| issue date = 07/14/1995
| issue date = 07/14/1995
| title = Transmits Turkey Point Nuclear Plant Service Water Operational Performance Insp,Self Assessment,Final Rept.
| title = Transmits Turkey Point Nuclear Plant Service Water Operational Performance Insp,Self Assessment,Final Rept.
| author name = BOHLKE W H
| author name = Bohlke W
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:PRIORITY 1 (ACCELERATED RZDS PROCESSING)
{{#Wiki_filter:PRIORITY 1 (ACCELERATED RZDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9507190048 DOC.DATE: 95/07/14 NOTARIZED:
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 P 50-251 Turkey Point Plant, Unit 4, Florida Power a d Light C 05000251 AUTH.NAME AUTHOR AFFILIATION BOHLKE,W.H.
ACCESSION NBR:9507190048           DOC.DATE:   95/07/14     NOTARIZED: NO         DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light               C 05000250 P 50-251 Turkey Point Plant, Unit 4, Florida Power a d Light               C 05000251 AUTH. NAME           AUTHOR AFFILIATION BOHLKE,W.H.         Florida Power & Light Co.
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)I  
RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document         Control Desk)           I


==SUBJECT:==
==SUBJECT:==
Transmits"Turkey Point Nuclear Plant Service Water Operational Performance Insp,Self Assessment, Final Rept." DISTRIBUTION CODE: A001D COPIES RECEIVED.LTR 1 ENCL J SIZE: P/0 TITLE: OR Submittal:
Transmits "Turkey Point Nuclear Plant Service Water Operational Performance Insp,Self Assessment, Final Rept."
General Distribution NOTES: RECIPIENT ID CODE/NAME'PD2-1 LA CROTEAU,R INTERN~/~EN~01 NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 EXTERNAL NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 0 1 1 RECIPIENT ID CODE/NAME PD2-1 PD NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D N NOTE TO ALL"RZDS" RECIPIENTS:
DISTRIBUTION CODE: A001D       COPIES RECEIVED. LTR     1   ENCL J   SIZE:   P/0 TITLE: OR Submittal: General Distribution NOTES:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DS (415-2083)
RECIPIENT            COPIES            RECIPIENT         COPIES ID CODE/NAME          LTTR ENCL        ID CODE/NAME       LTTR ENCL
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 11  
          'PD2-1 LA                 1    1      PD2-1 PD                1    1 CROTEAU,R                 1    1 INTERN   ~/~EN~
NRR/DRCH/HICB 01      1 1
1 1
NRR/DE/EMCB NRR/DSSA/SPLB 1
1 1
1 NRR/DSSA/SRXB            1    1      NUDOCS-ABSTRACT         1     1 OGC/HDS3                  1     0 EXTERNAL  NOAC                      1     1     NRC PDR                1     1 D
N NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DS (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR             12   ENCL   11
 
Florida Powar & Light Company, P.O. Box 14000, Juno Beach, FL 33408-0420 JUL    1  't )995 L-95-202 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:      Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Service Water System Operational Performance Ins ection Self Assessment This letter transmits the Final Report for the Turkey Point Units 3 and 4 Service Water System Operational Performance Inspection Self Assessment. This assessment was conducted at the plant site during the months of March and May of 1995.
FPL intentions to conduct a self assessment, according to the guidance in IP-40501, was provided via L-93-250 on 10/4/93. A detailed self assessment plan was provided via I 94-152 on 6/28/94. Conditional approval for the self assessment was granted by the NRC via Albert F.
Gibson to J. H. Goldberg correspondence dated 8/10/94.
An in-process inspection was conducted by the NRC the week of 3/20/95 and was documented on Inspection Reports 50-250/95-08 and 50-251/95-08 on 4/20/95.
Should there be any questions concerning this response, please contact us.
Very truly yours, W. H. Bohlke Vice President Nuclear Engineering and Licensing WHB/st Enclosure cc:      Stewart D. Ebneter, Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant 9507190048 950714 an FPL Group company          PDR  ADOCK 05000250 p                      PDR


Florida Powar&Light Company, P.O.Box 14000, Juno Beach, FL 33408-0420 JUL 1't)995 L-95-202 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Service Water System Operational Performance Ins ection Self Assessment This letter transmits the Final Report for the Turkey Point Units 3 and 4 Service Water System Operational Performance Inspection Self Assessment.
This assessment was conducted at the plant site during the months of March and May of 1995.FPL intentions to conduct a self assessment, according to the guidance in IP-40501, was provided via L-93-250 on 10/4/93.A detailed self assessment plan was provided via I 94-152 on 6/28/94.Conditional approval for the self assessment was granted by the NRC via Albert F.Gibson to J.H.Goldberg correspondence dated 8/10/94.An in-process inspection was conducted by the NRC the week of 3/20/95 and was documented on Inspection Reports 50-250/95-08 and 50-251/95-08 on 4/20/95.Should there be any questions concerning this response, please contact us.Very truly yours, W.H.Bohlke Vice President Nuclear Engineering and Licensing WHB/st Enclosure cc: Stewart D.Ebneter, Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant an FPL Group company 9507190048 950714 PDR ADOCK 05000250 p PDR
'V}}
'V}}

Latest revision as of 08:27, 22 October 2019

Transmits Turkey Point Nuclear Plant Service Water Operational Performance Insp,Self Assessment,Final Rept.
ML17353A254
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/14/1995
From: Bohlke W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17353A255 List:
References
L-95-202, NUDOCS 9507190048
Download: ML17353A254 (4)


Text

PRIORITY 1 (ACCELERATED RZDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9507190048 DOC.DATE: 95/07/14 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 P 50-251 Turkey Point Plant, Unit 4, Florida Power a d Light C 05000251 AUTH. NAME AUTHOR AFFILIATION BOHLKE,W.H. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) I

SUBJECT:

Transmits "Turkey Point Nuclear Plant Service Water Operational Performance Insp,Self Assessment, Final Rept."

DISTRIBUTION CODE: A001D COPIES RECEIVED. LTR 1 ENCL J SIZE: P/0 TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL

'PD2-1 LA 1 1 PD2-1 PD 1 1 CROTEAU,R 1 1 INTERN ~/~EN~

NRR/DRCH/HICB 01 1 1

1 1

NRR/DE/EMCB NRR/DSSA/SPLB 1

1 1

1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 EXTERNAL NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DS (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 11

Florida Powar & Light Company, P.O. Box 14000, Juno Beach, FL 33408-0420 JUL 1 't )995 L-95-202 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Service Water System Operational Performance Ins ection Self Assessment This letter transmits the Final Report for the Turkey Point Units 3 and 4 Service Water System Operational Performance Inspection Self Assessment. This assessment was conducted at the plant site during the months of March and May of 1995.

FPL intentions to conduct a self assessment, according to the guidance in IP-40501, was provided via L-93-250 on 10/4/93. A detailed self assessment plan was provided via I 94-152 on 6/28/94. Conditional approval for the self assessment was granted by the NRC via Albert F.

Gibson to J. H. Goldberg correspondence dated 8/10/94.

An in-process inspection was conducted by the NRC the week of 3/20/95 and was documented on Inspection Reports 50-250/95-08 and 50-251/95-08 on 4/20/95.

Should there be any questions concerning this response, please contact us.

Very truly yours, W. H. Bohlke Vice President Nuclear Engineering and Licensing WHB/st Enclosure cc: Stewart D. Ebneter, Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant 9507190048 950714 an FPL Group company PDR ADOCK 05000250 p PDR

'V