Transmits Turkey Point Nuclear Plant Service Water Operational Performance Insp,Self Assessment,Final Rept
ML17353A254
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/14/1995
From: Bohlke W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17353A255 List:
References
L-95-202, NUDOCS 9507190048
Download: ML17353A254 (4)


Text

PRIORITY 1 (ACCELERATED RZDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9507190048 DOC.DATE: 95/07/14 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 P

50-251 Turkey Point Plant, Unit 4, Florida Power a d Light C 05000251 AUTH.NAME AUTHOR AFFILIATION BOHLKE,W.H.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

I

SUBJECT:

Transmits "Turkey Point Nuclear Plant Service Water Operational Performance Insp,Self Assessment, Final Rept."

DISTRIBUTION CODE:

A001D COPIES RECEIVED. LTR 1

ENCL J SIZE: P/0 TITLE: OR Submittal:

General Distribution NOTES:

RECIPIENT ID CODE/NAME

'PD2-1 LA CROTEAU,R INTERN ~/~EN~

01 NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 EXTERNAL NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

0 1

1 RECIPIENT ID CODE/NAME PD2-1 PD NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

N NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL

DESK, ROOM OWFN 5DS (415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 12 ENCL 11

Florida Powar & Light Company, P.O. Box 14000, Juno Beach, FL 33408-0420 JUL 1 't )995 L-95-202 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.

20555 Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Service Water System Operational Performance Ins ection Self Assessment This letter transmits the Final Report for the Turkey Point Units 3 and 4 Service Water System Operational Performance Inspection Self Assessment.

This assessment was conducted at the plant site during the months of March and May of 1995.

FPL intentions to conduct a self assessment, according to the guidance in IP-40501, was provided via L-93-250 on 10/4/93.

A detailed self assessment plan was provided via I 94-152 on 6/28/94.

Conditional approval for the self assessment was granted by the NRC via Albert F.

Gibson to J. H. Goldberg correspondence dated 8/10/94.

An in-process inspection was conducted by the NRC the week of 3/20/95 and was documented on Inspection Reports 50-250/95-08 and 50-251/95-08 on 4/20/95.

Should there be any questions concerning this response, please contact us.

Very truly yours, W. H. Bohlke Vice President Nuclear Engineering and Licensing WHB/st Enclosure cc:

Stewart D. Ebneter, Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant an FPL Group company 9507190048 950714 PDR ADOCK 05000250 p

PDR

'V