT B Revision 2, 10-19-82 Page 1 of 1 Revision 2~ 10"19-82

0 PMP 2080 EPP.012 INDIANA 6 MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT

1. 0 OBJECTIVE This procedure provides guidance to the Plant Manager or Shift Super-visor regarding initial informat'ion supplied to off-site support groups.

This information is to be supplied upon declaration of an Unusual Event, Alert, Site Emergency, or General Emergency condition.

2.0 RESPONS'IBILITIES 2.1 The Plant Manager is responsible for the accomplishment of initial off-site notifications to individuals or agencies specified in this procedure.

2.2 The Shift Supervisor is responsible for the initial notifications to individuals or agencies specified in this procedure if:

a. In the Shift Supervisor's judgement, the Plant Manager will be unable to complete the notifications in a time-ly manner, or
b. The Shift. Supervisor is delegated this responsibility by the Plant Manager.

3.0 LIMITATIONS 3.1 Initial notification to the Berrien County Sheriff's Department and the Michigan State Police of an Unusual Event is expected to be completed within fifteen {15) minutes of event classification.

J 3.2 Initial notifications to the Michigan State Police and the Berrien County Sheriffs Department shall be immediate upon classification of an Alert, Site Emergency or General Emergency Condition and no-tification of the NRC. and appropriate AEP personnel.

4.0 INSTRUCTIONS 4.1 Upon declaration of an Unusual Event, Alert, Site Emergency or General Emergency the Plant Manager or SS shall provide all immediately available information from EXHIBIT A, 'ACCIDENT INFORMATION REPORTING DATA SHEET, to those listed on EXHIBIT B, INITIAL OFF-SITE NOTIFICATION LIST.

NOTE: EXHIBIT A AND EXHIBIT B SHOULD BE COMPLETED AND ROUTED TO THE PLANT MANAGER'S OFFICE UPON EVENT CLOSE-OUT.

NOTE: PHONE NUMBERS FOR ALL PERSONNEL ARE CONTAINED IN APPENDIX A OF THESE EMERGENCY PLAN PROCEDURES.

NOTE: IF PUBLIC AFFAIRS AND NRC AGREE A NEWS RELEASE IS TO BE MADE, THE NUCLEAR CENTER WILL PROVIDE THE RELEASE TO THE MICHIGAN STATE POLICE, THE BERRIEN COUNTY SHERIFF'S DEPARTMENT AND THE NEWS MEDIA.

Page 1 of 3 Revision 2,

o PMP 2080 EPP.012 EXHIBIT A ACCIDENT INFORMATION REPORTING DATA SHEET D.C. Cook Unit Date Time Classified Classification Description of Event Release Involved: Yes No. Estimated Duration (Time)

Release Rate Ci/sec Noble Gas Height: Ground Level Wind Speed (mph) Wind Direction (From) bT C Pascal Category Precipitation Site Boundary Dose Rate Projected Measured Injured Personnel Radioactively Contaminated Recommended Off-Site Emergency Protective Actions Off-Site Support Requested and Type Prognosis For Termination Or Worsening Prepared By SS/OSEC Page 2 of 3 Revision 2,

ly E

PMP 2080 EPP.012 EXHIBIT B INITIAL OFF-SITE NOTIFICATION LIST Event Classification: Unusual Event Alert Site Emergency General Emergency Event Closed-Out Event Notification Or Upgraded Initials/Time Initials/Time Berrien County Sheriff's Department REQUEST CALL BACK VERIFICATION Michigan State Police, Benton Harbor REQUEST CALL BACK VERIFICATION Assistant V.P. and Chief Nuclear Engineer Alternate: Assistant Chief Nuclear Engineer Alternate: Executive V,P. - Construction and New York Engineering Executive Assistant to the IRMECo President Alternate: ISMECo President.

Alternate: IGHECo V.P.

NRC Resident Inspector Alternate: Assistant NRC Resident Inspector NRC Region III/Washington Energy Information Center Manager Alternate: Public Affairs Director Alternate: Information Services Manager

  • Optional For Unusual Event Page 3 of 3 Revision 2,