{{#Wiki_filter:OT-3701-C11_513_RO Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: C11 CRDH Time Critical:
{{#Wiki_filter:OT-3701-C11_5 13_RO Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: C11 CRDH Time Critical:
No Alternate Path:
No Alternate Path:
Yes  Applicability:
Yes  Applicability:
Line 25: Line 25:
==References:==
==References:==


SOI-C11(CRDH) Rev 21 & SOI-C11(RCIS)
SOI-C11(CRDH) Rev 2 1 & SOI-C11(RCIS) Rev 2 8 Required Material:
Rev 28 Required Material:
SOI-C11(CRDH) & SOI
SOI-C11(CRDH) & SOI
-C11(RCIS)
-C11(RCIS) Task: 214-510-01-01 Withdraw a Control Rod 214-519-04-01 Respond to an Inability to Move Control Rods Task Standard:
Task: 214-510-01-01 Withdraw a Control Rod 214-519-04-01 Respond to an Inability to Move Control Rods Task Standard:
Withdraw control rod using double clutching method of Alternate Control Methods Rod Initially at Position "00" per SOI
Withdraw control rod using double clutching method of Alternate Control Methods Rod Initially at Position "00" per SOI
-C11(RCIS)
-C11(RCIS) K/A: 201003 - A2.01 Ability to (a) predict the impacts of the following on the CONTROL ROD AND DRIVE MECHANISM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Stuck rod. Importance: RO 3.4 SRO 3.6
K/A: 201003 - A2.01 Ability to (a) predict the impacts of the following on the CONTROL ROD AND DRIVE MECHANISM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Stuck rod. Importance: RO 3.4 SRO 3.6
: 1. Simulator Setup Instructions
: 1. Simulator Setup Instructions
: Reset simulator to a reactor startup IC
: Reset simulator to a reactor startup IC
Line 39: Line 36:
-C11-Del.sch and Event File JPM
-C11-Del.sch and Event File JPM
-C11-Del.evt auto load.Verify clean pull sheet (no asterisks).
-C11-Del.evt auto load.Verify clean pull sheet (no asterisks).
Place IOI
Place IOI-001, opened to 4/6, on desk. 2. Location / Method: Simulator / performance
-001, opened to 4/6, on desk. 2. Location / Method: Simulator / performance
: 3. Initial Condition: Start up is in progress after a reactor scram. Reactor Power is approximately 2%.. Beginni ng of Life pull sheets at Step 1 2. Unit Supervisor is operating per IOI-1 Cold Startup Section 4.6 Heat up to 940 psig. Drive water pressure is at 300 psid per SOI
: 3. Initial Condition: Start up is in progress after a reactor scram. Reactor Power is approximately 2%.. Beginning of Life pull sheets at Step 12. Unit Supervisor is operating per IOI-1 Cold Startup Section 4.6 Heat up to 940 psig. Drive water pressure is at 300 psid per SOI
-C11(RCIS).
-C11(RCIS).
: 4.        Initiating Cue: Unit Supervisor directs you to continue power ascensi on by withdrawing control rods until reactor pressure is 940 psig
: 4.        Initiating Cue: Unit Supervisor directs you to continue power ascensi on by withdrawing control rods until reactor pressure is 940 psig
.   
.   


Start Time End Time Operator OT-3701-C11_513_RO Rev 0  JPM BODY SHEET Standard:
Start Time End Time Operator OT-3701-C11_5 13_RO Rev 0  JPM BODY SHEET Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc- before performing task.
Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc- before performing task.
Standard: Performer follows management expectations with regards to safety and communication standards.
Standard:
Performer follows management expectations with regards to safety and communication standards.
Step 1  Continue Power Ascension:
Step 1  Continue Power Ascension:
Operator obtains Beginning of Life pull sheets and verifies step and position.
Operator obtains Beginning of Life pull sheets and verifies step and position.
Standard:
Standard: Operator verifies step and position on Beginning of Life pull sheets.
Operator verifies step and position on Beginning of Life pull sheets.
Instructor Cue:
Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___
Comment(s):____________________________
Comment(s):____________________________
____________________________________
____________________________________


OT-3701-C11_513_RO Rev 0  Step 2  SOI-C11(RCIS) 7.4 Notch Withdrawal for Single Rod or Gang 7.4.1  BEFORE withdrawing control rods in Modes 2, 3, 4, and 5, VERIFY Attachment 2, Single Control Rod Withdrawal Checklist, is complete.
OT-3701-C11_5 13_RO Rev 0  Step 2  SOI-C11(RCIS) 7.4 Notch Withdrawal for Single Rod or Gang 7.4.1  BEFORE withdrawing control rods in Modes 2, 3, 4, and 5, VERIFY Attachment 2, Single Control Rod Withdrawal Checklist, is complete.
Standard:
Standard: Verifies Attachment 2 complete if section 7.4 of SOI
Verifies Attachment 2 complete if section 7.4 of SOI
-C11 (RCIS) is referenced.
-C11 (RCIS) is referenced.
Instructor Cue:
Instructor Cue:
Inform operator Attachment 2 is complete.
Inform operator Attachment 2 is complete.
Notes: None  SAT ___ UNSAT ___
Notes: None  SAT ___ UNSAT ___
Comment(s):____________
Comment(s):____________
_______________________________
_______________________________
Line 78: Line 68:
A WITHDRAW BLOCK light by itself indicates a rod block signal due to plant status or nuclear instrumentation not associated with RPC constraints
A WITHDRAW BLOCK light by itself indicates a rod block signal due to plant status or nuclear instrumentation not associated with RPC constraints
.
.
OT-3701-C11_513_RO Rev 0 Step 3  7.4.2  SELECT the single rod OR rod gang.
OT-3701-C11_5 13_RO Rev 0 Step 3  7.4.2  SELECT the single rod OR rod gang.
Critical Step
Critical Step
: Operator selects correct rod.
: Operator selects correct rod.
Instructor Cue: None  Notes: None  SAT ___ UNSAT ___
Instructor Cue: None  Notes: None  SAT ___ UNSAT ___ Comment(s):______________________________
Comment(s):______________________________
__________________________________
__________________________________
NOTES  RAW DATA and alternating data mode (i.e., dual channel) should be selected when moving control rods.
NOTES  RAW DATA and alternating data mode (i.e., dual channel) should be selected when moving control rods.
Gang mode of rod withdrawal is not allowed with a rod drive transponder bypassed at the RGDC due to the possibility of the bypassed rod moving with the gang.
Gang mode of rod withdrawal is not allowed with a rod drive transponder bypassed at the RGDC due to the possibility of the bypassed rod moving with the gang.
 
OT-3701-C11_5 13_RO Rev 0 Step 4  7.4.3  MOMENTARILY DEPRESS WITHDRAW.
OT-3701-C11_513_RO Rev 0 Step 4  7.4.3  MOMENTARILY DEPRESS WITHDRAW.
7.4.4  OBSERVE the following:
7.4.4  OBSERVE the following:
The IN light comes on momentarily AND goes off.
The IN light comes on momentarily AND goes off.
Line 98: Line 86:
: Operator withdraws correct control rods Instructor Cue:
: Operator withdraws correct control rods Instructor Cue:
None  Notes: After Rod is off Zero if he depresses INSERT, JPM would be a failure. Three rods in the gang will work correctly, the fourth rod, rod 26-51 is stuck. SAT ___ UNSAT ___
None  Notes: After Rod is off Zero if he depresses INSERT, JPM would be a failure. Three rods in the gang will work correctly, the fourth rod, rod 26-51 is stuck. SAT ___ UNSAT ___
Comment(s):___________________________
Comment(s):___________________________
_____________________________________
_____________________________________


OT-3701-C11_513_RO Rev 0 Step 5  7.4.5  IF the SETTLE light goes off before the RDM indicates the new rod position, THEN perform the following:
OT-3701-C11_5 13_RO Rev 0 Step 5  7.4.5  IF the SETTLE light goes off before the RDM indicates the new rod position, THEN perform the following:
7.4.6  In Modes 3, 4, OR 5 Standard:
7.4.6  In Modes 3, 4, OR 5 Standard: Steps 7.4.5 & 7.4.6 are N/A for the rods that move.
Steps 7.4.5 & 7.4.6 are N/A for the rods that move.
Instructor Cue:
Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___
Comment(s):__________________________
Comment(s):__________________________
______________________________________
______________________________________
Line 120: Line 105:
Notes: Operator may select single rod 26-51 and attempt to withdraw. No Rod Movement, ROD at position 00.
Notes: Operator may select single rod 26-51 and attempt to withdraw. No Rod Movement, ROD at position 00.
SAT ___ UNSAT ___
SAT ___ UNSAT ___
Comment(s):______________________
Comment(s):______________________
__________________________________________
__________________________________________
NOTE Failure to achieve a green STABLE status LED is indicative of a gang misalignment condition AND will be indicated by the red MISALIGNED status LED.
NOTE Failure to achieve a green STABLE status LED is indicative of a gang misalignment condition AND will be indicated by the red MISALIGNED status LED.


OT-3701-C11_513_RO Rev 0 Step 7  7.24 Alternate Control Methods Rod Initially at Position "00" 7.24.1  IF NOT using a Control Rod Movement Sheet, THEN PERFORM the following:
OT-3701-C11_5 13_RO Rev 0 Step 7  7.24 Alternate Control Methods Rod Initially at Position "00" 7.24.1  IF NOT using a Control Rod Movement Sheet, THEN PERFORM the following:
Standard:
Standard: Step 7.24.1 is N
Step 7.24.1 is N
/A  Instructor Cue:
/A  Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___ Comment(s):__________________________
Comment(s):__________________________
______________________________________
______________________________________
Step 8  7.24.2  ATTEMPT to withdraw the rod by double clutching as follows:
Step 8  7.24.2  ATTEMPT to withdraw the rod by double clutching as follows:
7.24.2.a DEPRESS AND HOLD the IN TIMER SKIP for several seconds.
7.24.2.a DEPRESS AND HOLD the IN TIMER SKIP for several seconds.
7.24.2.b VERIFY the FULL IN light is on in the rod status display.
7.24.2.b VERIFY the FULL IN light is on in the rod status display.
7.24.2.c IMMEDIATELY OPERATE the CRD in Continuous Withdraw Mode.
7.24.2.c IMMEDIATELY OPERATE the CRD in Continuous Withdraw Mode.
Standard:
Standard: Operator attempts to move rod by double clutching.
Operator attempts to move rod by double clutching.
Instructor Cue:
Instructor Cue:
None  Notes: Operator may perform several attempts using double clutching.
None  Notes: Operator may perform several attempts using double clutching.
SAT ___ UNSAT ___
SAT ___ UNSAT ___ Comment (s):_____________________________
Comment(s):_____________________________
___________________________________
___________________________________
NOTES  The upper limit of the normal drive water pressure band may be increased to 300 psid during the Start
NOTES  The upper limit of the normal drive water pressure band may be increased to 300 psid during the Start
Line 147: Line 127:
The following methods will be performed in the sequence listed until a successful notch-out is achieved.
The following methods will be performed in the sequence listed until a successful notch-out is achieved.


OT-3701-C11_513_RO Rev 0  Step 9  7.24.3  IF the "double-clutching" method at the normal Drive Water pressure failed to move the rod, THEN ATTEMPT to move the rod using High Drive Water Pressure method as follows:    Standard:
OT-3701-C11_5 13_RO Rev 0  Step 9  7.24.3  IF the "double-clutching" method at the normal Drive Water pressure failed to move the rod, THEN ATTEMPT to move the rod using High Drive Water Pressure method as follows:    Standard: Step 7.24.3 is N/A since initially drive water pressure was at 300 psid and  
Step 7.24.3 is N/A since initially drive water pressure was at 300 psid and  


double clutching didn't work
double clutching didn't work
Line 154: Line 133:
If asked, pressure historically needed for moving the rod was 270 psig.
If asked, pressure historically needed for moving the rod was 270 psig.
Notes: None  SAT ___ UNSAT ___
Notes: None  SAT ___ UNSAT ___
Comment(s):______________
Comment(s):______________
__________________________________________________
__________________________________________________
Step 10 7.24.4  IF moving the rod has NOT been successful, THEN PERFORM the following:
Step 1 0 7.24.4  IF moving the rod has NOT been successful, THEN PERFORM the following:
7.24.4.a  RAISE CRDH drive differential pressure in 50 psid increments UNTIL rod motion is possible 500 psid is reached Critical Step
7.24.4.a  RAISE CRDH drive differential pressure in 50 psid increments UNTIL rod motion is possible 500 psid is reached Critical Step
: Operator adjusts drive water pressure higher by throttling closed on 1C11-F003, CRD Drive Pressure Control Valve Instructor Cue:
: Operator adjusts drive water pressure higher by throttling closed on 1C11-F003, CRD Drive Pressure Control Valve Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___
Comment(s):________________________________________________________________
Comment(s):________________________________________________________________
NOTE The drive water header pressure control valve is paralleled with an inline relief valve. Manual adjustment of drive water pressure must be below the relief valve setting (approx. 550 psig).
NOTE The drive water header pressure control valve is paralleled with an inline relief valve. Manual adjustment of drive water pressure must be below the relief valve setting (approx. 550 psig).


OT-3701-C11_513_RO Rev 0 Step 11 7.24.4.b ATTEMPT to WITHDRAW the rod using the normal method at each increment.:
OT-3701-C11_5 13_RO Rev 0 Step 1 1 7.24.4.b ATTEMPT to WITHDRAW the rod using the normal method at each increment.:
Critical Step
Critical Step
: Operator attempts to withdraw the Control rod.
: Operator attempts to withdraw the Control rod.
Line 172: Line 149:
-B0002, Control Rods Movements.
-B0002, Control Rods Movements.
SAT ___ UNSAT ___
SAT ___ UNSAT ___
Comment(s):________________________________________________________________
Comment(s):________________________________________________________________
Step 12 7.24.5 Rod withdrawal was NOT successful Drive water pressure is 500 psid THEN PERFORM the following:
Step 1 2 7.24.5 Rod withdrawal was NOT successful Drive water pressure is 500 psid THEN PERFORM the following:


7.24.6 IF moving control rods in accordance with Tech Spec 3.10.6, THEN RETURN Drive Water Pressure to normal as directed by the US/SS.
7.24.6 IF moving control rods in accordance with Tech Spec 3.10.6, THEN RETURN Drive Water Pressure to normal as directed by the US/SS.
Standard:
Standard: Steps 7.24.5 and 7.24.6 are N/A. Instructor Cue:
Steps 7.24.5 and 7.24.6 are N/A. Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___
Comment(s):___________________________
Comment(s):___________________________
_____________________________________
_____________________________________


OT-3701-C11_513_RO Rev 0 Step 13 7.24.7 IF NOT moving control rods in accordance with Tech Spec 3.10.6, THEN RETURN Drive Water Pressure to normal WHEN any one of the following condition is met:
OT-3701-C11_5 13_RO Rev 0 Step 1 3 7.24.7 IF NOT moving control rods in accordance with Tech Spec 3.10.6, THEN RETURN Drive Water Pressure to normal WHEN any one of the following condition is met:
The rod is at the withdrawal limit Rod movement is suspended The US/SO determine the elevated pressure is no longer needed Another Control Rod is to be selected Critical Step
The rod is at the withdrawal limit Rod movement is suspended The US/SO determine the elevated pressure is no longer needed Another Control Rod is to be selected Critical Step
: Operator adjusts drive water pressure lower by throttling open on 1C11
: Operator adjusts drive water pressure lower by throttling open on 1C11
-
-
F003, CRD Drive Pressure Control Valve
F003, CRD Drive Pressure Control Valve. Instructor Cue:
. Instructor Cue:
If asked, Drive Water Pressure should be returned to 300 PSID.
If asked, Drive Water Pressure should be returned to 300 PSID.
Notes: Terminate JPM when Drive Water pressure returned to 300 PSID.
Notes: Terminate JPM when Drive Water pressure returned to 300 PSID.
SAT ___ UNSAT ___
SAT ___ UNSAT ___
Comment(s):________________________________________________________________
Comment(s):________________________________________________________________
Terminating Cue: Rods that were attempted to be withdrawn are at withdraw limit.
Terminating Cue: Rods that were attempted to be withdrawn are at withdraw limit.
Evaluation Results:
Evaluation Results:
SAT_____ UNSAT_____
SAT_____ UNSAT_____
End Time OT-3701-C11_513_RO Rev 0 JPM CUE SHEET INITIAL CONDITIONS:
End Time OT-3701-C11_5 13_RO Rev 0 JPM CUE SHEET INITIAL CONDITIONS:
Start up is in progress after a reactor scram.
Start up is in progress after a reactor scram.
Reactor Power is approximately 2%.
Reactor Power is approximately 2%.
Line 209: Line 181:
Unit Supervisor directs you to continue power ascension by withdrawing control rods until reactor pressure is 940 psig
Unit Supervisor directs you to continue power ascension by withdrawing control rods until reactor pressure is 940 psig
.
.
OT-3701-E51_006  Rev 0  JOB PERFORMANCE MEASURE SETUP SHEET System: E51, Reactor Core Isolation Cooling Time Critical:
OT-3701-E51_006  Rev 0  JOB PERFORMANCE MEASURE SETUP SHEET System: E51 , Reactor Core Isolation Cooling Time Critical:
No Alternate Path:
No Alternate Path:
No Applicability:
No Applicability:
Line 218: Line 190:
==References:==
==References:==


EOP-SPI 6.6 Rev 0 Required Material EOP-SPI 6.6, RCIC Injection And Pressure Control Tasks: 217-565-04-01 Control RPV Level with RCIC Operating in the Injection Mode Task Standard:
EOP-SPI 6.6 Rev 0 Required Material EOP-SPI 6.6 , RCIC Injection And Pressure Control Tasks: 217-565-04-01 Control RPV Level with RCIC Operating in the Injection Mode Task Standard:
Lineup RCIC to control RPV level per EOP-SPI 6.6 K/A Data:
Lineup RCIC to control RPV level per EOP-SPI 6.6 K/A Data:
217000 K3.01 Knowledge of the effect that a loss or malfunction of the REACTOR CORE ISOLATION COOLING SYSTEM (RCIC) will have on following:
217000 K3.0 1 Knowledge of the effect that a loss or malfunction of the REACTOR CORE ISOLATION COOLING SYSTEM (RCIC) will have on following:
Reactor water level. Importance:
Reactor water level. Importance:
RO 3.7 / SRO 3.7 A4.05 Ability to manually operate and/or monitor in the control room: Reactor water level. Importance: RO 4.
RO 3.7 / SRO 3.7 A 4.0 5 Ability to manually operate and/or monitor in the control room: Reactor water level. Importance: RO 4.
1 / SRO 4.1  1. Setup Instructions
1 / SRO 4.1  1. Setup Instructions
:    Reset  simulator to IC-95. Insert Schedule file JPM
:    Reset  simulator to IC-95. Insert Schedule file JPM
Line 231: Line 203:
: 3. Initial Condition
: 3. Initial Condition
: The unit is scrammed and is operating IAW EOP
: The unit is scrammed and is operating IAW EOP
-1A. HPCS is tagged out for maintenance. Feedwater has been lost. RPV level band is 150" to 219".
-1 A. HPCS is tagged out for maintenance. Feedwater has been lost. RPV level band is 150" to 219".
RPV water level is lowering due to SRV operation
RPV water level is lowering due to SRV operation. 4. Initiating Cue:  The Unit Supervisor directs you restore and maintain RPV level IAW EOP-SPI 6.6 , RCIC Injection and Pressure Control. An I&C tech is standing by to assist you.
. 4. Initiating Cue:  The Unit Supervisor directs you restore and maintain RPV level IAW EOP-SPI 6.6, RCIC Injection and Pressure Control
. An I&C tech is standing by to assist you.


Start Time
Start Time
:  End Time:
:  End Time:
Candidate
Candidate:
:
OT-3701-E51_006  Rev 0  JPM BODY SHEET Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc before performing task.
OT-3701-E51_006  Rev 0  JPM BODY SHEET Standard:
Standard: Performer follows management expectations with regards to safety and communication standards.
Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc before performing task.
Standard:
Performer follows management expectations with regards to safety and communication standards.
Step 1  EOP-SPI 6.6, RCIC Injection and Pressure Control 1.0 IF the RCIC system is isolated OR an isolation may occur, THEN BYPASS isolations signals as follows:
Step 1  EOP-SPI 6.6, RCIC Injection and Pressure Control 1.0 IF the RCIC system is isolated OR an isolation may occur, THEN BYPASS isolations signals as follows:
:  1.1  AT H13-P629, Card File E21A
:  1.1  AT H13-P629, Card File E21A
Line 249: Line 216:
E31-N685A 1.2  AT H13-P618, Card File E12A
E31-N685A 1.2  AT H13-P618, Card File E12A
-Z6-1, REMOVE trip unit RX PRESS.
-Z6-1, REMOVE trip unit RX PRESS.
E31-N685B   Standard: Candidate goes to H13
E31-N 685B   Standard: Candidate goes to H13-P629 & P618 to remove trip units Instructor Cue:
-P629 & P618 to remove trip units Instructor Cue:
After Candidate locates each trip unit, inform him that the I&C Tech will remove the trip unit
After Candidate locates each trip unit, inform him that the I&C Tech will remove the trip unit
. The trip units E31-N685A & B are removed Notes: None  SAT ___ UNSAT ___
. The trip units E31-N685A & B are removed Notes: None  SAT ___ UNSAT ___
Comment(s):___________
Comment(s):___________
______________
______________
Line 261: Line 226:
RCIC LD ISOLATION BYPASS.
RCIC LD ISOLATION BYPASS.
E31A-S2B  RHR LD ISOL BYPASS FOR RHR AND RCIC.
E31A-S2B  RHR LD ISOL BYPASS FOR RHR AND RCIC.
E31A-S4B 1.4  AT H13-P632, VERIFY the following keylock switches in BYPASS:
E31A-S4B 1.4  AT H13-P6 3 2, VERIFY the following keylock switches in BYPASS:
RCIC LD ISOLATION BYPASS.
RCIC LD ISOLATION BYPASS.
E31A-S2A RHR LD ISOL BYPASS FOR RHR AND RCIC.
E31A-S2 A RHR LD ISOL BYPASS FOR RHR AND RCIC.
E31A-S4A   Critical Step
E31A-S4 A   Critical Step
: Candidate places keylock switches in BYPASS Instructor Cue:
: Candidate places keylock switches in BYPASS Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___ Comment(s):______________
Comment(s):______________
___________
___________
_______________________________________
_______________________________________
Line 275: Line 239:
: Candidate depresses isolation reset pushbuttons. Instructor Cue:
: Candidate depresses isolation reset pushbuttons. Instructor Cue:
None  Notes: Only S25 shows isolation SAT ___ UNSAT ___
None  Notes: Only S25 shows isolation SAT ___ UNSAT ___
Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________
Line 287: Line 250:
-F076 & F063
-F076 & F063
. Instructor Cue:
. Instructor Cue:
None  Notes: Candidate verifies valves E51-F064 & F068 are open. SAT ___ UNSAT ___
None  Notes: Candidate verifies valves E51-F064 & F068 are open. SAT ___ UNSAT ___ Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________


Line 297: Line 259:
-P629 to remove trip units Instructor Cue:
-P629 to remove trip units Instructor Cue:
After Candidate locates each trip unit, inform him that the I&C Tech will remove the trip unit
After Candidate locates each trip unit, inform him that the I&C Tech will remove the trip unit
. The trip units E51-N636A & B are removed Notes: None  SAT ___ UNSAT ___
. The trip units E 5 1-N6 36 A & B are removed Notes: None  SAT ___ UNSAT ___
 
Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________


OT-3701-E51_006  Rev 0  Step 6  3.0 IF RPV level will be below 130 inches (Level 2),
OT-3701-E51_006  Rev 0  Step 6  3.0 IF RPV level will be below 130 inches (Level 2), THEN AT H13
THEN AT H13
-P629, Card File E21A
-P629, Card File E21A
-Z2-1, REMOVE the following trip units to defeat the RCIC Automatic Initiation:
-Z2-1, REMOVE the following trip units to defeat the RCIC Automatic Initiation:
Line 311: Line 271:
-P629 to remove trip units Instructor Cue:
-P629 to remove trip units Instructor Cue:
If asked, and RPV level not yet below L2, respond, "RPV level is lowering" The I&C Tech will remove the trip units.
If asked, and RPV level not yet below L2, respond, "RPV level is lowering" The I&C Tech will remove the trip units.
The trip units E51-N636A & B are removed Notes: None  SAT ___ UNSAT ___
The trip units E 5 1-N6 36 A & B are removed Notes: None  SAT ___ UNSAT ___
 
Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________
Line 320: Line 279:
. 1E51-F010  4.2 TAKE RCIC PUMP SUPR PL SUCT ISOL to CLOSE.
. 1E51-F010  4.2 TAKE RCIC PUMP SUPR PL SUCT ISOL to CLOSE.
1E51-F031  Standard: Candidate observes RCIC suction on the CST
1E51-F031  Standard: Candidate observes RCIC suction on the CST
. Instructor Cue: None  Notes: Step 4 is N/A  SAT ___ UNSAT ___
. Instructor Cue: None  Notes: Step 4 is N/A  SAT ___ UNSAT ___ Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________


Line 329: Line 287:
1E51A-S18 6.0 CONFIRM the RCIC INIT  
1E51A-S18 6.0 CONFIRM the RCIC INIT  
- MN & FDW TB TRIP  
- MN & FDW TB TRIP  
- SEAL IN RESET white seal in light is OFF. 1E51A-S18  Standard: Candidate Depresses pushbutton and confirms whit e light off
- SEAL IN RESET white seal in light is OFF. 1E51A-S18  Standard: Candidate Depresses pushbutton and confirms whit e light off. Instructor Cue:
. Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___
Comment(s):_________________________
Comment(s):_________________________
__________________
__________________
Line 344: Line 300:
1P42-C001A Standard: Candidate verifies ESW and ECC pumps started. Instructor Cue:
1P42-C001A Standard: Candidate verifies ESW and ECC pumps started. Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___
Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________
Line 352: Line 307:
. Instructor Cue:
. Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___
Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________


OT-3701-E51_006  Rev 0  Step 11 10.0  INITIATE an evacuation from the following:
OT-3701-E51_006  Rev 0  Step 1 1 10.0  INITIATE an evacuation from the following:
Reactor Building Annulus.
Reactor Building Annulus.
Containment Building.
Containment Building.
Line 362: Line 316:
. Instructor Cue:
. Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___
Comment(s):_________________________
Comment(s):_________________________
___________
___________
____________________________
____________________________


Step 12 11.0 VERIFY the following:
Step 1 2 1 1.0 VERIFY the following:
RCIC SECOND TEST VALVE TO CST is OPEN.
RCIC SECOND TEST VALVE TO CST is OPEN.
1E51-F059  RCIC pump flow controller, in Auto set between 350 to 700 GPM.
1E51-F059  RCIC pump flow controller, in Auto set between 350 to 700 GPM.
Line 377: Line 330:
-1000 psig. Notes: Candidate verifies 1E51-R600 set at 350 to 700 GPM (not critical step)
-1000 psig. Notes: Candidate verifies 1E51-R600 set at 350 to 700 GPM (not critical step)
. SAT ___ UNSAT ___
. SAT ___ UNSAT ___
Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________


OT-3701-E51_006  Rev 0  Step 12  12.0 PERFORM Steps 13.0 and 14.0 as needed to maintain RPV Level and RPV pressure within directed bands.
OT-3701-E51_006  Rev 0  Step 12  1 2.0 PERFORM Steps 13.0 and 14.0 as needed to maintain RPV Level and RPV pressure within directed bands.
Standard: Candidate verifies the above
Standard: Candidate verifies the above
. Instructor Cue:
. Instructor Cue:
Line 388: Line 340:
However, will need to use Step 13.0 when RPV level is in band to stop level rise.
However, will need to use Step 13.0 when RPV level is in band to stop level rise.
SAT ___ UNSAT ___
SAT ___ UNSAT ___
Comment(s):____________
Comment(s):____________
_____________
_____________
Line 394: Line 345:


Step 13 14.0 WHEN desired to operate RCIC in the Level Control Mode as follows,  THEN PERFORM the following:
Step 13 14.0 WHEN desired to operate RCIC in the Level Control Mode as follows,  THEN PERFORM the following:
14.1  VERIFY RCIC STEAM SHUTOFF is OPEN.
1 4.1  VERIFY RCIC STEAM SHUTOFF is OPEN.
1E51-F045  Critical Step
1E51-F045  Critical Step
: Candidate opens E51
: Candidate opens E51
-F045. Instructor Cue:
-F045. Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___
Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________


OT-3701-E51_006  Rev 0  Step 14  14.2  IF the RCIC INJECTION VALVE is CLOSED, THEN THROTTLE the RCIC FIRST TEST VALVE TO CST UNTIL RCIC pump discharge pressure is 100 to 200 psig below RPV pressure.
OT-3701-E51_006  Rev 0  Step 14  1 4.2  IF the RCIC INJECTION VALVE is CLOSED, THEN THROTTLE the RCIC FIRST TEST VALVE TO CST UNTIL RCIC pump discharge pressure is 100 to 200 psig below RPV pressure.
1E51-F022  Critical Step
1E51-F022  Critical Step
: Candidate throttles open E51-F022. Instructor Cue:
: Candidate throttles open E51-F022. Instructor Cue:
None  Notes: SOI-E51 P&L warns against operating RCIC on min flow.
None  Notes: SOI-E51 P&L warns against operating RCIC on min flow.
SAT ___ UNSAT ___
SAT ___ UNSAT ___ Comment(s):___________
Comment(s):___________
______________
______________
_______________________________________
_______________________________________


Step 15  14.3  TAKE RCIC INJECTION VALVE to OPEN.
Step 15  1 4.3  TAKE RCIC INJECTION VALVE to OPEN.
1E51-F013  Critical Step
1E51-F013  Critical Step
: Candidate opens E51
: Candidate opens E51
-F013. Instructor Cue:
-F0 13. Instructor Cue:
None  Notes: Candidate needs to control RPV level in band of 150 to 219"
None  Notes: Candidate needs to control RPV level in band of 150 to 219"
. SAT ___ UNSAT ___
. SAT ___ UNSAT ___
Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________


OT-3701-E51_006  Rev 0  Step 16  14.4  VERIFY RCIC FIRST TEST VALVE TO CST is CLOSED. 1E51-F022 14.5 MAINTAIN RCIC flow between 350 GPM and 700 GPM. 1E51-R600  Standard: Candidate closes E51
OT-3701-E51_006  Rev 0  Step 16  1 4.4  VERIFY RCIC FIRST TEST VALVE TO CST is CLOSED. 1E51-F022 14.5 MAINTAIN RCIC flow between 350 GPM and 700 GPM. 1E51-R600  Standard: Candidate closes E51
-F022 and maintains RCIC flow in band
-F022 and maintains RCIC flow in band
. Instructor Cue:
. Instructor Cue:
None  Notes: If level rise is slow and candidate controls level in band, terminate the JPM. Otherwise continue to JPM step 17 SAT ___ UNSAT ___
None  Notes: If level rise is slow and candidate controls level in band, terminate the JPM. Otherwise continue to JPM step 17 SAT ___ UNSAT ___ Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________


Line 432: Line 379:
13.1 VERFIY RCIC INJECTION VALVE to CLOSED.
13.1 VERFIY RCIC INJECTION VALVE to CLOSED.
1E51-F013 13.2 VERIFY RCIC STEAM SHUTOFF is OPEN.
1E51-F013 13.2 VERIFY RCIC STEAM SHUTOFF is OPEN.
1E51-F045 13.3 MAINTAIN RCIC flow between 350 GPM and 700 GPM.
1E51-F0 45 13.3 MAINTAIN RCIC flow between 350 GPM and 700 GPM.
1E51-R600 13.4 THROTTLE RCIC FIRST TEST VALVE TO CST to maintain desired RPV pressure.
1E51-R600 13.4 THROTTLE RCIC FIRST TEST VALVE TO CST to maintain desired RPV pressure.
  . 1E51-F022  Standard: Candidate closes E51
  . 1E51-F022  Standard: Candidate closes E51
Line 439: Line 386:
None  Notes: When level is stable and in band, terminate the JPM.
None  Notes: When level is stable and in band, terminate the JPM.
SAT ___ UNSAT ___
SAT ___ UNSAT ___
Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________
Line 455: Line 401:
The Unit Supervisor directs you restore and maintain RPV level IAW EOP-SPI 6.6, RCIC Injection and Pressure Control. An I&C tech is standing by to assist you.
The Unit Supervisor directs you restore and maintain RPV level IAW EOP-SPI 6.6, RCIC Injection and Pressure Control. An I&C tech is standing by to assist you.


OT-3701-B21_009 Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: B21, Main Steam Time Critical:
OT-3701-B21_0 09 Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: B21, Main Steam Time Critical:
No Alternate Path:
No Alternate Path:
No Applicability:
No Applicability:
Line 477: Line 423:
: 4. Initiating Cue
: 4. Initiating Cue
:  The Unit Supervisor directs you reopen the MSIV's IAW EOP
:  The Unit Supervisor directs you reopen the MSIV's IAW EOP
-SPI 9.2, Opening MSIV's
-SPI 9.2, Opening MSIV's. Another operator is controlling RPV pressure.
. Another operator is controlling RPV pressure.
Start Time
Start Time
:  End Time:
:  End Time:
Candidate
Candidate:
:
Note: Run this JPM then E51
Note: Run this JPM then E51
-006 in sequence.
-006 in sequence.


OT-3701-B21_009 Rev 0 JPM BODY SHEET Standard:
OT-3701-B21_0 09 Rev 0 JPM BODY SHEET Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc before performing task.
Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc before performing task.
Standard: Performer follows management expectations with regards to safety and communication standards.
Standard:
Performer follows management expectations with regards to safety and communication standards.
Step 1  EOP-SPI 9.2, OPENING MSIV's 1.0 DEFEAT MSIV low RPV level isolation as follows:
Step 1  EOP-SPI 9.2, OPENING MSIV's 1.0 DEFEAT MSIV low RPV level isolation as follows:
AT H13-P694, VERIFY MSIV ISOL LO LEVEL BYPASS CH D keylock switch in BYP.
AT H13-P694, VERIFY MSIV ISOL LO LEVEL BYPASS CH D keylock switch in BYP.
Line 498: Line 440:
: Candidate verifies (places) keylock switches in BYPASS Instructor Cue:
: Candidate verifies (places) keylock switches in BYPASS Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___
Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________


OT-3701-B21_009 Rev 0 Step 2  2.0 VERIFY the following control switches are in CLOSE:
OT-3701-B21_0 09 Rev 0 Step 2  2.0 VERIFY the following control switches are in CLOSE:
MSL B OTBD MSIV.
MSL B OTBD MSIV.
B21-F028B  MSL D OTBD MSIV.
B21-F028B  MSL D OTBD MSIV.
Line 513: Line 454:
: Candidate places MSIV control switches in CLOSE. Instructor Cue:
: Candidate places MSIV control switches in CLOSE. Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___
 
Comme nt(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________


Step 3 3.0 AT Panel P680, VERIFY all Turbine Bypass Valves are CLOSED.
Step 3 3.0 AT Panel P680, VERIFY all Turbine Bypass Valves are CLOSED.
Standard: Candidate observes Turbine Bypass Valves are CLOSED. Instructor Cue:
Standard: Candidate observes Turbine Bypass Valves are CLOSE D. Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___
Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________


OT-3701-B21_009 Rev 0 Step 4  4.0 AT Panel P601, VERIFY the following drain valves are CLOSED:
OT-3701-B21_0 09 Rev 0 Step 4  4.0 AT Panel P601, VERIFY the following drain valves are CLOSED:
MSL Low Point DRN Shutoff.
MSL Low Point DRN Shutoff.
1B21-F015  Shutoff Vlv Before Seat Norm DRN.
1B21-F015  Shutoff Vlv Before Seat Norm DRN.
Line 534: Line 473:
- not critical step.
- not critical step.
SAT ___ UNSAT ___
SAT ___ UNSAT ___
Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________


Step 5 5.0 AT Panel P 870, VERIFY MST To RFPT A & B Supply Valve is CLOSED.
Step 5 5.0 AT Panel P 870 , VERIFY MST To RFPT A & B Supply Valve is CLOSED.
1N11-F100  Critical Step
1N11-F100  Critical Step
: Candidate places 1N11-F100 valve control switches in CLOSE. Instructor Cue: None  Notes: None  SAT ___ UNSAT ___
: Candidate places 1N11-F100 valve control switches in CLOSE. Instructor Cue: None  Notes: None  SAT ___ UNSAT ___
Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________


OT-3701-B21_009 Rev 0 Step 6  6.0 IF Main Turb Stop Valves Before Seat DRN valves are OPEN, THEN AT Panel P870, LATCH controller 1N22
OT-3701-B21_0 09 Rev 0 Step 6  6.0 IF Main Turb Stop Valves Before Seat DRN valves are OPEN, THEN AT Panel P870, LATCH controller 1N22
-R235, Main Turb Stop Valves Before Seat DRN Valve controller as follows:
-R235, Main Turb Stop Valves Before Seat DRN Valve controller as follows:
1N22-F340A  1N22-F340B  1N22-F340C  1N22-F340D  6.1 VERIFY Main Turb Stop Valves Before Seat DRN Valve controller at 100%.
1N22-F340A  1N22-F340B  1N22-F340C  1N22-F340D  6.1 VERIFY Main Turb Stop Valves Before Seat DRN Valve controller at 100%.
Line 554: Line 491:
. Instructor Cue:
. Instructor Cue:
None  Notes: Step 6.3 is N/A SAT ___ UNSAT ___
None  Notes: Step 6.3 is N/A SAT ___ UNSAT ___
Comment(s):_________________________
Comment(s):_________________________
__________
__________
_____________________________
_____________________________


OT-3701-B21_009 Rev 0 Step 7  7.0 WHEN the following alarms have cleared, MSL ISOL MAIN STEAM LINE FLOW HIGH.
OT-3701-B21_0 09 Rev 0 Step 7  7.0 WHEN the following alarms have cleared, MSL ISOL MAIN STEAM LINE FLOW HIGH.
   (H13-P601-19A-A3)  MSL ISOL TURBINE AREA TEMP HIGH.
   (H13-P601-19A-A3)  MSL ISOL TURBINE AREA TEMP HIGH.
  (H13-P601-19A-B3)  MSL & RWCU ISOL STEAM TUNNEL TEMP HIGH.
  (H13-P601-19A-B3)  MSL & RWCU ISOL STEAM TUNNEL TEMP HIGH.
Line 566: Line 502:
1B21H-S33  MSL & NS4 OTBD ISOL SEAL IN RESET.
1B21H-S33  MSL & NS4 OTBD ISOL SEAL IN RESET.
1B21H-S32  Critical Step
1B21H-S32  Critical Step
: Candidate Depresses 1B21H-S33 and 1B21H
: Candidate Depresses 1B21H-S33 and 1B21H-S32 to clear isolation signal. Instructor Cue:
-S32 to clear isolation signal. Instructor Cue:
None  Notes: Alarm H13-P 601-19A-A1 will clear.
None  Notes: Alarm H13-P601-19A-A1 will clear.
SAT ___ UNSAT ___
SAT ___ UNSAT ___
Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________
Line 579: Line 513:
1B21-F020  INBD MSIV Before Seat Warmup Drain.
1B21-F020  INBD MSIV Before Seat Warmup Drain.
1B21-F021  Critical Step:
1B21-F021  Critical Step:
Candidate opens the above listed valves. Instructor Cue:
Candidate opens the above listed valve s. Instructor Cue:
None  Notes: When drain valves are opened, RPV pressure will start to lower. Pressure control on SRV's no longer required.
None  Notes: When drain valves are opened, RPV pressure will start to lower. Pressure control on SRV's no longer required.
SAT ___ UNSAT ___
SAT ___ UNSAT ___
Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________


OT-3701-B21_009 Rev 0 Step 9  9.0 Instrument Air is isolated to the Drywell NO known air leak is present in Containment NO known air leak is present in Drywell THEN RESTORE Instrument Air to Containment and Drywell as follows:
OT-3701-B21_0 09 Rev 0 Step 9  9.0 Instrument Air is isolated to the Drywell NO known air leak is present in Containment NO known air leak is present in Drywell THEN RESTORE Instrument Air to Containment and Drywell as follows:
9.1  VERIFY INST AIR DRYWELL ISOL valve is OPEN.
9.1  VERIFY INST AIR DRYWELL ISOL valve is OPEN.
P52-F646  9.2  VERIFY INST AIR CNTMT ISOL valve is OPEN.
P52-F646  9.2  VERIFY INST AIR CNTMT ISOL valve is OPEN.
P52-F200  Standard: Candidate verifies opens the air isolation valves
P52-F200  Standard: Candidate verifies opens the air isolation valves
. Instructor Cue:
. Instructor Cue:
If asked, there are no known air leaks in containment or drywell Notes: None  SAT ___ UNSAT ___
If asked, there are no known air leaks in containment or drywell Notes: None  SAT ___ UNSAT ___ Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________


OT-3701-B21_009 Rev 0 Step 10  10.0 SELECT an available MSL to OPEN. MSL B MSL D MSL A MSL C 11.0 PLACE the SELECTED MSL OTBD MSIV control switch in Auto, to open the outboard MSIV.
OT-3701-B21_0 09 Rev 0 Step 10  10.0 SELECT an available MSL to OPEN. MSL B MSL D MSL A MSL C 11.0 PLACE the SELECTED MSL OTBD MSIV control switch in Auto, to open the outboard MSIV.
B21-F028B B21-F028D B21-F028A B21-F028C 12.0 PLACE the SELECTED MSL INBD MSIV control switch in Auto, to open the inboard MSIV.
B21-F028B B21-F028D B21-F028A B21-F028C 12.0 PLACE the SELECTED MSL INBD MSIV control switch in Auto, to open the inboard MSIV.
B21-F022B B21-F022D B21-F022A B21-F022C  Critical Step
B21-F022B B21-F022D B21-F022A B21-F022C  Critical Step
Line 602: Line 534:
None  Notes: Opening the first MSL causes an RPV level perturbation.
None  Notes: Opening the first MSL causes an RPV level perturbation.
SAT ___ UNSAT ___
SAT ___ UNSAT ___
Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________


OT-3701-B21_009 Rev 0 Step 11  14.0 VERIFY the following control switches are in AUTO:
OT-3701-B21_0 09 Rev 0 Step 11  1 4.0 VERIFY the following control switches are in AUTO:
MSL B OTBD MSIV.
MSL B OTBD MSIV.
B21-F028B  MSL D OTBD MSIV.
B21-F028B  MSL D OTBD MSIV.
Line 617: Line 548:
B21-F022C  Standard: Candidate places control switches for remaining MSIV's in AUTO
B21-F022C  Standard: Candidate places control switches for remaining MSIV's in AUTO
. Instructor Cue:
. Instructor Cue:
None  Notes: Step 13 is N/A Terminate the JPM SAT ___ UNSAT ___
None  Notes: Step 1 3 is N/A Terminate the JPM SAT ___ UNSAT ___
 
Comment(s):_________________________
Comment(s):_________________________
_______________________________________
_______________________________________
Line 626: Line 556:
. Evaluation Results:
. Evaluation Results:
SAT_____ UNSAT_____
SAT_____ UNSAT_____
End Time OT-3701-B21_009 Rev 0 JPM CUE SHEET INITIAL CONDITIONS:
End Time OT-3701-B21_0 09 Rev 0 JPM CUE SHEET INITIAL CONDITIONS:
The unit is scrammed and is operating IAW EOP
The unit is scrammed and is operating IAW EOP
-1A. MSIV's closed due to a Mode Switch malfunction which has been corrected.
-1 A. MSIV's closed due to a Mode Switch malfunction which has been corrected.
INITIATING CUE:
INITIATING CUE:
The Unit Supervisor directs you reopen the MSIV's IAW EOP-SPI 9.2, Opening MSIV's.
The Unit Supervisor directs you reopen the MSIV's IAW EOP-SPI 9.2, Opening MSIV's.
Another operator is controlling RPV pressure.
Another operator is controlling RPV pressure.


OT-3701-E12_506_RO Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: E12, Residual Heat Removal Time Critical:
OT-3701-E12_5 06_RO Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: E12, Residual Heat Removal Time Critical:
No Alternate Path:
No Alternate Path:
Yes Applicability:
Yes Applicability:
RO Safety Function:
RO Safety Function:
4: Heat Removal From Reactor Core Setting: Simulator Validated:
4: Heat Removal From Reactor Core Setting: Simulator Validated:
36 minutes  
3 6 minutes  


==References:==
==References:==


SOI-E12 Rev. 5 7 & ONI-E12-2 Rev 29 Required Material SOI-E12 - Residual Heat Removal System Tasks: 205-535-01-01 Warmup and Initiate Shutdown Cooling from Standby Readiness Task Standard:
SOI-E12 Rev. 5 7 & ONI-E1 2-2 Rev 2 9 Required Material SOI-E12 - Residual Heat Removal System Tasks: 205-535-01-01 Warmup and Initiate Shutdown Cooling from Standby Readiness Task Standard:
Initiate SDC in Alternate Return Path mode prior to exceeding 200° F in vessel. K/A Data:
Initiate SDC in Alternate Return Path mode prior to exceeding 200° F in vessel. K/A Data:
205000 Ability to (a) predict the impacts of the following on the Shutdown Cooling System (RHR Shutdown Cooling Mode) ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations::  A2.06 SDC/RHR pump trips
205000 Ability to (a) predict the impacts of the following on the Shutdown Cooling System (RHR Shutdown Cooling Mode) ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations::  A2.0 6 SDC/RHR pump trips. Importance RO 3.
. Importance RO 3.
4 / SRO 3.5. A2.10 R Valve operation. Importance: RO 2.9 SRO 2.9  Ability to manually operate and/or monitor in the control room: A4.01 SDC/RHR pumps Importance RO 3.7 / SRO 3.7. A4.03 SDC/RHR discharge valves Importance RO 3.6 / SRO 3.5. A4.09 System flow
4 / SRO 3.5. A2.10 R Valve operation. Importance: RO 2.9 SRO 2.9  Ability to manually operate and/or monitor in the control room: A4.01 SDC/RHR pumps Importance RO 3.7 / SRO 3.7. A4.03 SDC/RHR discharge valves Importance RO 3.6 / SRO 3.5. A4.09 System flow
. Importance RO 3.1 / SRO 3.1
. Importance RO 3.1 / SRO 3.1


OT-3701-E12_506_RO Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET contd. 1. Simulator Setup Instructions
OT-3701-E12_5 06_RO Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET contd. 1. Simulator Setup Instructions
: Reset simulator to IC 96 (RPV temperature  
: Reset simulator to IC 96 (RPV temperature  
~ 120°F). Run schedule file JPM
~ 1 2 0°F). Run schedule file JPM
-E12-506 (malfunctio n mv06_1e12f0053a
-E12-506 (malfunctio n mv06_1e12f0053a
  & remote Function RH07 for RHR B pump breaker control power loss
  & remote Function RH07 for RHR B pump breaker control power loss
Line 657: Line 586:
Verify Low Flow Control screen up on DFWCS. Provide marked
Verify Low Flow Control screen up on DFWCS. Provide marked
-up copy of SOI
-up copy of SOI
-E12. Place simulator in run after reading Initial Conditions to Operator.
-E12. Place simulator in run after reading Initial Conditions to Operator. 2. Location / Method: Simulator / performance
: 2. Location / Method: Simulator / performance
: 3. Initial Condition
: 3. Initial Condition
: The plant shutdown due to scram yesterday. Currently in Mode 4 and the Unit Supervisor is operating in IOI
: The plant shutdown due to scram yesterday. Currently in Mode 4 and the Unit Supervisor is operating in IOI
-12 Maintaining Cold Shutdown. RHR B was operating in Shutdown Cooling when the pump tripped. The Unit Supervisor has entered ONI-E12-2 Loss of Decay Heat Removal. No Reactor Recirculation pumps are in operation. Reactor temperature band is 1 10 to 120 degrees F. RPV temperature was 1 15 degrees F prior to trip.
-12 Maintaining Cold Shutdown. RHR B was operating in Shutdown Cooling when the pump tripped. The Unit Supervisor has entered ONI-E12-2 Loss of Decay Heat Removal. No Reactor Recirculation pumps are in operation. Reactor temperature band is 1 10 to 1 20 degrees F. RPV temperature was 1 15 degrees F prior to trip.
The RO shifting SDC loops became ill.
The RO shifting SDC loops became ill.
: 4. Initiating Cue
: 4. Initiating Cue
: The Unit Supervisor directs you
: The Unit Supervisor directs you
, the Reactor Operator, to continue shifting Shutdown Cooling loops from B to A using RHR A through the Normal Return Path. Section 4.7 Shutdown Cooling Startup for RHR A is complete through Step 4.7.1
, the Reactor Operator , to continue shifting Shutdown Cooling loops from B to A using RHR A through the Normal Return Path. Section 4.7 Shutdown Cooling Startup for RHR A is complete through Step 4.7.1
: 4. Monitor Reactor Temperature per IOI
: 4. Monitor Reactor Temperature per IOI
-12 after RHR A is in SDC
-12 after RHR A is in SDC
Line 673: Line 601:
Operator:     
Operator:     


OT-3701-E12_506_RO Rev 0 JPM BODY SHEET  Standard:
OT-3701-E12_5 06_RO Rev 0 JPM BODY SHEET  Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc- before performing task.
Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc- before performing task.
Standard: Performer follows management expectations with regards to safety and communication standards.
Standard:
Step 1  SO I-E12, RESIDUAL HEAT REMOVAL SYSTEM 2.0 Precautions And Limitations 2.2  Observe the following limitations during the operation of the RHR pumps:
Performer follows management expectations with regards to safety and communication standards.
Step 1  SOI-E12, RESIDUAL HEAT REMOVAL SYSTEM 2.0 Precautions And Limitations 2.2  Observe the following limitations during the operation of the RHR pumps:
Do not operate the RHR pump against a shutoff head for greater than 8 seconds.
Do not operate the RHR pump against a shutoff head for greater than 8 seconds.


Line 688: Line 614:
Operator reviews place
Operator reviews place
-kept copy of SOI
-kept copy of SOI
-E12 including Precautions and Limitations and panel H13
-E12 including Precautions and Limitations and panel H13-P601. Standard: The Operator reviews place
-P601. Standard:
The Operator reviews place
-kept copy of SOI
-kept copy of SOI
-E12. Instructor Cue:
-E12. Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___
Comment(s):__________________________
Comment(s):__________________________
______________________________________
______________________________________


OT-3701-E12_506_RO Rev 0 Step 2  4.7.15 Hold the Oncoming RJR HX'S BYPASS VALVE in CLOSE for 59
OT-3701-E12_5 06_RO Rev 0 Step 2  4.7.15 Hold the Oncoming RJR HX'S BYPASS VALVE in CLOSE for 59
-62 seconds
-62 seconds
. 1E12-F048A    Critical Step
. 1E12-F048A    Critical Step
: The Operator closes 1E12F048A for 59-62 seconds
: The Operator closes 1E12F0 48 A for 59-62 seconds
. Instructor Cue:
. Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___  Comment(s):________________________________________________________________
None  Notes: None  SAT ___ UNSAT ___  Comment(s):________________________________________________________________
Step 3  4.7.16 Hold the Oncoming RJR HX'S OUTLET VALVE in CLOSE until closed
Step 3  4.7.16 Hold the Oncoming RJR HX'S OUTLET VALVE in CLOSE until closed
. 1E12-F003A    Critical Step
. 1E12-F003A    Critical Step
: The Operator closes 1E12F003A. Instructor Cue:
: The Operator closes 1E12F0 03 A. Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___ Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


OT-3701-E12_506_RO Rev 0 Step 4  4.7.17 It is desired to establish the Normal Return Path 1E12-F053A 1E12-F053B  RHR Upper Pool Cooling Isol is closed 1E12-F037A 1E12-F037B  LPCI Injection Valve is closed 1E12-F042A 1E12-F042B  THEN PERFORM the following:
OT-3701-E12_5 06_RO Rev 0 Step 4  4.7.17 It is desired to establish the Normal Return Path 1E12-F053A 1E12-F053B  RHR Upper Pool Cooling Isol is closed 1E12-F037A 1E12-F037B  LPCI Injection Valve is closed 1E12-F042A 1E12-F042B  THEN PERFORM the following:
4.7.17.a IF the Feedwater System is shutdown, THEN VERIFY the Oncoming RHR loop FDW HDR SHUTOFF is closed, to prevent flow to the feedwater system.
4.7.17.a IF the Feedwater System is shutdown, THEN VERIFY the Oncoming RHR loop FDW HDR SHUTOFF is closed, to prevent flow to the feedwater system.
1B21-F065A 1B21-F065B    Standard:
1B21-F065A 1B21-F065B    Standard: The Operator observes that feedwater is shutdown and the B21F065's are closed. Instructor Cue:
The Operator observes that feedwater is shutdown and the B21F065's are closed. Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___
Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


OT-3701-E12_506_RO Rev 0 Step 5  CAUTIONS  The RHR PUMP MIN FLOW VALVE is downpowered in the closed position.
OT-3701-E12_5 06_RO Rev 0 Step 5  CAUTIONS  The RHR PUMP MIN FLOW VALVE is downpowered in the closed position.
Throttling open the RHR HX'S BYPASS VALVE, 1E12
Throttling open the RHR HX'S BYPASS VALVE, 1E12
-F048A(B) after starting the pump ensures pump min flow requirements are met following pump start.
-F048A(B) after starting the pump ensures pump min flow requirements are met following pump start.
Line 726: Line 646:
:  HOLD the SHUTDOWN COOLING TO FDW SHUTOFF in OPEN, UNTIL open.
:  HOLD the SHUTDOWN COOLING TO FDW SHUTOFF in OPEN, UNTIL open.
1E12-F053A  TAKE the RHR PUMP to START.
1E12-F053A  TAKE the RHR PUMP to START.
1E12-C002A  4.7.17.b.2 WITHIN 8 seconds, THROTTLE RHR HX'S BYPASS VALVE, UNTIL RHR  PUMP FLOW is at least 2575 gpm.
1E12-C002A  4.7.17.b.2 WITHIN 8 seconds, THROTTLE RHR HX'S BYPASS VALVE, UNTIL RHR  PUMP FLOW is at least 2575 gpm. Critical Step: The Operator starts to open 1E12F053A and starts RHR A pump
Critical Step: The Operator starts to open 1E12F053A and starts RHR A pump
. Instructor Cue:
. Instructor Cue:
: 1. After report of valve failure, if pump was started, and the operator recommends it, direct operator to shutdown RHR A pump while deciding on a course of action.   
: 1. After report of valve failure, if pump was started, and the operator recommends it, direct operator to shutdown RHR A pump while deciding on a course of action.   
: 2. Direct Operator to establish shutdown cooling, this is an emergency.
: 2. Direct Operator to establish shutdown cooling, this is an emergency. Notes: Operator may or may not start pump if he notices failure of 1E12
Notes: Operator may or may not start pump if he notices failure of 1E12
-F053A. 1E12-F053A is failed closed and will lose indication simulating blown fuse. If Operator started pump, the Minimum Flow Valve was down-powered per step 4.7.10.c and the pump will not have minimum flow protection SAT ___ UNSAT ___ Comment(s):________________________________________________________________
-F053A. 1E12-F053A is failed closed and will lose indication simulating blown fuse. If Operator started pump, the Minimum Flow Valve was down-powered per step 4.7.10.c and the pump will not have minimum flow protection SAT ___ UNSAT ___
Comment(s):________________________________________________________________


OT-3701-E12_506_RO Rev 0 Step 6  4.7.18 It is desired to establish the Refuel Return Path 1E12-F037A 1E12-F037B Operator determines that this step is N/A.
OT-3701-E12_5 06_RO Rev 0 Step 6  4.7.18 It is desired to establish the Refuel Return Path 1E12-F0 37 A 1E12-F0 37 B Operator determines that this step is N/A.
Standard:
Standard: This Step is N/A. The Operator cannot use Refuel Mode Path
This Step is N/A. The Operator cannot use Refuel Mode Path
. Instructor Cue:
. Instructor Cue:
None  Notes: Plant not in Mode 5, Vessel Head installed.
None  Notes: Plant not in Mode 5, Vessel Head installed.
SAT ___ UNSAT ___
SAT ___ UNSAT ___ Comment(s):___________________________________________________
Comment(s):___________________________________________________
_____________
_____________


OT-3701-E12_506_RO Rev 0 Step 7  CAUTION  Operation of the RHR Loop with Vessel Injection via the LPCI Injection Line has the potential to result in fatigue failure of incore instrument tubes and burnishing of fuel channels.
OT-3701-E12_5 06_RO Rev 0 Step 7  CAUTION  Operation of the RHR Loop with Vessel Injection via the LPCI Injection Line has the potential to result in fatigue failure of incore instrument tubes and burnishing of fuel channels. The RHR PUMP MIN FLOW VALVE is downpowered in the closed position.
The RHR PUMP MIN FLOW VALVE is downpowered in the closed position.
Throttling open the RHR HX'S BYPASS VALVE, 1E12
Throttling open the RHR HX'S BYPASS VALVE, 1E12
-F048A(B) after starting the pump ensures pump min flow requirements are met following pump start.
-F048A(B) after starting the pump ensures pump min flow requirements are met following pump start.
Maintain RHR Shutdown Cooling flow greater than 2575 gpm to ensure that the RHR PUMP A(B) has adequate minimum flow.
Maintain RHR Shutdown Cooling flow greater than 2575 gpm to ensure that the RHR PUMP A(B) has adequate minimum flow.
4.7.19 It is desired to establish the Alternate Return Path 1E12-F042A 1E12-F042B Normal Shutdown Cooling return path is unavailable 1E12-F053A 1E12-F053B Refuel Shutdown Cooling return path is unavailable 1E12-F037A 1E12-F037B THEN PERFORM the following:
4.7.19 It is desired to establish the Alternate Return Path 1E12-F0 42 A 1E12-F0 42 B Normal Shutdown Cooling return path is unavailable 1E12-F053 A 1E12-F0 5 3B Refuel Shutdown Cooling return path is unavailable 1E12-F0 37 A 1E12-F0 37 B THEN PERFORM the following:
4.7.19.a REFER TO Alternate Shutdown Cooling Data (Attachment 42) and TAKE Pre-Start Data. Standard:
4.7.19.a REFER TO Alternate Shutdown Cooling Data (Attachment 42) and TAKE Pre-Start Data. Standard: The Operator requests/obtains Attachment 42.
The Operator requests/obtains Attachment 42.
Instructor Cue:
Instructor Cue:
This is an Emergency
This is an Emergency
. Establish Shutdown Cooling. Another Reactor Operator has taken prestart data on Attachment  
. Establish Shutdown Cooling. Another Reactor Operator has taken prestart data on Attachment  
: 42. Notes: None  SAT ___ UNSAT ___
: 42. Notes: None  SAT ___ UNSAT ___
Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


OT-3701-E12_506_RO Rev 0 Step 8  CAUTIONS  The RHR PUMP MIN FLOW VALVE is downpowered in the closed position.
OT-3701-E12_5 06_RO Rev 0 Step 8  CAUTIONS  The RHR PUMP MIN FLOW VALVE is downpowered in the closed position.
Throttling open the RHR HX'S BYPASS VALVE, 1E12
Throttling open the RHR HX'S BYPASS VALVE, 1E12
-F048A(B) after starting the pump ensures pump min flow requirements are met following pump start.
-F048A(B) after starting the pump ensures pump min flow requirements are met following pump start.
Maintain RHR Shutdown Cooling flow greater than 2575 gpm to ensure that the RHR PUMP A(B) has adequate minimum flow.
Maintain RHR Shutdown Cooling flow greater than 2575 gpm to ensure that the RHR PUMP A(B) has adequate minimum flow.
4.7.19.b INITIATE flow through the LPCI INJECTION VALVE as follows:  1E12-F042A 4.7.19.b.1 PERFORM the following simultaneously:
4.7.19.b INITIATE flow through the LPCI INJECTION VALVE as follows:  1E12-F0 42 A 4.7.19.b.1 PERFORM the following simultaneously:
TAKE the LPCI INJECTION VALVE to OPEN.
TAKE the LPCI INJECTION VALVE to OPEN.
1E12-F042A  TAKE the RHR PUMP to START.
1E12-F042A  TAKE the RHR PUMP to START.
1E12-C002A    Critical Step: The Operator starts to open 1E12
1E12-C002A    Critical Step: The Operator starts to open 1E12
-F042A and starts RHR A pump
-F0 42A and starts RHR A pump
. Instructor Cue:
. Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___
Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


OT-3701-E12_506_RO Rev 0 Step 9  4.7.19.b.2 WITHIN 8 seconds, THROTTLE RHR HX'S BYPASS VALVE, UNTIL RHR PUMP FLOW is at least 2575 gpm.
OT-3701-E12_5 06_RO Rev 0 Step 9  4.7.19.b.2 WITHIN 8 seconds, THROTTLE RHR HX'S BYPASS VALVE, UNTIL RHR PUMP FLOW is at least 2575 gpm. 1E12- F048A 1E12-R603A 4.7.19.c JOG OPEN the RHR HX'S BYPASS VALVE in 1000
1E12- F048A 1E12-R603A 4.7.19.c JOG OPEN the RHR HX'S BYPASS VALVE in 1000
-2000 gpm increments, UNTIL RHR PUMP FLOW is 2575-7100 gpm. 1E12- F048A 1E12-R603A    Standard: Within 8 seconds the Operator opens 1E12
-2000 gpm increments, UNTIL RHR PUMP FLOW is 2575-7100 gpm.
1E12- F048A 1E12-R603A    Standard: Within 8 seconds the Operator opens 1E12
-F048A until flow is > 2575 gpm then controls flow within directed band
-F048A until flow is > 2575 gpm then controls flow within directed band
. Instructor Cue:
. Instructor Cue:
Line 784: Line 693:
If SPDS RPV Temperature Trend is displayed, RPV temp will initially rise once flow is established, then lower as cooling is established.
If SPDS RPV Temperature Trend is displayed, RPV temp will initially rise once flow is established, then lower as cooling is established.
SAT ___ UNSAT ___
SAT ___ UNSAT ___
Comment(s):___________
Comment(s):___________
_____________________________________________________
_____________________________________________________


OT-3701-E12_506_RO Rev 0 Step 10  4.7.19.d NOTIFY the following of the use of the Shutdown Cooling return flow to the Vessel via LPCI INJECTION VALVE so the required fuel inspection may be scheduled:
OT-3701-E12_5 06_RO Rev 0 Step 10  4.7.19.d NOTIFY the following of the use of the Shutdown Cooling return flow to the Vessel via LPCI INJECTION VALVE so the required fuel inspection may be scheduled:
Reactor Engineering.
Reactor Engineering.
Outage Planning.
Outage Planning.
4.7.19.e INITIATE a special report to the NRC in accordance with PAP
4.7.19.e INITIATE a special report to the NRC in accordance with PAP
-1604. 4.7.19.f GO TO RHR Shutdown Cooling Operations for RHR A(B).
-1604. 4.7.19.f GO TO RHR Shutdown Cooling Operations for RHR A(B).
Standard:
Standard: The Operator will proceed to Section 7.6 , RHR Shutdown Cooling Operations for RHR A(B)
The Operator will proceed to Section 7.6, RHR Shutdown Cooling Operations for RHR A(B)
. Instructor Cue:
. Instructor Cue:
Steps 4.7.19.d & e are being performed by the Shift Manager
Steps 4.7.19.d & e are being performed by the Shift Manager
. Notes: None  SAT ___ UNSAT ___
. Notes: None  SAT ___ UNSAT ___
Comment(s):________________________________________________________________
Comment(s):________________________________________________________________
Step 11  7.6 RHR Shutdown Cooling Operations for RHR A(B)
Step 11  7.6 RHR Shutdown Cooling Operations for RHR A(B)
NOTES  Normal Design parameters for Shutdown Cooling/Test Mode operation:
NOTES  Normal Design parameters for Shutdown Cooling/Test Mode operation:
  - RHR Pump Flow 7000-7100 gpm.
  - RHR Pump Flow 7000-7100 gpm. - RHR Pump Amps 95-110 Amps. - RHR A Head Spray Flow 0 - 500 gpm. - RHR Suction Pressure Less than 135 psig.
- RHR Pump Amps 95-110 Amps.
  - RHR HX ESW Outlet Temps Less than 108 o F. - RHR Pump Suct Temp  Less than 100 oF (Refuel Mode).
- RHR A Head Spray Flow 0 - 500 gpm. - RHR Suction Pressure Less than 135 psig.
  - RHR HX ESW Outlet Temps Less than 108 oF. - RHR Pump Suct Temp  Less than 100 oF (Refuel Mode).
  - RHR HX'S RHR Outlet Temp Less than 86 oF (Refuel Mode).
  - RHR HX'S RHR Outlet Temp Less than 86 oF (Refuel Mode).
The following actions can be performed in any logical order or repeated to support current plant conditions.
The following actions can be performed in any logical order or repeated to support current plant conditions.


OT-3701-E12_506_RO Rev 0 Step 11 - Continued 7.6.1 OBSERVE the following limitation s when in Shutdown Cooling:
OT-3701-E12_5 06_RO Rev 0 Step 11 - Continued 7.6.1 OBSERVE the following limitation s when in Shutdown Cooling:
MAINTAIN cooldown rate less than 100oF in any 1 hour period.
MAINTAIN cooldown rate less than 100 oF in any 1 hour period.
DO NOT allow any RHR piping which has been inadvertently drained to be refilled with water from the Reactor Vessel.
DO NOT allow any RHR piping which has been inadvertently drained to be refilled with water from the Reactor Vessel.
MAINTAIN Vessel temperature below 190 oF while in Shutdown Cooling. WHEN using the alternate return path, THEN MONITOR the following additional items:
MAINTAIN Vessel temperature below 190 oF while in Shutdown Cooling. WHEN using the alternate return path, THEN MONITOR the following additional items:
1E12-F042A  MAINTAIN RHR FLOW in the band 2575
1E12-F042A  MAINTAIN RHR FLOW in the band 2575-7100 gpm. 1E12-F042A  1E12-F042B  MAINTAIN RHR H2O DISCH temperature greater than 65 o F. 1E12-R601 Pt 5 (magenta)  1E12-R601 Pt 6 (orange)  Standard: The Operator establishes flow of 2575 to 7100 gpm. Instructor Cue:
-7100 gpm.
Establish a cooldown to restore Reactor temperature to band of 1 10 to 1 20 deg F. Notes: Reactor temperature will increase steadily if cooling is not established.
1E12-F042A  1E12-F042B  MAINTAIN RHR H2O DISCH temperature greater than 65 oF. 1E12-R601 Pt 5 (magenta)  1E12-R601 Pt 6 (orange)  Standard:
The Operator establishes flow of 2575 to 7100 gpm. Instructor Cue:
Establish a cooldown to restore Reactor temperature to band of 1 10 to 120 deg F. Notes: Reactor temperature will increase steadily if cooling is not established.
SAT ___ UNSAT ___
SAT ___ UNSAT ___
Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


OT-3701-E12_506_RO Rev 0 Step 12  7.6.2 PERFORM the following as needed to maintain desired cooldown rate AND RHR Pump flow 7000
OT-3701-E12_5 06_RO Rev 0 Step 12  7.6.2 PERFORM the following as needed to maintain desired cooldown rate AND RHR Pump flow 7000
-7100 (alternate return path 257 5-7100):  1E12-R603A  1E12-R603B:  THROTTLE RHR HX'S OUTLET VALVE. 1E12-F003A  THROTTLE RHR HX'S BYPASS VALVE. 1E12-F048A      Critical Step
-7100 (alternate return path 257 5-7100):  1E12-R603A  1E12-R603B:  THROTTLE RHR HX'S OUTLET VALVE. 1E12-F003A  THROTTLE RHR HX'S BYPASS VALVE. 1E12-F048A      Critical Step
: The Operator throttles opens 1E12F003A and 1E12F048A is throttled close to establish a cooldown
: The Operator throttle s open s 1E12F0 03 A and 1E12F0 48 A is throttled close to establish a cooldown
. Instructor Cu e: Establish a cooldown to restore temperature within band of 110 to 120
. Instructor Cu e: Establish a cooldown to restore temperature within band of 110 to 120 degrees. Flow Band is 7000 to 7100 gpm. Notes: Exceeding 200 degrees Reactor Water temperature would be a failure.
 
degrees. Flow Band is 7000 to 7100 gpm. Notes: Exceeding 200 degrees Reactor Water temperature would be a failure.
200 degrees is a MODE change.
200 degrees is a MODE change.
Operator can establish full cooling and not have a problem with 100 degrees per hour.
Operator can establish full cooling and not have a problem with 100 degrees per hour.
Line 833: Line 731:
Terminate JPM once satisfied with cooldown rate.
Terminate JPM once satisfied with cooldown rate.
SAT ___ UNSAT ___
SAT ___ UNSAT ___
Comment(s):______________________
Comment(s):______________________
__________________________________________
__________________________________________
Line 839: Line 736:
Terminating Cue: Shutdown Cooling Flow established through Alternate Return path, a cooldown rate has been established and Reactor Water Temperature is maintained less than 200 degrees. Evaluation Results:
Terminating Cue: Shutdown Cooling Flow established through Alternate Return path, a cooldown rate has been established and Reactor Water Temperature is maintained less than 200 degrees. Evaluation Results:
SAT_____ UNSAT_____
SAT_____ UNSAT_____
End Time OT-3701-E12_506_RO Rev 0 JPM CUE SHEET INITIAL CONDITIONS:
End Time OT-3701-E12_5 06_RO Rev 0 JPM CUE SHEET INITIAL CONDITIONS:
The plant shutdown due to scram yesterday.
The plant shutdown due to scram yesterday.
Currently in Mode 4 and the Unit Supervisor is operating in IOI
Currently in Mode 4 and the Unit Supervisor is operating in IOI
-12 Maintaining Cold Shutdown.
-12 Maintaining Cold Shutdown.
RHR B was operating in Shutdown Cooling when the pump tripped.
RHR B was operating in Shutdown Cooling when the pump tripped. The Unit Supervisor has entered ONI
The Unit Supervisor has entered ONI
-E12-2 Loss of Decay Heat Removal. No Reactor Recirculation pumps are in operation.
-E12-2 Loss of Decay Heat Removal.
Reactor temperature band is 1 10 to 1 20 degrees F.
No Reactor Recirculation pumps are in operation.
Reactor temperature band is 1 10 to 120 degrees F.
RPV temperature was 1 15 degrees F prior to trip.
RPV temperature was 1 15 degrees F prior to trip.
The RO shifting SDC loops became ill.
The RO shifting SDC loops became ill.
INITIATING CUE:
INITIATING CUE:
The Unit Supervisor directs you
The Unit Supervisor directs you
, the Reactor Operator, to continue shifting Shutdown Cooling loops from B to A using RHR A through the Normal Return Path.
, the Reactor Operator , to continue shifting Shutdown Cooling loops from B to A using RHR A through the Normal Return Path.
Section 4.7 Shutdown Cooling Startup for RHR A is complete through Step 4.7.1
Section 4.7 Shutdown Cooling Startup for RHR A is complete through Step 4.7.1
: 4. Monitor Reactor Temperature per IOI
: 4. Monitor Reactor Temperature per IOI
-12 after RHR A is in SDC.
-12 after RHR A is in SDC.


OT-3701-R43_501 Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: R43, Division 1 And 2 Diesel Generator Time Critical:
OT-3701-R43_5 01 Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: R43, Division 1 And 2 Diesel Generator Time Critical:
No Alternate Path:
No Alternate Path:
Yes Applicability:
Yes Applicability:
Line 875: Line 770:
: Reset Simulator to IC 9
: Reset Simulator to IC 9
: 4. Insert Schedule file JPM
: 4. Insert Schedule file JPM
-R43-501 and verify Event file JPM R4 3 auto loads.
-R43-5 01 and verify Event file JPM R4 3 auto loads.
Evaluator and Driver coordinate to insert Events 3 & 4 in JPM Steps 10, 14, & 19.
Evaluator and Driver coordinate to insert Events 3 & 4 in JPM Steps 10, 14, & 19.
: 2. Location / Method: Simulator / performance
: 2. Location / Method: Simulator / performance
Line 883: Line 778:
-R43 section 6.1 Remote Shutdown to Standby Readiness.
-R43 section 6.1 Remote Shutdown to Standby Readiness.
Start Time
Start Time
:  End Time:    Candidate
:  End Time:    Candidate:
:
OT-3701-R43_5 01 Rev 0 JPM BODY SHEET Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc- before performing task.
OT-3701-R43_501 Rev 0 JPM BODY SHEET Standard:
Standard: Performer follows management expectations with regards to safety and communication standards.
Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc- before performing task.
Standard:
Performer follows management expectations with regards to safety and communication standards.
Step 1  SOI-R43 - Division 1 And 2 Diesel Generator System 6.1 Remote - Shutdown to Standby Readiness NOTES  If the voltage and speed are not adjusted on DG shutdown, the DG will need to be started and shutdown per this SOI to adjust speed and voltage prior to operability.
Step 1  SOI-R43 - Division 1 And 2 Diesel Generator System 6.1 Remote - Shutdown to Standby Readiness NOTES  If the voltage and speed are not adjusted on DG shutdown, the DG will need to be started and shutdown per this SOI to adjust speed and voltage prior to operability.
Emergency stop is accomplished by performing Emergency Shutdown.
Emergency stop is accomplished by performing Emergency Shutdown.
6.1.1 IF diesel unloading was NOT within the unloading limits listed in the Precautions and Limitations THEN OPEN the Diesel Turbo Prelube Oil Valve. 1R47-F544B    Standard:
6.1.1 IF diesel unloading was NOT within the unloading limits listed in the Precautions and Limitations THEN OPEN the Diesel Turbo Prelube Oil Valve. 1R47-F544B    Standard: Step 6.1.1 is N/A. The Operator may ask examiner for unloading rate.
Step 6.1.1 is N/A. The Operator may ask examiner for unloading rate.
Instructor Cue:
Instructor Cue:
If  asked, the diesel unloading was within limits
If  asked, the diesel unloading was within limits
. Notes: None  SAT ___ UNSAT ___
. Notes: None  SAT ___ UNSAT ___ Comment(s):__________
Comment(s):__________
______________________________________________________
______________________________________________________


OT-3701-R43_501 Rev 0  Step 2  6.1.2 VERIFY the DIESEL GENERATOR in AUTO at 1H13
OT-3701-R43_5 01 Rev 0  Step 2  6.1.2 VERIFY the DIESEL GENERATOR in AUTO at 1H13
-P877. Div 2 6.1.3 VERIFY the DIESEL GENERATOR CONTROL TRANSFER is in CONT RM at the Generator Control Panel. 1H51
-P877. Div 2 6.1.3 VERIFY the DIESEL GENERATOR CONTROL TRANSFER is in CONT RM at the Generator Control Panel. 1H51
-P055B    Standard:
-P055B    Standard: The Operator verifies DG is in AUTO at P877 and calls Plant Operator (PPO) to verify transfer switch in CONT RM at P055B
The Operator verifies DG is in AUTO at P877 and calls Plant Operator (PPO) to verify transfer switch in CONT RM at P055B
. Instructor Cue:
. Instructor Cue:
Transfer switch in CONT RM at P055B
Transfer switch in CONT RM at P055B
. Notes: None  SAT ___ UNSAT ___
. Notes: None  SAT ___ UNSAT ___ Comment(s):_________________________________
Comment(s):_________________________________
_______________________________
_______________________________
Step 3  6.1.4 PERFORM the following at 1H13
Step 3  6.1.4 PERFORM the following at 1H13
-P877: 6.1.4.a VERIFY the DIESEL GEN OUT OF SERVICE is in NORM. Div 2 6.1.4.b CONFIRM the DIESEL GEN BRKR green light is on EH1201 6.1.4.c IF the PREFERRED SOURCE BRKR is closed EH1212, THEN PLACE the SYNC SEL SWITCH in TH1.
-P877: 6.1.4.a VERIFY the DIESEL GEN OUT OF SERVICE is in NORM. Div 2 6.1.4.b CONFIRM the DIESEL GEN BRKR green light is on EH1201 6.1.4.c IF the PREFERRED SOURCE BRKR is closed EH1212, THEN PLACE the SYNC SEL SWITCH in TH1.
Standard:
Standard: The Operator verifies DG Out Of Service switch in NORM and confirms EH1201 green light on
The Operator verifies DG Out Of Service switch in NORM and confirms EH1201 green light on
. Instructor Cue:
. Instructor Cue:
None  Notes: Step 6.1.4.c is N/A SAT ___ UNSAT ___
None  Notes: Step 6.1.4.c is N/A SAT ___ UNSAT ___
Comment(s):___________________
Comment(s):___________________
_____________________________________________
_____________________________________________


OT-3701-R43_501 Rev 0 Step 4  6.1.4.d IF the ALTN PREFERRED SOURCE EH1213 BRKR is closed, THEN PLACE the SYNC SEL SWITCH in TH21.
OT-3701-R43_5 01 Rev 0 Step 4  6.1.4.d IF the ALTN PREFERRED SOURCE EH1213 BRKR is closed, THEN PLACE the SYNC SEL SWITCH in TH21.
6.1.4.e ADJUST the DIESEL GEN GOVERNOR so the SYNCHROSCOPE is moving slow in the FAST direction.
6.1.4.e ADJUST the DIESEL GEN GOVERNOR so the SYNCHROSCOPE is moving slow in the FAST direction.
1R43-R032B 6.1.4.f PLACE the SYNC SEL SWITCH in OFF.
1R43-R032B 6.1.4.f PLACE the SYNC SEL SWITCH in OFF.
Critical Step
Critical Step
: The Operator places Synch Select Switch in TH21 and adjusts governor so synchroscope is moving slow in Fast direction
: The Operator places Synch Select Switch in TH21 and adjusts governor so synchroscope is moving slow in Fast direction. Then places the SYNC SEL SWITCH in OFF
. Then places the SYNC SEL SWITCH in OFF
. Instructor Cue:
. Instructor Cue:
None  Notes: A few seconds after the governor taken to raise, the DG TRIP* PROTECT RELAY LOCKOUT annunciator will alarm but the DG will not trip.
None  Notes: A few seconds after the governor taken to raise, the DG TRIP* PROTECT RELAY LOCKOUT annunciator will alarm but the DG will not trip. After the candidate references the ARI, they may shutdown the DG by continuing in this shutdown section or performing Emergency Shutdown.
After the candidate references the ARI, they may shutdown the DG by continuing in this shutdown section or performing Emergency Shutdown.
If candidate performs Emergency shutdown, go to JPM Step  
If candidate performs Emergency shutdown, go to JPM Step  
: 15. (JPM Steps 5
: 15. (JPM Steps 5
-14 are not required)
-14 are not required)
SAT ___ UNSAT ___
SAT ___ UNSAT ___
Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


OT-3701-R43_501 Rev 0 Step 5  6.1.4.g ADJUST the DIESEL GEN VOLTAGE RGLTR to read 4100 to 4200 Volts on DIESEL GEN A
OT-3701-R43_5 01 Rev 0 Step 5  6.1.4.g ADJUST the DIESEL GEN VOLTAGE RGLTR to read 4100 to 4200 Volts on DIESEL GEN A
-B VOLTS. 1R43-R027B    Critical Step
-B VOLTS. 1R43-R027B    Critical Step
: The Operator adjusts voltage regulator to obtain 4100 to 4200 volts on 1R43R027B
: The Operator adjusts voltage regulator to obtain 4100 to 4200 volts on 1R43R027B. Instructor Cue:
. Instructor Cue:
None  Notes: Voltage set @ 4000V  
None  Notes: Voltage set @ 4000V  
- will need to adjust voltage up. SAT ___ UNSAT ___
- will need to adjust voltage up. SAT ___ UNSAT ___
Comment(s):________________________________________________________________
Comment(s):________________________________________________________________
Step 6  6.1.5 The DIESEL GENERATOR FIELD BREAKER CLOSED amber light is off at Generator Control Panel 1H51-P055A 1H51-P055B The bulb is good.
Step 6  6.1.5 The DIESEL GENERATOR FIELD BREAKER CLOSED amber light is off at Generator Control Panel 1H51-P055A 1H51-P055 B The bulb is good.
THEN PERFORM the following:
THEN PERFORM the following:
6.1.5.a INITIATE a Notification 6.1.5.b INFORM the Unit Supervisor
6.1.5.a INITIATE a Notification 6.1.5.b INFORM the Unit Supervisor
. Standard:
. Standard: The Operator Contacts PPO to confirm Amber light status
The Operator Contacts PPO to confirm Amber light status
. Instructor Cue:
. Instructor Cue:
PPO reports, "Amber light on
PPO reports, "Amber light on
."  Notes: Steps 6.1.5.a & b are N/A.
."  Notes: Steps 6.1.5.a & b are N/A.
SAT ___ UNSAT ___
SAT ___ UNSAT ___ Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


OT-3701-R43_501 Rev 0 Step 7  NOTE The Diesel Generator is Inoperable for Manual starts for 2  
OT-3701-R43_5 01 Rev 0 Step 7  NOTE The Diesel Generator is Inoperable for Manual starts for 2  
- 3 minutes, until the Unit Avail Emergency Status light is illuminated.
- 3 minutes, until the Unit Avail Emergency Status light is illuminated.
6.1.6 RECORD appropriate Maintenance Rule status in Plant Narrative Log.
6.1.6 RECORD appropriate Maintenance Rule status in Plant Narrative Log.
Line 961: Line 840:
. Instructor Cue:
. Instructor Cue:
Another Operator will log Maintenance Rule status in Plant Narrative Log. Notes: Step 6.1.6 is not critical. Driver: Ensure Event 2 is activated upon shutdown.
Another Operator will log Maintenance Rule status in Plant Narrative Log. Notes: Step 6.1.6 is not critical. Driver: Ensure Event 2 is activated upon shutdown.
SAT ___ UNSAT ___
SAT ___ UNSAT ___ Comment(s):________________________________________________________________
Comment(s):________________________________________________________________
Step 8  6.1.8 Observe the DIESEL GENERATOR FIELD BREAKER CLOSED light is de-energized.
Step 8  6.1.8 Observe the DIESEL GENERATOR FIELD BREAKER CLOSED light is de-energized.
Standard:
Standard: The Operator Contacts PPO to confirm Amber light status. Instructor Cue:
The Operator Contacts PPO to confirm Amber light status. Instructor Cue:
PPO reports, "Amber light off."  Notes: None  SAT ___ UNSAT ___
PPO reports, "Amber light off."  Notes: None  SAT ___ UNSAT ___
Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


OT-3701-R43_501 Rev 0 Step 9  6.1.9 IF the DIESEL GENERATOR FIELD BREAKER CLOSED light is energized, THEN PERFORM the following:
OT-3701-R43_5 01 Rev 0 Ste p 9  6.1.9 IF the DIESEL GENERATOR FIELD BREAKER CLOSED light is energized, THEN PERFORM the following:
Standard:
Standard: Step 6.1.9 is N
Step 6.1.9 is N
/A. Instructor Cue:
/A. Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___ Comment(s):___________________________________________________
Comment(s):___________________________________________________
_____________
_____________


OT-3701-R43_501 Rev 0 Step 10  6.1.10 IF annunciator DG TRIP* PROTECT RELAY LOCKOUT (1H13
OT-3701-R43_5 01 Rev 0 Step 10  6.1.10 IF annunciator DG TRIP* PROTECT RELAY LOCKOUT (1H13
-P877-1, E2) is in alarm, THEN PERFORM the following:
-P877-1, E2) is in alarm, THEN PERFORM the following:
NOTE When operating the Diesel Generator control switch (from PULL
NOTE When operating the Diesel Generator control switch (from PULL
Line 987: Line 861:
-P054B    Critical Step
-P054B    Critical Step
: The Operato r places Div 2 DG in PULL
: The Operato r places Div 2 DG in PULL
-TO-LOCK and Directs NLO to place Mode Select switch in INOP. Instructor Cue:
-T O-LOCK and Directs NLO to place Mode Select switch in INOP. Instructor Cue:
If asked, Relay 86 G/1 is tripped. A minute after being directed to PLACE the MODE SELECT keylock in INOP, report that it is in INOP
If asked, Relay 86 G/1 is tripped. A minute after being directed to PLACE the MODE SELECT keylock in INOP, report that it is in INOP
. Notes: Driver: When directed to place the mode select keylock in INOP, activate Event  
. Notes: Driver: When directed to place the mode select keylock in INOP, activate Event  
: 3. SAT ___ UNSAT ___
: 3. SAT ___ UNSAT ___
Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


OT-3701-R43_501 Rev 0 Step 11  6.1.10.c Refer to SVI
OT-3701-R43_5 01 Rev 0 Step 11  6.1.10.c Refer to SVI
-R10-T5227 and Perform actions for T.S. 3.8.1 Condition B. 6.1.10.d RECORD appropriate Maintenance Rule status in Plant Narrative Log 6.1.10.e INITIATE a Notification 6.1.10.f INFORM the Unit Supervisor
-R10-T5227 and Perform actions for T.S. 3.8.1 Condition B. 6.1.10.d RECORD appropriate Maintenance Rule status in Plant Narrative Log 6.1.10.e INITIATE a Notification 6.1.10.f INFORM the Unit Supervisor
. Standard:
. Standard: The Operator notifies Unit Supervisor 86G is tripped and places DIESEL GEN OUT OF SERVICE switch to INOP
The Operator notifies Unit Supervisor 86G is tripped and places DIESEL GEN OUT OF SERVICE switch to INOP
. Instructor Cue:
. Instructor Cue:
Another Operator is performing Steps 6.1.10.c, d and e.
Another Operator is performing Steps 6.1.10.c, d and e.
Notes: None  SAT ___ UNSAT ___
Notes: None  SAT ___ UNSAT ___ Comment(s):________________________________________________________________
Comment(s):________________________________________________________________
Step 12  6.1.11  IF annunciator DG TRIP DIFF RELAY LOCKOUT (1H13
Step 12  6.1.11  IF annunciator DG TRIP DIFF RELAY LOCKOUT (1H13
-P877-1, E4) is in alarm, THEN PERFORM the following:
-P877-1, E4) is in alarm, THEN PERFORM the following:
6.1.12 IF Diesel Turbo Prelube Valve is open, THEN CLOSE the Diesel Turbo Prelube Valve. 1R47-F544B    Standard:
6.1.12 IF Diesel Turbo Prelube Valve is open, THEN CLOSE the Diesel Turbo Prelube Valve. 1R47-F544B    Standard: Steps 6.1.11 and 6.1.12 are N/A.
Steps 6.1.11 and 6.1.12 are N/A.
Instructor Cue:
Instructor Cue:
If asked for Step 6.1.12, Turbo Prelube Valve is closed. Notes: None  SAT ___ UNSAT ___
If asked for Step 6.1.12, Turbo Prelube Valve is closed. Notes: None  SAT ___ UNSAT ___
Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


OT-3701-R43_501 Rev 0 Step 13 6.1.13 WHEN the control system is reset, as evidenced by Unit Avail Emergency Status light illuminated approximately 2 minutes after shutdown, THEN PERFORM the following:
OT-3701-R43_5 01 Rev 0 Step 1 3 6.1.13 WHEN the control system is reset, as evidenced by Unit Avail Emergency Status light illuminated approximately 2 minutes after shutdown, THEN PERFORM the following:
6.1.13.a CONFIRM that the following indicate approximately zero:
6.1.13.a CONFIRM that the following indicate approximately zero:
Gen Field Amps 1R43-R112B  Gen Field Volts 1R43-R113B    Standard:
Gen Field Amps 1R43-R112B  Gen Field Volts 1R43-R113B    Standard: Operator request PPO report above readings
Operator request PPO report above readings
. Instructor Cue: When asked for report of field amps and volts, PPO reports, "1R43-R112B is 105 amps and 1R43-R113B is 40 vdc."  Notes: The control system will not reset due to DG in Pull
. Instructor Cue: When asked for report of field amps and volts, PPO reports, "1R43-R112B is 105 amps and 1R43-R113B is 40 vdc."  Notes: The control system will not reset due to DG in Pull
-To-Lock (JPM Step  
-To-Lock (JPM Step  
: 10) The Operator has same indications on P877, R43R020B and R43R021B of 105 Amps and 40 Volts and should inform the US.
: 10) The Operator has same indications on P877, R43R020B and R43R021B of 105 Amps and 40 Volts and should inform the US.
SAT ___ UNSAT ___
SAT ___ UNSAT ___
Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


OT-3701-R43_501 Rev 0 Step 14  6.1.13.b IF the field is still energized, THEN PERFORM the following:
OT-3701-R43_5 01 Rev 0 Step 14  6.1.13.b IF the field is still energized, THEN PERFORM the following:
6.1.13.b.1 INFORM the Unit Supervisor
6.1.13.b.1 INFORM the Unit Supervisor
. 6.1.13.b.2 OPEN the following disconnect for the offgoing generator:
. 6.1.13.b.2 OPEN the following disconnect for the offgoing generator:
Line 1,029: Line 896:
: The Operator Directs the PPO to open Disc 27 at ED1B06
: The Operator Directs the PPO to open Disc 27 at ED1B06
. Instructor Cue:
. Instructor Cue:
If asked, Relay 86 G/1 is tripped. After a few minutes, report that ED1B06 Disc 27 is OPEN Notes: Driver: When directed to open Disc 27 at ED1B06, activate Event 4.
If aske d, Relay 86 G/1 is tripped. After a few minutes, report that ED1B06 Disc 27 is OPEN Notes: Driver: When directed to open Disc 27 at ED1B06, activate Event 4.
After the candidate acknowledges the field is de
After the candidate acknowledges the field is de
-energized, terminate the JPM  SAT ___ UNSAT ___  Comment(s):________________________________________________________________
-energized, terminate the JPM  SAT ___ UNSAT ___  Comment(s):________________________________________________________________


OT-3701-R43_501 Rev 0 Step 15 6.4 Emergency Shutdown 6.4.1 IF tripping the DG from 1H13
OT-3701-R43_5 01 Rev 0 Step 1 5 6.4 Emergency Shutdown 6.4.1 IF tripping the DG from 1H13
-P877, THEN PERFORM the following
-P877, THEN PERFORM the following
:  NOTES When operating the Diesel Generator control switch (from PULL
:  NOTES When operating the Diesel Generator control switch (from PULL
Line 1,042: Line 909:
Critical Step
Critical Step
: The Operator places the Diesel Generator in PULL
: The Operator places the Diesel Generator in PULL
-TO-LOCK and takes the diesel gen br eaker to TRIP and reports to the US Instructor Cue:
-TO-LOCK and take s the diesel gen br ea k er to TRIP and reports to the US Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___ Comment(s):_____________________________
Comment(s):_____________________________
___________________________________
___________________________________
Step 17 6.4.2  IF tripping the DG locally, THEN PERFORM the following
Step 1 7 6.4.2  IF tripping the DG locally, THEN PERFORM the following
:    Standard: Step 6.4.2 is N/A
:    Standard: Step 6.4.2 is N/A
. Instructor Cue:
. Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___
Comment(s):___________________________________________
Comment(s):___________________________________________
_____________________
_____________________


OT-3701-R43_501 Rev 0 Step 18 NOTES When operating the Diesel Generator control switch (from PULL
OT-3701-R43_5 01 Rev 0 Step 1 8 NOTES When operating the Diesel Generator control switch (from PULL
-TO-LOCK to AUTO, or from AUTO to PULL
-TO-LOCK to AUTO, or from AUTO to PULL
-TO-LOCK), a deliberate pause in the STOP position is required in order to ensure proper operation of the associated circuitry.
-TO-LOCK), a deliberate pause in the STOP position is required in order to ensure proper operation of the associated circuitry.
Line 1,065: Line 930:
A minute after being directed to PLACE the MODE SELECT keylock in INOP, report that it is in INOP.
A minute after being directed to PLACE the MODE SELECT keylock in INOP, report that it is in INOP.
I will declare the Diesel Generator INOP Notes: None  SAT ___ UNSAT ___
I will declare the Diesel Generator INOP Notes: None  SAT ___ UNSAT ___
Comment(s):____________________
Comment(s):____________________
____________________________________________
____________________________________________


OT-3701-R43_501 Rev 0 Step 18 6.4.6  WHEN time permits, THEN CONTINUE.
OT-3701-R43_5 01 Rev 0 Step 1 8 6.4.6  WHEN time permits, THEN CONTINUE.
6.4.7  OBSERVE the following indicate approximately zero:
6.4.7  OBSERVE the following indicate approximately zero:
Gen Field Amps 1R43
Gen Field Amps 1R43
Line 1,080: Line 944:
-R113B is 40 vdc."
-R113B is 40 vdc."
Notes: None  SAT ___ UNSAT ___
Notes: None  SAT ___ UNSAT ___
Comment(s):_______________________________________________________
Comment(s):_______________________________________________________
_________
_________   Step 1 9 6.4.8 IF the field is still energized, THEN OPEN the disconnect for the offgoing generator:
Step 19 6.4.8 IF the field is still energized, THEN OPEN the disconnect for the offgoing generator:
GENERATOR (FIELD FLASH) CONTROL PNL, 1H51
GENERATOR (FIELD FLASH) CONTROL PNL, 1H51
-P055B ED1B-06 Disc 27
-P055B ED1B-06 Disc 27
Line 1,091: Line 953:
After the candidate acknowledges the field is de
After the candidate acknowledges the field is de
-energized, terminate the JPM  SAT ___ UNSAT ___
-energized, terminate the JPM  SAT ___ UNSAT ___
Comment(s):________________________________________________________________
Comment(s):________________________________________________________________
Terminating Cue: Division 2 DG is in Pull to Lock and ED1B06 Disc 27 is open.
Terminating Cue: Division 2 DG is in Pull to Lock and ED1B06 Disc 27 is open.
Line 1,097: Line 958:
SAT_____ UNSAT_____
SAT_____ UNSAT_____


End Time OT-3701-R43_501 Rev 0 JPM CUE SHEET INITIAL CONDITIONS:
End Time OT-3701-R43_5 01 Rev 0 JPM CUE SHEET INITIAL CONDITIONS:
The Div 2 DG has completed a four
The Div 2 DG has completed a four
-hour maintenance run.
-hour maintenance run.
Line 1,114: Line 975:
==References:==
==References:==


SOI-D17B Rev. 14 Required Material:
SOI-D17B R e v. 14 Required Material:
SOI-D17B, Airborne Radiation Monitoring System Process Tasks: 088-517-01-01 Assist Startup of Drywell Atmosphere Monitor 1D17
SOI-D17B, Airborne Radiation Monitoring System Process Tasks: 088-517-01-01 Assist Startup of Drywell Atmosphere Monitor 1D17
-K670 Task Standard:
-K670 Task Standard:
Line 1,120: Line 981:
-K670 per SOI-D17B K/A Data:
-K670 per SOI-D17B K/A Data:
272000 A1.01 Ability to predict and/or monitor changes in parameters associated with operating the RADIATION MONITORING SYSTEM controls including:
272000 A1.01 Ability to predict and/or monitor changes in parameters associated with operating the RADIATION MONITORING SYSTEM controls including:
Lights, alarms, and indications associated with normal operations. Importance: RO 3.2 / SRO 3.2
Lights, alarms, and indications associated with normal operations. Importance: RO 3.2 / SRO 3.2. 1. Setup Instructions
. 1. Setup Instructions
: Reset Simulator to any IC. Insert Schedule file JPM
: Reset Simulator to any IC. Insert Schedule file JPM
-D17_001. Close valves D17-F071A, D17
-D17_001. Close valves D17-F071A, D17
Line 1,128: Line 988:
-F079B. Place DW Moving Filter Switch to OFF. Evaluator coordinate JPM Step 7 with Driver
-F079B. Place DW Moving Filter Switch to OFF. Evaluator coordinate JPM Step 7 with Driver
. 2. Location / Method
. 2. Location / Method
: Simulator
: Simulator 3. Initial Condition
: 3. Initial Condition
:  Plant conditions are as is. The DW Radiation Monitor 1D17-K670 was shutdown to secured status for an RPS Bus transfer, which is now complete. 4. Initiating Cue
:  Plant conditions are as is
. The DW Radiation Monitor 1D17-K670 was shutdown to secured status for an RPS Bus transfer, which is now complete
. 4. Initiating Cue
:  Unit Supervisor directs you the Reactor Operator to Startup the DW Radiation Monitor 1D17-K670 from secured status
:  Unit Supervisor directs you the Reactor Operator to Startup the DW Radiation Monitor 1D17-K670 from secured status
.
.
Start Time
Start Time:  End Time:
:  End Time:
Candidate:     
Candidate
:     


OT-3701-D17-001  Rev 0 JPM BODY SHEET Standard:
OT-3701-D17-001  Rev 0 JPM BODY SHEET Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc.
Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc.
before performing task.
before performing task.
Standard:
Standard: Performer follows management expectations with regards to safety and communication standards.
Performer follows management expectations with regards to safety and communication standards.
Step 1  SOI-D17B, Airborne Radiation Monitoring System Process 4.2  Drywell Atmosphere Monitor 1D17
Step 1  SOI-D17B, Airborne Radiation Monitoring System Process 4.2  Drywell Atmosphere Monitor 1D17
-K670, Startup From Secured Status 4.2.1 PERFORM the following in the Control Room (at 1H13
-K670, Startup From Secured Status 4.2.1 PERFORM the following in the Control Room (at 1H13
-P804): 4.2.1.a VERIFY the FUNCTION switches on the Readout Modules are in the OPER position.
-P804): 4.2.1.a VERIFY the FUNCTION switches on the Readout Modules are in the OPER position. Gas Module 1D17-K676  Iodine Module 1D17-K677  Particulate Module 1D17-K678  Standard: Candidate identifies each module and verifies switches in OPER position Instructor Cue:
Gas Module 1D17-K676  Iodine Module 1D17-K677  Particulate Module 1D17-K678  Standard:
No ne Notes: Switches should already be in OPER.
Candidate identifies each module and verifies switches in OPER position Instructor Cue:
SAT ___ UNSAT ___ Comment(s):________________________________________________________________
None Notes: Switches should already be in OPER.
SAT ___ UNSAT ___
Comment(s):________________________________________________________________


OT-3701-D17-001  Rev 0 Step 2  4.2.1.b MOMENTARILY DEPRESS the FAIL/RESET button for each of the following readout modules to reset any locked in rad monitor alarms:
OT-3701-D17-001  Rev 0 Step 2  4.2.1.b MOMENTARILY DEPRESS the FAIL/RESET button for each of the following readout modules to reset any locked in rad monitor alarms:
Gas Module 1D17-K676  Iodine Module 1D17-K677  Particulate Module 1D17-K678  Standard:
Gas Module 1D17-K676  Iodine Module 1D17-K677  Particulate Module 1D17-K678  Standard: Candidate identifies FAIL/RESET pushbutton for each module and depresses them. Instructor Cue:
Candidate identifies FAIL/RESET pushbutton for each module and depresses them. Instructor Cue:
None  Notes: No alarms are present if RED and AMBER lights are off
None  Notes: No alarms are present if RED and AMBER lights are off
. SAT ___ UNSAT ___
. SAT ___ UNSAT ___ Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


Step 3  4.2.1.c PLACE the MOVING FILTER POWER SWITCH in ON.
Step 3  4.2.1.c PLACE the MOVING FILTER POWER SWITCH in ON.
Line 1,166: Line 1,014:
None  Notes: Moving Filter Power Switch is taken to OFF during shutdown.
None  Notes: Moving Filter Power Switch is taken to OFF during shutdown.
The light remains off until started by RP Tech (See NOTE above)
The light remains off until started by RP Tech (See NOTE above)
SAT ___ UNSAT ___
SAT ___ UNSAT ___ Comment(s):___________________________________________
Comment(s):___________________________________________
_____________________
_____________________


Line 1,173: Line 1,020:


OT-3701-D17-001  Rev 0 Step 4  4.2.1.d VERIFY the PAPER CONTROL SWITCH is in NORM.
OT-3701-D17-001  Rev 0 Step 4  4.2.1.d VERIFY the PAPER CONTROL SWITCH is in NORM.
1D17-K679  Standard:
1D17-K679  Standard: Candidate identifies Paper Control Switch and verifies it is in NORM.
Candidate identifies Paper Control Switch and verifies it is in NORM.
Instructor Cue:
Instructor Cue:
None  Notes: Switch should already be in NORM.
None  Notes: Switch should already be in NORM.
SAT ___ UNSAT ___
SAT ___ UNSAT ___ Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


Step 5  4.2.2 OPEN the following (at 1H13
Step 5  4.2.2 OPEN the following (at 1H13
Line 1,185: Line 1,030:
Instructor Cue:
Instructor Cue:
None  Notes: Valves are closed during shutdown.
None  Notes: Valves are closed during shutdown.
SAT ___ UNSAT ___
SAT ___ UNSAT ___ Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


OT-3701-D17-001  Rev 0 Step 6  4.2.3 OPEN the following (at 1H13
OT-3701-D17-001  Rev 0 Step 6  4.2.3 OPEN the following (at 1H13
-P882):  DW RAD MON INBD SUCT ISOL 1D17-F071B DW RAD MON INBD DISCH ISOL 1D17-F079B   Critical Step
-P88 2):  DW RAD MON INBD SUCT ISOL 1D17-F071 B DW RAD MON INBD DISCH ISOL 1D17-F079 B   Critical Step
: Candidate opens the valves by taking each control switch to OPEN.
: Candidate opens the valves by taking each control switch to OPEN.
Instructor Cue:
Instructor Cue:
None  Notes: Valves are closed during shutdown.
None  Notes: Valves are closed during shutdown.
SAT ___ UNSAT ___
SAT ___ UNSAT ___ Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


Step 7  Candidate contacts Radiation Protection to perform steps 4
Step 7  Candidate contacts Radiation Protection to perform steps 4
.2.4 and 4.2.5. Standard:
.2.4 and 4.2.5. Standard: Candidate contacts Radiation Protection to perform steps 4.
Candidate contacts Radiation Protection to perform steps 4.
2.4 and 4.2.5. Candidate verifies Low Flow annunciator clear and Filter Tear Light is OFF. Instructor Cue:
2.4 and 4.2.5. Candidate verifies Low Flow annunciator clear and Filter Tear Light is OFF. Instructor Cue:
Have operator contact RP Tech on phone or GAITronics.
Have operator contact RP Tech on phone or GAITronics.
As RP Tech, after given direction, " I will perform SOI
As RP Tech , after given direction, " I will perform SOI
-D17B steps 4.
-D17B steps 4.
2.4 and 4.2.5 for startup of DW rad monitor"
2.4 and 4.2.5 for startup of DW rad monitor"
. Report back a moment after the low flow annunciator resets (initiating Event 10)
. Report back a moment after the low flow annunciator resets (initiating Event 10), "SOI-D17B steps 4.2.4 for startup of DW rad monitor are complete. Do you have any alarms?"
, "SOI-D17B steps 4.2.4 for startup of DW rad monitor are complete. Do you have any alarms?"
Notes: Steps 4.2.4 and 4.2.5 are performed by Radiation Protection Personnel
Notes: Steps 4.2.4 and 4.2.5 are performed by Radiation Protection Personnel
. Driver: After being directed to perform steps 4.2.4 & 4.2.5, initiate Event 10 (for RP Tech actions)
. Driver: After being directed to perform steps 4.2.4 & 4.2.5, initiate Event 10 (for RP Tech actions)
SAT ___ UNSAT ___
SAT ___ UNSAT ___ Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


OT-3701-D17-001  Rev 0 Step 8  4.2.6 PERFORM independent verification of required components.
OT-3701-D17-001  Rev 0 Step 8  4.2.6 PERFORM independent verification of required components.
Standard:
Standard: Candidate identifies Independent verification is required.
Candidate identifies Independent verification is required.
Instructor Cue:
Instructor Cue:
RP Tech will provide IV.
RP Tech will provide IV.
Notes: Terminate the JPM SAT ___ UNSAT ___
Notes: Terminate the JPM SAT ___ UNSAT ___ Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


Terminating Cue:
Terminating Cue:
Line 1,224: Line 1,062:
SAT_____ UNSAT_____
SAT_____ UNSAT_____
End Time:
End Time:
OT-3701-D17-001  Rev 0 JPM CUE SHEET INITIAL CONDITIONS:
OT-3701-D17-001  Rev 0 JPM CUE SHEET INITIAL CONDITIONS:
Plant conditions are as is. The DW Radiation Monitor 1D17
Plant conditions are as is. The DW Radiation Monitor 1D17
Line 1,241: Line 1,078:
==References:==
==References:==


SOI-P40/41 Rev. 9 Required Material:
SOI-P 40/4 1 Rev. 9 Required Material:
SOI-P40/41, Service Water And Service Water Screen Wash Tasks: 276-505-02-01 Shift Service Water Pumps Task Standard:
SOI-P 40/41 , Service Water And Service Water Screen Wash Tasks: 276-505-02-01 Shift Service Water Pumps Task Standard:
Shift Service Water Pumps from B to D per SOI-P40/41 K/A Data:
Shift Service Water Pumps from B to D per SOI-P 40/4 1 K/A Data:
400000 A4.01 Ability to manually operate and / or monitor in the control room:
400000 A4.01 Ability to manually operate and / or monitor in the control room:
CCW indications and control. Importance: RO 3.
CCW indications and control. Importance: RO 3.
Line 1,259: Line 1,096:
Start Time
Start Time
:  End Time:
:  End Time:
Candidate
Candidate:     
:     


OT-3701-P41-001  Rev 0 JPM BODY SHEET Standard:
OT-3701-P41-001  Rev 0 JPM BODY SHEET Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc.
Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc.
before performing task.
before performing task.
Standard:
Standard: Performer follows management expectations with regards to safety and communication standards.
Performer follows management expectations with regards to safety and communication standards.
Step 1  SOI-P41, Service Water And Service Water Screen Wash 7.1  Shifting Service Water Pumps 7.1.1 START the oncoming Service Water Pump as follows:
Step 1  SOI-P41, Service Water And Service Water Screen Wash 7.1  Shifting Service Water Pumps 7.1.1 START the oncoming Service Water Pump as follows:
7.1.1.1.a THROTTLE, as necessary, the SW Pump Lube Water Supply valve to maintain the oncoming Service Water Pump seal flow between 3 and 5 gpm.
7.1.1.1.a THROTTLE, as necessary, the SW Pump Lube Water Supply valve to maintain the oncoming Service Water Pump seal flow between 3 and 5 gpm.
0P41- F546A 0P41- F546B 0P41- F546C 0P41- F546D  0P41- N150A 0P41- N150B 0P41- N150C 0P41- N150D  Standard:
0P41- F546A 0P41- F546B 0P41- F546C 0P41- F546D  0P41- N150A 0P41- N150B 0P41- N150C 0P41- N150D  Standard: Candidate contacts NLO to perform step 7.1.2 Instructor Cue:
Candidate contacts NLO to perform step 7.1.2 Instructor Cue:
SW Pump D seal water flow is 4.0 gpm.
SW Pump D seal water flow is 4.0 gpm.
If asked, all other SW pumps seal flows are also in band.
If asked, all other SW pumps seal flows are also in band.
If asked, oil level is in band.
If asked, oil level is in band.
Notes: None  SAT ___ UNSAT ___
Notes: None  SAT ___ UNSAT ___ Comment(s):_____________________________________________________________
Comment(s):_____________________________________________________________
___   
___   


OT-3701-P41-001  Rev 0 Step 2  7.1.1.b TAKE the SW PUMP DISCH VLV to OPEN. P41- F040A P41- F040B P41- F040C P41- F040D 7.1.1.c WHEN the blue light comes on, THEN PRESS the STOP button.
OT-3701-P41-001  Rev 0 Step 2  7.1.1.b TAKE the SW PUMP DISCH VLV to OPEN. P41- F040A P41- F040B P41- F040C P41- F040D 7.1.1.c WHEN the blue light comes on, THEN PRESS the STOP button.
7.1.1.d TAKE the SW PUMP to START.
7.1.1.d TAKE the SW PUMP to START.
P41- C001A P41- C001B P41- C001C P41- C001D  Critical Step
P41- C001A P41- C001B P41- C001C P41- C001D  Critical Step
Line 1,285: Line 1,117:
Then takes SW Pump D to start
Then takes SW Pump D to start
. Instructor Cue:
. Instructor Cue:
None  Notes: Candidate should announce start of SW pump D over PA system SAT ___ UNSAT ___
None  Notes: Candidate should announce start of SW pump D over PA system SAT ___ UNSAT ___ Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


Step 3  7.1.1.e WHEN the oncoming SW PUMP AMPS stabilize,  
Step 3  7.1.1.e WHEN the oncoming SW PUMP AMPS stabilize, THEN TAKE the oncoming SW PUMP DISCH VLV to OPEN.
 
THEN TAKE the oncoming SW PUMP DISCH VLV to OPEN.
P41- F040A P41- F040B P41- F040C P41- F040D  Critical Step: Candidate takes SW Pump D discharge valve to OPEN
P41- F040A P41- F040B P41- F040C P41- F040D  Critical Step: Candidate takes SW Pump D discharge valve to OPEN
. Instructor Cue:
. Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___ Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


OT-3701-P41-001  Rev 0 Step 4  7.1.2 SHUTDOWN the Offgoing Service Water Pump as follows:  7.1.2.a PERFORM the following steps concurrently:
OT-3701-P41-001  Rev 0 Step 4  7.1.2 SHUTDOWN the Offgoing Service Water Pump as follows:  7.1.2.a PERFORM the following steps concurrently:
7.1.2.a.1 TAKE the SW PUMP DISCH VLV to CLOSE. P41- F040A P41- F040B P41- F040C P41- F040D 7.1.2.a.2 WHEN either of the following occur, The applicable blue light comes on SW Pump Discharge valve  indicates full closed P41- F040A P41- F040B P41- F040C P41- F040D  THEN TAKE the SW PUMP to STOP.
7.1.2.a.1 TAKE the SW PUMP DISCH VLV to CLOSE. P41- F040A P41- F040B P41- F040C P41- F040D 7.1.2.a.2 WHEN either of the following occur, The applicable blue light comes on SW Pump Discharge valve  indicates full closed P41- F040A P41- F040B P41- F040C P41- F040D  THEN TAKE the SW PUMP to STOP.
P41- C001A P41- C001B P41- C001C P41- C001D  Critical Step
P41- C001A P41- C001B P41- C001C P41- C001D  Critical Step
: Candidate takes SW Pump B discharge valve to CLOSE and stops SW Pump B when blue light comes on or when Discharge Valve indicates full closed. Instructor Cue:
: Candidate takes SW Pump B discharge valve to CLOSE and stops SW Pump B when blue light comes on or when Discharge Valve indicates full closed. Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___ Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


CAUTION Operation of a Service Water Pump with its discharge valve at less than the minimum flow position (blue light) may result in pump damage.
CAUTION Operation of a Service Water Pump with its discharge valve at less than the minimum flow position (blue light) may result in pump damage.
Line 1,308: Line 1,135:
P41-F400  P41- R051A P41- R051B P41- R051C P41- R051D      7.1.2.c VERIFY the applicable SW PUMP DISCH VLV indicates CLOSED.
P41-F400  P41- R051A P41- R051B P41- R051C P41- R051D      7.1.2.c VERIFY the applicable SW PUMP DISCH VLV indicates CLOSED.
P41- F040A P41- F040B P41- F040C P41- F040D  7.1.3 DIRECT Chemistry to place the Service Water Chlorination AND Dechlorination System in operation in accordance with SOI
P41- F040A P41- F040B P41- F040C P41- F040D  7.1.3 DIRECT Chemistry to place the Service Water Chlorination AND Dechlorination System in operation in accordance with SOI
-P48/84B. Standard:
-P48/84B. Standard: Candidate should not need to throttle P41
Candidate should not need to throttle P41
-F400. Candidate will close P41
-F400. Candidate will close P41
-F040B if not previously done.
-F040B if not previously done.
Candidate calls Chemistry about chlorination. Instructor Cue:
Candidate calls Chemistry about chlorination. Instructor Cue:
None  Notes: Terminate the JPM SAT ___ UNSAT ___
None  Notes: Terminate the JPM SAT ___ UNSAT ___ Comment(s):________________________________________________________________
Comment(s):________________________________________________________________


Terminating Cue:
Terminating Cue:
Line 1,320: Line 1,145:
Evaluation Results
Evaluation Results
:  SAT_____ UNSAT_____
:  SAT_____ UNSAT_____
End Time:
End Time:   NOTE In the following step, 55
NOTE In the following step, 55
-60 psig is the normal range for SW pump discharge pressure.
-60 psig is the normal range for SW pump discharge pressure.
Discharge pressure outside of this range is permissible provided pressure is maintained between 46 and 64 psig.
Discharge pressure outside of this range is permissible provided pressure is maintained between 46 and 64 psig.
Line 1,330: Line 1,154:
INITIATING CUE:
INITIATING CUE:
Unit Supervisor directs you the Reactor Operator to perform the weekly Service water pump shift to equalize run time.
Unit Supervisor directs you the Reactor Operator to perform the weekly Service water pump shift to equalize run time.
Shift from SW Pump B to D running
Shift from SW Pump B to D running.
.
OT-3701-M25_501  Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: M25/M26 Control Room Ventilation and Emergency Recirc System Time Critical:
OT-3701-M25_501  Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: M25/M26 Control Room Ventilation and Emergency Recirc System Time Critical:
No Alternate Path:
No Alternate Path:
Line 1,344: Line 1,167:
-M25-005 Required Material
-M25-005 Required Material
: SOI-M25/26, Control Room HVAC And Emergency Recirculating System Task: 037-531-01-01 Shift to (Manual) Emerg Rcirc from Smoke Clear or Norm 037-534-04-01 Operate System Using Individual Fan Control Switches Task Standard:
: SOI-M25/26, Control Room HVAC And Emergency Recirculating System Task: 037-531-01-01 Shift to (Manual) Emerg Rcirc from Smoke Clear or Norm 037-534-04-01 Operate System Using Individual Fan Control Switches Task Standard:
Shift Control Room HVAC to Emergency Recirc using individual control switches.
Shift Control Room HVAC to Emergency Recirc using individual control switches. K/A: 290003 - A2.03  Ability to (a) predict the impacts of the following on the CONTROL ROOM HVAC ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Initiation/reconfiguration failure. Importance: RO 3.4 SRO 3.6
K/A: 290003 - A2.03  Ability to (a) predict the impacts of the following on the CONTROL ROOM HVAC ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Initiation/reconfiguration failure. Importance: RO 3.4 SRO 3.6
: 1. Setup Instructions
: 1. Setup Instructions
: Reset simulator to IC 95 Insert Schedule file JPM
: Reset simulator to IC 95 Insert Schedule file JPM
-M25-506.sch. Place a Yellow Switch Cap s on M25 A Supply Fan and M26 A Emergency Recirc Fan
-M2 5-506.sch. Place a Yellow Switch Cap s on M25 A Supply Fan and M26 A Emergency Recirc Fan
. 2. Location / Method: Simulator / Performance  
. 2. Location / Method: Simulator / Performance  
: 3. Initial Condition
: 3. Initial Condition
: Plant conditions are as is
: Plant conditions are as is. CR HVAC Supply Fan A is tagged out to replace a broken belt. The Security Shift Supervisor reports that a tanker truck carrying anhydrous ammonia overturned on Parm ly Rd. near the contractors gate and is leaking its contents. Lake County Haz ma t has been called
. CR HVAC Supply Fan A is tagged out to replace a broken belt
. The Security Shift Supervisor reports that a tanker truck carrying anhydrous ammonia overturned on Parm ly Rd. near the contractors gate and is leaking its contents. Lake County Haz mat has been called
. The wind is blowing out of the south at 10 mph.
. The wind is blowing out of the south at 10 mph.
: 4. Initiating Cue
: 4. Initiating Cue: The Unit Supervisor directs you
: The Unit Supervisor directs you
, the Reactor Operator
, the Reactor Operator
, to shift Control Room Ventilation to Emergency Recirc
, to shift Control Room Ventilation to Emergency Recirc
. Start Time:  Stop Time:    Candidate
. Start Time:  Stop Time:    Candidate:     
:     


OT-3701-M25_501  Rev 0 JPM BODY SHEET Standard:
OT-3701-M25_501  Rev 0 JPM BODY SHEET Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc before performing task.
Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc before performing task.
Standard: Performer follows management expectations with regards to safety and communication standards.
Standard:
Performer follows management expectations with regards to safety and communication standards.
Step 1  SOI-M25/26, Control Room HVAC And Emergency Recirculating System 7.5 Shifting From NORM Or SMOKE CLEAR To EMERG RCIRC
Step 1  SOI-M25/26, Control Room HVAC And Emergency Recirculating System 7.5 Shifting From NORM Or SMOKE CLEAR To EMERG RCIRC
:  7.5.1 PLACE both of the following in EMERG RCIRC:
:  7.5.1 PLACE both of the following in EMERG RCIRC:
Line 1,374: Line 1,190:
Notes: When M25-S8 taken to ER, the Return Fan will lose power causing a TRAIN TRIP.
Notes: When M25-S8 taken to ER, the Return Fan will lose power causing a TRAIN TRIP.
  (Annunciator H13
  (Annunciator H13
-P904-01-C6)  SAT ___ UNSAT ___
-P904-01-C6)  SAT ___ UNSAT ___ Comment(s):_________________________________________________________________
Comment(s):_________________________________________________________________


OT-3701-M25_501  Rev 0 Step 2  ARI-H13-P904-0001-C6  1.0 CAUSE OF ALARM 1.1  Loss of power to or low flow sensed on:
OT-3701-M25_501  Rev 0 Step 2  ARI-H13-P904-0001-C6  1.0 CAUSE OF ALARM 1.1  Loss of power to or low flow sensed on:
CONT RM HVAC RETURN FAN B, M25
CONT RM HVAC RETURN FAN B, M25
-C002B 4.0 Subsequent Operator Actions 4.3 Take M25/26 B Train Initiate Switch to STOP Standard:
-C002B 4.0 Subsequent Operator Actions 4.3 Take M25/26 B Train Initiate Switch to STOP Standard: Operator reviews ARI and suggests course of action.
Operator reviews ARI and suggests course of action.
May take train initiate switch to STOP.
May take train initiate switch to STOP.
Instructor Cue:
Instructor Cue:
Line 1,389: Line 1,203:
If train initiate switch taken to STOP, Train Trip annunciator will momentarily reset until switch returned to AUTO. The Candidate should refer to the SOI and use Individual Control Switches to start B train in ER
If train initiate switch taken to STOP, Train Trip annunciator will momentarily reset until switch returned to AUTO. The Candidate should refer to the SOI and use Individual Control Switches to start B train in ER
. SAT ___ UNSAT ___
. SAT ___ UNSAT ___
Comment(s):______________________________________________________________
Comment(s):______________________________________________________________
___
___
Line 1,403: Line 1,216:
. Notes: Step 7.13.2 is for the 'operating' train. The train is tripped.
. Notes: Step 7.13.2 is for the 'operating' train. The train is tripped.
The Candidate can proceed to Section 7.12
The Candidate can proceed to Section 7.12
. SAT ___ UNSAT ___
. SAT ___ UNSAT ___ Comment(s):_________________________________________________________________
Comment(s):_________________________________________________________________
NOTE When possible, the startup should be in accordance with the normal startup methods which utilize the CONT RM HVAC TRAIN CONT switches.
NOTE When possible, the startup should be in accordance with the normal startup methods which utilize the CONT RM HVAC TRAIN CONT switches.


OT-3701-M25_501  Rev 0 Step 4  7.12 Startup To EMERG RCIRC Using Individual Fan Controls 7.12.1 VERIFY both of the following in EMRG RCIRC:
OT-3701-M25_501  Rev 0 Step 4  7.1 2 Startup To EMERG RCIRC Using Individual Fan Controls 7.1 2.1 VERIFY both of the following in EMRG RCIRC:
CONT RM HVAC TRAIN A MODE SELECT M25-S7  CONT RM HVAC TRAIN B MODE SELECT M25-S8  Standard: Operator verifies both switches are in ER Instructor Cue:
CONT RM HVAC TRAIN A MODE SELECT M25-S7  CONT RM HVAC TRAIN B MODE SELECT M25-S8  Standard: Operator verifies both switches are in ER Instructor Cue:
None  Notes: The switches should have been previously placed in ER.
None  Notes: The switches should have been previously placed in ER.
SAT ___ UNSAT ___
SAT ___ UNSAT ___ Comment(s):_________________________________________________________________
Comment(s):_________________________________________________________________


Step 5 7.12.2 PLACE the following fans in ON:
Step 5 7.1 2.2 PLACE the following fans in ON:
CONT RM HVAC SUPP FAN M25-C001B  CONT RM EMG RCIRC FAN M26-C001B  Critical Step
CONT RM HVAC SUPP FAN M25-C001B  CONT RM EMG RCIRC FAN M26-C001B  Critical Step
: Operator places both fans in ON
: Operator places both fans in ON
Line 1,419: Line 1,230:
None  Notes: Starting M25
None  Notes: Starting M25
-C001B allows M26
-C001B allows M26
-C001B to auto start unless Train Initiate Switch previously taken to STOP. It is still required to place Control Switch for M26
-C001 B to auto start unless Train Initiate Switch previously taken to STOP. It is still required to place Control Switch for M26
-C001B to Start.
-C001 B to Start. SAT ___ UNSAT ___ Comment(s):_________________
SAT ___ UNSAT ___
Comment(s):_________________
________________________________________________
________________________________________________


Line 1,431: Line 1,240:
If asked, M24
If asked, M24
-F051A & B are both closed.
-F051A & B are both closed.
N0otes: None  SAT ___ UNSAT ___
N 0otes: None  SAT ___ UNSAT ___ Comment(s):_________________________________________________________________
Comment(s):_________________________________________________________________


Step 7 7.12.4 IF the train is being started due to an emergency condition, THEN TAKE the following to CLOSE:  CONT RM HVAC A INBD SUPP DMPR M25-F020B  CONT RM HVAC B INBD SUPP DMPR M25-F020A  Standard: Candidate takes dampers to Close
Step 7 7.12.4 IF the train is being started due to an emergency condition, THEN TAKE the following to CLOSE:  CONT RM HVAC A INBD SUPP DMPR M25-F020B  CONT RM HVAC B INBD SUPP DMPR M25-F020A  Standard: Candidate takes dampers to Close
. Instructor Cue:
. Instructor Cue:
None  Notes: None  SAT ___ UNSAT ___
None  Notes: None  SAT ___ UNSAT ___ Comment(s):_________________________________________________________________
Comment(s):_________________________________________________________________


OT-3701-M25_501  Rev 0 Step 8  7.12.5 Control Room relative humidity is  70% Control Room relative humidity is unknown TAKE the CONT RM EMG RCIRC ELEC HTG CONT to START.
OT-3701-M25_501  Rev 0 Step 8  7.12.5 Control Room relative humidity is  70% Control Room relative humidity is unknown TAKE the CONT RM EMG RCIRC ELEC HTG CONT to START.
Line 1,443: Line 1,250:
Instructor Cue:
Instructor Cue:
None  Notes: The computer points show the control room moisture as NORMAL. This indicates humidity is 70%. Terminate the JPM SAT ___ UNSAT ___
None  Notes: The computer points show the control room moisture as NORMAL. This indicates humidity is 70%. Terminate the JPM SAT ___ UNSAT ___
Comment(s):_____________________________________
Comment(s):_____________________________________
____________________________
____________________________
Line 1,452: Line 1,258:
Evaluation Results:
Evaluation Results:
SAT_____ UNSAT_____
SAT_____ UNSAT_____
End Time:
End Time:   NOTE Relative humidity of  70% is determined by an alarm on the computer points M26-BC003 or M26-BC004.
NOTE Relative humidity of  70% is determined by an alarm on the computer points M26-BC003 or M26-BC004.
OT-3701-M25_501  Rev 0 JPM CUE SHEET INITIAL CONDITIONS:
OT-3701-M25_501  Rev 0 JPM CUE SHEET INITIAL CONDITIONS:
Plant conditions are as is
Plant conditions are as is. CR HVAC Supply Fan A is tagged out to replace a broken belt.
. CR HVAC Supply Fan A is tagged out to replace a broken belt.
The Security Shift Supervisor reports that a tanker truck carrying anhydrous ammonia overturned on Parmly Rd. near the contractors gate and is leaking its contents.
The Security Shift Supervisor reports that a tanker truck carrying anhydrous ammonia overturned on Parmly Rd. near the contractors gate and is leaking its contents.
Lake County Hazmat has been called.
Lake County Hazmat has been called.

Revision as of 19:22, 13 July 2018

2013 Perry Initial License Examination Administered Simulator JPMs
ML13353A127
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 04/04/2013
From:
NRC/RGN-III
To:
FirstEnergy Nuclear Operating Co
Shared Package
ML11354A271 List:
References
OT-3701-C11_513_RO, Rev 0
Download: ML13353A127 (83)


Text

OT-3701-C11_5 13_RO Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: C11 CRDH Time Critical:

No Alternate Path:

Yes Applicability:

RO/SRO Safety Function:

1. Reactivity Control Validated Time: 17 Minutes

References:

SOI-C11(CRDH) Rev 2 1 & SOI-C11(RCIS) Rev 2 8 Required Material:

SOI-C11(CRDH) & SOI

-C11(RCIS) Task: 214-510-01-01 Withdraw a Control Rod 214-519-04-01 Respond to an Inability to Move Control Rods Task Standard:

Withdraw control rod using double clutching method of Alternate Control Methods Rod Initially at Position "00" per SOI

-C11(RCIS) K/A: 201003 - A2.01 Ability to (a) predict the impacts of the following on the CONTROL ROD AND DRIVE MECHANISM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Stuck rod. Importance: RO 3.4 SRO 3.6

1. Simulator Setup Instructions
Reset simulator to a reactor startup IC
94. Insert Schedule file JPM C11

-513. Verify Schedule file JPM

-C11-Del.sch and Event File JPM

-C11-Del.evt auto load.Verify clean pull sheet (no asterisks).

Place IOI-001, opened to 4/6, on desk. 2. Location / Method: Simulator / performance

3. Initial Condition: Start up is in progress after a reactor scram. Reactor Power is approximately 2%.. Beginni ng of Life pull sheets at Step 1 2. Unit Supervisor is operating per IOI-1 Cold Startup Section 4.6 Heat up to 940 psig. Drive water pressure is at 300 psid per SOI

-C11(RCIS).

4. Initiating Cue: Unit Supervisor directs you to continue power ascensi on by withdrawing control rods until reactor pressure is 940 psig

.

Start Time End Time Operator OT-3701-C11_5 13_RO Rev 0 JPM BODY SHEET Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc- before performing task.

Standard: Performer follows management expectations with regards to safety and communication standards.

Step 1 Continue Power Ascension:

Operator obtains Beginning of Life pull sheets and verifies step and position.

Standard: Operator verifies step and position on Beginning of Life pull sheets.

Instructor Cue:

None Notes: None SAT ___ UNSAT ___

Comment(s):____________________________

____________________________________

OT-3701-C11_5 13_RO Rev 0 Step 2 SOI-C11(RCIS) 7.4 Notch Withdrawal for Single Rod or Gang 7.4.1 BEFORE withdrawing control rods in Modes 2, 3, 4, and 5, VERIFY Attachment 2, Single Control Rod Withdrawal Checklist, is complete.

Standard: Verifies Attachment 2 complete if section 7.4 of SOI

-C11 (RCIS) is referenced.

Instructor Cue:

Inform operator Attachment 2 is complete.

Notes: None SAT ___ UNSAT ___

Comment(s):____________

_______________________________

_____________________

NOTES The REACTOR MODE SWITCH must be in STARTUP/STANDBY, REFUEL or RUN for individual rod motion or in STARTUP/STANDBY or RUN for Gang Rod motion.

The Rod Pattern Controller rod sequence constraints are enforced even when withdrawing a control rod under the One

-Rod-Out interlock (i.e., with the REACTOR MODE SWITCH in REFUEL).

Rod or gang withdrawal is allowed if both the WITHDRAW BLOCK and WITHDRAW INHIBIT lights are off.

A red WITHDRAW BLOCK light in conjunction with a red WITHDRAW INHIBIT light indicates rod motion is disallowed by the RPC.

A WITHDRAW BLOCK light by itself indicates a rod block signal due to plant status or nuclear instrumentation not associated with RPC constraints

.

OT-3701-C11_5 13_RO Rev 0 Step 3 7.4.2 SELECT the single rod OR rod gang.

Critical Step

Operator selects correct rod.

Instructor Cue: None Notes: None SAT ___ UNSAT ___ Comment(s):______________________________

__________________________________

NOTES RAW DATA and alternating data mode (i.e., dual channel) should be selected when moving control rods.

Gang mode of rod withdrawal is not allowed with a rod drive transponder bypassed at the RGDC due to the possibility of the bypassed rod moving with the gang.

OT-3701-C11_5 13_RO Rev 0 Step 4 7.4.3 MOMENTARILY DEPRESS WITHDRAW.

7.4.4 OBSERVE the following:

The IN light comes on momentarily AND goes off.

The OUT light comes on AND goes off after approximately 2 seconds.

The RDM indicates the new rod position(s).

The SETTLE light comes on for approximately 6 seconds AND goes off.

Expected changes occur in Nuclear Instrumentation.

IF in gang withdrawal, THEN the new position is displayed in the GANG POSITION subsection of the RDM AND the green STABLE status LED will be on.

Critical Step

Operator withdraws correct control rods Instructor Cue:

None Notes: After Rod is off Zero if he depresses INSERT, JPM would be a failure. Three rods in the gang will work correctly, the fourth rod, rod 26-51 is stuck. SAT ___ UNSAT ___

Comment(s):___________________________

_____________________________________

OT-3701-C11_5 13_RO Rev 0 Step 5 7.4.5 IF the SETTLE light goes off before the RDM indicates the new rod position, THEN perform the following:

7.4.6 In Modes 3, 4, OR 5 Standard: Steps 7.4.5 & 7.4.6 are N/A for the rods that move.

Instructor Cue:

None Notes: None SAT ___ UNSAT ___

Comment(s):__________________________

______________________________________

Step 6 7.4.2 SELECT the single rod OR rod gang.

(possible repeat of steps)

Critical Step

Operator selects correct rod 26-51 and attempts withdraw. Operator may attempt a couple of withdraws.

Instructor Cue:

1. Wait for the Candidate to suggest/request using alternate control methods then direct him to use alternate controls

. 2. Hand Candidate yellow copy SOI

-C11(RCIS) after he obtains simulator copy.

Notes: Operator may select single rod 26-51 and attempt to withdraw. No Rod Movement, ROD at position 00.

SAT ___ UNSAT ___

Comment(s):______________________

__________________________________________

NOTE Failure to achieve a green STABLE status LED is indicative of a gang misalignment condition AND will be indicated by the red MISALIGNED status LED.

OT-3701-C11_5 13_RO Rev 0 Step 7 7.24 Alternate Control Methods Rod Initially at Position "00" 7.24.1 IF NOT using a Control Rod Movement Sheet, THEN PERFORM the following:

Standard: Step 7.24.1 is N

/A Instructor Cue:

None Notes: None SAT ___ UNSAT ___ Comment(s):__________________________

______________________________________

Step 8 7.24.2 ATTEMPT to withdraw the rod by double clutching as follows:

7.24.2.a DEPRESS AND HOLD the IN TIMER SKIP for several seconds.

7.24.2.b VERIFY the FULL IN light is on in the rod status display.

7.24.2.c IMMEDIATELY OPERATE the CRD in Continuous Withdraw Mode.

Standard: Operator attempts to move rod by double clutching.

Instructor Cue:

None Notes: Operator may perform several attempts using double clutching.

SAT ___ UNSAT ___ Comment (s):_____________________________

___________________________________

NOTES The upper limit of the normal drive water pressure band may be increased to 300 psid during the Start

-Up following a Reactor Scram.

The following methods will be performed in the sequence listed until a successful notch-out is achieved.

OT-3701-C11_5 13_RO Rev 0 Step 9 7.24.3 IF the "double-clutching" method at the normal Drive Water pressure failed to move the rod, THEN ATTEMPT to move the rod using High Drive Water Pressure method as follows: Standard: Step 7.24.3 is N/A since initially drive water pressure was at 300 psid and

double clutching didn't work

. Instructor Cue:

If asked, pressure historically needed for moving the rod was 270 psig.

Notes: None SAT ___ UNSAT ___

Comment(s):______________

__________________________________________________

Step 1 0 7.24.4 IF moving the rod has NOT been successful, THEN PERFORM the following:

7.24.4.a RAISE CRDH drive differential pressure in 50 psid increments UNTIL rod motion is possible 500 psid is reached Critical Step

Operator adjusts drive water pressure higher by throttling closed on 1C11-F003, CRD Drive Pressure Control Valve Instructor Cue:

None Notes: None SAT ___ UNSAT ___

Comment(s):________________________________________________________________

NOTE The drive water header pressure control valve is paralleled with an inline relief valve. Manual adjustment of drive water pressure must be below the relief valve setting (approx. 550 psig).

OT-3701-C11_5 13_RO Rev 0 Step 1 1 7.24.4.b ATTEMPT to WITHDRAW the rod using the normal method at each increment.:

Critical Step

Operator attempts to withdraw the Control rod.

Instructor Cue:

None Notes: Driver: After Drive Water Pressure is increased to 350 PSID, Event 18 will automatically initiate. Verify Event 18 initiates when . Using elevated drive water pressure may result in the control rod overshooting the desired position. If this occurs, the rod is recovered to the desired position using FTI

-B0002, Control Rods Movements.

SAT ___ UNSAT ___

Comment(s):________________________________________________________________

Step 1 2 7.24.5 Rod withdrawal was NOT successful Drive water pressure is 500 psid THEN PERFORM the following:

7.24.6 IF moving control rods in accordance with Tech Spec 3.10.6, THEN RETURN Drive Water Pressure to normal as directed by the US/SS.

Standard: Steps 7.24.5 and 7.24.6 are N/A. Instructor Cue:

None Notes: None SAT ___ UNSAT ___

Comment(s):___________________________

_____________________________________

OT-3701-C11_5 13_RO Rev 0 Step 1 3 7.24.7 IF NOT moving control rods in accordance with Tech Spec 3.10.6, THEN RETURN Drive Water Pressure to normal WHEN any one of the following condition is met:

The rod is at the withdrawal limit Rod movement is suspended The US/SO determine the elevated pressure is no longer needed Another Control Rod is to be selected Critical Step

Operator adjusts drive water pressure lower by throttling open on 1C11

-

F003, CRD Drive Pressure Control Valve. Instructor Cue:

If asked, Drive Water Pressure should be returned to 300 PSID.

Notes: Terminate JPM when Drive Water pressure returned to 300 PSID.

SAT ___ UNSAT ___

Comment(s):________________________________________________________________

Terminating Cue: Rods that were attempted to be withdrawn are at withdraw limit.

Evaluation Results:

SAT_____ UNSAT_____

End Time OT-3701-C11_5 13_RO Rev 0 JPM CUE SHEET INITIAL CONDITIONS:

Start up is in progress after a reactor scram.

Reactor Power is approximately 2%.

Beginning of Life pull sheets at Step 12.

Unit Supervisor is operating per IOI

-1 Cold Startup Section 4.6 Heat up to 940 psig.

Drive water pressure is at 300 psid per SOI

-C11(RCIS).

INITIATING CUE:

Unit Supervisor directs you to continue power ascension by withdrawing control rods until reactor pressure is 940 psig

.

OT-3701-E51_006 Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: E51 , Reactor Core Isolation Cooling Time Critical:

No Alternate Path:

No Applicability:

RO/SRO Safety Function:

2 - Reactor Water Inventory Control Validated:

17 minutes

References:

EOP-SPI 6.6 Rev 0 Required Material EOP-SPI 6.6 , RCIC Injection And Pressure Control Tasks: 217-565-04-01 Control RPV Level with RCIC Operating in the Injection Mode Task Standard:

Lineup RCIC to control RPV level per EOP-SPI 6.6 K/A Data:

217000 K3.0 1 Knowledge of the effect that a loss or malfunction of the REACTOR CORE ISOLATION COOLING SYSTEM (RCIC) will have on following:

Reactor water level. Importance:

RO 3.7 / SRO 3.7 A 4.0 5 Ability to manually operate and/or monitor in the control room: Reactor water level. Importance: RO 4.

1 / SRO 4.1 1. Setup Instructions

Reset simulator to IC-95. Insert Schedule file JPM

-E51-006. Verify Event file E51

-006 loads.

Place yellow switch caps on HPCS Pump and Injection valve

. 2. Location / Method: Simulator / Perform

3. Initial Condition
The unit is scrammed and is operating IAW EOP

-1 A. HPCS is tagged out for maintenance. Feedwater has been lost. RPV level band is 150" to 219".

RPV water level is lowering due to SRV operation. 4. Initiating Cue: The Unit Supervisor directs you restore and maintain RPV level IAW EOP-SPI 6.6 , RCIC Injection and Pressure Control. An I&C tech is standing by to assist you.

Start Time

End Time:

Candidate:

OT-3701-E51_006 Rev 0 JPM BODY SHEET Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc before performing task.

Standard: Performer follows management expectations with regards to safety and communication standards.

Step 1 EOP-SPI 6.6, RCIC Injection and Pressure Control 1.0 IF the RCIC system is isolated OR an isolation may occur, THEN BYPASS isolations signals as follows:

1.1 AT H13-P629, Card File E21A

-Z3-1, REMOVE trip unit RX PRESS.

E31-N685A 1.2 AT H13-P618, Card File E12A

-Z6-1, REMOVE trip unit RX PRESS.

E31-N 685B Standard: Candidate goes to H13-P629 & P618 to remove trip units Instructor Cue:

After Candidate locates each trip unit, inform him that the I&C Tech will remove the trip unit

. The trip units E31-N685A & B are removed Notes: None SAT ___ UNSAT ___

Comment(s):___________

______________

_______________________________________

OT-3701-E51_006 Rev 0 Step 2 1.3 AT H13-P642, VERIFY the following keylock switches in BYPASS:

RCIC LD ISOLATION BYPASS.

E31A-S2B RHR LD ISOL BYPASS FOR RHR AND RCIC.

E31A-S4B 1.4 AT H13-P6 3 2, VERIFY the following keylock switches in BYPASS:

RCIC LD ISOLATION BYPASS.

E31A-S2 A RHR LD ISOL BYPASS FOR RHR AND RCIC.

E31A-S4 A Critical Step

Candidate places keylock switches in BYPASS Instructor Cue:

None Notes: None SAT ___ UNSAT ___ Comment(s):______________

___________

_______________________________________

Step 3 1.5 AT H13-P601, DEPRESS the following pushbuttons:

RCIC DIVISION 1 ISOLATION RESET E51A-S16 RCIC DIVISION 2 ISOLATION RESET E51A-S25 Critical Step

Candidate depresses isolation reset pushbuttons. Instructor Cue:

None Notes: Only S25 shows isolation SAT ___ UNSAT ___

Comment(s):_________________________

_______________________________________

OT-3701-E51_006 Rev 0 Step 4 1.6 AT H13-P601, VERIFY the following valves are OPEN:

1.6.1 RCIC ST SUPP WARMUP ISOL. E51-F076 1.6.2 RCIC ST SUPP INBD ISOL.

E51-F063 1.6.3 RCIC ST SUPP OTBD ISOL.

E51-F064 1.6.4 RCIC TURB EXHAUST SHUTOFF.

E51-F068 Critical Step

Candidate opens E51

-F076 & F063

. Instructor Cue:

None Notes: Candidate verifies valves E51-F064 & F068 are open. SAT ___ UNSAT ___ Comment(s):_________________________

_______________________________________

Step 5 2.0 AT H13-P629, Card File E21A

-Z6-1, REMOVE the following trip units to defeat the RCIC High Suppression Pool Level suction transfer: SUPR PL LVL.

E51-N636A SUPR PL LVL.

E51-N636E Standard: Candidate goes to H13

-P629 to remove trip units Instructor Cue:

After Candidate locates each trip unit, inform him that the I&C Tech will remove the trip unit

. The trip units E 5 1-N6 36 A & B are removed Notes: None SAT ___ UNSAT ___

Comment(s):_________________________

_______________________________________

OT-3701-E51_006 Rev 0 Step 6 3.0 IF RPV level will be below 130 inches (Level 2), THEN AT H13

-P629, Card File E21A

-Z2-1, REMOVE the following trip units to defeat the RCIC Automatic Initiation:

RX Level.

1B21-N692A RX Level.

1B21-N692E Standard: Candidate goes to H13

-P629 to remove trip units Instructor Cue:

If asked, and RPV level not yet below L2, respond, "RPV level is lowering" The I&C Tech will remove the trip units.

The trip units E 5 1-N6 36 A & B are removed Notes: None SAT ___ UNSAT ___

Comment(s):_________________________

_______________________________________

OT-3701-E51_006 Rev 0 Step 7 4.0 The CST is available RCIC PUMP SUPR PL SUCT ISOL, 1E51-F031 is OPEN THEN PLACE RCIC suction on the CST as follows:

4.1 TAKE RCIC PUMP CST SUCTION VALVE to OPEN

. 1E51-F010 4.2 TAKE RCIC PUMP SUPR PL SUCT ISOL to CLOSE.

1E51-F031 Standard: Candidate observes RCIC suction on the CST

. Instructor Cue: None Notes: Step 4 is N/A SAT ___ UNSAT ___ Comment(s):_________________________

_______________________________________

Step 8 5.0 DEPRESS the RCIC INIT

- MN & FDW TB TRIP

- SEAL IN RESET pushbutton.

1E51A-S18 6.0 CONFIRM the RCIC INIT

- MN & FDW TB TRIP

- SEAL IN RESET white seal in light is OFF. 1E51A-S18 Standard: Candidate Depresses pushbutton and confirms whit e light off. Instructor Cue:

None Notes: None SAT ___ UNSAT ___

Comment(s):_________________________

__________________

_____________________

NOTE The control switch for RCIC PUMP SUPR PL SUCT ISOL, 1E51

-F031, must be placed in CLOSE prior to RCIC PUMP CST SUCTION VALVE, 1E51

-F010, reaching full open or the CST/Supr Pool suction interlock will cause RCIC PUMP CST SUCTION VALVE, 1E51-F010, to close automatically.

OT-3701-E51_006 Rev 0 Step 9 7.0 IF ESW PUMP A is available AND is NOT running, THEN TAKE ESW A PUMP control switch to START.

1P45-C001A 8.0 IF ECC PUMP A is available AND is NOT running, THEN TAKE ECC A PUMP control switch to START.

1P42-C001A Standard: Candidate verifies ESW and ECC pumps started. Instructor Cue:

None Notes: None SAT ___ UNSAT ___

Comment(s):_________________________

_______________________________________

Step 10 9.0 IF RCIC gland seal compressor is available, THEN VERIFY the RCIC gland seal compressor is running.

E51-C004 Standard: Candidate starts gland seal compressor

. Instructor Cue:

None Notes: None SAT ___ UNSAT ___

Comment(s):_________________________

_______________________________________

OT-3701-E51_006 Rev 0 Step 1 1 10.0 INITIATE an evacuation from the following:

Reactor Building Annulus.

Containment Building.

Standard: Candidate announces evacuation over PA

. Instructor Cue:

None Notes: None SAT ___ UNSAT ___

Comment(s):_________________________

___________

____________________________

Step 1 2 1 1.0 VERIFY the following:

RCIC SECOND TEST VALVE TO CST is OPEN.

1E51-F059 RCIC pump flow controller, in Auto set between 350 to 700 GPM.

1E51-R600 RCIC TURBINE TRIP THRT V LATCH is OPEN.

1E51-F510 RCIC TURBINE TRIP THRT V POSITION is OPEN.

1E51-F510 Critical Step

Candidate Opens 1E51-F059 and takes 1E51-F510 to close to latch the valve and opens 1E51-F510. Instructor Cue:

If asked, pressure band is 600

-1000 psig. Notes: Candidate verifies 1E51-R600 set at 350 to 700 GPM (not critical step)

. SAT ___ UNSAT ___

Comment(s):_________________________

_______________________________________

OT-3701-E51_006 Rev 0 Step 12 1 2.0 PERFORM Steps 13.0 and 14.0 as needed to maintain RPV Level and RPV pressure within directed bands.

Standard: Candidate verifies the above

. Instructor Cue:

None Notes: Step 13.0 is not used now

- using RCIC for level control.

However, will need to use Step 13.0 when RPV level is in band to stop level rise.

SAT ___ UNSAT ___

Comment(s):____________

_____________

_______________________________________

Step 13 14.0 WHEN desired to operate RCIC in the Level Control Mode as follows, THEN PERFORM the following:

1 4.1 VERIFY RCIC STEAM SHUTOFF is OPEN.

1E51-F045 Critical Step

Candidate opens E51

-F045. Instructor Cue:

None Notes: None SAT ___ UNSAT ___

Comment(s):_________________________

_______________________________________

OT-3701-E51_006 Rev 0 Step 14 1 4.2 IF the RCIC INJECTION VALVE is CLOSED, THEN THROTTLE the RCIC FIRST TEST VALVE TO CST UNTIL RCIC pump discharge pressure is 100 to 200 psig below RPV pressure.

1E51-F022 Critical Step

Candidate throttles open E51-F022. Instructor Cue:

None Notes: SOI-E51 P&L warns against operating RCIC on min flow.

SAT ___ UNSAT ___ Comment(s):___________

______________

_______________________________________

Step 15 1 4.3 TAKE RCIC INJECTION VALVE to OPEN.

1E51-F013 Critical Step

Candidate opens E51

-F0 13. Instructor Cue:

None Notes: Candidate needs to control RPV level in band of 150 to 219"

. SAT ___ UNSAT ___

Comment(s):_________________________

_______________________________________

OT-3701-E51_006 Rev 0 Step 16 1 4.4 VERIFY RCIC FIRST TEST VALVE TO CST is CLOSED. 1E51-F022 14.5 MAINTAIN RCIC flow between 350 GPM and 700 GPM. 1E51-R600 Standard: Candidate closes E51

-F022 and maintains RCIC flow in band

. Instructor Cue:

None Notes: If level rise is slow and candidate controls level in band, terminate the JPM. Otherwise continue to JPM step 17 SAT ___ UNSAT ___ Comment(s):_________________________

_______________________________________

Step 17 13.0 WHEN desired to operate RCIC in the Pressure Control Mode as follows, then perform the following:

13.1 VERFIY RCIC INJECTION VALVE to CLOSED.

1E51-F013 13.2 VERIFY RCIC STEAM SHUTOFF is OPEN.

1E51-F0 45 13.3 MAINTAIN RCIC flow between 350 GPM and 700 GPM.

1E51-R600 13.4 THROTTLE RCIC FIRST TEST VALVE TO CST to maintain desired RPV pressure.

. 1E51-F022 Standard: Candidate closes E51

-F022 and maintains RCIC flow in band

. Instructor Cue:

None Notes: When level is stable and in band, terminate the JPM.

SAT ___ UNSAT ___

Comment(s):_________________________

_______________________________________

Terminating Cue:

RCIC is injecting into the RPV and controlling level in band

. Evaluation Results

SAT_____ UNSAT_____

End Time OT-3701-E51_006 Rev 0 JPM CUE SHEET INITIAL CONDITIONS:

The unit is scrammed and is operating IAW EOP

-1A. HPCS is tagged out for maintenance.

Feedwater has been lost.

RPV level band is 150" to 219".

RPV water level is lowering due to SRV operation.

INITIATING CUE:

The Unit Supervisor directs you restore and maintain RPV level IAW EOP-SPI 6.6, RCIC Injection and Pressure Control. An I&C tech is standing by to assist you.

OT-3701-B21_0 09 Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: B21, Main Steam Time Critical:

No Alternate Path:

No Applicability:

RO/SRO Safety Function:

3 - Reactor Pressure Control Validated Time: 15 minutes

References:

EOP-SPI 9.2 Rev 1 Required Material EOP-SPI 9.2, Opening MSIVs Tasks: 239-527-01-01 Open MSIV's from H13

-P601 Task Standard:

Reopen MSIV's to control RPV pressure per EOP-SPI 9.2 K/A Data:

239001 K3.08 Knowledge of the effect that a loss or malfunction of the Main And Reheat Steam System will have on following: Decay heat removal.

Importance:

RO 3.4 / SRO 3.5 A2.03 Ability to (a) predict the impacts of the following on the Main And Reheat Steam System ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: MSIV closure. Importance: RO 4.0 / SRO 4.2

1. Setup Instructions
Reset simulator to IC-95. Driver will need to control RPV pressure using SRV's until MSL drains are opened. (control in 940 to 1000 psig band)

Do not go to RUN until SPDS falls through

2. Location / Method: Simulator / Perform
3. Initial Condition: The unit is scrammed and is operating IAW EOP

-1A. MSIV's closed due to a Mode Switch malfunction which has been corrected.

4. Initiating Cue
The Unit Supervisor directs you reopen the MSIV's IAW EOP

-SPI 9.2, Opening MSIV's. Another operator is controlling RPV pressure.

Start Time

End Time:

Candidate:

Note: Run this JPM then E51

-006 in sequence.

OT-3701-B21_0 09 Rev 0 JPM BODY SHEET Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc before performing task.

Standard: Performer follows management expectations with regards to safety and communication standards.

Step 1 EOP-SPI 9.2, OPENING MSIV's 1.0 DEFEAT MSIV low RPV level isolation as follows:

AT H13-P694, VERIFY MSIV ISOL LO LEVEL BYPASS CH D keylock switch in BYP.

B21H-S76D AT H13-P691, VERIFY MSIV ISOL LO LEVEL BYPASS CH A keylock switch in BYP.

B21H-S76A AT H13-P692, VERIFY MSIV ISOL LO LEVEL BYPASS CH B keylock switch in BYP.

B21H-S76B AT H13-P693, VERIFY MSIV ISOL LO LEVEL BYPASS CH C keylock switch in BYP.

B21H-S76C Critical Step

Candidate verifies (places) keylock switches in BYPASS Instructor Cue:

None Notes: None SAT ___ UNSAT ___

Comment(s):_________________________

_______________________________________

OT-3701-B21_0 09 Rev 0 Step 2 2.0 VERIFY the following control switches are in CLOSE:

MSL B OTBD MSIV.

B21-F028B MSL D OTBD MSIV.

B21-F028D MSL A OTBD MSIV.

B21-F028A MSL C OTBD MSIV. B21-F028C MSL B INBD MSIV.

B21-F022B MSL D INBD MSIV.

B21-F022D MSL A INBD MSIV.

B21-F022A MSL C INBD MSIV.

B21-F022C Critical Step

Candidate places MSIV control switches in CLOSE. Instructor Cue:

None Notes: None SAT ___ UNSAT ___

Comme nt(s):_________________________

_______________________________________

Step 3 3.0 AT Panel P680, VERIFY all Turbine Bypass Valves are CLOSED.

Standard: Candidate observes Turbine Bypass Valves are CLOSE D. Instructor Cue:

None Notes: None SAT ___ UNSAT ___

Comment(s):_________________________

_______________________________________

OT-3701-B21_0 09 Rev 0 Step 4 4.0 AT Panel P601, VERIFY the following drain valves are CLOSED:

MSL Low Point DRN Shutoff.

1B21-F015 Shutoff Vlv Before Seat Norm DRN.

1N22-F450 Shutoff Vlv Before Seat Warmup DRN.

1N22-F455 INBD MSIV Before Seat Normal Drain.

1B21-F033. Critical Step

Candidate places drain valve control switches in CLOSE. Instructor Cue:

None Notes: N22-F455 already closed

- not critical step.

SAT ___ UNSAT ___

Comment(s):_________________________

_______________________________________

Step 5 5.0 AT Panel P 870 , VERIFY MST To RFPT A & B Supply Valve is CLOSED.

1N11-F100 Critical Step

Candidate places 1N11-F100 valve control switches in CLOSE. Instructor Cue: None Notes: None SAT ___ UNSAT ___

Comment(s):_________________________

_______________________________________

OT-3701-B21_0 09 Rev 0 Step 6 6.0 IF Main Turb Stop Valves Before Seat DRN valves are OPEN, THEN AT Panel P870, LATCH controller 1N22

-R235, Main Turb Stop Valves Before Seat DRN Valve controller as follows:

1N22-F340A 1N22-F340B 1N22-F340C 1N22-F340D 6.1 VERIFY Main Turb Stop Valves Before Seat DRN Valve controller at 100%.

1N22-R235 6.2 WHEN controller Main Turb Stop Valves Before Seat DRN Valve has been at 100% for at least 10 seconds, THEN VERIFY Main Turb Stop Valves Before Seat DRN Valve controller at 0%.

1N22-R235 6.3 IF 1N22-F340A-D are still open (controller does not latch), THEN AT 1H13-P866 Bay D, RELEASE latching relay by manually pulling Release tab, located on top right of relay.

1N22-K032 Critical Step

Candidate performs steps 6.1 and 6.2 to close drain valves

. Instructor Cue:

None Notes: Step 6.3 is N/A SAT ___ UNSAT ___

Comment(s):_________________________

__________

_____________________________

OT-3701-B21_0 09 Rev 0 Step 7 7.0 WHEN the following alarms have cleared, MSL ISOL MAIN STEAM LINE FLOW HIGH.

(H13-P601-19A-A3) MSL ISOL TURBINE AREA TEMP HIGH.

(H13-P601-19A-B3) MSL & RWCU ISOL STEAM TUNNEL TEMP HIGH.

(H13-P601-19A-B4) THEN DEPRESS the following pushbuttons:

MSL & NS4 INBD ISOL SEAL IN RESET.

1B21H-S33 MSL & NS4 OTBD ISOL SEAL IN RESET.

1B21H-S32 Critical Step

Candidate Depresses 1B21H-S33 and 1B21H-S32 to clear isolation signal. Instructor Cue:

None Notes: Alarm H13-P 601-19A-A1 will clear.

SAT ___ UNSAT ___

Comment(s):_________________________

_______________________________________

Step 8 8.0 VERIFY the following valves are OPEN:

MSL DRN & MSIV BYP INBD ISOL.

B21-F016 MSL DRN & MSIV BYP OTBD ISOL.

B21-F019 MSIV BYP VLV For MST Line Warm Up.

1B21-F020 INBD MSIV Before Seat Warmup Drain.

1B21-F021 Critical Step:

Candidate opens the above listed valve s. Instructor Cue:

None Notes: When drain valves are opened, RPV pressure will start to lower. Pressure control on SRV's no longer required.

SAT ___ UNSAT ___

Comment(s):_________________________

_______________________________________

OT-3701-B21_0 09 Rev 0 Step 9 9.0 Instrument Air is isolated to the Drywell NO known air leak is present in Containment NO known air leak is present in Drywell THEN RESTORE Instrument Air to Containment and Drywell as follows:

9.1 VERIFY INST AIR DRYWELL ISOL valve is OPEN.

P52-F646 9.2 VERIFY INST AIR CNTMT ISOL valve is OPEN.

P52-F200 Standard: Candidate verifies opens the air isolation valves

. Instructor Cue:

If asked, there are no known air leaks in containment or drywell Notes: None SAT ___ UNSAT ___ Comment(s):_________________________

_______________________________________

OT-3701-B21_0 09 Rev 0 Step 10 10.0 SELECT an available MSL to OPEN. MSL B MSL D MSL A MSL C 11.0 PLACE the SELECTED MSL OTBD MSIV control switch in Auto, to open the outboard MSIV.

B21-F028B B21-F028D B21-F028A B21-F028C 12.0 PLACE the SELECTED MSL INBD MSIV control switch in Auto, to open the inboard MSIV.

B21-F022B B21-F022D B21-F022A B21-F022C Critical Step

Candidate selects and opens the isolation valves for one main steam line

. Instructor Cue:

None Notes: Opening the first MSL causes an RPV level perturbation.

SAT ___ UNSAT ___

Comment(s):_________________________

_______________________________________

OT-3701-B21_0 09 Rev 0 Step 11 1 4.0 VERIFY the following control switches are in AUTO:

MSL B OTBD MSIV.

B21-F028B MSL D OTBD MSIV.

B21-F028D MSL A OTBD MSIV.

B21-F028A MSL C OTBD MSIV.

B21-F028C MSL B INBD MSIV.

B21-F022B MSL D INBD MSIV.

B21-F022D MSL A INBD MSIV.

B21-F022A MSL C INBD MSIV.

B21-F022C Standard: Candidate places control switches for remaining MSIV's in AUTO

. Instructor Cue:

None Notes: Step 1 3 is N/A Terminate the JPM SAT ___ UNSAT ___

Comment(s):_________________________

_______________________________________

Terminating Cue:

MSIV's are open

. Evaluation Results:

SAT_____ UNSAT_____

End Time OT-3701-B21_0 09 Rev 0 JPM CUE SHEET INITIAL CONDITIONS:

The unit is scrammed and is operating IAW EOP

-1 A. MSIV's closed due to a Mode Switch malfunction which has been corrected.

INITIATING CUE:

The Unit Supervisor directs you reopen the MSIV's IAW EOP-SPI 9.2, Opening MSIV's.

Another operator is controlling RPV pressure.

OT-3701-E12_5 06_RO Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: E12, Residual Heat Removal Time Critical:

No Alternate Path:

Yes Applicability:

RO Safety Function:

4: Heat Removal From Reactor Core Setting: Simulator Validated:

3 6 minutes

References:

SOI-E12 Rev. 5 7 & ONI-E1 2-2 Rev 2 9 Required Material SOI-E12 - Residual Heat Removal System Tasks: 205-535-01-01 Warmup and Initiate Shutdown Cooling from Standby Readiness Task Standard:

Initiate SDC in Alternate Return Path mode prior to exceeding 200° F in vessel. K/A Data:

205000 Ability to (a) predict the impacts of the following on the Shutdown Cooling System (RHR Shutdown Cooling Mode) ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:: A2.0 6 SDC/RHR pump trips. Importance RO 3.

4 / SRO 3.5. A2.10 R Valve operation. Importance: RO 2.9 SRO 2.9 Ability to manually operate and/or monitor in the control room: A4.01 SDC/RHR pumps Importance RO 3.7 / SRO 3.7. A4.03 SDC/RHR discharge valves Importance RO 3.6 / SRO 3.5. A4.09 System flow

. Importance RO 3.1 / SRO 3.1

OT-3701-E12_5 06_RO Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET contd. 1. Simulator Setup Instructions

Reset simulator to IC 96 (RPV temperature

~ 1 2 0°F). Run schedule file JPM

-E12-506 (malfunctio n mv06_1e12f0053a

& remote Function RH07 for RHR B pump breaker control power loss

). Maintain reactor vessel level between 250 and 260" using Low Flow Control for feedwater and G33 blowdown. Simulator driver to control vessel level.

Verify Low Flow Control screen up on DFWCS. Provide marked

-up copy of SOI

-E12. Place simulator in run after reading Initial Conditions to Operator. 2. Location / Method: Simulator / performance

3. Initial Condition
The plant shutdown due to scram yesterday. Currently in Mode 4 and the Unit Supervisor is operating in IOI

-12 Maintaining Cold Shutdown. RHR B was operating in Shutdown Cooling when the pump tripped. The Unit Supervisor has entered ONI-E12-2 Loss of Decay Heat Removal. No Reactor Recirculation pumps are in operation. Reactor temperature band is 1 10 to 1 20 degrees F. RPV temperature was 1 15 degrees F prior to trip.

The RO shifting SDC loops became ill.

4. Initiating Cue
The Unit Supervisor directs you

, the Reactor Operator , to continue shifting Shutdown Cooling loops from B to A using RHR A through the Normal Return Path. Section 4.7 Shutdown Cooling Startup for RHR A is complete through Step 4.7.1

4. Monitor Reactor Temperature per IOI

-12 after RHR A is in SDC

.

Start Time

End Time:

Operator:

OT-3701-E12_5 06_RO Rev 0 JPM BODY SHEET Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc- before performing task.

Standard: Performer follows management expectations with regards to safety and communication standards.

Step 1 SO I-E12, RESIDUAL HEAT REMOVAL SYSTEM 2.0 Precautions And Limitations 2.2 Observe the following limitations during the operation of the RHR pumps:

Do not operate the RHR pump against a shutoff head for greater than 8 seconds.

2.6 Operation of the LPCI mode of RHR with injection flow to the vessel shall only be done in an accident condition, a plant emergency condition, or an approved test condition of short duration. ONI

-E12-2, Loss of Decay Heat Removal, and IOI

-11, Shutdown From Outside Control Room, direct the use of the LPCI injection lines as Alternate Shutdown Cooling flow paths. Use of this flow path is still subject to

reportability (as described in PAP

-1604) when used for Alternate Shutdown Cooling. 4.7 Shutdown Cooling Startup for RHR A(B)

Operator reviews place

-kept copy of SOI

-E12 including Precautions and Limitations and panel H13-P601. Standard: The Operator reviews place

-kept copy of SOI

-E12. Instructor Cue:

None Notes: None SAT ___ UNSAT ___

Comment(s):__________________________

______________________________________

OT-3701-E12_5 06_RO Rev 0 Step 2 4.7.15 Hold the Oncoming RJR HX'S BYPASS VALVE in CLOSE for 59

-62 seconds

. 1E12-F048A Critical Step

The Operator closes 1E12F0 48 A for 59-62 seconds

. Instructor Cue:

None Notes: None SAT ___ UNSAT ___ Comment(s):________________________________________________________________

Step 3 4.7.16 Hold the Oncoming RJR HX'S OUTLET VALVE in CLOSE until closed

. 1E12-F003A Critical Step

The Operator closes 1E12F0 03 A. Instructor Cue:

None Notes: None SAT ___ UNSAT ___ Comment(s):________________________________________________________________

OT-3701-E12_5 06_RO Rev 0 Step 4 4.7.17 It is desired to establish the Normal Return Path 1E12-F053A 1E12-F053B RHR Upper Pool Cooling Isol is closed 1E12-F037A 1E12-F037B LPCI Injection Valve is closed 1E12-F042A 1E12-F042B THEN PERFORM the following:

4.7.17.a IF the Feedwater System is shutdown, THEN VERIFY the Oncoming RHR loop FDW HDR SHUTOFF is closed, to prevent flow to the feedwater system.

1B21-F065A 1B21-F065B Standard: The Operator observes that feedwater is shutdown and the B21F065's are closed. Instructor Cue:

None Notes: None SAT ___ UNSAT ___

Comment(s):________________________________________________________________

OT-3701-E12_5 06_RO Rev 0 Step 5 CAUTIONS The RHR PUMP MIN FLOW VALVE is downpowered in the closed position.

Throttling open the RHR HX'S BYPASS VALVE, 1E12

-F048A(B) after starting the pump ensures pump min flow requirements are met following pump start.

Maintain RHR Shutdown Cooling flow greater than 2575 gpm to ensure that the RHR PUMP A(B) has adequate minimum flow.

4.7.17.a INITIATE flow through the SHUTDOWN COOLING TO FDW SHUTOFF as follows: 1E12-F053A 1E12-F053B 4.7.17.b.1 PERFORM the following simultaneously

HOLD the SHUTDOWN COOLING TO FDW SHUTOFF in OPEN, UNTIL open.

1E12-F053A TAKE the RHR PUMP to START.

1E12-C002A 4.7.17.b.2 WITHIN 8 seconds, THROTTLE RHR HX'S BYPASS VALVE, UNTIL RHR PUMP FLOW is at least 2575 gpm. Critical Step: The Operator starts to open 1E12F053A and starts RHR A pump

. Instructor Cue:

1. After report of valve failure, if pump was started, and the operator recommends it, direct operator to shutdown RHR A pump while deciding on a course of action.
2. Direct Operator to establish shutdown cooling, this is an emergency. Notes: Operator may or may not start pump if he notices failure of 1E12

-F053A. 1E12-F053A is failed closed and will lose indication simulating blown fuse. If Operator started pump, the Minimum Flow Valve was down-powered per step 4.7.10.c and the pump will not have minimum flow protection SAT ___ UNSAT ___ Comment(s):________________________________________________________________

OT-3701-E12_5 06_RO Rev 0 Step 6 4.7.18 It is desired to establish the Refuel Return Path 1E12-F0 37 A 1E12-F0 37 B Operator determines that this step is N/A.

Standard: This Step is N/A. The Operator cannot use Refuel Mode Path

. Instructor Cue:

None Notes: Plant not in Mode 5, Vessel Head installed.

SAT ___ UNSAT ___ Comment(s):___________________________________________________

_____________

OT-3701-E12_5 06_RO Rev 0 Step 7 CAUTION Operation of the RHR Loop with Vessel Injection via the LPCI Injection Line has the potential to result in fatigue failure of incore instrument tubes and burnishing of fuel channels. The RHR PUMP MIN FLOW VALVE is downpowered in the closed position.

Throttling open the RHR HX'S BYPASS VALVE, 1E12

-F048A(B) after starting the pump ensures pump min flow requirements are met following pump start.

Maintain RHR Shutdown Cooling flow greater than 2575 gpm to ensure that the RHR PUMP A(B) has adequate minimum flow.

4.7.19 It is desired to establish the Alternate Return Path 1E12-F0 42 A 1E12-F0 42 B Normal Shutdown Cooling return path is unavailable 1E12-F053 A 1E12-F0 5 3B Refuel Shutdown Cooling return path is unavailable 1E12-F0 37 A 1E12-F0 37 B THEN PERFORM the following:

4.7.19.a REFER TO Alternate Shutdown Cooling Data (Attachment 42) and TAKE Pre-Start Data. Standard: The Operator requests/obtains Attachment 42.

Instructor Cue:

This is an Emergency

. Establish Shutdown Cooling. Another Reactor Operator has taken prestart data on Attachment

42. Notes: None SAT ___ UNSAT ___

Comment(s):________________________________________________________________

OT-3701-E12_5 06_RO Rev 0 Step 8 CAUTIONS The RHR PUMP MIN FLOW VALVE is downpowered in the closed position.

Throttling open the RHR HX'S BYPASS VALVE, 1E12

-F048A(B) after starting the pump ensures pump min flow requirements are met following pump start.

Maintain RHR Shutdown Cooling flow greater than 2575 gpm to ensure that the RHR PUMP A(B) has adequate minimum flow.

4.7.19.b INITIATE flow through the LPCI INJECTION VALVE as follows: 1E12-F0 42 A 4.7.19.b.1 PERFORM the following simultaneously:

TAKE the LPCI INJECTION VALVE to OPEN.

1E12-F042A TAKE the RHR PUMP to START.

1E12-C002A Critical Step: The Operator starts to open 1E12

-F0 42A and starts RHR A pump

. Instructor Cue:

None Notes: None SAT ___ UNSAT ___

Comment(s):________________________________________________________________

OT-3701-E12_5 06_RO Rev 0 Step 9 4.7.19.b.2 WITHIN 8 seconds, THROTTLE RHR HX'S BYPASS VALVE, UNTIL RHR PUMP FLOW is at least 2575 gpm. 1E12- F048A 1E12-R603A 4.7.19.c JOG OPEN the RHR HX'S BYPASS VALVE in 1000

-2000 gpm increments, UNTIL RHR PUMP FLOW is 2575-7100 gpm. 1E12- F048A 1E12-R603A Standard: Within 8 seconds the Operator opens 1E12

-F048A until flow is > 2575 gpm then controls flow within directed band

. Instructor Cue:

If asked, Flow band is 2575 to 7100 gpm. Notes: Initial flow will be

~ 3500 gpm. Reactor coolant temperature should be between 140 and 150 degrees if Operator establishes flow with some urgency. Once flow is established through HX, use recorder point 1 or SPDS RHR In temp. If Operator delays and spends time reviewing the procedure, Reactor temperature could be as high as 180 degrees.

Temperature indication will be RHR out on S PDS or Point 5 on recorder with E12F003A closed.

If SPDS RPV Temperature Trend is displayed, RPV temp will initially rise once flow is established, then lower as cooling is established.

SAT ___ UNSAT ___

Comment(s):___________

_____________________________________________________

OT-3701-E12_5 06_RO Rev 0 Step 10 4.7.19.d NOTIFY the following of the use of the Shutdown Cooling return flow to the Vessel via LPCI INJECTION VALVE so the required fuel inspection may be scheduled:

Reactor Engineering.

Outage Planning.

4.7.19.e INITIATE a special report to the NRC in accordance with PAP

-1604. 4.7.19.f GO TO RHR Shutdown Cooling Operations for RHR A(B).

Standard: The Operator will proceed to Section 7.6 , RHR Shutdown Cooling Operations for RHR A(B)

. Instructor Cue:

Steps 4.7.19.d & e are being performed by the Shift Manager

. Notes: None SAT ___ UNSAT ___

Comment(s):________________________________________________________________

Step 11 7.6 RHR Shutdown Cooling Operations for RHR A(B)

NOTES Normal Design parameters for Shutdown Cooling/Test Mode operation:

- RHR Pump Flow 7000-7100 gpm. - RHR Pump Amps95-110 Amps. - RHR A Head Spray Flow 0 - 500 gpm. - RHR Suction Pressure Less than 135 psig.

- RHR HX ESW Outlet Temps Less than 108 o F. - RHR Pump Suct Temp Less than 100 oF (Refuel Mode).

- RHR HX'S RHR Outlet Temp Less than 86 oF (Refuel Mode).

The following actions can be performed in any logical order or repeated to support current plant conditions.

OT-3701-E12_5 06_RO Rev 0 Step 11 - Continued 7.6.1 OBSERVE the following limitation s when in Shutdown Cooling:

MAINTAIN cooldown rate less than 100 oF in any 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period.

DO NOT allow any RHR piping which has been inadvertently drained to be refilled with water from the Reactor Vessel.

MAINTAIN Vessel temperature below 190 oF while in Shutdown Cooling. WHEN using the alternate return path, THEN MONITOR the following additional items:

1E12-F042A MAINTAIN RHR FLOW in the band 2575-7100 gpm. 1E12-F042A 1E12-F042B MAINTAIN RHR H2O DISCH temperature greater than 65 o F. 1E12-R601 Pt 5 (magenta) 1E12-R601 Pt 6 (orange) Standard: The Operator establishes flow of 2575 to 7100 gpm. Instructor Cue:

Establish a cooldown to restore Reactor temperature to band of 1 10 to 1 20 deg F. Notes: Reactor temperature will increase steadily if cooling is not established.

SAT ___ UNSAT ___

Comment(s):________________________________________________________________

OT-3701-E12_5 06_RO Rev 0 Step 12 7.6.2 PERFORM the following as needed to maintain desired cooldown rate AND RHR Pump flow 7000

-7100 (alternate return path 257 5-7100): 1E12-R603A 1E12-R603B: THROTTLE RHR HX'S OUTLET VALVE. 1E12-F003A THROTTLE RHR HX'S BYPASS VALVE. 1E12-F048A Critical Step

The Operator throttle s open s 1E12F0 03 A and 1E12F0 48 A is throttled close to establish a cooldown

. Instructor Cu e: Establish a cooldown to restore temperature within band of 110 to 120 degrees. Flow Band is 7000 to 7100 gpm. Notes: Exceeding 200 degrees Reactor Water temperature would be a failure.

200 degrees is a MODE change.

Operator can establish full cooling and not have a problem with 100 degrees per hour.

Due to decay heat load, operator will need to go to nearly full flow through HX to turn temperature.

Terminate JPM once satisfied with cooldown rate.

SAT ___ UNSAT ___

Comment(s):______________________

__________________________________________

Terminating Cue: Shutdown Cooling Flow established through Alternate Return path, a cooldown rate has been established and Reactor Water Temperature is maintained less than 200 degrees. Evaluation Results:

SAT_____ UNSAT_____

End Time OT-3701-E12_5 06_RO Rev 0 JPM CUE SHEET INITIAL CONDITIONS:

The plant shutdown due to scram yesterday.

Currently in Mode 4 and the Unit Supervisor is operating in IOI

-12 Maintaining Cold Shutdown.

RHR B was operating in Shutdown Cooling when the pump tripped. The Unit Supervisor has entered ONI

-E12-2 Loss of Decay Heat Removal. No Reactor Recirculation pumps are in operation.

Reactor temperature band is 1 10 to 1 20 degrees F.

RPV temperature was 1 15 degrees F prior to trip.

The RO shifting SDC loops became ill.

INITIATING CUE:

The Unit Supervisor directs you

, the Reactor Operator , to continue shifting Shutdown Cooling loops from B to A using RHR A through the Normal Return Path.

Section 4.7 Shutdown Cooling Startup for RHR A is complete through Step 4.7.1

4. Monitor Reactor Temperature per IOI

-12 after RHR A is in SDC.

OT-3701-R43_5 01 Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: R43, Division 1 And 2 Diesel Generator Time Critical:

No Alternate Path:

Yes Applicability:

RO/SRO Safety Function:

6 - Electrical Setting: Simulator Validated:

28 minutes

References:

SOI-R43 Rev 42 Required Material: SOI-R43 - Division 1 And 2 Diesel Generator System Tasks: 264-506-01-01 Shutdown the SBDG to Standby Readiness (Remote)

Task Standard:

Shutdown Div 2 DG from Control Room then place in PTL

. K/A Data:

264000 Ability to manually operate and/or monitor in the control room: A4.04 Manual start, loading, and stopping of emergency generator: Plant

-Specific. Importance RO 3.

7 / SRO 3.7. 1. Simulator Setup Instructions

Reset Simulator to IC 9
4. Insert Schedule file JPM

-R43-5 01 and verify Event file JPM R4 3 auto loads.

Evaluator and Driver coordinate to insert Events 3 & 4 in JPM Steps 10, 14, & 19.

2. Location / Method: Simulator / performance
3. Initial Condition
The Div 2 DG has completed a four

-hour maintenance run. It has been disconnected from EH12 and is ready to be shutdown. PPO is standing by at the diesel to assist. 4. Initiating Cue: The Unit Supervisor directs you as the Reactor Operator to shutdown Div 2 DG to standby readiness in accordance with SOI

-R43 section 6.1 Remote Shutdown to Standby Readiness.

Start Time

End Time: Candidate:

OT-3701-R43_5 01 Rev 0 JPM BODY SHEET Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc- before performing task.

Standard: Performer follows management expectations with regards to safety and communication standards.

Step 1 SOI-R43 - Division 1 And 2 Diesel Generator System 6.1 Remote - Shutdown to Standby Readiness NOTES If the voltage and speed are not adjusted on DG shutdown, the DG will need to be started and shutdown per this SOI to adjust speed and voltage prior to operability.

Emergency stop is accomplished by performing Emergency Shutdown.

6.1.1 IF diesel unloading was NOT within the unloading limits listed in the Precautions and Limitations THEN OPEN the Diesel Turbo Prelube Oil Valve. 1R47-F544B Standard: Step 6.1.1 is N/A. The Operator may ask examiner for unloading rate.

Instructor Cue:

If asked, the diesel unloading was within limits

. Notes: None SAT ___ UNSAT ___ Comment(s):__________

______________________________________________________

OT-3701-R43_5 01 Rev 0 Step 2 6.1.2 VERIFY the DIESEL GENERATOR in AUTO at 1H13

-P877. Div 2 6.1.3 VERIFY the DIESEL GENERATOR CONTROL TRANSFER is in CONT RM at the Generator Control Panel. 1H51

-P055B Standard: The Operator verifies DG is in AUTO at P877 and calls Plant Operator (PPO) to verify transfer switch in CONT RM at P055B

. Instructor Cue:

Transfer switch in CONT RM at P055B

. Notes: None SAT ___ UNSAT ___ Comment(s):_________________________________

_______________________________

Step 3 6.1.4 PERFORM the following at 1H13

-P877: 6.1.4.a VERIFY the DIESEL GEN OUT OF SERVICE is in NORM. Div 2 6.1.4.b CONFIRM the DIESEL GEN BRKR green light is on EH1201 6.1.4.c IF the PREFERRED SOURCE BRKR is closed EH1212, THEN PLACE the SYNC SEL SWITCH in TH1.

Standard: The Operator verifies DG Out Of Service switch in NORM and confirms EH1201 green light on

. Instructor Cue:

None Notes: Step 6.1.4.c is N/A SAT ___ UNSAT ___

Comment(s):___________________

_____________________________________________

OT-3701-R43_5 01 Rev 0 Step 4 6.1.4.d IF the ALTN PREFERRED SOURCE EH1213 BRKR is closed, THEN PLACE the SYNC SEL SWITCH in TH21.

6.1.4.e ADJUST the DIESEL GEN GOVERNOR so the SYNCHROSCOPE is moving slow in the FAST direction.

1R43-R032B 6.1.4.f PLACE the SYNC SEL SWITCH in OFF.

Critical Step

The Operator places Synch Select Switch in TH21 and adjusts governor so synchroscope is moving slow in Fast direction. Then places the SYNC SEL SWITCH in OFF

. Instructor Cue:

None Notes: A few seconds after the governor taken to raise, the DG TRIP* PROTECT RELAY LOCKOUT annunciator will alarm but the DG will not trip. After the candidate references the ARI, they may shutdown the DG by continuing in this shutdown section or performing Emergency Shutdown.

If candidate performs Emergency shutdown, go to JPM Step

15. (JPM Steps 5

-14 are not required)

SAT ___ UNSAT ___

Comment(s):________________________________________________________________

OT-3701-R43_5 01 Rev 0 Step 5 6.1.4.g ADJUST the DIESEL GEN VOLTAGE RGLTR to read 4100 to 4200 Volts on DIESEL GEN A

-B VOLTS. 1R43-R027B Critical Step

The Operator adjusts voltage regulator to obtain 4100 to 4200 volts on 1R43R027B. Instructor Cue:

None Notes: Voltage set @ 4000V

- will need to adjust voltage up. SAT ___ UNSAT ___

Comment(s):________________________________________________________________

Step 6 6.1.5 The DIESEL GENERATOR FIELD BREAKER CLOSED amber light is off at Generator Control Panel 1H51-P055A 1H51-P055 B The bulb is good.

THEN PERFORM the following:

6.1.5.a INITIATE a Notification 6.1.5.b INFORM the Unit Supervisor

. Standard: The Operator Contacts PPO to confirm Amber light status

. Instructor Cue:

PPO reports, "Amber light on

." Notes: Steps 6.1.5.a & b are N/A.

SAT ___ UNSAT ___ Comment(s):________________________________________________________________

OT-3701-R43_5 01 Rev 0 Step 7 NOTE The Diesel Generator is Inoperable for Manual starts for 2

- 3 minutes, until the Unit Avail Emergency Status light is illuminated.

6.1.6 RECORD appropriate Maintenance Rule status in Plant Narrative Log.

6.1.7 TAKE the DIESEL GENERATOR to STOP at 1H13

-P877. Critical Step

The Operator Stops Div 2 DG

. Instructor Cue:

Another Operator will log Maintenance Rule status in Plant Narrative Log. Notes: Step 6.1.6 is not critical. Driver: Ensure Event 2 is activated upon shutdown.

SAT ___ UNSAT ___ Comment(s):________________________________________________________________

Step 8 6.1.8 Observe the DIESEL GENERATOR FIELD BREAKER CLOSED light is de-energized.

Standard: The Operator Contacts PPO to confirm Amber light status. Instructor Cue:

PPO reports, "Amber light off." Notes: None SAT ___ UNSAT ___

Comment(s):________________________________________________________________

OT-3701-R43_5 01 Rev 0 Ste p 9 6.1.9 IF the DIESEL GENERATOR FIELD BREAKER CLOSED light is energized, THEN PERFORM the following:

Standard: Step 6.1.9 is N

/A. Instructor Cue:

None Notes: None SAT ___ UNSAT ___ Comment(s):___________________________________________________

_____________

OT-3701-R43_5 01 Rev 0 Step 10 6.1.10 IF annunciator DG TRIP* PROTECT RELAY LOCKOUT (1H13

-P877-1, E2) is in alarm, THEN PERFORM the following:

NOTE When operating the Diesel Generator control switch (from PULL

-TO-LOCK to AUTO, or from AUTO to PULL

-TO-LOCK), a deliberate pause in the STOP position is required in order to ensure proper operation of the associated circuitry.

6.1.10.a PLACE DIESEL GENERATOR in PULL

-TO-LOCK 6.1.10.b PLACE the MODE SELECT keylock in INOP. 1H51

-P054B Critical Step

The Operato r places Div 2 DG in PULL

-T O-LOCK and Directs NLO to place Mode Select switch in INOP. Instructor Cue:

If asked, Relay 86 G/1 is tripped. A minute after being directed to PLACE the MODE SELECT keylock in INOP, report that it is in INOP

. Notes: Driver: When directed to place the mode select keylock in INOP, activate Event

3. SAT ___ UNSAT ___

Comment(s):________________________________________________________________

OT-3701-R43_5 01 Rev 0 Step 11 6.1.10.c Refer to SVI

-R10-T5227 and Perform actions for T.S. 3.8.1 Condition B. 6.1.10.d RECORD appropriate Maintenance Rule status in Plant Narrative Log 6.1.10.e INITIATE a Notification 6.1.10.f INFORM the Unit Supervisor

. Standard: The Operator notifies Unit Supervisor 86G is tripped and places DIESEL GEN OUT OF SERVICE switch to INOP

. Instructor Cue:

Another Operator is performing Steps 6.1.10.c, d and e.

Notes: None SAT ___ UNSAT ___ Comment(s):________________________________________________________________

Step 12 6.1.11 IF annunciator DG TRIP DIFF RELAY LOCKOUT (1H13

-P877-1, E4) is in alarm, THEN PERFORM the following:

6.1.12 IF Diesel Turbo Prelube Valve is open, THEN CLOSE the Diesel Turbo Prelube Valve. 1R47-F544B Standard: Steps 6.1.11 and 6.1.12 are N/A.

Instructor Cue:

If asked for Step 6.1.12, Turbo Prelube Valve is closed. Notes: None SAT ___ UNSAT ___

Comment(s):________________________________________________________________

OT-3701-R43_5 01 Rev 0 Step 1 3 6.1.13 WHEN the control system is reset, as evidenced by Unit Avail Emergency Status light illuminated approximately 2 minutes after shutdown, THEN PERFORM the following:

6.1.13.a CONFIRM that the following indicate approximately zero:

Gen Field Amps 1R43-R112B Gen Field Volts 1R43-R113B Standard: Operator request PPO report above readings

. Instructor Cue: When asked for report of field amps and volts, PPO reports, "1R43-R112B is 105 amps and 1R43-R113B is 40 vdc." Notes: The control system will not reset due to DG in Pull

-To-Lock (JPM Step

10) The Operator has same indications on P877, R43R020B and R43R021B of 105 Amps and 40 Volts and should inform the US.

SAT ___ UNSAT ___

Comment(s):________________________________________________________________

OT-3701-R43_5 01 Rev 0 Step 14 6.1.13.b IF the field is still energized, THEN PERFORM the following:

6.1.13.b.1 INFORM the Unit Supervisor

. 6.1.13.b.2 OPEN the following disconnect for the offgoing generator:

GENERATOR (FIELD FLASH) CONTROL PNL, 1H51

-P055B ED1B06 Disc 27 Critical Step

The Operator Directs the PPO to open Disc 27 at ED1B06

. Instructor Cue:

If aske d, Relay 86 G/1 is tripped. After a few minutes, report that ED1B06 Disc 27 is OPEN Notes: Driver: When directed to open Disc 27 at ED1B06, activate Event 4.

After the candidate acknowledges the field is de

-energized, terminate the JPM SAT ___ UNSAT ___ Comment(s):________________________________________________________________

OT-3701-R43_5 01 Rev 0 Step 1 5 6.4 Emergency Shutdown 6.4.1 IF tripping the DG from 1H13

-P877, THEN PERFORM the following

NOTES When operating the Diesel Generator control switch (from PULL

-TO-LOCK to AUTO, or from AUTO to PULL

-TO-LOCK), a deliberate pause in the STOP position is required in order to ensure proper operation of the associated circuitry.

6.4.1.a PLACE the offgoing DIESEL GENERATOR in PULL

-TO-LOCK 6.4.1.b TAKE the offgoing DIESEL GEN BRKR to TRIP.

Critical Step

The Operator places the Diesel Generator in PULL

-TO-LOCK and take s the diesel gen br ea k er to TRIP and reports to the US Instructor Cue:

None Notes: None SAT ___ UNSAT ___ Comment(s):_____________________________

___________________________________

Step 1 7 6.4.2 IF tripping the DG locally, THEN PERFORM the following

Standard: Step 6.4.2 is N/A

. Instructor Cue:

None Notes: None SAT ___ UNSAT ___

Comment(s):___________________________________________

_____________________

OT-3701-R43_5 01 Rev 0 Step 1 8 NOTES When operating the Diesel Generator control switch (from PULL

-TO-LOCK to AUTO, or from AUTO to PULL

-TO-LOCK), a deliberate pause in the STOP position is required in order to ensure proper operation of the associated circuitry.

6.4.3 VERIFY the offgoing DIESEL GENERATOR in PULL

-TO-LOCK at 1H13-P877 6.4.4 PLACE MODE SELECT keylock in INOP.

6.4.5 DECLARE the Diesel Generator Inoperable.

Standard: Candidate verifies DG in Pull

-To-Lock and directs the NLO to place the Mode Select switch in INOP.

Instructor Cue:

A minute after being directed to PLACE the MODE SELECT keylock in INOP, report that it is in INOP.

I will declare the Diesel Generator INOP Notes: None SAT ___ UNSAT ___

Comment(s):____________________

____________________________________________

OT-3701-R43_5 01 Rev 0 Step 1 8 6.4.6 WHEN time permits, THEN CONTINUE.

6.4.7 OBSERVE the following indicate approximately zero:

Gen Field Amps 1R43

-R112B Gen Field Volts 1R43

-R113B. Standard: Candidate observes/directs NLO to report field volts/amps

. Instructor Cue:

When asked for report of field amps and volts, PPO reports, "1R43

-

R112B is 105 amps and 1R43

-R113B is 40 vdc."

Notes: None SAT ___ UNSAT ___

Comment(s):_______________________________________________________

_________ Step 1 9 6.4.8 IF the field is still energized, THEN OPEN the disconnect for the offgoing generator:

GENERATOR (FIELD FLASH) CONTROL PNL, 1H51

-P055B ED1B-06 Disc 27

. Standard: The Operator Directs the PPO to open Disc 27 at ED1B06

. Instructor Cue:

After a few minutes, report that ED1B06 Disc 27 is OPEN Notes: Driver: When directed to open Disc 27 at ED1B06, activate Event 4.

After the candidate acknowledges the field is de

-energized, terminate the JPM SAT ___ UNSAT ___

Comment(s):________________________________________________________________

Terminating Cue: Division 2 DG is in Pull to Lock and ED1B06 Disc 27 is open.

Evaluation Results:

SAT_____ UNSAT_____

End Time OT-3701-R43_5 01 Rev 0 JPM CUE SHEET INITIAL CONDITIONS:

The Div 2 DG has completed a four

-hour maintenance run.

It has been disconnected from EH12 and is ready to be shutdown. PPO is standing by at the diesel to assist.

INITIATING CUE:

The Unit Supervisor directs you as the Reactor Operator to shutdown Div 2 DG to standby readiness in accordance with SOI

-R43 section 6.1 Remote Shutdown to Standby Readiness.

OT-3701-D17-001 Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: D17B Airborne Radiation Monitoring Time Critical:

No Alternate Path:

No Applicability:

RO/SRO Safety Function:

7 - Instrumentation Validated:

8 Minutes

References:

SOI-D17B R e v. 14 Required Material:

SOI-D17B, Airborne Radiation Monitoring System Process Tasks: 088-517-01-01 Assist Startup of Drywell Atmosphere Monitor 1D17

-K670 Task Standard:

Startup Drywell Atmosphere Monitor 1D17

-K670 per SOI-D17B K/A Data:

272000 A1.01 Ability to predict and/or monitor changes in parameters associated with operating the RADIATION MONITORING SYSTEM controls including:

Lights, alarms, and indications associated with normal operations. Importance: RO 3.2 / SRO 3.2. 1. Setup Instructions

Reset Simulator to any IC. Insert Schedule file JPM

-D17_001. Close valves D17-F071A, D17

-F079A, D17

-F071B, and D17

-F079B. Place DW Moving Filter Switch to OFF. Evaluator coordinate JPM Step 7 with Driver

. 2. Location / Method

Simulator 3. Initial Condition
Plant conditions are as is. The DW Radiation Monitor 1D17-K670 was shutdown to secured status for an RPS Bus transfer, which is now complete. 4. Initiating Cue
Unit Supervisor directs you the Reactor Operator to Startup the DW Radiation Monitor 1D17-K670 from secured status

.

Start Time: End Time:

Candidate:

OT-3701-D17-001 Rev 0 JPM BODY SHEET Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc.

before performing task.

Standard: Performer follows management expectations with regards to safety and communication standards.

Step 1 SOI-D17B, Airborne Radiation Monitoring System Process 4.2 Drywell Atmosphere Monitor 1D17

-K670, Startup From Secured Status 4.2.1 PERFORM the following in the Control Room (at 1H13

-P804): 4.2.1.a VERIFY the FUNCTION switches on the Readout Modules are in the OPER position. Gas Module 1D17-K676 Iodine Module 1D17-K677 Particulate Module 1D17-K678 Standard: Candidate identifies each module and verifies switches in OPER position Instructor Cue:

No ne Notes: Switches should already be in OPER.

SAT ___ UNSAT ___ Comment(s):________________________________________________________________

OT-3701-D17-001 Rev 0 Step 2 4.2.1.b MOMENTARILY DEPRESS the FAIL/RESET button for each of the following readout modules to reset any locked in rad monitor alarms:

Gas Module 1D17-K676 Iodine Module 1D17-K677 Particulate Module 1D17-K678 Standard: Candidate identifies FAIL/RESET pushbutton for each module and depresses them. Instructor Cue:

None Notes: No alarms are present if RED and AMBER lights are off

. SAT ___ UNSAT ___ Comment(s):________________________________________________________________

Step 3 4.2.1.c PLACE the MOVING FILTER POWER SWITCH in ON.

1D17-K679 Critical Step

Candidate places the Moving Filter Power Switch to ON. Instructor Cue:

None Notes: Moving Filter Power Switch is taken to OFF during shutdown.

The light remains off until started by RP Tech (See NOTE above)

SAT ___ UNSAT ___ Comment(s):___________________________________________

_____________________

NOTE This step will not apply power to the moving filter. Power is applied when it is turned on at the sample enclosure in a following step.

OT-3701-D17-001 Rev 0 Step 4 4.2.1.d VERIFY the PAPER CONTROL SWITCH is in NORM.

1D17-K679 Standard: Candidate identifies Paper Control Switch and verifies it is in NORM.

Instructor Cue:

None Notes: Switch should already be in NORM.

SAT ___ UNSAT ___ Comment(s):________________________________________________________________

Step 5 4.2.2 OPEN the following (at 1H13

-P881): DW RAD MON OTBD SUCT ISOL 1D17-F071A DW RAD MON OTBD DISCH ISOL 1D17-F079A Critical Step

Candidate opens the valves by taking each control switch to OPEN.

Instructor Cue:

None Notes: Valves are closed during shutdown.

SAT ___ UNSAT ___ Comment(s):________________________________________________________________

OT-3701-D17-001 Rev 0 Step 6 4.2.3 OPEN the following (at 1H13

-P88 2): DW RAD MON INBD SUCT ISOL 1D17-F071 B DW RAD MON INBD DISCH ISOL 1D17-F079 B Critical Step

Candidate opens the valves by taking each control switch to OPEN.

Instructor Cue:

None Notes: Valves are closed during shutdown.

SAT ___ UNSAT ___ Comment(s):________________________________________________________________

Step 7 Candidate contacts Radiation Protection to perform steps 4

.2.4 and 4.2.5. Standard: Candidate contacts Radiation Protection to perform steps 4.

2.4 and 4.2.5. Candidate verifies Low Flow annunciator clear and Filter Tear Light is OFF. Instructor Cue:

Have operator contact RP Tech on phone or GAITronics.

As RP Tech , after given direction, " I will perform SOI

-D17B steps 4.

2.4 and 4.2.5 for startup of DW rad monitor"

. Report back a moment after the low flow annunciator resets (initiating Event 10), "SOI-D17B steps 4.2.4 for startup of DW rad monitor are complete. Do you have any alarms?"

Notes: Steps 4.2.4 and 4.2.5 are performed by Radiation Protection Personnel

. Driver: After being directed to perform steps 4.2.4 & 4.2.5, initiate Event 10 (for RP Tech actions)

SAT ___ UNSAT ___ Comment(s):________________________________________________________________

OT-3701-D17-001 Rev 0 Step 8 4.2.6 PERFORM independent verification of required components.

Standard: Candidate identifies Independent verification is required.

Instructor Cue:

RP Tech will provide IV.

Notes: Terminate the JPM SAT ___ UNSAT ___ Comment(s):________________________________________________________________

Terminating Cue:

The Drywell Airborne rad monitor is started up from secured status

. Evaluation Results:

SAT_____ UNSAT_____

End Time:

OT-3701-D17-001 Rev 0 JPM CUE SHEET INITIAL CONDITIONS:

Plant conditions are as is. The DW Radiation Monitor 1D17

-K670 was shutdown to secured status for an RPS Bus transfer, which is now complete.

INITIATING CUE:

Unit Supervisor directs you the Reactor Operator to Startup the DW Radiation Monitor 1D17

-K670 from secured status.

OT-3701-P41-001 Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: P41 - Service Water Time Critical:

No Alternate Path:

No Applicability:

RO/SRO Safety Function:

8 - Plant Service Systems Validated:

10 Minutes

References:

SOI-P 40/4 1 Rev. 9 Required Material:

SOI-P 40/41 , Service Water And Service Water Screen Wash Tasks: 276-505-02-01 Shift Service Water Pumps Task Standard:

Shift Service Water Pumps from B to D per SOI-P 40/4 1 K/A Data:

400000 A4.01 Ability to manually operate and / or monitor in the control room:

CCW indications and control. Importance: RO 3.

1 / SRO 3.0. 1. Setup Instructions

Reset simulator to any IC. (IC-94 for ILO Exam) Verify SW pump B is running and SW pump D is in standby.

Load Schedule file JPM

-P41-001. Verify Event file JPM-P41-001 loads.

2. Location / Method
Simulator / Performance
3. Initial Condition
Plant conditions are as is.
4. Initiating Cue
Unit Supervisor directs you the Reactor Operator to perform the weekly Service water pump shift to equalize run time

. Shift from SW Pump B to D running.

Start Time

End Time:

Candidate:

OT-3701-P41-001 Rev 0 JPM BODY SHEET Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc.

before performing task.

Standard: Performer follows management expectations with regards to safety and communication standards.

Step 1 SOI-P41, Service Water And Service Water Screen Wash 7.1 Shifting Service Water Pumps 7.1.1 START the oncoming Service Water Pump as follows:

7.1.1.1.a THROTTLE, as necessary, the SW Pump Lube Water Supply valve to maintain the oncoming Service Water Pump seal flow between 3 and 5 gpm.

0P41- F546A 0P41- F546B 0P41- F546C 0P41- F546D 0P41- N150A 0P41- N150B 0P41- N150C 0P41- N150D Standard: Candidate contacts NLO to perform step 7.1.2 Instructor Cue:

SW Pump D seal water flow is 4.0 gpm.

If asked, all other SW pumps seal flows are also in band.

If asked, oil level is in band.

Notes: None SAT ___ UNSAT ___ Comment(s):_____________________________________________________________

___

OT-3701-P41-001 Rev 0 Step 2 7.1.1.b TAKE the SW PUMP DISCH VLV to OPEN. P41- F040A P41- F040B P41- F040C P41- F040D 7.1.1.c WHEN the blue light comes on, THEN PRESS the STOP button.

7.1.1.d TAKE the SW PUMP to START.

P41- C001A P41- C001B P41- C001C P41- C001D Critical Step

Candidate takes SW Pump D discharge valve to OPEN.

Presses the STOP button when the blue light comes on.

Then takes SW Pump D to start

. Instructor Cue:

None Notes: Candidate should announce start of SW pump D over PA system SAT ___ UNSAT ___ Comment(s):________________________________________________________________

Step 3 7.1.1.e WHEN the oncoming SW PUMP AMPS stabilize, THEN TAKE the oncoming SW PUMP DISCH VLV to OPEN.

P41- F040A P41- F040B P41- F040C P41- F040D Critical Step: Candidate takes SW Pump D discharge valve to OPEN

. Instructor Cue:

None Notes: None SAT ___ UNSAT ___ Comment(s):________________________________________________________________

OT-3701-P41-001 Rev 0 Step 4 7.1.2 SHUTDOWN the Offgoing Service Water Pump as follows: 7.1.2.a PERFORM the following steps concurrently:

7.1.2.a.1 TAKE the SW PUMP DISCH VLV to CLOSE. P41- F040A P41- F040B P41- F040C P41- F040D 7.1.2.a.2 WHEN either of the following occur, The applicable blue light comes on SW Pump Discharge valve indicates full closed P41- F040A P41- F040B P41- F040C P41- F040D THEN TAKE the SW PUMP to STOP.

P41- C001A P41- C001B P41- C001C P41- C001D Critical Step

Candidate takes SW Pump B discharge valve to CLOSE and stops SW Pump B when blue light comes on or when Discharge Valve indicates full closed. Instructor Cue:

None Notes: None SAT ___ UNSAT ___ Comment(s):________________________________________________________________

CAUTION Operation of a Service Water Pump with its discharge valve at less than the minimum flow position (blue light) may result in pump damage.

OT-3701-P41-001 Rev 0 Step 5 7.1.2.b THROTTLE the NCC HX SW BYPASS VLV to achieve the desired operating pump discharge pressures.

P41-F400 P41- R051A P41- R051B P41- R051C P41- R051D 7.1.2.c VERIFY the applicable SW PUMP DISCH VLV indicates CLOSED.

P41- F040A P41- F040B P41- F040C P41- F040D 7.1.3 DIRECT Chemistry to place the Service Water Chlorination AND Dechlorination System in operation in accordance with SOI

-P48/84B. Standard: Candidate should not need to throttle P41

-F400. Candidate will close P41

-F040B if not previously done.

Candidate calls Chemistry about chlorination. Instructor Cue:

None Notes: Terminate the JPM SAT ___ UNSAT ___ Comment(s):________________________________________________________________

Terminating Cue:

Service Water pumps have been shifted from B to D running.

Evaluation Results

SAT_____ UNSAT_____

End Time: NOTE In the following step, 55

-60 psig is the normal range for SW pump discharge pressure.

Discharge pressure outside of this range is permissible provided pressure is maintained between 46 and 64 psig.

OT-3701-P41-001 Rev 0 JPM CUE SHEET INITIAL CONDITIONS:

Plant conditions are as is.

INITIATING CUE:

Unit Supervisor directs you the Reactor Operator to perform the weekly Service water pump shift to equalize run time.

Shift from SW Pump B to D running.

OT-3701-M25_501 Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: M25/M26 Control Room Ventilation and Emergency Recirc System Time Critical:

No Alternate Path:

Yes Applicability:

RO/SRO Safety Function:

9 - Radioactivity Release Validated Time: 12 Minutes

References:

SOI-M25/26 Rev. 22 & ARI

-H13-P904-0001 Rev 10, Cyc-14 T/O EPY

-M25-005 Required Material

SOI-M25/26, Control Room HVAC And Emergency Recirculating System Task: 037-531-01-01 Shift to (Manual) Emerg Rcirc from Smoke Clear or Norm 037-534-04-01 Operate System Using Individual Fan Control Switches Task Standard:

Shift Control Room HVAC to Emergency Recirc using individual control switches. K/A: 290003 - A2.03 Ability to (a) predict the impacts of the following on the CONTROL ROOM HVAC ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Initiation/reconfiguration failure. Importance: RO 3.4 SRO 3.6

1. Setup Instructions
Reset simulator to IC 95 Insert Schedule file JPM

-M2 5-506.sch. Place a Yellow Switch Cap s on M25 A Supply Fan and M26 A Emergency Recirc Fan

. 2. Location / Method: Simulator / Performance

3. Initial Condition
Plant conditions are as is. CR HVAC Supply Fan A is tagged out to replace a broken belt. The Security Shift Supervisor reports that a tanker truck carrying anhydrous ammonia overturned on Parm ly Rd. near the contractors gate and is leaking its contents. Lake County Haz ma t has been called

. The wind is blowing out of the south at 10 mph.

4. Initiating Cue: The Unit Supervisor directs you

, the Reactor Operator

, to shift Control Room Ventilation to Emergency Recirc

. Start Time: Stop Time: Candidate:

OT-3701-M25_501 Rev 0 JPM BODY SHEET Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc before performing task.

Standard: Performer follows management expectations with regards to safety and communication standards.

Step 1 SOI-M25/26, Control Room HVAC And Emergency Recirculating System 7.5 Shifting From NORM Or SMOKE CLEAR To EMERG RCIRC

7.5.1 PLACE both of the following in EMERG RCIRC:

CONT RM HVAC TRAIN A MODE SELECT M25-S7 CONT RM HVAC TRAIN B MODE SELECT M25-S8 Critical Step

Operator places both switches in EMERG RCIRC

. Instructor Cue:

If asked to check return fan fuses, respond that you found the control power transformer charred and all fuses blown in MCC bucket.

Notes: When M25-S8 taken to ER, the Return Fan will lose power causing a TRAIN TRIP.

(Annunciator H13

-P904-01-C6) SAT ___ UNSAT ___ Comment(s):_________________________________________________________________

OT-3701-M25_501 Rev 0 Step 2 ARI-H13-P904-0001-C6 1.0 CAUSE OF ALARM 1.1 Loss of power to or low flow sensed on:

CONT RM HVAC RETURN FAN B, M25

-C002B 4.0 Subsequent Operator Actions 4.3 Take M25/26 B Train Initiate Switch to STOP Standard: Operator reviews ARI and suggests course of action.

May take train initiate switch to STOP.

Instructor Cue:

If Candidate requests to perform Subsequent Action 4.3, direct him to perform action.

If Candidate does not suggest a course of action, ask what they recommend.

Remind him that toxic gas is moving toward the plant.

Notes: The Alarm Response Instruction is not helpful in this instance.

If train initiate switch taken to STOP, Train Trip annunciator will momentarily reset until switch returned to AUTO. The Candidate should refer to the SOI and use Individual Control Switches to start B train in ER

. SAT ___ UNSAT ___

Comment(s):______________________________________________________________

___

OT-3701-M25_501 Rev 0 Step 3 SOI-M25/26, Control Room HVAC And Emergency Recirculating System 2.0 Precautions and Limitations 2.3 A train trip signal is generated by any of the following:

Loss of power to any of the respective train's fans Loss of control power to any of the respective train's fans Low flow on any running fan in the respective train Upon receipt of a train trip signal, all of the fans in the train will stop. An automatic Emergency Recirculation initiation signal bypasses the train trip signal and will start the appropriate fans. Any other operation of the fans with a train trip signal must be by individual control switches. Following a train trip, the trip signal may be reset by performance of the section Shifting Trains (Any Mode, Manual Initiation) to place the alternate train in operation and the tripped train in standby.

2.14 Fan operation using Individual Fan Control Switches defeats the train trip logic.

Verification of system lineup and frequent monitoring of the system is required to preclude an adverse system condition.

7.13 Shifting Trains/Operating Modes While Operating Using Individual Fan Control Switches 7.13.1 REFER TO the appropriate section to shutdown the operating train to Standby Readiness Using Individual Fan Control Switches.

7.13.2 IF the train can NOT be started in accordance with normal startup methods using CONT RM HVAC TRAIN CONT, THEN REFER TO the appropriate section and STARTUP the oncoming train Using Individual Fan Control Switches.

Standard: Operator reviews SOI and determines using Individual Fan Control Switches is required

. Instructor Cue:

If asked, shutdown the B train to Standby Readiness Using Individual Fan Control Switches is not required since it tripped

. Notes: Step 7.13.2 is for the 'operating' train. The train is tripped.

The Candidate can proceed to Section 7.12

. SAT ___ UNSAT ___ Comment(s):_________________________________________________________________

NOTE When possible, the startup should be in accordance with the normal startup methods which utilize the CONT RM HVAC TRAIN CONT switches.

OT-3701-M25_501 Rev 0 Step 4 7.1 2 Startup To EMERG RCIRC Using Individual Fan Controls 7.1 2.1 VERIFY both of the following in EMRG RCIRC:

CONT RM HVAC TRAIN A MODE SELECT M25-S7 CONT RM HVAC TRAIN B MODE SELECT M25-S8 Standard: Operator verifies both switches are in ER Instructor Cue:

None Notes: The switches should have been previously placed in ER.

SAT ___ UNSAT ___ Comment(s):_________________________________________________________________

Step 5 7.1 2.2 PLACE the following fans in ON:

CONT RM HVAC SUPP FAN M25-C001B CONT RM EMG RCIRC FAN M26-C001B Critical Step

Operator places both fans in ON

. Instructor Cue:

None Notes: Starting M25

-C001B allows M26

-C001 B to auto start unless Train Initiate Switch previously taken to STOP. It is still required to place Control Switch for M26

-C001 B to Start. SAT ___ UNSAT ___ Comment(s):_________________

________________________________________________

OT-3701-M25_501 Rev 0 Step 6 7.12.3 CONFIRM components are in the proper configuration in accordance with the appropriate attachment:

Train B in Operation and Train A Shutdown (Attachment 6)

Standard: Operator confirms component positions using Attachment 6.

Instructor Cue:

If asked, M24

-F051A & B are both closed.

N 0otes: None SAT ___ UNSAT ___ Comment(s):_________________________________________________________________

Step 7 7.12.4 IF the train is being started due to an emergency condition, THEN TAKE the following to CLOSE: CONT RM HVAC A INBD SUPP DMPR M25-F020B CONT RM HVAC B INBD SUPP DMPR M25-F020A Standard: Candidate takes dampers to Close

. Instructor Cue:

None Notes: None SAT ___ UNSAT ___ Comment(s):_________________________________________________________________

OT-3701-M25_501 Rev 0 Step 8 7.12.5 Control Room relative humidity is 70% Control Room relative humidity is unknown TAKE the CONT RM EMG RCIRC ELEC HTG CONT to START.

M26-D001A M26-D001B Standard: Candidate checks humidity.

Instructor Cue:

None Notes: The computer points show the control room moisture as NORMAL. This indicates humidity is 70%. Terminate the JPM SAT ___ UNSAT ___

Comment(s):_____________________________________

____________________________

Terminating Cue:

B Train of Control Room Ventilation is running in Emergency Recirc.

Evaluation Results:

SAT_____ UNSAT_____

End Time: NOTE Relative humidity of 70% is determined by an alarm on the computer points M26-BC003 or M26-BC004.

OT-3701-M25_501 Rev 0 JPM CUE SHEET INITIAL CONDITIONS:

Plant conditions are as is. CR HVAC Supply Fan A is tagged out to replace a broken belt.

The Security Shift Supervisor reports that a tanker truck carrying anhydrous ammonia overturned on Parmly Rd. near the contractors gate and is leaking its contents.

Lake County Hazmat has been called.

The wind is blowing out of the south at 10 mph.

INITIATING CUE:

The Unit Supervisor directs you

, the Reactor Operator

, to shift Control Room Ventilation to Emergency Recirc.