ML080850155: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML080850155
| number = ML080850155
| issue date = 03/26/2008
| issue date = 03/26/2008
| title = Susquehanna Steam Electric Station - Units 1 & 2 - Summary of March 18, 2008, Meeting with PPL Susquehanna, on Submission Details for Susquehanna Units and 2, Pose-Extended Power Uprate (EPU) Power Ascension (Tac No. MD8079)
| title = Units 1 & 2 - Summary of March 18, 2008, Meeting with PPL Susquehanna, on Submission Details for Susquehanna Units and 2, Pose-Extended Power Uprate (EPU) Power Ascension (Tac No. MD8079)
| author name = Vaidya B K
| author name = Vaidya B
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000387, 05000388
| docket = 05000387, 05000388
| license number =  
| license number =  
| contact person = vaidya B K, NRR/DLPM, 415-3308
| contact person = vaidya B, NRR/DLPM, 415-3308
| case reference number = TAC MD8079
| case reference number = TAC MD8079
| package number = ML080850177
| package number = ML080850177
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:March 26, 2008  
{{#Wiki_filter:March 26, 2008 LICENSEE:       PPL SUSQUEHANNA, LLC FACILITY:       SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2
 
LICENSEE: PPL SUSQUEHANNA, LLC  
 
FACILITY: SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF MARCH 18, 2008, MEETING WITH PPL SUSQUEHANNA, ON SUBMISSION DETAILS FOR SUSQUEHANNA UNITS 1 AND 2, POST- EXTENDED POWER UPRATE (EPU) POWER ASCENSION (TAC NO. MD8079)  
OF MARCH 18, 2008, MEETING WITH PPL SUSQUEHANNA, ON SUBMISSION DETAILS FOR SUSQUEHANNA UNITS 1 AND 2, POST- EXTENDED POWER UPRATE (EPU) POWER ASCENSION (TAC NO. MD8079)
 
On March 18, 2008, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives of PPL Susquehanna (PPL) to discuss PPLs plan for complying with the extended power uprate (EPU) Steam Dryer License Conditions. A list of attendees is enclosed.
On March 18, 2008, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives of PPL Susquehanna (PPL) to discuss PPL's plan for complying with the extended power uprate (EPU) Steam Dryer License Conditions. A list of attendees is enclosed.  
The licensees presentation included Proprietary Information (See Agencywide Documents Access and Management System (ADAMS) Accession No. ML080810346 for Proprietary version and ADAMS Accession No. ML080810339 for Non-Proprietary version).
 
The licensee provided details regarding the new steam dryer design features, locations, and types of instrumentation to be used, additional analyses needed to reflect the new dryer as-built configuration, and the format and logistics for data submission during the power ascension phase. The licensee also discussed an ongoing steam dryer modification to correct the interference issue they recently encountered with the new Unit 1 Steam Dryer.
The licensee's presentation included Proprietary Information (See Agencywide Documents Access and Management System (ADAMS) Accession No. ML080810346 for Proprietary version and ADAMS Accession No. ML080810339 for Non-Proprietary version).  
With the verbal consent of the owners of the Proprietary Information, PPL, and General Electric - Hitachi, the members of the public were in attendance throughout the meeting. Public Meeting Feedback forms were not received.
 
Please direct any inquiries to me at 301-415-3308, or bkv@nrc.gov.
The licensee provided details regarding the new steam dryer design features, locations, and types of instrumentation to be used, additional analyses needed to reflect the new dryer as-built configuration, and the format and logistics for data submission during the power ascension phase. The licensee also discussed an ongoing steam dryer modification to correct the interference issue they recently encountered with the new Unit 1 Steam Dryer.  
                                      /RA/
 
Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388
With the verbal consent of the owners of the Proprietary Information, PPL, and General Electric - Hitachi, the members of the public were in attendance throughout the meeting. Public Meeting Feedback forms were not received.  
 
Please direct any inquiries to me at 301-415-3308, or bkv@nrc.gov.
 
      /RA/ Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
 
Docket Nos. 50-387 and 50-388  


==Enclosure:==
==Enclosure:==


List of Attendees  
List of Attendees cc w/encl: See next page


cc w/encl: See next page Susquehanna Steam Electric Station, Unit Nos. 1 and 2  
Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:
Cornelius J. Gannon                              Bryan A. Snapp, Esq Vice President - Nuclear Operations              Assoc. General Counsel PPL Susquehanna, LLC                              PPL Services Corporation 769 Salem Blvd., NUCSB3                          Two North Ninth Street, GENTW3 Berwick, PA 18603-0467                            Allentown, PA 18101-1179 Robert M. Paley                                  Document Control Services General Manager - Plant Support                  PPL Susquehanna, LLC PPL Susquehanna, LLC                              Two North Ninth Street, GENPL4 769 Salem Blvd., NUCSB2                          Allentown, PA 18101-1179 Berwick, PA 18603-0467 Richard W. Osborne Rocco R. Sgarro                                  Allegheny Electric Cooperative, Inc.
Manager - Nuclear Regulatory Affairs              212 Locust Street PPL Susquehanna, LLC                              P.O. Box 1266 Two North Ninth Street, GENPL4                    Harrisburg, PA 17108-1266 Allentown, PA 18101-1179 Director, Bureau of Radiation Protection Supervisor -                                      Pennsylvania Department of Nuclear Regulatory Affairs                        Environmental Protection PPL Susquehanna, LLC                              Rachel Carson State Office Building 769 Salem Blvd., NUCSA4                          P.O. Box 8469 Berwick, PA 18603-0467                            Harrisburg, PA 17105-8469 Michael H. Crowthers                              Senior Resident Inspector Supervisor - Nuclear Regulatory Affairs          U.S. Nuclear Regulatory Commission PPL Susquehanna, LLC                              P.O. Box 35, NUCSA4 Two North Ninth Street, GENPL4                    Berwick, PA 18603-0035 Allentown, PA 18101-1179 Regional Administrator, Region 1 Ronald E. Smith                                  U.S. Nuclear Regulatory Commission General Manager - Site Preparedness              475 Allendale Road and Services                                    King of Prussia, PA 19406 PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4                          Board of Supervisors Berwick, PA 18603-0467                            Salem Township P.O. Box 405 Michael H. Rose                                  Berwick, PA 18603-0035 Manager - Quality Assurance PPL Susquehanna, LLC                              Dr. Judith Johnsrud 769 Salem Blvd., NUCSB2                          National Energy Committee Berwick, PA 18603-0467                            Sierra Club 443 Orlando Avenue Joseph J. Scopelliti                              State College, PA 16803 Community Relations Manager, Susquehanna                                      Mr. Britt T. McKinney PPL Susquehanna, LLC                              Sr. Vice President & CNO 634 Salem Blvd., SSO                              PPL Susquehanna, LLC Berwick, PA 18603-0467                            769 Salem Blvd., NUCSB3 Berwick, PA 18603


cc:
MEETING ATTENDANCE LIST MARCH 18, 2008 EXTENDED POWER UPRATE (EPU)
POST EPU POWER ASCENSION SUSQUEHANNA, UNITS 1 AND 2 Name                            Organization Bhalchandra K. Vaidya            NRC/NRR/DORL Mark Kowal                      NRC/NRR/DORL Kamal Manoly                    NRC/NRR/EMCB Mark Hartzman                    NRC/NRR/EMCB Chakrapani Basavaraju            NRC/NRR/EMCB Richard Guzman                  NRC/NRR/DORL Zena Abdullahi                  NRC/ACRS Richard Pagodin                  PPL SUSQUEHANNA John Bartos                      PPL SUSQUEHANNA John Krais                      PPL SUSQUEHANNA Michael Crowthers                PPL SUSQUEHANNA Robert Sheranko                  PPL SUSQUEHANNA Enrico J. Betti                  GE HITACHI Lance Hubbard (*)                ALLEGHENY ELECTRIC COOPERATIVE Brad Fuller (*)                  COMMONWEALTH OF PENNSYLVANIA
(*) Members of the Public.
Enclosure


Cornelius J. Gannon Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA  18603-0467
ML080810339 for Non-Proprietary version).
 
The licensee provided details regarding the new steam dryer design features, locations, and types of instrumentation to be used, additional analyses needed to reflect the new dryer as-built configuration, and the format and logistics for data submission during the power ascension phase. The licensee also discussed an ongoing steam dryer modification to correct the interference issue they recently encountered with the new Unit 1 Steam Dryer.
Robert M. Paley General Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467
With the verbal consent of the owners of the Proprietary Information, PPL, and General Electric - Hitachi, the members of the public were in attendance throughout the meeting. Public Meeting Feedback forms were not received.
 
Please direct any inquiries to me at 301-415-3308, or bkv@nrc.gov.
Rocco R. Sgarro Manager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179
                                      /RA/
 
Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388
Supervisor -
Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467
 
Michael H. Crowthers Supervisor - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179
 
Ronald E. Smith General Manager - Site Preparedness and Services PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467
 
Michael H. Rose Manager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467
 
Joseph J. Scopelliti Community Relations Manager,     
 
Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA  18603-0467 Bryan A. Snapp, Esq Assoc. General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA  18101-1179
 
Document Control Services PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179
 
Richard W. Osborne Allegheny Electric Cooperative, Inc.
212 Locust Street P.O. Box 1266 Harrisburg, PA  17108-1266
 
Director, Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469
 
Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035
 
Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406
 
Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035
 
Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803
 
Mr. Britt T. McKinney Sr. Vice President & CNO PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603 Enclosure MEETING ATTENDANCE LIST MARCH 18, 2008 EXTENDED POWER UPRATE (EPU)
POST EPU POWER ASCENSION SUSQUEHANNA, UNITS 1 AND 2 Name Organization Bhalchandra K. Vaidya NRC/NRR/DORL Mark Kowal NRC/NRR/DORL Kamal Manoly NRC/NRR/EMCB Mark Hartzman NRC/NRR/EMCB Chakrapani Basavaraju NRC/NRR/EMCB Richard Guzman NRC/NRR/DORL Zena Abdullahi NRC/ACRS Richard Pagodin PPL SUSQUEHANNA John Bartos PPL SUSQUEHANNA John Krais PPL SUSQUEHANNA Michael Crowthers PPL SUSQUEHANNA Robert Sheranko PPL SUSQUEHANNA Enrico J. Betti GE HITACHI Lance Hubbard (*) ALLEGHENY ELECTRIC COOPERATIVE Brad Fuller (*) COMMONWEALTH OF PENNSYLVANIA
(*)  Members of the Public.
 
ML080810339 for Non-Proprietary version).  
 
The licensee provided details regarding the new steam dryer design features, locations, and types of instrumentation to be used, additional analyses needed to reflect the new dryer as-built configuration, and the format and logistics for data submission during the power ascension phase. The licensee also discussed an ongoing steam dryer modification to correct the interference issue they recently encountered with the new Unit 1 Steam Dryer.  
 
With the verbal consent of the owners of the Proprietary Information, PPL, and General Electric - Hitachi, the members of the public were in attendance throughout the meeting. Public Meeting Feedback forms were not received.  
 
Please direct any inquiries to me at 301-415-3308, or bkv@nrc.gov.
 
      /RA/ Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
 
Docket Nos. 50-387 and 50-388  


==Enclosure:==
==Enclosure:==


List of Attendees  
List of Attendees cc w/encl: See next page DISTRIBUTION PUBLIC                                               RidsNrrLAGLappert LPL1-1 r/f                                           RidsOgcRp RidsAcrsAcnw&mMailCenter                             RidsNrrOd RidsNrrDorlLpl1-1                                     RidsNrrDeEmcb RidsNrrPmBVaidya                                     RidsRgn1MailCenter RidsNrrLASLittle ADAMS Accession No. PKG: ML080850177, Mtg Notice: ML080630382, Mtg Summary ML080850155                       NRC-001 OFFICE       LPLI-1/PM         LPL4/LAiT             LPLI-1/LA       LPLI-1/BC NAME         BVaidya           GLappert               SLittle       MKowal DATE         3/26/08             3/26/08             3/26/08         3/26/08}}
 
cc w/encl: See next page
 
DISTRIBUTION PUBLIC LPL1-1 r/f RidsAcrsAcnw&mMailCenter RidsNrrDorlLpl1-1 RidsNrrPmBVaidya RidsNrrLASLittle RidsNrrLAGLappert RidsOgcRp RidsNrrOd RidsNrrDeEmcb RidsRgn1MailCenter ADAMS Accession No. PKG: ML080850177, Mtg Notice: ML080630382, Mtg Summary ML080850155   NRC-001 OFFICE LPLI-1/PM LPL4/LAiT LPLI-1/LA LPLI-1/BC NAME BVaidya GLappert SLittle MKowal DATE 3/26/08 3/26/08 3/26/08 3/26/08}}

Latest revision as of 19:26, 14 November 2019

Units 1 & 2 - Summary of March 18, 2008, Meeting with PPL Susquehanna, on Submission Details for Susquehanna Units and 2, Pose-Extended Power Uprate (EPU) Power Ascension (Tac No. MD8079)
ML080850155
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/26/2008
From: Bhalchandra Vaidya
NRC/NRR/ADRO/DORL/LPLI-1
To:
Susquehanna
vaidya B, NRR/DLPM, 415-3308
Shared Package
ML080850177 List:
References
TAC MD8079
Download: ML080850155 (4)


Text

March 26, 2008 LICENSEE: PPL SUSQUEHANNA, LLC FACILITY: SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2

SUBJECT:

SUMMARY

OF MARCH 18, 2008, MEETING WITH PPL SUSQUEHANNA, ON SUBMISSION DETAILS FOR SUSQUEHANNA UNITS 1 AND 2, POST- EXTENDED POWER UPRATE (EPU) POWER ASCENSION (TAC NO. MD8079)

On March 18, 2008, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives of PPL Susquehanna (PPL) to discuss PPLs plan for complying with the extended power uprate (EPU) Steam Dryer License Conditions. A list of attendees is enclosed.

The licensees presentation included Proprietary Information (See Agencywide Documents Access and Management System (ADAMS) Accession No. ML080810346 for Proprietary version and ADAMS Accession No. ML080810339 for Non-Proprietary version).

The licensee provided details regarding the new steam dryer design features, locations, and types of instrumentation to be used, additional analyses needed to reflect the new dryer as-built configuration, and the format and logistics for data submission during the power ascension phase. The licensee also discussed an ongoing steam dryer modification to correct the interference issue they recently encountered with the new Unit 1 Steam Dryer.

With the verbal consent of the owners of the Proprietary Information, PPL, and General Electric - Hitachi, the members of the public were in attendance throughout the meeting. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-3308, or bkv@nrc.gov.

/RA/

Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosure:

List of Attendees cc w/encl: See next page

Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:

Cornelius J. Gannon Bryan A. Snapp, Esq Vice President - Nuclear Operations Assoc. General Counsel PPL Susquehanna, LLC PPL Services Corporation 769 Salem Blvd., NUCSB3 Two North Ninth Street, GENTW3 Berwick, PA 18603-0467 Allentown, PA 18101-1179 Robert M. Paley Document Control Services General Manager - Plant Support PPL Susquehanna, LLC PPL Susquehanna, LLC Two North Ninth Street, GENPL4 769 Salem Blvd., NUCSB2 Allentown, PA 18101-1179 Berwick, PA 18603-0467 Richard W. Osborne Rocco R. Sgarro Allegheny Electric Cooperative, Inc.

Manager - Nuclear Regulatory Affairs 212 Locust Street PPL Susquehanna, LLC P.O. Box 1266 Two North Ninth Street, GENPL4 Harrisburg, PA 17108-1266 Allentown, PA 18101-1179 Director, Bureau of Radiation Protection Supervisor - Pennsylvania Department of Nuclear Regulatory Affairs Environmental Protection PPL Susquehanna, LLC Rachel Carson State Office Building 769 Salem Blvd., NUCSA4 P.O. Box 8469 Berwick, PA 18603-0467 Harrisburg, PA 17105-8469 Michael H. Crowthers Senior Resident Inspector Supervisor - Nuclear Regulatory Affairs U.S. Nuclear Regulatory Commission PPL Susquehanna, LLC P.O. Box 35, NUCSA4 Two North Ninth Street, GENPL4 Berwick, PA 18603-0035 Allentown, PA 18101-1179 Regional Administrator, Region 1 Ronald E. Smith U.S. Nuclear Regulatory Commission General Manager - Site Preparedness 475 Allendale Road and Services King of Prussia, PA 19406 PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Board of Supervisors Berwick, PA 18603-0467 Salem Township P.O. Box 405 Michael H. Rose Berwick, PA 18603-0035 Manager - Quality Assurance PPL Susquehanna, LLC Dr. Judith Johnsrud 769 Salem Blvd., NUCSB2 National Energy Committee Berwick, PA 18603-0467 Sierra Club 443 Orlando Avenue Joseph J. Scopelliti State College, PA 16803 Community Relations Manager, Susquehanna Mr. Britt T. McKinney PPL Susquehanna, LLC Sr. Vice President & CNO 634 Salem Blvd., SSO PPL Susquehanna, LLC Berwick, PA 18603-0467 769 Salem Blvd., NUCSB3 Berwick, PA 18603

MEETING ATTENDANCE LIST MARCH 18, 2008 EXTENDED POWER UPRATE (EPU)

POST EPU POWER ASCENSION SUSQUEHANNA, UNITS 1 AND 2 Name Organization Bhalchandra K. Vaidya NRC/NRR/DORL Mark Kowal NRC/NRR/DORL Kamal Manoly NRC/NRR/EMCB Mark Hartzman NRC/NRR/EMCB Chakrapani Basavaraju NRC/NRR/EMCB Richard Guzman NRC/NRR/DORL Zena Abdullahi NRC/ACRS Richard Pagodin PPL SUSQUEHANNA John Bartos PPL SUSQUEHANNA John Krais PPL SUSQUEHANNA Michael Crowthers PPL SUSQUEHANNA Robert Sheranko PPL SUSQUEHANNA Enrico J. Betti GE HITACHI Lance Hubbard (*) ALLEGHENY ELECTRIC COOPERATIVE Brad Fuller (*) COMMONWEALTH OF PENNSYLVANIA

(*) Members of the Public.

Enclosure

ML080810339 for Non-Proprietary version).

The licensee provided details regarding the new steam dryer design features, locations, and types of instrumentation to be used, additional analyses needed to reflect the new dryer as-built configuration, and the format and logistics for data submission during the power ascension phase. The licensee also discussed an ongoing steam dryer modification to correct the interference issue they recently encountered with the new Unit 1 Steam Dryer.

With the verbal consent of the owners of the Proprietary Information, PPL, and General Electric - Hitachi, the members of the public were in attendance throughout the meeting. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-3308, or bkv@nrc.gov.

/RA/

Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosure:

List of Attendees cc w/encl: See next page DISTRIBUTION PUBLIC RidsNrrLAGLappert LPL1-1 r/f RidsOgcRp RidsAcrsAcnw&mMailCenter RidsNrrOd RidsNrrDorlLpl1-1 RidsNrrDeEmcb RidsNrrPmBVaidya RidsRgn1MailCenter RidsNrrLASLittle ADAMS Accession No. PKG: ML080850177, Mtg Notice: ML080630382, Mtg Summary ML080850155 NRC-001 OFFICE LPLI-1/PM LPL4/LAiT LPLI-1/LA LPLI-1/BC NAME BVaidya GLappert SLittle MKowal DATE 3/26/08 3/26/08 3/26/08 3/26/08