ML17261A743: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 31: Line 31:
................................
................................
..............
..............
1.3-1 1.4  Frequency
1.3-1 1.4  Frequency ................................
................................
................................
................................
..........................
..........................
Line 95: Line 94:
... 3.3.4.1-1 3.3.5.1  Emergency Core Cooling System (ECCS) Instrumentation
... 3.3.4.1-1 3.3.5.1  Emergency Core Cooling System (ECCS) Instrumentation
  ................
  ................
3.3.5.1-1 3.3.5.2  Reactor Pressure Vessel (RPV) Water Inventory Control    -1 3.3.5.23 Reactor Core Isolation Cooling (RCIC) System Instrumentation
3.3.5.1-1 3.3.5.2  Reactor Pressure Vessel (RPV) Water Inventory Control    -1 3.3.5.2 3 Reactor Core Isolation Cooling (RCIC) System Instrumentation
  ................................
  ................................
................................
................................
..........
..........
3.3.5.23-1 3.3.6.1  Primary Containment Isolation Instrumentation
3.3.5.2 3-1 3.3.6.1  Primary Containment Isolation Instrumentation
  ................................
  ................................
.. 3.3.6.1-1 3.3.6.2  Secondary Containment Isolation Instrumentation .............................
.. 3.3.6.1-1 3.3.6.2  Secondary Containment Isolation Instrumentation .............................
Line 122: Line 121:
  ................................
  ................................
...................
...................
3.4.1-1 3.4.2  Jet Pumps
3.4.1-1 3.4.2  Jet Pumps ................................
................................
................................
................................
..................
..................
Line 144: Line 142:
3.4.8-1 3.4.9  RCS Pressure and Temperature (P/T) Limits
3.4.8-1 3.4.9  RCS Pressure and Temperature (P/T) Limits
  .............................
  .............................
3.4.9-1  3.5  EMERGENCY CORE COOLING SYSTEMS (ECCS), RPV WATER INVENTORY CONTROL, AND REACT OR CORE    ISOLATION COOLING (RCIC) SYSTEM 3.5.1  ECCS  Operating
3.4.9-1  3.5  EMERGENCY CORE COOLING SYSTEMS (ECCS), RPV WATER INVENTORY CONTROL, AND REACT OR CORE    ISOLATION COOLING (RCIC) SYSTEM 3.5.1  ECCS  Operating ................................
................................
................................
................................
..... 3.5.1-1 3.5.2  RPV Water Inventory Control ECCS  Shutdown ........................
..... 3.5.1-1 3.5.2  RPV Water Inventory Control ECCS  Shutdown ........................
Line 179: Line 176:
  ................................
  ................................
...................
...................
3.6.2.2-1 3.6.2.3  Residual Heat Removal (RHR) Suppression Pool Cooling .........
3.6.2.2-1 3.6.2.3  Residual Heat Removal (RHR) Suppression Pool Cooling ......... 3.6.2.3-1 3.6.2.4  Drywell-to-Suppression Chamber Differential Pressure
3.6.2.3-1 3.6.2.4  Drywell-to-Suppression Chamber Differential Pressure
  ..............
  ..............
3.6.2.4-1 3.6.3.1  Primary Containment System Concentration
3.6.2.4-1 3.6.3.1  Primary Containment System Concentration
Line 194: Line 190:
  ................................
  ................................
...... 3.6.4.3-1  3.7  PLANT SYSTEMS 3.7.1  Residual Heat Removal Service Water (RHRSW) System
...... 3.6.4.3-1  3.7  PLANT SYSTEMS 3.7.1  Residual Heat Removal Service Water (RHRSW) System
  .........
  ......... 3.7.1-1 3.7.2  Emergency Service Water (ESW) System and Ultimate Heat Sink (UMS)
3.7.1-1 3.7.2  Emergency Service Water (ESW) System and Ultimate Heat Sink (UMS)
  ................................
  ................................
................................
................................
Line 202: Line 197:


JAFNPP 1.1-2a Amendment 315 1.1 Definitions (continued)
JAFNPP 1.1-2a Amendment 315 1.1 Definitions (continued)
DRAIN TIME The DRAIN TIME is the time it would take for the water inventory in and above the Reactor Pressure Vessel (RPV) to drain to the top of the active (TAF) seated in the RPV assuming:
DRAIN TIME The DRAIN TIME is the time it would take for the water inventory in and above the Reactor Pressure Vessel (RPV) to drain to the top of the active (TAF) seated in the RPV assuming: a) The water inventory above the TAF is divided by the limiting drain rate:
a) The water inventory above the TAF is divided by the limiting drain rate:
b) The limiting drain rate is the larger of the drain rate through a single penetration flow path with the highest flow rate, or the sum of the drain rates through multiple penetration flow paths susceptible to a common mode failure (e.g., seismic event, loss of normal power, single human error), for all penetration flow paths below the TAF except:
b) The limiting drain rate is the larger of the drain rate through a single penetration flow path with the highest flow rate, or the sum of the drain rates through multiple penetration flow paths susceptible to a common mode failure (e.g., seismic event, loss of normal power, single human error), for all penetration flow paths below the TAF except:
: 1. Penetration flow paths connected to an intact closed system, or isolated by manual or automatic valves that are locked, sealed or otherwise secured in the closed position, blank flanges, or other devices that prevent flow of reactor coolant through the penetration flow paths;
: 1. Penetration flow paths connected to an intact closed system, or isolated by manual or automatic valves that are locked, sealed or otherwise secured in the closed position, blank flanges, or other devices that prevent flow of reactor coolant through the penetration flow paths;
Line 210: Line 204:
c) The penetration flow paths required to be evaluated per paragraph b) are assumed to open instantaneously and are not subsequently isolated, and no water is assumed to be subsequently added to the RPV water inventory; d) No additional draining events occur; and e) Realistic cross-sectional areas and drain rates are used A Bounding DRAIN TIME may be used in lieu of a calculated value.  (continued)
c) The penetration flow paths required to be evaluated per paragraph b) are assumed to open instantaneously and are not subsequently isolated, and no water is assumed to be subsequently added to the RPV water inventory; d) No additional draining events occur; and e) Realistic cross-sectional areas and drain rates are used A Bounding DRAIN TIME may be used in lieu of a calculated value.  (continued)


ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-1 Amendment 274315 3.3 INSTRUMENTATION 3.3.5.1 Emergency Core Cooling System (ECCS) Instrumentation LCO  3.3.5.1 The ECCS instrumentation for each Function in Table 3.3.5.1
ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-1 Amendment 274 315 3.3 INSTRUMENTATION 3.3.5.1 Emergency Core Cooling System (ECCS) Instrumentation LCO  3.3.5.1 The ECCS instrumentation for each Function in Table 3.3.5.1
-1 shall be OPERABLE.
-1 shall be OPERABLE.
APPLICABILITY:
APPLICABILITY:
Line 219: Line 213:
-1 for  the channel.
-1 for  the channel.
Immediately B. As required by Required Action A.1 and referenced in Table 3.3.5.1
Immediately B. As required by Required Action A.1 and referenced in Table 3.3.5.1
-1. B.1 - - - - - -NOTES- - - - --  1. Only applicable in MODES 1, 2, and 3. 2. Only applicable for functions 1.a, 1.b, 2.a, and 2.b. - - - - - - - - - - - - - - - -  Declare supported feature(s) inoperable when its redundant feature ECCS initiation capability is inoperable.
-1. B.1 - - - - - -NOTE S- - - - --  1. Only applicable in MODES 1, 2,   and 3. 2. Only applicable for functions 1.a, 1.b, 2.a,   and 2.b. - - - - - - - - - - - - - - - -  Declare supported feature(s) inoperable when its redundant feature ECCS initiation capability is inoperable.
1 hour from discovery of loss of  initiation capability for feature(s) in both divisions.
1 hour from discovery of loss of  initiation capability for feature(s) in both divisions.
AND  (continued)
AND  (continued)


ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-2 Amendment 274315   ACTIONS  (continued)
ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-2 Amendment 274 315   ACTIONS  (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. (continued)
B.2 - - - - - -NOTE - - - - - -  Only applicable for functions 3.a and 3.b. - - - - - - - - - - - - - - - - - Declare High Pressure Coolant Injection (HPCI) System inoperable.
B.2 - - - - - -NOTE - - - - - -  Only applicable for functions 3.a and 3.b. - - - - - - - - - - - - - - - - - Declare High Pressure Coolant Injection (HPCI) System inoperable.
AND  B.3 Place cha nnel in  trip.      1 hour from discovery of loss of HPCI initiation capability 24 hours    C. As required by Required Action A.1 and referenced in Table 3.3.5.1
AND  B.3 Place cha nnel in  trip.      1 hour from discovery of loss of HPCI initiation capability 24 hours    C. As required by Required Action A.1 and referenced in Table 3.3.5.1
-1. C.1 - - - - - -NOTES- - - - - -  1. Only applicable in MODES 1, 2, and 3. 2. Only applicable for functions 1.c, 1.d, 2.c,    2.d, and 2.f. - - - - - - - - - - - - - - - -  Declare supported feature(s) inoperable when its redundant feature ECCS initiation capability is inoperable.
-1. C.1 - - - - - -NOTE S- - - - - -  1. Only applicable in MODES 1, 2,   and 3. 2. Only applicable for functions 1.c, 1.d, 2.c ,    2.d, and 2.f. - - - - - - - - - - - - - - - -  Declare supported feature(s) inoperable when its redundant feature ECCS initiation capability is inoperable.
1 hour from discovery of loss of  initiation capability for feature(s) in both divisions.
1 hour from discovery of loss of  initiation capability for feature(s) in both divisions.
AND  C.2 Restore channel to OPERABLE status.
AND  C.2 Restore channel to OPERABLE status.
24 hours (continued)
24 hours (continued)


ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-3 Amendment 274315 ACTIONS  (continued CONDITION REQUIRED ACTION COMPLETION TIME D. As required by Required Action A.1 and referenced in Table 3.3.5.1-1. D.1 - - - - - -NOTE- - - - - -  Only applicable if HPCI pump suction is not aligned to the suppression pool.
ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-3 Amendment 274 315 ACTIONS  (continued CONDITION REQUIRED ACTION COMPLETION TIME D. As required by Required Action A.1 and referenced in Table 3.3.5.1-1. D.1 - - - - - -NOTE- - - - - -  Only applicable if HPCI pump suction is not aligned to the suppression pool.
  . - - - - - - - - - - - - - - - - -  Declare HPCI System inoperable.
  . - - - - - - - - - - - - - - - - -  Declare HPCI System inoperable.
AND  D.2.1 Place channel in trip. OR  D.2.2 Align the HPCI pump  suction to the suppression pool.
AND  D.2.1 Place channel in trip. OR  D.2.2 Align the HPCI pump  suction to the suppression pool.
1 hour from discovery of loss of HPCI initiation capability 24 hours    24 hours (continued)
1 hour from discovery of loss of HPCI initiation capability 24 hours    24 hours (continued)


ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-4 Amendment 274315 ACTIONS  (continued)
ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-4 Amendment 274 315 ACTIONS  (continued)
CONDITION REQUIRED ACTION COMPLETION TIME E. As required by Required Action A.1 and referenced in Table 3.3.5.1
CONDITION REQUIRED ACTION COMPLETION TIME E. As required by Required Action A.1 and referenced in Table 3.3.5.1
-1. E.1 - - - - - -NOTES- - - - - -  1. Only Applicable in MODES 1, 2, and 3. 2. Only applicable for functions 1.e, 1.f, and 2.g. .. - - - - - - - - - - - - - - - - -  Declare supported Feature(s) inoperable when its redundant feature ECCS Initiation capability Is inoperable AND  E.2 Restore channel to OPERABLE status.
-1. E.1 - - - - - -NOTE S- - - - - -  1. Only Applicable in MODES 1, 2,   and 3. 2. Only applicable for functions 1.e,   1.f, and 2.g. .. - - - - - - - - - - - - - - - - -  Declare supported Feature(s) inoperable when its redundant feature ECCS Initiation capability Is inoperable AND  E.2 Restore channel to OPERABLE status.
1 hour from discovery of loss of  initiation capability for subsystems in both divisions.
1 hour from discovery of loss of  initiation capability for subsystems in both divisions.
7 days (continued)
7 days (continu ed)
ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-5 Amendment 274315 ACTIONS  (continued)
ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-5 Amendment 274 315 ACTIONS  (continued)
CONDITION REQUIRED ACTION COMPLETION TIME F. As required by Required Action A.1 and referenced in Table 3.3.5.1
CONDITION REQUIRED ACTION COMPLETION TIME F. As required by Required Action A.1 and referenced in Table 3.3.5.1
-1. F.1 Declare Automatic Depressurization System (ADS) valves inoperable.
-1. F.1 Declare Automatic Depressurization System (ADS) valves inoperable.
Line 250: Line 244:
AND  1 hour from discovery of loss of ADS initiation capability to both trip systems.    (continued)
AND  1 hour from discovery of loss of ADS initiation capability to both trip systems.    (continued)


ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-6 Amendment 274315 ACTIONS  (continued)
ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-6 Amendment 274 315 ACTIONS  (continued)
CONDITION REQUIRED ACTION COMPLETION TIME G. (continued)
CONDITION REQUIRED ACTION COMPLETION TIME G. (continued)
G.2 Restore channel to OPERABLE status.
G.2 Restore channel to OPERABLE status.
Line 261: Line 255:
-1 to determine which SRs apply for each ECCS Function.
-1 to determine which SRs apply for each ECCS Function.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows:  (a) for up to 6 hours for Functions 3.c, 3.f, and 3.g; and (b) for up to 6 hours for Functions other than 3.c, 3.f, and 3.g provided the associated Function or the redundant Function maintains ECCS initiation capability.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows:  (a) for up to 6 hours for Functions 3.c, 3.f, and 3.g; and (b) for up to 6 hours for Functions other than 3.c, 3.f, and 3.g provided the associated Function or the redundant Function maintains ECCS initiation capability.
  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  SURVELLANCE FREQUENCY SR 3.3.5.1.1 Perform CHANNEL CHECK.
  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  SURVELLANCE FREQUENCY SR 3.3.5.1.1 Perform CHANNEL CHECK.
In accordance with the Surveillance Frequency Control Program   SR 3.3.5.1.2 Perform CHANNEL FUNCTIONAL TEST.
In accordance with the Surveillance Frequency Control Progra m   SR 3.3.5.1.2 Perform CHANNEL FUNCTIONAL TEST.
In accordance with the Surveillance Frequency Control Program   SR 3.3.5.1.3 Perform CHANNEL CALIBRATION.
In accordance with the Surveillance Frequency Control Progra m   SR 3.3.5.1.3 Perform CHANNEL CALIBRATION.
In accordance with the Surveillance Frequency Control Program   SR 3.3.5.1.4 Calibrate the trip units.
In accordance with the Surveillance Frequency Control Progra m   SR 3.3.5.1.4 Calibrate the trip units.
In accordance with the Surveillance Frequency Control Program   SR 3.3.5.1.5 Perform CHANNEL CALIBRATION.
In accordance with the Surveillance Frequency Control Progra m   SR 3.3.5.1.5 Perform CHANNEL CALIBRATION.
In accordance with the Surveillance Frequency Control Program   SR 3.3.5.1.6 Perform LOGIC SYSTEM FUNCTIONAL TEST.
In accordance with the Surveillance Frequency Control Progra m   SR 3.3.5.1.6 Perform LOGIC SYSTEM FUNCTIONAL TEST.
In accordanc e with the Surveillance Frequency Control Program ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-8 Amendment 274315 Table 3.3.5.1
In accordanc e with the Surveillance Frequency Control Progra m ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-8 Amendment 274 315 Table 3.3.5.1
-1 (page 1 of 5)
-1 (page 1 of 5)
Emergency Core Cooling System Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE      1. Core Spray System     
Emergency Core Cooling System Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE      1. Core Spray System     
: a. Reactor Vessel Water Level  Low Low Low (Level 1) 1, 2, 3, 4(a), 5(a) 4(ab) B SR  3.3.5.1.1 SR  3.3.5.1.
: a. Reactor Vessel Water Level  Low Low Low (Level 1) 1, 2, 3, 4(a), 5(a) 4 (a b) B SR  3.3.5.1.1 SR  3.3.5.1.
2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 18  inches
2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 18  inches
: b. Drywell Pressure  
: b. Drywell Pressure - High  1, 2, 3 4 (a b) B SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6
- High  1, 2, 3 4(ab) B SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6
: c. Reactor Pressure  Low (Injection Permissive) 1, 2, 3 4 C SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 and 90 psig        4 (a), 5(a) 4 B SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 and 90 psig      d. Core Spray Pump Start  Time Delay Relay 1, 2, 3 , 4(a), 5(a) 1 per pump C SR  3.3.5.1.5 SR  3.3.5.1.6 seconds      e. Core Spray Pump Discharge Flow  Low (Bypass) 1, 2, 3 , 4(a), 5(a) 1 per pump E SR  3.3.5.1.5 SR  3.3.5.1.6 and        f. Core Spray Pump Discharge Pressure  High (Bypass) 1, 2, 3 , 4 (a), 5(a) 1 per pump E SR  3.3.5.1.3 SR  3.3.5.1.6 110 psig      2. Low Pressure Coolant Injection (LPCI) System
: c. Reactor Pressure  Low (Injection Permissive) 1, 2, 3 4 C SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 and 90 psig        4(a), 5(a) 4 B SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 and 90 psig      d. Core Spray Pump Start  Time Delay Relay 1, 2, 3, 4(a), 5(a) 1 per pump C SR  3.3.5.1.5 SR  3.3.5.1.6 seconds      e. Core Spray Pump Discharge Flow  Low (Bypass) 1, 2, 3, 4(a), 5(a) 1 per pump E SR  3.3.5.1.5 SR  3.3.5.1.6 and        f. Core Spray Pump Discharge Pressure  High (Bypass) 1, 2, 3, 4(a), 5(a) 1 per pump E SR  3.3.5.1.3 SR  3.3.5.1.6 110 psig      2. Low Pressure Coolant Injection (LPCI) System
: a. Reactor Vessel Water Level  Low Low Low (Level 1) 1, 2, 3 , 4(a), 5(a) 4 (a b) B SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 (continued) a) When associated ECCS subsystem(s) are required to be OPERABLE per LCO 3.5.2, ECCS  Shutdown. b)a) Also required to initiate the associated emergency diesel generator subsystem.
: a. Reactor Vessel Water Level  Low Low Low (Level 1) 1, 2, 3, 4(a), 5(a) 4(ab) B SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 (continued) a) When associated ECCS subsystem(s) are required to be OPERABLE per LCO 3.5.2, ECCS  Shutdown.
b)a) Also required to initiate the associated emergency diesel generator subsystem.


ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-9 Amendment 274315 Table 3.3.5.1
ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-9 Amendment 274 315 Table 3.3.5.1
-1 (page 2 of 5)
-1 (page 2 of 5)
Emergency Core Cooling System Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE      2. LPCI System (continued)
Emergency Core Cooling System Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE      2. LPCI System (continued)
: b. Drywell Pressure  
: b. Drywell Pressure - High 1, 2, 3 ,  4 (a b) B SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6
- High 1, 2, 3,  4(ab) B SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6
: c. Reactor Pressure  Low (Injection Permissive) 1, 2, 3 4 C SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 and        4(a), 5(a) 4 B SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 and        d. Reactor Pressure  Low (Recirculation Discharge Valve Permissive) 1 (b c), 2 (b c), 3 (b c) 4 C SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 295 psig        e. Reactor Vessel Shroud Level (Level 0) 1, 2, 3  2 B SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 1.0 inches        f. Low Pressure Coolant Injection Pump Start  Time Delay Relay 1, 2, 3 , 4(a), 5(a) 1 per pump C SR  3.3.5.1.5 SR  3.3.5.1.6 Pumps A , D    1.51 seconds        Pumps B , C    6.73 seconds            (continued) a) When associated ECCS subsystem(s) are required to be OPERABLE per LCO 3.5.2.
: c. Reactor Pressure  Low (Injection Permissive) 1, 2, 3 4 C SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 and        4(a), 5(a) 4 B SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 and        d. Reactor Pressure  Low (Recirculation Discharge Valve Permissive) 1(bc), 2(bc), 3(bc) 4 C SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 295 psig        e. Reactor Vessel Shroud Level (Level 0) 1, 2, 3  2 B SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 1.0 inches        f. Low Pressure Coolant Injection Pump Start  Time Delay Relay 1, 2, 3, 4(a), 5(a) 1 per pump C SR  3.3.5.1.5 SR  3.3.5.1.6 Pumps A, D    1.51 seconds        Pumps B, C    6.73 seconds            (continued) a) When associated ECCS subsystem(s) are required to be OPERABLE per LCO 3.5.2.
b)a) Also required to initiate the associated emergency diesel generator subsystem.
b)a) Also required to initiate the associated emergency diesel generator subsystem.
c)b) With associated recirculation pump discharge valve open.
c)b) With associated recirculation pump discharge valve open.


ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-10 Amendment 274315 Table 3.3.5.1
ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-10 Amendment 274 315 Table 3.3.5.1
-1 (page 3 of 5)
-1 (page 3 of 5)
Emergency Core Cooling System Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE      2. LPCI System (continued)
Emergency Core Cooling System Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE      2. LPCI System (continued)
: g. Low Pressure Coolant Injection Pump Discharge Flow  Low (Bypass) 1, 2, 3, 4(a), 5(a) 1 per subsystem E SR  3.3.5.1.5 SR  3.3.5.1.6 040 gpm and        h. Containment Pressure  
: g. Low Pressure Coolant Injection Pump Discharge Flow  Low (Bypass) 1, 2, 3 , 4(a), 5(a) 1 per subsystem E SR  3.3.5.1.5 SR  3.3.5.1.6 040 gpm and        h. Containment Pressure - High  1, 2, 3 4 B SR  3.3.5.1.
- High  1, 2, 3 4 B SR  3.3.5.1.
3 SR  3.3.5.1.6
3 SR  3.3.5.1.6
: 3. High Pressure Coolant Injection (HPCI) System
: 3. High Pressure Coolant Injection (HPCI) System
: a. Reactor Vessel Water Level  Low Low (Level 2) 1, 2(cd), 3(cd) 4 B SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 126.5  inches        b. Drywell Pressure  
: a. Reactor Vessel Water Level  Low Low (Level 2) 1, 2 (c d), 3 (c d) 4 B SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 126.5  inches        b. Drywell Pressure - High 1, 2 (c d), 3 (c d) 4 B SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 2.7 psig        c. Reactor Vessel Water Level  High (Level 8) 1, 2 (c d), 3 (c d) 2 C SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 222.5 inches      d. Condensate Storage Tank Level - Low 1, 2 (c d), 3 (c d) 4 D SR  3.3.5.1.3 SR  3.3.5.1.6 59.5 inches
- High 1, 2(cd), 3(cd) 4 B SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 2.7 psig        c. Reactor Vessel Water Level  High (Level 8) 1, 2(cd), 3(cd) 2 C SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 222.5 inches      d. Condensate Storage Tank Level - Low 1, 2(cd), 3(cd) 4 D SR  3.3.5.1.3 SR  3.3.5.1.6 59.5 inches
: e. Suppression Pool Water Level  High 1, 2 (c d), 3 (c d) 2 D  SR  3.3.5.1.3 SR  3.3.5.1.6 14.5 ft      f. High Pressure Coolant Injection Pump Discharge Flow  
: e. Suppression Pool Water Level  High 1, 2(cd), 3(cd) 2 D  SR  3.3.5.1.3 SR  3.3.5.1.6 14.5 ft      f. High Pressure Coolant Injection Pump Discharge Flow  
- :Low (Bypass) 1, 2 (c d), 3 (c d) 1 E SR  3.3.5.1.5 SR  3.3.5.1.6 and 800 gpm      g. High Pressure Coolant Injection Pump Discharge Pressure  High (Bypass) 1, 2 (c d), 3 (c d) 1 E SR  3.3.5.1.3 SR  3.3.5.1.6 and 80 psig            (continued) a) When associated ECCS subsystem(s) are required to be OPERABLE per LCO 3.5.2.
- :Low (Bypass) 1, 2(cd), 3(cd) 1 E SR  3.3.5.1.5 SR  3.3.5.1.6 and 800 gpm      g. High Pressure Coolant Injection Pump Discharge Pressure  High (Bypass) 1, 2(cd), 3(cd) 1 E SR  3.3.5.1.3 SR  3.3.5.1.6 and 80 psig            (continued) a) When associated ECCS subsystem(s) are required to be OPERABLE per LCO 3.5.2.
c) With rector steam dose pressure > 150 psig.
c) With rector steam dose pressure > 150 psig.


ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-11 Amendment 274315 Table 3.3.5.1
ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-11 Amendment 274 315 Table 3.3.5.1
-1 (page 4 of 5)
-1 (page 4 of 5)
Emergency Core Cooling System Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE      4. Automatic Depressurization System (ADS) Trip System A
Emergency Core Cooling System Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE      4. Automatic Depressurization System (ADS) Trip System A
: a. Reactor Vessel Water Level  Low Low Low (Level 1) 1, 2(cd), 3(cd) 2 F SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 18 inches
: a. Reactor Vessel Water Level  Low Low Low (Level 1) 1, 2 (c d), 3 (c d) 2 F SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 18 inches       b. Automatic Depressurization System Initiation Timer  1, 2 (c d), 3 (c d) 1 G SR  3.3.5.1.5 SR  3.3.5.1.6 134 seconds
: b. Automatic Depressurization System Initiation Timer  1, 2(cd), 3(cd) 1 G SR  3.3.5.1.5 SR  3.3.5.1.6 134 seconds
: c. Reactor Vessel Water Level  Low (Level  
: c. Reactor Vessel Water Level  Low (Level  
: 3) 1, 2(cd), 3(cd) 1 F SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 177 inches        d. Core Spray Pump Discharge Pressure  
: 3) 1, 2 (c d), 3 (c d) 1 F SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 177 inches        d. Core Spray Pump Discharge Pressure - High 1, 2 (c d), 3 (c d) 2 G SR  3.3.5.1.3 SR  3.3.5.1.6 90 psig and 110 psig        e. Low Pressure Coolant Injection Pump Discharge Pressure - High  1, 2 (c d), 3 (c d) 4 G SR  3.3.5.1.
- High 1, 2(cd), 3(cd) 2 G SR  3.3.5.1.3 SR  3.3.5.1.6 90 psig and 110 psig        e. Low Pressure Coolant Injection Pump Discharge Pressure  
- High  1, 2(cd), 3(cd) 4 G SR  3.3.5.1.
3 SR  3.3.5.1.6 105 psig and 145 psig        5. ADS Trip System B
3 SR  3.3.5.1.6 105 psig and 145 psig        5. ADS Trip System B
: a. Reactor Vessel Water Level  Low Low Low (Level 1) 1, 2(cd), 3(cd) 2 F SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 18 inches        b. Automatic Depressurization System Initiation Timer 1, 2(cd), 3(cd) 1 G  SR  3.3.5.1.
: a. Reactor Vessel Water Level  Low Low Low (Level 1) 1, 2 (c d), 3 (c d) 2 F SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6 18 inches        b. Automatic Depressurization System Initiation Timer 1, 2 (c d), 3 (c d) 1 G  SR  3.3.5.1.
5 SR  3.3.5.1.6 134 seconds (continued)
5 SR  3.3.5.1.6 134 seconds (continued)
: c. With rector steam dose pressure > 150 psig.
: c. With rector steam dose pressure > 150 psig.


ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-12 Amendment 274315 Table 3.3.5.1
ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-12 Amendment 274 315 Table 3.3.5.1
-1 (page 5 of 5)
-1 (page 5 of 5)
Emergency Core Cooling System Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE      5. ADS Trip System B (continued)
Emergency Core Cooling System Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE      5. ADS Trip System B (continued)
: c. Reactor Vessel Water Level  Low (Level 3) 1, 2(cd), 3(cd) 1 F SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6
: c. Reactor Vessel Water Level  Low (Level 3) 1, 2 (c d), 3 (c d) 1 F SR  3.3.5.1.1 SR  3.3.5.1.2 SR  3.3.5.1.4 SR  3.3.5.1.5 SR  3.3.5.1.6
: d. Core Spray Pump Discharge Pressure  
: d. Core Spray Pump Discharge Pressure - High 1, 2 (c d), 3 (c d) 2 G SR  3.3.5.1.3 SR  3.3.5.1.6 90 psig and        e. Low Pressure Coolant Injection Pump Discharge Pressure - High 1, 2 (c d), 3 (c d) 4 G SR  3.3.5.1.
- High 1, 2(cd), 3(cd) 2 G SR  3.3.5.1.3 SR  3.3.5.1.6 90 psig and        e. Low Pressure Coolant Injection Pump Discharge Pressure  
- High 1, 2(cd), 3(cd) 4 G SR  3.3.5.1.
3 SR  3.3.5.1.
3 SR  3.3.5.1.
6  105 psig and 145 psig            (continued) d)c)  With rector steam dose pressure > 150 psig.
6  105 psig and 145 psig            (continued) d)c)  With rector steam dose pressure > 150 psig.


RPV Water Inventory Control Instrumentation 3.3.5.2 JAFNPP 3.3.5.2-1 Amendment 315    3.3  INSTRUMENTAT ION 3.3.5.2  Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation LCO 3.3.5.2 The RPV Water Inventory Control instrumentation for each Function in Table 3.3.5.2-1 shall be OPERABLE.
RPV Water Inventory C ontrol Instrumentation 3.3.5.2 JAFNPP 3.3.5.2-1 Amendment 315    3.3  INSTRUMENTAT I O N 3.3.5.2  Reactor Pressure Vess e l (RPV) Wa t er Inventory Control Inst rumentation LCO 3.3.5.2 The RPV Water Inventory Control instrumentation for each Function in Table 3.3.5.2-1 shall be OPERABLE. APPLICAB ILITY: According to Table 3.3.5.2-1. ACTIONS ---------------
APPLICABILITY: According to Table 3.3.5.2-1. ACTIONS ---------------
----------------
----------------
----------------
----------------
-------------
-------------
NOTE-----------
NO T E-----------
----------------
----------------
----------------
----------------
----------------
----------------
Separate Condition entry is allowed for each channel. ---------------
Separate Condition ent r y is allowed for each ch annel. ---------------
----------------
----------------
----------------
----------------
Line 341: Line 324:
----------------
----------------
----------------
----------------
CONDITION REQUIRED ACTION  COMPLETION TIME A. One or more channels inoperable.
CONDITION REQUIR E D ACTION  COMPLET I ON T I M E A. O ne or more channels inoperable.
A.1 Enter the Condition referenced in Table 3.3.5.2-1 for the channel. Immediately B. As required by Required Action A.1 and referenced in Table 3.3.5.2-1. B.1 Declare associated penetration flow path(s) incapable of automatic isolation.
A.1 Enter the Condition referenced in Table 3.3.5.2-1 for the channel. Immediately B. A s required by Required Action A.1 and referenced in Table 3.3.5.2-1. B.1 Declare associated penetration flow path(s) incapable of automatic isolation.
AND  B.2 Calculate DRAIN TIME. Immediately Immediately C. As required by Required Action A.1 and referenced in Table 3.3.5.2-1. C.1 Place channel in trip. 1 hour  D. As required by Required Action A.1 and referenced in Table 3.3.5.2-1. D.1 Restore channel to OPERABLE status. 24 hours RPV Water Inventory Control Instrumentation 3.3.5.2 JAFNPP 3.3.5.2-2 Amendment 315    ACTIONS (continued)
AND  B.2 Calculate DRAIN T I M E. Immediately Immediately C. A s required by Required Action A.1 and referenced in Table 3.3.5.2-1. C.1 Place chan n el in trip. 1 hour  D. A s required by Required Action A.1 and referenced in Table 3.3.5.2-1. D.1 Restore ch a nnel to OP ERAB LE status. 24 hours RPV Water Inventory C ontrol Instrumentation 3.3.5.2 JAFNPP 3.3.5.2-2 Amendment 315    ACTIONS (continued)
CONDITION REQUIRED ACTION  COMPLETION TIME E. Required Action and associated Completion Time of Condition C or D not met. E.1 Declare associated low pressure ECCS injection
CONDITION REQUIR E D ACTION  COMPLET I ON T I M E E. Required Action and associa t ed Completion Time of Condition C or D not met. E.1 Declare associated low pressure ECCS injection/sp r ay subsystem inoperable.
/spray subsystem inoperable.
Immediately SUR VEILL ANCE REQU IREMENTS ---------------
Immediately SURVEILLANCE REQUIREMENTS ---------------
----------------
----------------
----------------
----------------
-------------
-------------
NOTE-----------
NO T E-----------
----------------
----------------
----------------
----------------
----------------
----------------
Refer to Table 3.3.5.2-1 to determine which SRs apply for each ECCS Function. ---------------
Refer to Table 3.3.5.2-1 t o determine which SRs apply for each ECCS F unction. ---------------
----------------
----------------
----------------
----------------
Line 362: Line 344:
----------------
----------------
----------------
----------------
SURVEILLANCE FREQUENCY SR  3.3.5.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program  SR  3.3.5.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program  SR  3.3.5.2.3 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program RPV Water Inventory Control Instrumentation 3.3.5.2 JAFNPP 3.3.5.2-3 Amendment 315  Table 3.3.5.2-1 (page 1 of 1) RPV Water Inventory Control Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE        1. Core Spray
SUR VEILL A NCE FREQUENCY SR  3.3.5.2.1 Perform CHANNEL CHECK. In accorda n ce with the Surveillance Frequency Control Program  SR  3.3.5.2.2 Perform CHANNEL FUNCTIONAL TEST. In accorda n ce with the Surveillance Frequency Control Program  SR  3.3.5.2.3 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accorda n ce with the Surveillance Frequency Control Program RPV Water Inventory C ontrol Instrumentation 3.3.5.2 JAFNPP 3.3.5.2-3 Amendment 315  Table 3.3.5.2-1 (page 1 of 1) RPV Water Inventory C ontrol Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE        1. Core Spray
: a. a. Reactor Pressure  Low (Injection Permissive) 4, 5 4 C SR 3.3.5.2.1 SR 3.3.5.2.2
: a. a. Reactor Pressure  Low (Injection Permissive) 4, 5 4 C SR 3.3.5.2.1 SR 3.3.5.2.2
  < 490 psig        b. b. Core Spray Pump Discharge Flow  Low (Bypass) 4, 5 1 per pump (a) D SR 3.3.5.2.1 SR 3.3.5.2.2
  < 490 psig        b. b. Core Spray Pump Discharge Flow  Low (Bypass) 4, 5 1 per pump (a) D SR 3.3.5.2.1 SR 3.3.5.2.2
Line 374: Line 356:
: a. a. Reactor Vessel Water Level  Low Level 3 (b) 2 in one trip system B SR 3.3.5.2.1 SR 3.3.5.2.2
: a. a. Reactor Vessel Water Level  Low Level 3 (b) 2 in one trip system B SR 3.3.5.2.1 SR 3.3.5.2.2
  > 177 inches (b) When automatic isolation of the associated penetration flow path(s) is credited in calculating DRAIN TIME.
  > 177 inches (b) When automatic isolation of the associated penetration flow path(s) is credited in calculating DRAIN TIME.
RCIC System Instrumentation 3.3.5.32 JAFNPP 3.3.5.32-1 Amendment 274315 3.3 INSTRUMENTATION 3.3.5.32 Reactor Core Isolation Cooling (RCIC) System Instrumentation LCO  3.3.5.32 The RCIC System instrumentation for each Function in Table 3.3.5.
RCIC System Instrumentation 3.3.5.3 2 JAFNPP 3.3.5.3 2-1 Amendment 274 315 3.3 INSTRUMENTATION 3.3.5.3 2 Reactor Core Isolation Cooling (RCIC) System Instrumentation LCO  3.3.5.3 2 The RCIC System instrumentation for each Function in Table 3.3.5.
32-1 shall be OPERABLE.
3 2-1 shall be OPERABLE. APPLICABILITY:
APPLICABILITY:
MODE 1,  MODES 2 and 3 with reactor steam dome pressure > 150 psig ACTIONS  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - NOTE- - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - -  Separate Condition entry is allowed for each channel.
MODE 1,  MODES 2 and 3 with reactor steam dome pressure > 150 psig ACTIONS  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - NOTE- - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - -  Separate Condition entry is allowed for each channel.
  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels inoperable
  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels inoperable
. A.1 Enter the Condition referenced in Table 3.3.5.
. A.1 Enter the Condition referenced in Table 3.3.5.
32-1 for  the channel.
3 2-1 for  the channel.
Immediately B. As required by Required Action A.1 and referenced in Table 3.3.5.
Immediately B. As required by Required Action A.1 and referenced in Table 3.3.5.
32-1. B.1 Declare RCIC System inoperable.
3 2-1. B.1 Declare RCIC System inoperable.
AND 1 hour from discovery of loss of RCIC initiation capability B.2 Place channel in Trip. 24 hours    C. As required by Required Action A.1 and referenced in Table 3.3.5.
AND 1 hour from discovery of loss of RCIC initiation capability B.2 Place channel in Trip. 24 hours    C. As required by Required Action A.1 and referenced in Table 3.3.5.
32-1. C.1 Restore channel in OPERABLE status.
3 2-1. C.1 Restore channel in OPERABLE status.
24 hours      (continued)
24 hours      (continued)


RCIC System Instrumentation 3.3.5.32 JAFNPP 3.3.5.32-2 Amendment 274315 ACTIONS  (continued)
RCIC System Instrumentation 3.3.5.3 2 JAFNPP 3.3.5.3 2-2 Amendment 274 315 ACTIONS  (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D. As required by Required Action A.1 and referenced in Table 3.3.5.
CONDITION REQUIRED ACTION COMPLETION TIME D. As required by Required Action A.1 and referenced in Table 3.3.5.
32-1. D.1 - - - - - -NOTE- - - - - - -  Only applicable if  RCIC pump suction is not aligned to the suppression pool.
3 2-1. D.1 - - - - - -NOTE- - - - - - -  Only applicable if  RCIC pump suction is not aligned to the suppression pool.
   - - - - - - - - - - - - - - - - - Declare (
   - - - - - - - - - - - - - - - - - Declare (R CI C) System inoperable.
RCIC) System inoperable.
AND        1 hour from discovery of loss of  automatic R CI C initiation capability D.2.1 Place channel in trip. OR  24 hours  D.2.2 Align RCIC pump suction to the suppression pool.
AND        1 hour from discovery of loss of  automatic R CIC initiation capability D.2.1 Place channel in trip. OR  24 hours  D.2.2 Align RCIC pump suction to the suppression pool.
24 hours    E. Required Action and associated Completion Time of Condition B, C, or D not met.
24 hours    E. Required Action and associated Completion Time of Condition B, C, or D not met.
E.1 Declare RCIC System inoperable.
E.1 Declare RCIC System inoperable.
Immediately
Immediately


RCIC System Instrumentation 3.3.5.32 JAFNPP 3.3.5.32-3 Amendment 301315 SURVEILLANCE REQUIREMENTS
RCIC System Instrumentation 3.3.5.3 2 JAFNPP 3.3.5.3 2-3 Amendment 301 315 SURVEILLANCE REQUIREMENTS
   - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -NOTES- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  1. Refer to Table 3.3.5.
   - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -NOTES- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  1. Refer to Table 3.3.5.
32-1 to determine which SRs apply for each RCIC Function.
3 2-1 to determine which SRs apply for each RCIC Function. 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows:  (a) for up to 6 hours for Functions 2 and 4; and (b) for up to 6 hours fo r Functions 1 and 3 provided the associated Function maintains RCIC initiation capability.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows:  (a) for up to 6 hours for Functions 2 and 4; and (b) for up to 6 hours fo r Functions 1 and 3 provided the associated Function maintains RCIC initiation capability.
  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  SURVELLANCE FREQUENCY SR 3.3.5.3 2.1  Perform CHANNEL CHECK.
  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  SURVELLANCE FREQUENCY SR 3.3.5.32.1  Perform CHANNEL CHECK.
In accordance with the Surveillance Frequency Control Progra m   SR 3.3.5.3 2.2  Perform CHANNEL FUNCTIONAL TEST.
In accordance with the Surveillance Frequency Control Program   SR 3.3.5.32.2  Perform CHANNEL FUNCTIONAL TEST.
In accordance with the Surveillance Frequency Control Progra m   SR 3.3.5.3 2.3  Perform CHANNEL CALIBRATION.
In accordance with the Surveillance Frequency Control Program   SR 3.3.5.
In accordance with the Surveillance Frequency Control Progra m   SR 3.3.5.3 2.4  Calibrate the trip units.
32.3  Perform CHANNEL CALIBRATION.
In accordance with the Surveillance Frequency Control Progra m   SR 3.3.5.3 2.5  Perform CHANNEL CALIBRATION.
In accordance with the Surveillance Frequency Control Program   SR 3.3.5.
In accordance with the Surveillance Frequency Control Progra m   SR 3.3.5.3 2.6  Perform LOGIC SYSTEM FUNCTIONAL TEST.
32.4  Calibrate the trip units.
In accordance with the Surveillance Frequency Control Progra m RCIC System Instrumentation 3.3.5.3 2 JAFNPP 3.3.5.3 2-4 Amendment 274 315 Table 3.3.5.
In accordance with the Surveillance Frequency Control Program   SR 3.3.5.
3 2-1 Reactor Core Isolation Cooling System Instrumentation (Page 1 of 1)      FUNCTION  REQUIRED CHANNELS PER FUNCTION  CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE      1. Reactor Vessel Water Level  Low Low (Level 2) 4 B SR  3.3.5.
32.5  Perform CHANNEL CALIBRATION.
3 2.1 SR  3.3.5.
In accordance with the Surveillance Frequency Control Program   SR 3.3.5.
3 2.2 SR  3.3.5.
32.6  Perform LOGIC SYSTEM FUNCTIONAL TEST.
3 2.4 SR  3.3.5.
In accordance with the Surveillance Frequency Control Program RCIC System Instrumentation 3.3.5.32 JAFNPP 3.3.5.32-4 Amendment 274315 Table 3.3.5.
3 2.5 SR  3.3.5.
32-1 Reactor Core Isolation Cooling System Instrumentation (Page 1 of 1)      FUNCTION  REQUIRED CHANNELS PER FUNCTION  CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE      1. Reactor Vessel Water Level  Low Low (Level 2) 4 B SR  3.3.5.
3 2.6        2. Reactor Vessel Water Level  High (Level 8) 2 C SR  3.3.5.
32.1 SR  3.3.5.
3 2.1 SR  3.3.5.
32.2 SR  3.3.5.
3 2.2 SR  3.3.5.
32.4 SR  3.3.5.
3 2.4 SR  3.3.5.
32.5 SR  3.3.5.
3 2.5 SR  3.3.5.
32.6        2. Reactor Vessel Water Level  High (Level 8) 2 C SR  3.3.5.
3 2.6      3. Condensate Storage Tank Level - Low 4 D SR  3.3.5.
32.1 SR  3.3.5.
3 2.3 SR  3.3.5.
32.2 SR  3.3.5.
3 2.6      4. Manual Initiat ion 1 C SR  3.3.5.
32.4 SR  3.3.5.
3 2.6 NA Primary Containment Isolation Instrumentation 3.3.6.1 JAFNPP 3.3.6.1-3 Amendment 274 315 ACTIONS  (continued)
32.5 SR  3.3.5.
32.6      3. Condensate Storage Tank Level - Low 4 D SR  3.3.5.
32.3 SR  3.3.5.
32.6      4. Manual Initiat ion 1 C SR  3.3.5.
32.6 NA Primary Containment Isolation Instrumentation 3.3.6.1 JAFNPP 3.3.6.1-3 Amendment 274315 ACTIONS  (continued)
CONDITION REQUIRED ACTION COMPLETION TIME H. Required Action and associated Completion Time of Condition F or G not met.
CONDITION REQUIRED ACTION COMPLETION TIME H. Required Action and associated Completion Time of Condition F or G not met.
OR  As required by Required Action C
OR  As required by Required Action C
Line 438: Line 413:
OR  J.2  Initiate action to isolate the Residual Heat Removal (RHR) Shutdown Cooling System. Immediately Immediately
OR  J.2  Initiate action to isolate the Residual Heat Removal (RHR) Shutdown Cooling System. Immediately Immediately


Primary Containment Isolation Instrumentation 3.3.6.1    JAFNPP 3.3.6.1-10 Amendment 298315 Table 3.3.6.1-1 (page 5 of 6)  Primary Containment Isolation Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER TRIP SYSTEM CONDITIONS REFERENCED FROM REQUIRED ACTION C.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE  5. Reactor Water Cleanup (RWCU) System Isolation
Primary Containment Isolation Instrumentation 3.3.6.1    JAFNPP 3.3.6.1-10 Amendment 298 315 Table 3.3.6.1-1 (page 5 of 6)  Primary Containment Isolation Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER TRIP SYSTEM CONDITIONS REFERENCED FROM REQUIRED ACTION C.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE  5. Reactor Water Cleanup (RWCU) System Isolation
: a. RWCU Suction Line Penetration Area TemperatureHigh    1,2,3    1    F    SR  3.3.6.1.3 SR  3.3.6.1.7 144F b. RWCU Pump Area TemperatureHigh    1,2,3    1 per  room    F    SR  3.3.6.1.3 SR  3.3.6.1.7 165F for Pump Room A and  175F for Pump Room B  c. RWCU Heat Exchanger Room Area TemperatureHigh  1,2,3 1 F SR  3.3.6.1.3 SR  3.3.6.1.7 155F d. SLC System Initiation 1,2 2(d) I SR  3.3.6.1.7 NA  e. Reactor Vessel Water LevelLow (Level
: a. RWCU Suction Line Penetration Area TemperatureHigh    1,2,3    1    F    SR  3.3.6.1.3 SR  3.3.6.1.7 144 F b. RWCU Pump Area TemperatureHigh    1,2,3    1 per  room    F    SR  3.3.6.1.3 SR  3.3.6.1.7 165F for Pump Room A and  175F for Pump Room B  c. RWCU Heat   Exchanger Room Area TemperatureHigh  1,2,3 1 F SR  3.3.6.1.3 SR  3.3.6.1.7 155 F d. SLC System Initiation 1,2 2(d) I SR  3.3.6.1.7 NA  e. Reactor Vessel Water LevelLow (Level
: 3) 1,2,3 2 F SR  3.3.6.1.1 SR  3.3.6.1.2 SR  3.3.6.1.4 SR  3.3.6.1.5 SR  3.3.6.1.7 177 inches
: 3) 1,2,3 2 F SR  3.3.6.1.1 SR  3.3.6.1.2 SR  3.3.6.1.4 SR  3.3.6.1.5 SR  3.3.6.1.7 177 inches
: f. Drywell PressureHigh 1,2,3 2 F SR  3.3.6.1.1 SR  3.3.6.1.2 SR  3.3.6.1.4 SR  3.3.6.1.5 SR  3.3.6.1.7 2.7 psig 6. Shutdown Cooling System Isolation
: f. Drywell PressureHigh 1,2,3 2 F SR  3.3.6.1.1 SR  3.3.6.1.2 SR  3.3.6.1.4 SR  3.3.6.1.5 SR  3.3.6.1.7 2.7 psig 6. Shutdown Cooling System Isolation   a. Reactor PressureHigh    1,2,3    1    F    SR  3.3.6.1.1 SR  3.3.6.1.
: a. Reactor PressureHigh    1,2,3    1    F    SR  3.3.6.1.1 SR  3.3.6.1.
2 SR  3.3.6.1.
2 SR  3.3.6.1.
4 SR  3.3.6.1.5 SR  3.3.6.1.7 74 psig    b. Reactor Vessel Water LevelLow (Level 3) 3,4,5  2(e)  J      SR  3.3.6.1.1 SR  3.3.6.1.2 SR  3.3.6.1.4 SR  3.3.6.1.5 SR  3.3.6.1.7 177 inches (continued)
4 SR  3.3.6.1.5 SR  3.3.6.1.7 74 psig    b. Reactor Vessel Water LevelLow (Level 3) 3,4,5  2(e)  J      SR  3.3.6.1.1 SR  3.3.6.1.2 SR  3.3.6.1.4 SR  3.3.6.1.5 SR  3.3.6.1.7 177 inches     (continued)
   (d) SLC System Initiation only inputs into one of the two trip systems and only isolates one valve in the RWCU suction and return line.  (e) Only one trip system required in MODES 4 and 5 when RHR Shutdown Cooling System integrity maintained.
   (d) SLC System Initiation only inputs into one of the two trip systems and only isolates one valve in the RWCU suction and return line.  (e) Only one trip system required in MODES 4 and 5 when RHR Shutdown Cooling System integrity maintained.


Secondary Containment Isolation Instrumentation 3.3.6.2 JAFNPP 3.3.6.2-4 Amendment 276315 `  Table 3.3.6.2
Secondary Containment Isolation Instrumentation 3.3.6.2 JAFNPP 3.3.6.2-4 Amendment 27 6 315 `  Table 3.3.6.2
-1 (page 1 of 1)
-1 (page 1 of 1)
Secondary Containment Isolation Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER TRIP SYSTEM SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE      1. Reactor Vessel Water      Level  Low (Level 3) 1, 2, 3, (a)  2 SR 3.3.6.2.1 SR 3.3.6.2.2 SR 3.3.6.2.4 SR 3.3.6.2.5 SR 3.3.6.2.6
Secondary Containment Isolation Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER TRIP SYSTEM SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE      1. Reactor Vessel Water      Level  Low (Level 3) 1, 2, 3, (a)  2 SR 3.3.6.2.1 SR 3.3.6.2.2 SR 3.3.6.2.4 SR 3.3.6.2.5 SR 3.3.6.2.6
: 2. Drywell Pressure  
: 2. Drywell Pressure - High  1, 2, 3 2 SR 3.3.6.2.1 SR 3.3.6.2.2 SR 3.3.6.2.4 SR 3.3.6.2.5 SR 3.3.6.2.6      3. Reactor Building Exhaust Radiation  
- High  1, 2, 3 2 SR 3.3.6.2.1 SR 3.3.6.2.2 SR 3.3.6.2.4 SR 3.3.6.2.5 SR 3.3.6.2.6      3. Reactor Building Exhaust Radiation  
- High 1, 2, 3 , (a), (b) 1 SR 3.3.6.2.1 SR 3.3.6.2.3 SR 3.3.6.2.6  24,800 cpa      4. Refueling Floor Exhaust Radiation  
- High 1, 2, 3, (a), (b) 1 SR 3.3.6.2.1 SR 3.3.6.2.3 SR 3.3.6.2.6  24,800 cpa      4. Refueling Floor Exhaust Radiation  
- High  1, 2, 3, (a), (b) 1 SR 3.3.6.2.1 SR 3.3.6.2.3 SR 3.3.6.2.6 (a) During operation with a potential for draining the reactor vessel.
- High  1, 2, 3, (a), (b) 1 SR 3.3.6.2.1 SR 3.3.6.2.3 SR 3.3.6.2.6 (a) During operation with a potential for draining the reactor vessel.
  (b)(a) During movement of recently irradiated fuel assemblies in secondary containment.
  (b)(a) During movement of recently irradiated fuel assemblies in secondary containment.


CREVAS System Instrumentation 3.3.7.1    JAFNPP 3.3.7.1-1 Amendment 276315 3.3 INSTRUMENTATION 3.3.7.1 Control Room Emergency Ventilation Air Supply (CREVAS)
CREVAS System Instrumentation 3.3.7.1    JAFNPP 3.3.7.1-1 Amendment 276315 3.3 INSTRUMENTATION 3.3.7.1 Control Room Emergency Ventilation Air Supply (CREVAS)
System Instrumentation LCO 3.3.7.1 The Control Room Air Inlet RadiationHigh channel shall be OPERABLE.
System Instrumentation LCO 3.3.7.1 The Control Room Air Inlet RadiationHigh channel shall be OPERABLE. APPLICABILITY:
APPLICABILITY:
MODES 1, 2 and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel. ACTIONS  CONDITION REQUIRED ACTION COMPLETION TIME A. Channel inoperable.
MODES 1, 2 and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel. ACTIONS  CONDITION REQUIRED ACTION COMPLETION TIME A. Channel inoperable.
A.1      Place the CREVAS System in the isolate mode of operation.
A.1      Place the CREVAS System in the isolate mode of operation.
OR  A.2      Declare both CREVAS subsystems inoperable.
OR  A.2      Declare both CREVAS subsystems inoperable.
Line 465: Line 437:
   ----------------------------------------------------------NOTE-----------------------------------------------
   ----------------------------------------------------------NOTE-----------------------------------------------
When the channel is placed in an inoperable status solely for performance of required Surveillances, entry into the Condition and Required Actions may be delayed for up to 6 hours. ------------------------------------------------------------------------------------------------------------------
When the channel is placed in an inoperable status solely for performance of required Surveillances, entry into the Condition and Required Actions may be delayed for up to 6 hours. ------------------------------------------------------------------------------------------------------------------
SURVEILLANCE FREQUENCY SR  3.3.7.1.1 Perform CHANNEL CHECK.
SURVEILLANCE FREQUENCY SR  3.3.7.1.1         Perform CHANNEL CHECK.
In accordance with the Surveillance Frequency Control Program SR  3.3.7.1.2 Perform CHANNEL CALIBRATION. The Allowable Value shall be  4000 cpm.
In accordance with the Surveillance Frequency Control Program SR  3.3.7.1.2         Perform CHANNEL CALIBRATION. The Allowable Value shall be  4000 cpm. In accordance with the Surveillance Frequency Control Program
In accordance with the Surveillance Frequency Control Program


ECCS - Operating 3.5.1  JAFNPP 3.5.1-1 Amendment 284315 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS), RPV WATER INVENTORY CONTROL, AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1  ECCS-Operating LCO  3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of six safety/relief valves shall be OPERABLE.
ECCS - Operating 3.5.1  JAFNPP 3.5.1-1 Amendment 284 315 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS), RPV WATER INVENTORY CONTROL, AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1  ECCS-Operating LCO  3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of six safety/relief valves shall be OPERABLE.
APPLICABILITY:
APPLICABILITY:
MODE 1,  MODES 2 and 3, except high pressure coolant injection (HPCI) and ADS valves are not required to be OPERABLE with reactor steam dome psig. ACTIONS ---------------------------------------------------------NOTE-------------------------------------------------------------
MODE 1,  MODES 2 and 3, except high pressure coolant injection (HPCI) and ADS valves are not required to be OPERABLE with reactor steam dome psig. ACTIONS ---------------------------------------------------------NOTE-------------------------------------------------------------
LCO 3.0.4.b is not applicable to HPCI.
LCO 3.0.4.b is not applicable to HPCI.
  -----------------------------------------------------------------------------------------------------------------------------
  -----------------------------------------------------------------------------------------------------------------------------
-    CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure ECCS injection/spray subsystem inoperable.
-    CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure ECCS injection/spray subsystem inoperable.
OR  One low pressure coolant injection (LPCI) pump in both LPCI subsystems inoperable.
OR  One low pressure coolant injection (LPCI) pump in both LPCI subsystems inoperable.
A.1  Restore low pressure ECCS injection/spray subsystem(s) to OPERABLE status.
A.1  Restore low pressure ECCS injection/spray subsystem(s) to OPERABLE status.
Line 480: Line 451:
12 hours    36 hours  (continued)
12 hours    36 hours  (continued)


RPV Water Inventory Control ECCS - Shutdown 3.5.2 JAFNPP 3.5.2-1 Amendment 274315 3.5 EMERGENCY CORE COOLING SYSTEM (ECCS), RPV WATER INVENTORY CONTROL, AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.2  Reactor Pressure Vessel (RPV) Water Inventory Control ECCS - Shutdown LCO  3.5.2 DRAIN TIME of RPV water inventory to the top of act ive fuel (TAF) shall be > 36 hours.
RPV Water Inventory Control ECCS - Shutdown 3.5.2 JAFNPP 3.5.2-1 Amendment 274 315 3.5 EMERGENCY CORE COOLING SYSTEM (ECCS), RPV WATER INVENTORY CONTROL, AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.2  Reactor Pressure Vessel (RPV) Water Inventory Control E CCS - Shutdown LCO  3.5.2 DRAIN TIME of RPV water inventory to the top of act ive fuel (TAF) shall be > 36 hours. AND    OneTwo low pressure ECCS injection/spray subsystem s shall be  OPERABLE.     -------------------------------------NOTE------------------------------------------------
AND    OneTwo low pressure ECCS injection/spray subsystem s shall be  OPERABLE.
    -------------------------------------NOTE------------------------------------------------
A Low Pressure Coolant Injection (LPCI) subsystem may be considered OPERABLE during alignment and operation for decay heat removal if capable of being manually realigned and not otherwise inoperable.
A Low Pressure Coolant Injection (LPCI) subsystem may be considered OPERABLE during alignment and operation for decay heat removal if capable of being manually realigned and not otherwise inoperable.
  ----------------------------------------------------------------------------------------------
  ----------------------------------------------------------------------------------------------
APPLICABILITY:
APPLICABILITY:
MODES 4 and 5  MODES 5, except with the spent fuel storage pool gates the reactor pressure vessel flange.
MODE S 4 and 5  MODES 5, except with the spent fuel storage pool gates the reactor pressure vessel flange.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One rRequired low pressure ECCS injection/spray subsystem inoperable.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One r Required low pressure ECCS injection/spray subsystem inoperable.
A.1 Restore required low pressure ECCS injection/spray subsystem to OPER ABLE  status. 4 hours    B. Required Action and associated Completion Time of Condition A not met. B.1 Initiate action to establish a method of water injection capable of operating without offsite electrical power. Initiate action to suspend operations with.a potential for draining the reactor vessel (OPDRVs).
A.1 Restore required low pressure ECCS injection/spray subsystem to OPER ABLE  status. 4 hours    B. Required Action and associated Completion Time of Condition A not met. B.1 Initiate action to establish a method of water injection capable of operating without offsite electrical power. Initiate action to suspend operations with.a potential for draining the reactor vessel (OPDRVs).
Immediately
Immediately


RPV Water Inventory Control ECCS - Shutdown 3.5.2 JAFNPP 3.5.2-2 Amendment 274315 C. DRAIN TIME < 36 hours and  8 hours. C.1 Verify secondary containment boundary is capable of being establish ed in less than the DRAIN TIME. AND  C.2 Verify each secondary containment penetration flow path is capable of being isolated in less than the DRAIN TIME. AND  C.3  Verify one standby gas treatment subsystem is capable of being placed in operation in less than the DRAIN TIME. 4 hours          4 hours          4 hours    C. Two required low pressure ECCS injection/spray subsystems inoperable.
RPV Water Inventory Control ECCS - Shutdown 3.5.2 JAFNPP 3.5.2-2 Amendment 274 315 C. DRAIN TIME < 36 hours and  8 hours. C.1 Verify secondary containment boundary is capable of being establish e d in less than t he DRAIN T IME. AND  C.2 Verify each secondary containment penetration flow path is capable of being isol at ed in less t h an the DRAIN TIME. AND  C.3  Verify one standby gas treatment subsystem is capable of being placed in operation in less than t h e DRAIN T IME. 4 hours          4 hours          4 hours    C. Two required low pressure ECCS injection/spray subsystems inoperable.
C.1 Initiate action to suspend OPDRVs.
C.1 Initiate action to suspend OPDRVs.
AND Immediately C.2 Restore one required low pressure ECCS injection/spray subsystem to OPERBLE status. 4 hours (continued)
AND Immediately C.2 Restore one required low pressure ECCS injection/spray subsystem to OPERBLE status. 4 hours (continued)


RPV Water Inventory Control ECCS - Shutdown 3.5.2 JAFNPP 3.5.2-2 Amendment 274315   ACTIONS  (continued)
RPV Water Inventory Control ECCS - Shutdown 3.5.2 JAFNPP 3.5.2-2 Amendment 274 315   ACTIONS  (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D. DRAIN TIME < 8 hours.Required Action C.2 and E. associated Completion F.D. Time not met. D.1 ------------- NOTE --------------Initiate Required ECCS injection/spray subsystem or additional method of water injection shall be capable of operating without offsite electrical power.
CONDITION REQUIRED ACTION COMPLETION TIME D. DRAIN TIME < 8 hours.Required Action C.2 and E. associated Completion F.D. Time not met. D.1 ------------- NOTE --------------Initiate Required ECCS injection/spray subsystem or additional method of water injection shall be capable of operating without offsite electrical power.
  -------------------------------------
  -------------------------------------
Line 501: Line 470:
Initiate action to establish an additional method of water injection with water sources capable of maintaining RPV water > TAF for > 36 hours. AND  Immediately D.2 Initiate action to establish secondary containment boundary. restore  one standby gas treatment subsystem to OPERABLE status. AND  Immediately D.3 Initiate action to isolate each secondary containment penetration flow path or verify it can be manually isolated from the control room.
Initiate action to establish an additional method of water injection with water sources capable of maintaining RPV water > TAF for > 36 hours. AND  Immediately D.2 Initiate action to establish secondary containment boundary. restore  one standby gas treatment subsystem to OPERABLE status. AND  Immediately D.3 Initiate action to isolate each secondary containment penetration flow path or verify it can be manually isolated from the control room.
restore  Isolation capability in each required secondary containment penetration flow path not isolated.
restore  Isolation capability in each required secondary containment penetration flow path not isolated.
Immediately AND RPV Water Inventory Control ECCS - Shutdown 3.5.2 JAFNPP 3.5.2-3 Amendment 274315 D.4 Initiate action to verify o ne standby gas treatment subsystem is capable of being placed in operation.
Immediately AND RPV Water Inventory Control ECCS - Shutdown 3.5.2 JAFNPP 3.5.2-3 Amendment 274 315 D.4 Initiate action to verify o n e standby gas treatment subsystem is capable of being placed in operation.
E. Required Action and associated Completion Time of Condition C or D not met. OR DRAIN TIME < 1 hour. E.1 Initiate action to restore DRAIN TIME to  36 hours. Immediately SURVEILLANCE REQUIREMENTS SURVELLANCE FREQUENCY SR 3.5.2.1  Verify DRAIN TIME  36 hours. In accordance with the Surveillance Frequency Control Program  SR 3.5.2.12 Verify, for each required low pressure coolant injection (LPCI) subsystem, the suppression pool water level is 33 ft. In accordance with the Surveillance Frequency Control Program  (continued)
E. Required Action and associa t ed Completion Time of Condition C or D not met. O R DRAIN T I ME < 1 hour. E.1 Initiate ac t i o n to restore DRAIN T I ME to  36 hours. Immediately SURVEILLANCE REQUIREMENTS SURVELLANCE FREQUENCY SR 3.5.2.1  Verify DRA I N TIME  3 6 hours. In accorda n ce with the Surveillance Frequency Control Program  SR 3.5.2.1 2 Verify, for each required low pressure coolant injection (LPCI) subsystem, the suppression pool water level is 33 ft. In accordance with the Surveillance Frequency Control Program  (continued)


RPV Water Inventory Control ECCS - Shutdown 3.5.2 JAFNPP 3.5.2-4 Amendment 274315 SURVEILLANCE REQUIREMENTS (continued)
RPV Water Inventory Control ECCS - Shutdown 3.5.2 JAFNPP 3.5.2-4 Amendment 274 315 SURVEILLANCE REQUIREMENTS (continued)
SURVELLANCE FREQUENCY SR 3.5.2.23 Verify for each a required Ccore sSpray (CS) subsystem, the:  a. b. The water level in each condensate storage Tank is > 324 inches  
SURVELLANCE FREQUENCY SR 3.5.2.2 3 Verify for each a required C c ore s Spray (CS) subsystem, the:  a. b. The water level in each condensate storage Tank is > 324 inches  
- - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - -  Only one required CS subsystem may take credit for this option during OPDRVs.
- - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - -  Only one required CS subsystem may take credit for this option during OPDRVs.
  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  The water level in each condensate storage Tank is    In accordance with the Surveillance Frequency Control Program   SR 3.5.2.34 Verify, for eachthe required ECCS injection/spray subsystem, the piping is filled with water from the pump discharge valve to the injection valve.
  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  The water level in each condensate storage Tank is    In accordance with the Surveillance Frequency Control Progra m   SR 3.5.2.3 4 Verify, for each the required ECCS injection/spray subsystem, the piping is filled with water from the pump discharge valve to the injection valve.
In accordance with the Surveillance Frequency Control Program   SR 3.5.2.45 - - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - - - One LPCI subsystem may be considered OPERABLE during alignment and operation for decay heat removal if capable of being manually realigned and not otherwise inoperable.
In accordance with the Surveillance Frequency Control Progra m   SR 3.5.2.4 5 - - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - - - One LPCI subsystem may be considered OPERABLE during alignment and operation for decay heat removal if capable of being manually realigned and not otherwise inoperable.
  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  Verify each for the required ECCS injection/spray subsystem
  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  Verify each for the required ECCS injection/spray subsystem
, each  manual, power operated, and automatic valve in the flow path, that is not locked, seated, or otherwise secured in position, is in the correct position.
, each  manual, power operated, and automatic valve in the flow path, that is not locked, seated, or otherwise secured in position, is in the correct position.
In accordance with the Surveillance Frequency Control Program (continued)
In accordance with the Surveillance Frequency Control Progra m (continued)


RPV Water Inventory Control ECCS - Shutdown 3.5.2 JAFNPP 3.5.2-5 Amendment 274315 SURVEILLANCE REQUIREMENTS (continued)
RPV Water Inventory Control ECCS - Shutdown 3.5.2 JAFNPP 3.5.2-5 Amendment 274 315 SURVEILLANCE REQUIREMENTS (continued)
SURVELLANCE FREQUENCY SR 3.5.2.56 Operate the required ECCS injection/spray subsystem through the recirculation line for > 10 minutes.Verify each required ECCS pump develops the specified flow rate against a system head corresponding to the specified reactor pressure above primary containment pressure.
SURVELLANCE FREQUENCY SR 3.5.2.5 6 Operate the required ECCS injection/spray subsystem through the recirculation line for > 10 minutes.Verify each required ECCS pump develops the specified flow rate against a system head corresponding to the specified reactor pressure above primary containment pressure. SYSTEM HEAD CORRESPONDING TO A REACTOR PRESSURE    NO. ABOVE PRIMARY OF CONTAINMENT SYSTEM FLOW  RATE  PUMPS PRESSURE OF C S     1  LPCI  7700  gpm   1    In accordance with the Inservice Testing Program  SR 3.5.2.7 Verify each valve credited for automatically isolating a penetration flow path actuates to the isolation position on an actual or simulated isolation signal.
SYSTEM HEAD CORRESPONDING TO A REACTOR PRESSURE    NO. ABOVE PRIMARY OF CONTAINMENT SYSTEM FLOW  RATE  PUMPS PRESSURE OF CS     1  LPCI  7700  gpm 1    In accordance with the Inservice Testing Program  SR 3.5.2.7 Verify each valve credited for automatically isolating a penetration flow path actuates to the isolation position on an actual or simulated isolation signal.
In accordance with the Surveillance Frequency Control Program  SR 3.5.2.6 8 - - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - - - Vessel injection/spray may be excluded.
In accordance with the Surveillance Frequency Control Program  SR 3.5.2.68 - - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - - - Vessel injection/spray may be excluded.
  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  Verify theeach required ECCS injection/spray subsystem actuates on an a manual actual or simulated automatic initiation signal.
  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  Verify theeach required ECCS injection/spray subsystem actuates on an a manual actual or simulated automatic initiation signal.
In accordance with the Surveillance Frequency Control Program RCIC SYSTEM 3.5.3 JAFNPP 3.5.3-1 Amendment 284315   3.5  EMERGENCY CORE COOLING SYSTEMS (E CCS), RPV WATER INVENTORY CONTROL, AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.3  RCIC System LCO  3.5.3 The RCIC System shall be OPERABLE.
In accordance with the Surveillance Frequency Control Program RCIC SYSTEM 3.5.3 JAFNPP 3.5.3-1 Amendment 2 84 315   3.5  EMERGENCY CORE COOLING SYSTEMS (E CCS), RPV WATER INVENTORY CONTROL, AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.3  RCIC System LCO  3.5.3 The RCIC System shall be OPERABLE.
APPLICABILITY:
APPLICABILITY:
MODE 1,  MODES 2 and 3 with reactor steam dome pressure >
MODE 1,  MODES 2 and 3 with reactor steam dome pressure >
150 psig. ACTIONS NOTE LCO 3.0.4
150 psig. ACTIONS NOTE LCO 3.0.4.b is not applicable to RCIC.
.b is not applicable to RCIC.


CONDITION REQUIRED ACTION COMPLETION TIME  A. RCIC System inoperable.
CONDITION REQUIRED ACTION COMPLETION TIME  A. RCIC System inoperable.
A.1  Verify by administrative means High Pressure Coolant Injection System is OPERABLE.
A.1  Verify by administrative means High Pressure Coolant Injection System is OPERABLE. AND  A.2  Restore RCIC System to OPERABLE status.
AND  A.2  Restore RCIC System to OPERABLE status.
Immediately 14 days  B. Required Action and associated Completion Time not met.
Immediately 14 days  B. Required Action and associated Completion Time not met.
B.1  Be in MODE
B.1  Be in MODE
: 3. AND  B.2  Reduce reactor steam dome pressure to 50 psig. 12 hours    36 hours PCIVs 3.6.1.3 JAFNPP 3.6.1.3-6 Amendment 274315 ACTIONS  (continued)
: 3. AND  B.2  Reduce reactor steam dome pressure to 50 psig. 12 hours    36 hours PCIVs 3.6.1.3 JAFNPP 3.6.1.3-6 Amendment 274 315 ACTIONS  (continued)
CONDITION REQUIRED ACTION COMPLETION TIME F. Required Action and associated Completion Time of Condition A, B, C, D, or E not met In MODE 1, 2, or 3.
CONDITION REQUIRED ACTION COMPLETION TIME F. Required Action and associated Completion Time of Condition A, B, C, D, or E not met In MODE 1, 2, or 3.
F.1 Be in MODE 3.
F.1 Be in MODE 3.
Line 536: Line 502:
Immediately
Immediately


Secondary Containment 3.6.4.1  JAFNPP 3.6.4.1-1 Amendment 276315 3.6  CONTAINMENT SYSTEMS 3.6.4.1  Secondary Containment LCO  3.6.4.1 The secondary containment shall be OPERABLE.
Secondary Containment 3.6.4.1  JAFNPP 3.6.4.1-1 Amendment 276 315 3.6  CONTAINMENT SYSTEMS 3.6.4.1  Secondary Containment LCO  3.6.4.1 The secondary containment shall be OPERABLE.
APPLICABILITY:
APPLICABILITY:
MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).
MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).
Line 547: Line 513:
AND        Immediately (continued)
AND        Immediately (continued)


Secondary Containment 3.6.4.1  JAFNPP 3.6.4.1-2 Amendment 301315 ACTIONS  (continued)
Secondary Containment 3.6.4.1  JAFNPP 3.6.4.1-2 Amendment 301 315 ACTIONS  (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C.  (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C.  (continued)
C.2 Initiate action to suspend OPDVRVs. Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR  3.6.4.1.1 Verify secondary containment vacuum is 0.25 inch  of vacuum water gauge.
C.2 Initiate action to suspend OPDVRVs. Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR  3.6.4.1.1 Verify secondary containment vacuum is 0.25 inch  of vacuum water gauge.
In accordance with the Surveillance Frequency Control Program  SR  3.6.4.1.2 Verify all secondary containment equipment hatches are closed and sealed.
In accordance with the Surveillance Frequency Control Program  SR  3.6.4.1.2 Verify all secondary containment equipment hatches are closed and sealed.
In accordance with the Surveillance Frequency Control Program  SR  3.6.4.1.3 Verify one secondary containment access door in each access opening is closed.
In accordance with the Surveillance Frequency Control Program  SR  3.6.4.1.3 Verify one secondary containment access door in each access opening is closed.
In accordance with the Surveillance Frequency Control Program  SR  3.6.4.1.4 Verify the secondary containment can be maintained 0.25 inch of vacuum water gauge for 1 hour using one SGT subsystem at a flow rate  6000 cfm. In accordance with the Surveillance Frequency Control Program SCIVs  3.6.4.2  JAFNPP 3.6.4.2-1 Amendment 276315 3.6  CONTAINMENT SYSTEMS 3.6.4.2  Secondary Containment Isolation Valves (SCIVs)
In accordance with the Surveillance Frequency Control Program  SR  3.6.4.1.4 Verify the secondary containment can be maintained 0.25 inch of vacuum water gauge for 1 hour using one SGT subsystem at a flow rate  6000 cfm. In accordance with the Surveillance Frequency Control Program SCIVs  3.6.4.2  JAFNPP 3.6.4.2-1 Amendment 27 6 315 3.6  CONTAINMENT SYSTEMS 3.6.4.2  Secondary Containment Isolation Valves (SCIVs)
LCO  3.6.4.2 Each SCIV shall be OPERABLE.
LCO  3.6.4.2 Each SCIV shall be OPERABLE.
APPLICABILITY:
APPLICABILITY:
MODES 1, 2, and 3,  During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).
MODES 1, 2, and 3,  During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS ----------------------------------------------------NOTES----------------------------------------------------
ACTIONS ----------------------------------------------------NOTES----------------------------------------------------
: 1. Penetration flow paths may be unisolated intermittently under administrative controls.
: 1. Penetration flow paths may be unisolated intermittently under administrative controls.
Line 562: Line 528:
  -------------------------------------------------------------------------------------------------------------------
  -------------------------------------------------------------------------------------------------------------------
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more penetration flow paths with one SCIV inoperable.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more penetration flow paths with one SCIV inoperable.
A.1 Isolate the affected penetration flow path by use of at least one closed and de-activated automatic valve, closed manual valve, or blind flange.
A.1 Isolate the affected penetration flow path by use of at least one closed and de-activated automatic valve,   closed manual valve, or blind flange.
AND  8 hours            (continued)
AND  8 hours            (continued)


SCIVs  3.6.4.2  JAFNPP 3.6.4.2-2 Amendment 27 4  ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued)
SCIVs  3.6.4.2  JAFNPP 3.6.4.2-2 Amendment 27 4  ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued)
A.2 --------NOTES--------  1. Isolation devices in high radiation areas may be verified by use of administrative means. 2. Isolation devices that are locked, sealed, or otherwise secured may be verified by use of  administrative means.  -----------------------------      Verify the affected penetration flow path is isolated.
A.2 --------NOTES--------  1. Isolation devices in high radiation areas may be verified by use of administrative means. 2. Isolation devices that are locked, sealed, or otherwise secured may be verified by use of  administrative means.  -----------------------------      Verify the affected penetration flow path is isolated.                 Once per 31 days.
Once per 31 days.
B. ---------NOTE--------- Only applicable to penetration flow paths with two isolation valves.  ----------------------
B. ---------NOTE---------
Only applicable to penetration flow paths with two isolation valves.  ----------------------
One or more penetration flow paths with two SCIVs inoperable.
One or more penetration flow paths with two SCIVs inoperable.
B.1 Isolate the affected penetration flow path by use of at least one closed and de-activated automatic valve, closed manual valve, or blind flange.
B.1 Isolate the affected penetration flow path by use of at least one closed and de-activated automatic valve, closed manual valve, or blind flange.
4 hours    C. Required Action and associated Completion Time of Condition A  or B not met in MODE 1, 2, or 3. C.1  Be in MODE
4 hours    C. Required Action and associated Completion Time of Condition A  or B not met in MODE 1, 2, or 3. C.1  Be in MODE
: 3. AND  C.2  Be in MODE
: 3. AND  C.2  Be in MODE
: 4. 12 hours    36 hours    (continued)
: 4. 12 hours    36 hours    (continued)


SCIVs  3.6.4.2  JAFNPP 3.6.4.2-3 Amendment 276315 ACTIONS  (continued)
SCIVs  3.6.4.2  JAFNPP 3.6.4.2-3 Amendment 276 315 ACTIONS  (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and associated Completion Time of Condition A or B not met during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs. D.1  --------NOTE---------
CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and associated Completion Time of Condition A or B not met during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs. D.1  --------NOTE--------- LCO 3.0.3 is not applicable.
LCO 3.0.3 is not applicable.
  ---------------------
  ---------------------
Suspend movement of recently irradiated fuel assemblies in the secondary containment.
Suspend movement of recently irradiated fuel assemblies in the secondary containment.
AND  D.2Initiate action to suspend OPDRVs.      Immediately Immediately
AND  D.2Initiate action to suspend OPDRVs.      Immediately Immediately


SCIVs  3.6.4.2  JAFNPP 3.6.4.2-4 Amendment 301 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR  3.6.4.2.1
SCIVs  3.6.4.2  JAFNPP 3.6.4.2-4 Amendment 301 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR  3.6.4.2.1 ------------------------NOTES------------------------- 1. Valves and blind flanges in high radiation areas may be verified by use of administrative means. 2. Not required to be met for SCIVs that are open under administrative controls.
------------------------NOTES------------------------- 1. Valves and blind flanges in high radiation areas may be verified by use of administrative means. 2. Not required to be met for SCIVs that are open under administrative controls.
   -----------------------------------------------------------
   -----------------------------------------------------------
Verify each secondary containment isolation manual valve and blind flange that is not locked, sealed, or otherwise secured and is required to be closed during accident conditions is closed.
Verify each secondary containment isolation manual valve and blind flange that is not locked, sealed, or otherwise secured and is required to be closed during accident conditions is closed.
In accordance With the Surveillance Frequency Control Program SR  3.6.4.2.2 Verify the isolation time of each power operated, automatic SCIV is within limits.
In accordance With the Surveillance Frequency Control Program SR  3.6.4.2.2 Verify the isolation time of each power operated, automatic SCIV is within limits.
In accordance with the Surveillance Frequency Control Program SR  3.6.4.2.3 Verify each automatic SCIV actuates to the isolation position on an actual or simulated actuation signal.
In accordance with the Surveillance Frequency Control Program SR  3.6.4.2.3 Verify each automatic SCIV actuates to the isolation position on an actual or simulated actuation signal.
In accordance with the Surveillance Frequency Control Program SGT System 3.6.4.3  JAFNPP 3.6.4.3-1 Amendment 276315 3.6  CONTAINMENT SYSTEMS 3.6.4.3  Standby Gas Treatment (SGT) System LCO  3.6.4.3 Two SGT subsystems shall be OPERABLE.
In accordance with the Surve illance Frequ e ncy Control Program SGT System 3.6.4.3  JAFNPP 3.6.4.3-1 Amendment 276 315 3.6  CONTAINMENT SYSTEMS 3.6.4.3  Standby Gas Treatment (SGT) System LCO  3.6.4.3 Two SGT subsystems shall be OPERABLE.
APPLICABILITY:
APPLICABILITY:
MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).
MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).
Line 602: Line 564:
OR    Immediately (continued)
OR    Immediately (continued)


SGT System 3.6.4.3  JAFNPP 3.6.4.3-2 Amendment 276315 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. (continued)
SGT System 3.6.4.3  JAFNPP 3.6.4.3-2 Amendment 276 315 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. (continued)
C.2.1  Suspend movement of recently irradiated fuel assemblies in secondary containment.
C.2.1  Suspend movement of recently irradiated fuel assemblies in secondary containment.
AND  C.2.2  Initiate action to suspend OPDRVs.
AND  C.2.2  Initiate action to suspend OPDRVs.
Immediately Immediately D. Two SGT subsystems inoperable in MODE 1, 2, or 3. D.1  Enter LCO 3.0.3.
Immediately Immediately D. Two SGT subsystems inoperable in MODE 1,     2, or 3. D.1  Enter LCO 3.0.3.
Immediately E. Two SGT subsystems  inoperable during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs.
Immediately E. Two SGT subsystems  inoperable during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs.
E.1  --------NOTE---------
E.1  --------NOTE---------   LCO 3.0.3 is not applicable.
LCO 3.0.3 is not applicable.
   -------------------------  Suspend movement of recently irradiated fuel assemblies in secondary containment.
   -------------------------  Suspend movement of recently irradiated fuel assemblies in secondary containment.
AND  E.2  Initiate action to suspend OPDRVs.
AND  E.2  Initiate action to suspend OPDRVs.
Immediately Immediately
Immediately Immediately


SGT System 3.6.4.3    JAFNPP 3.6.4.3-3 Amendment 301 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR  3.6.4.3.1 Operate each SGT subsystem for  10 continuous hours with heaters operating.
SGT System 3.6.4.3    JAFNPP 3.6.4.3-3 Amendment 301 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR  3.6.4.3.1 Operate each SGT subsystem for  10 continuous hours with heaters operating.
In accordance with the Surveillance Frequency Control Program  SR  3.6.4.3.2 Perform required SGT filter testing in accordance with the Ventilation Filter Testing Program (VFTP).
In accordance with the Surv eillance Freq uency Control Program  SR  3.6.4.3.2 Perform required SGT filter testing in accordance with the Ventilation Filter Testing Program (VFTP).
In accordance with the VFTP SR  3.6.4.3.3 Verify each SGT subsystem actuates on an actual or simulated initiation signal. In accordance With the Surveillance Frequency Control Program SR  3.6.4.3.4 Manually cycle each SGT subsystem filter cooling cross-tie valve.
In accordance with the VFTP SR  3.6.4.3.3 Verify each SGT subsystem actuates on an actual or simulated initiation signal. In accordance With the Surv eillance Freq uency Contr ol Program   SR  3.6.4.3.4 Manually cycle each SGT subsystem filter cooling cross-tie valve.
In accordance With the Surveillance Frequency Control Program CREVAS System 3.7.3  JAFNPP 3.7.3-1 Amendment 289315 3.7  PLANT SYSTEMS 3.7.3  Control Room Emergency Ventilation Air Supply (CREVAS) System LCO  3.7.3 Two CREVAS subsystems shall be OPERABLE.
In accordance With the Surv eillance Freq uency Control Program CREVAS System 3.7.3  JAFNPP 3.7.3-1 Amendment 2 89 315 3.7  PLANT SYSTEMS 3.7.3  Control Room Emergency Ventilation Air Supply (CREVAS) System LCO  3.7.3 Two CREVAS subsystems shall be OPERABLE.
   -----------------------------
   -----------------------------
------ NOTE ------------------------------
------ NOTE ------------------------------
Line 622: Line 583:
   -----------------------------------------------------------------------------------
   -----------------------------------------------------------------------------------
APPLICABILITY:
APPLICABILITY:
MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).
MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS  CONDITION REQUIRED ACTION COMPLETION TIME A. One CREVAS subsystem inoperable for reasons other than Condition B
ACTIONS  CONDITION REQUIRED ACTION COMPLETION TIME A. One CREVAS subsystem inoperable for reasons other than Condition B
. A.1  Restore CREVAS subsystem to OPERABLE status. 7 days  B. One or more CREVAS subsystems inoperable due to inoperable CRE boundary in MODE 1, 2, or 3. B.1 Initiate action to implement mitigating actions. AND  B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits. AND  B.3  Restore CRE boundary to OPERABLE status.
. A.1  Restore CREVAS subsystem to OPERABLE status. 7 days  B. One or more CREVAS subsystems inoperable due to inoperable CRE boundary in MODE 1, 2, or 3. B.1 Initiate action to implement mitigating actions. AND  B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits. AND  B.3  Restore CRE boundary to OPERABLE status.
Immediately 24 hours        90 days    (continued)
Immediately 24 hours        90 days    (continued)


CREVAS System 3.7.3  JAFNPP 3.7.3-2 Amendment 289315 ACTIONS  (continued)
CREVAS System 3.7.3  JAFNPP 3.7.3-2 Amendment 289 315 ACTIONS  (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and associated Completion Time of Condition A or B not met in MODE 1, 2, or 3. C.1  Be in MODE
CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and associated Completion Time of Condition A or B not met in MODE 1, 2, or 3. C.1  Be in MODE
: 3. AND  C.2  Be in MODE
: 3. AND  C.2  Be in MODE
Line 637: Line 598:
OR  D.2.1 Suspend movement of recently irradiated fuel assemblies in the secondary containment.
OR  D.2.1 Suspend movement of recently irradiated fuel assemblies in the secondary containment.
AND  D.2.2 Initiate action to suspend OPDRVs.      Immediately Immediately Immediately E. Two CREVAS subsystems inoperable in MODE 1, 2, or 3 for reasons other than Condition B.
AND  D.2.2 Initiate action to suspend OPDRVs.      Immediately Immediately Immediately E. Two CREVAS subsystems inoperable in MODE 1, 2, or 3 for reasons other than Condition B.
E.1  Enter LCO
E.1  Enter LCO 3.0.3. Immediately (continued)


====3.0.3. Immediately====
CREVAS System 3.7.3  JAFNPP 3.7.3-3 Amendment 301 315 ACTIONS  (continued)
    (continued)
 
CREVAS System 3.7.3  JAFNPP 3.7.3-3 Amendment 301315 ACTIONS  (continued)
CONDITION REQUIRED ACTION COMPLETION TIME F. Two CREVAS subsystems inoperable during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs. OR  One or more CREVAS subsystems inoperable due to an inoperable CRE boundary during movement of recently irradiated fuel in the secondary containment or during OPDRVs.
CONDITION REQUIRED ACTION COMPLETION TIME F. Two CREVAS subsystems inoperable during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs. OR  One or more CREVAS subsystems inoperable due to an inoperable CRE boundary during movement of recently irradiated fuel in the secondary containment or during OPDRVs.
   -------------
   -------------
Line 649: Line 607:
  ----------------------------------------
  ----------------------------------------
F.1 Suspend movement of recently irradiated fuel assemblies in the secondary containment.
F.1 Suspend movement of recently irradiated fuel assemblies in the secondary containment.
AND  F.2 Initiate action to suspend OPDRVs.      Immediately Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR  3.7.3.1 Operate each CREVAS subsystem for  15 minutes
AND  F.2 Initiate action to suspend OPDRVs.      Immediately Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR  3.7.3.1 Operate each CREVAS subsystem for  15 minutes. In accordance with the Surveillance Frequency Control Program  SR  3.7.3.2 Perform required CREVAS filter testing in accordance with the Ventilation Filter Testing Program (VFTP).
. In accordance with the Surveillance Frequency Control Program  SR  3.7.3.2 Perform required CREVAS filter testing in accordance with the Ventilation Filter Testing Program (VFTP).
In accordance with the VFTP (continued)
In accordance with the VFTP (continued)


CREVAS System 3.7.3  JAFNPP 3.7.3-4 Amendment 289  SURVEILLANCE REQUIREMENTS (continued)
CREVAS System 3.7.3  JAFNPP 3.7.3-4 Amendment 289  SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR  3.7.3.3 Perform required CRE unfiltered air in
SURVEILLANCE FREQUENCY SR  3.7.3.3 Perform required CRE unfiltered air in
-leakage testing in accordance with the control room Envelope Habitability Program. In accordance with the Control Room Envelope Habitability Program Control Room AC System 3.7.4  JAFNPP 3.7.4-1 Amendment 290  315  3.7  PLANT SYSTEMS 3.7.4  Control Room Air Conditioning (AC) System LCO  3.7.4 Two control room AC subsystems shall be OPERABLE.
-leakage testing in accordance with the control room Envelope Habitability Program. In accordance with the Control Room Envelope Habitability Program Control Room AC System 3.7.4  JAFNPP 3.7.4-1 Amendment 290  315  3.7  PLANT SYSTEMS 3.7.4  Control Room Air Conditioning (AC) System LCO  3.7.4 Two control room AC subsystems shall be OPERABLE.
APPLICABILITY:
APPLICABILITY:
MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment,  During operations with a potential for draining the reactor vessel (OPDRVs).
MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment,  During operations with a potential for draining the reactor vessel (OPDRVs). ACTIONS    CONDITION REQUIRED ACTION COMPLETION TIME A. One control room AC subsystem inoperable.
ACTIONS    CONDITION REQUIRED ACTION COMPLETION TIME A. One control room AC subsystem inoperable.
A.1    Restore control room AC subsystem to OPERABLE status. 30 days  B. Two control room AC subsystems inoperable.
A.1    Restore control room AC subsystem to OPERABLE status. 30 days  B. Two control room AC subsystems inoperable.
B.1    Verify control room area temperature  
B.1    Verify control room area temperature  
< 90 &deg;F. AND  B.2 Restore one control room AC subsystem to OPERABLE status.
< 90 &deg;F. AND  B.2 Restore one control room AC subsystem to OPERABLE status.
Once per 4 hours 72 hours  C. Required Action and associated Completion Time of Condition A or B not met in MODE 1, 2, or  
Once per 4 hours 72 hours  C. Required Action and associated Completion Time of Condition A or B not met in MODE 1, 2, or 3. C.1  Be in MODE 3.
: 3. C.1  Be in MODE 3.
AND  C.2  Be in MODE 4.
AND  C.2  Be in MODE 4.
12 hours    36 hours    (continued)
12 hours    36 hours    (continued)


Control Room AC System  3.7.4  JAFNPP 3.7.4-2 Amendment 290          315 ACTIONS  (continued)
Control Room AC System  3.7.4  JAFNPP 3.7.4-2 Amendment 290          315 ACTIONS  (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and associated Completion Time of Condition A not met during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs.
CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and associated Completion Time of Condition A not met during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs.
   - - - - - - - - -  NOTE - - - - - - - - - -  LCO 3.0.3 is not applicable.
   - - - - - - - - -  NOTE - - - - - - - - - -  LCO 3.0.3 is not applicable.
  - - - - - - - - - - - - - - - - - - - - - - - -  D.1  Place OPERABLE control room AC subsystem in operation.
  - - - - - - - - - - - - - - - - - - - - - - - -  D.1  Place OPERABLE control room AC subsystem in operation.
Line 677: Line 632:
AND  E.2 Initiate action to suspend OPDRVs.      Immediately Immediately SURVEILLANCE REQUIREMENTS
AND  E.2 Initiate action to suspend OPDRVs.      Immediately Immediately SURVEILLANCE REQUIREMENTS


Control Room AC System 3.7.4  JAFNPP 3.7.4-3 Amendment 301  SURVEILLANCE FREQUENCY SR  3.7.4.1 Verify each control room AC subsystem has the capability to remove the assumed heat load.
Control Room AC System 3.7.4  JAFNPP 3.7.4-3 Amendment 301  SURVEILLANCE FREQUENCY SR  3.7.4.1 Verify each control room AC subsystem has the capability to remove the assumed heat load.
In accordance with the Surveillance Frequency Control Program
In accordance with the Surveillance Frequency Control Program


AC Sources
AC Sources
  - Shutdown  3.8.2  JAFNPP 3.8.2-1 Amendment 276315 3.8  ELECTRICAL POWER SYSTEMS 3.8.2  AC Sources
  - Shutdown  3.8.2  JAFNPP 3.8.2-1 Amendment 276 315 3.8  ELECTRICAL POWER SYSTEMS 3.8.2  AC Sources
- Shutdown  LCO  3.8.2 The following AC electrical power sources shall be OPERABLE:
- Shutdown  LCO  3.8.2 The following AC electrical power sources shall be OPERABLE:
: a. One qualified circuit between the offsite transmission network and one division of the plant Class 1E AC  electrical power distribution subsystem(s) required by LCO 3.8.8, "Distribution Systems
: a. One qualified circuit between the offsite transmission network and one division of the plant Class 1E AC  electrical power distribution subsystem(s) required by LCO 3.8.8, "Distribution Systems
-Shutdown";
-Shutdown";
: b. One qualified circuit, which maybe the same circuit required by LCO 3.8.2.a, between the offsite transmission network and the other division of the plant Class 1E AC electrical power distribution subsystem(s),
: b. One qualified circuit, which maybe the same circuit required by LCO 3.8.2.a, between the offsite transmission network and the other division of the plant Class 1E AC electrical power distribution subsystem(s), when a second division is required by LCO 3.8.8; and  
when a second division is required by LCO 3.8.8; and  
: c. One emergency diesel generator (EDG) subsystem capable of supplying one division of the plant Class 1E AC  electrical power distribution subsystem(s) required by LCO 3.8.8. APPLICABILITY:
: c. One emergency diesel generator (EDG) subsystem capable of supplying one division of the plant Class 1E AC  electrical power distribution subsystem(s) required by LCO 3.8.8. APPLICABILITY:
MODES 4 and 5,  During movement of recently irradiated fuel assemblies in the secondary containment.
MODES 4 and 5,  During movement of recently irradiated fuel assemblies in the secondary containment.


AC Sources
AC Sources
  - Shutdown  3.8.2  JAFNPP 3.8.2-2 Amendment 276315 ACTIONS -------------------------------------------------
  - Shutdown  3.8.2  JAFNPP 3.8.2-2 Amendment 276 315 ACTIONS -------------------------------------------------
---------NOTE-----------------------------------------------------------
---------NOTE-----------------------------------------------------------
LCO 3.0.3 is not applicable.
LCO 3.0.3 is not applicable.
  -----------------------------------------------------------------------------------------------------------------------------
  -----------------------------------------------------------------------------------------------------------------------------
CONDITION REQUIRED ACTION COMPLETION TIME A. One or both required offsite circuits inoperable.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or both required offsite circuits inoperable.
   -------------------NOTE------------------
   -------------------NOTE------------------
Enter applicable Condition and Required Actions of LCO 3.8.8, when any required division is de
Enter applicable Condition and Required Actions of LCO 3.8.8, when any required division is de
-energized as a result of Condition A. --------------------------------------------
-energized as a result of Condition A. --------------------------------------------
-  A.1  Declare affected required feature(s),
-  A.1  Declare affected required feature(s),   with no offsite power available,   inoperable.
with no offsite power available, inoperable.
OR  A.2.1  Suspend CORE ALTERATIONS.
OR  A.2.1  Suspend CORE ALTERATIONS.
AND  A.2.2  Suspend movement of recently irradiated fuel assemblies in the secondary containment.
AND  A.2.2  Suspend movement of recently irradiated fuel assemblies in the secondary containment.
Line 707: Line 660:


AC Sources
AC Sources
  - Shutdown  3.8.2  JAFNPP 3.8.2-3 Amendment 276315 ACTIONSCONDITION REQUIRED ACTION COMPLETION TIME A. (continued)
  - Shutdown  3.8.2  JAFNPP 3.8.2-3 Amendment 276 315 ACTIONSCONDITION REQUIRED ACTION COMPLETION TIME A. (continued)
A.2.34 Initiate action to restore required offsite power circuit(s) to OPERABLE status.
A.2.3 4 Initiate action to restore required offsite power circuit(s) to OPERABLE status.
Immediately B. One required EDG subsystem inoperable.
Immediately B. One required EDG subsystem inoperable.
B.1  Suspend CORE ALTERATIONS.
B.1  Suspend CORE ALTERATIONS.
AND  B.2  Suspend movement of recently irradiated fuel assemblies in secondary containment.
AND  B.2  Suspend movement of recently irradiated fuel assemblies in secondary containment.
AND  B.3  Initiate action to suspend OPDRVs.
AND  B.3  Initiate action to suspend OPDRVs.
AND  B.34   Initiate action to restore required EDG subsystem to OPERABLE status. Immediately Immediately Immediately Immediately
AND  B.3 4   Initiate action to restore required EDG subsystem to OPERABLE status. Immediately Immediately Immediately Immediately


AC SourcesShutdown  3.8.2  JAFNPP 3.8.2-4 Amendment 274315 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR  3.8.2.1  ---------------------------NOTES---------------------
AC SourcesShutdown  3.8.2  JAFNPP 3.8.2-4 Amendment 27 4 315 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR  3.8.2.1  ---------------------------NOTES---------------------
: 1. The following SRs are not required to be performed:  SR 3.8.1.3, SR 3.8.1.8, SR 3.8.1.9, SR 3.8.1.11, SR 3.8.1.12, and SR 3.8.1.13.
: 1. The following SRs are not required to be performed:  SR 3.8.1.3, SR 3.8.1.8, SR 3.8.1.9, SR 3.8.1.11, SR 3.8.1.12, and SR 3.8.1.13.
: 2. SR 3.8.1.10 and SR 3.8.1.12 are not required to be met when associated ECCS subsystem(s) are not required to be OPERABLE per LCO 3.5.2, "ECCS-ShutdownRPV Water Inventory Control
: 2. SR 3.8.1.10 and SR 3.8.1.12 are not required to be met when associated ECCS subsystem(s) are not required to be OPERABLE per LCO 3.5.2, " ECCS-ShutdownRPV Water Inventory Control
." ------------------------------------------------------------
." ------------------------------------------------------------
For AC sources required to be OPERABLE the SRs of Specification 3.8.1, except SR 3.8.1.7, are applicable.
For AC sources required to be OPERABLE the SRs of Specification 3.8.1, except SR 3.8.1.7, are applicable.
In accordance with applicable SRs DC Sources
In accordance with applicable SRs DC Sources
- Shutdown  3.8.5  JAFNPP 3.8.5-1 Amendment 276 3.8  ELECTRICAL POWER SYSTEMS 3.8.5  DC SourcesShutdown  LCO  3.8.5 One 125 VDC electrical power subsystem shall be OPERABLE to support one division of the plant Class IE DC Electrical Power Distribution System required by LCO 3.8.8,  "Distribution Systems
- Shutdown  3.8.5  JAFNPP 3.8.5-1 Amendment 276 3.8  ELECTRICAL POWER SYSTEMS 3.8.5  DC SourcesShutdown  LCO  3.8.5 One 125 VDC electrical power subsystem shall be OPERABLE to support one division of the plant Class IE DC Electrical Power Distribution System required by LCO 3.8.8,  "Distribution Systems
-Shutdown."
-Shutdown."   APPLICABILITY:
APPLICABILITY:
MODES 4 and 5,  During movement of recently irradiated fuel assemblies in the secondary containment.
MODES 4 and 5,  During movement of recently irradiated fuel assemblies in the secondary containment.
ACTIONS  -----------------------------------------------------------NOTE----------------------------------------------------------
ACTIONS  -----------------------------------------------------------NOTE----------------------------------------------------------
LCO 3.0.3 is not applicable.
LCO 3.0.3 is not applicable.
  -----------------------------------------------------------------------------------------------------------------------------
  -----------------------------------------------------------------------------------------------------------------------------
CONDITION REQUIRED ACTION COMPLETION TIME A. Required DC electrical power subsystem inoperable.
CONDITION REQUIRED ACTION COMPLETION TIME A. Required DC electrical power subsystem inoperable.
A.1  Declare affected required feature(s) inoperable.
A.1  Declare affected required feature(s) inoperable.
OR  A.2.1 Suspend CORE ALTERATIONS.
OR  A.2.1 Suspend CORE ALTERATIONS.
Line 735: Line 687:


DC Sources
DC Sources
  -Shutdown  3.8.5  JAFNPP 3.8.5-2 Amendment 274315 ACTIONS CONDITIONS REQUIRED ACTION COMPLETION TIME A. (continued)
  -Shutdown  3.8.5  JAFNPP 3.8.5-2 Amendment 27 4 315 ACTIONS CONDITIONS REQUIRED ACTION COMPLETION TIME A. (continued)
A.2.3 Initiate action to suspend operations with a potential for draining the reactor vessel. AND  A.2.34 Initiate action to restore required DC electrical power subsystem to OPERABLE status. Immediately Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR  3.8.5.1 -----------------------NOTE--------------------
A.2.3 Initiate action to suspend operations with a potential for draining the reactor vessel. AND  A.2.3 4 Initiate action to restore required DC electrical power subsystem to OPERABLE status. Immediately Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR  3.8.5.1 -----------------------NOTE--------------------
--  The following SRs are not required to be performed:  SR 3.8.4.2, SR 3.8.4.3, and SR 3.8.4.4.  ------------------------------------------------------
--  The following SRs are not required to be performed:  SR 3.8.4.2, SR 3.8.4.3, and SR 3.8.4.4.  ------------------------------------------------------
For DC electrical power subsystem required to be OPERABLE the following SRs are applicable:
For DC electrical power subsystem required to be OPERABLE the following SRs are applicable:
SR 3.8.4.1, SR 3.8.4.2, SR 3.8.4.3, and SR 3.8.4.4.        In accordance with applicable SRs Distribution Systems
SR 3.8.4.1, SR 3.8.4.2, SR 3.8.4.3, and SR 3.8.4.4.        In accordance with applicable SRs Distribution Systems
- Shutdown  3.8.8  JAFNPP 3.8.8-1 Amendment 276315 3.8  ELECTRICAL POWER SYSTEMS 3.8.8  Distribution SystemsShutdown  LCO  3.8.8 The necessary portions of the AC and 125 VDC electrical power distribution subsystems shall be OPERABLE to support equipment required to be OPERABLE.
- Shutdown  3.8.8  JAFNPP 3.8.8-1 Amendment 276 315 3.8  ELECTRICAL POWER SYSTEMS 3.8.8  Distribution SystemsShutdown  LCO  3.8.8 The necessary portions of the AC and 125 VDC electrical power distribution subsystems shall be OPERABLE to support equipment required to be OPERABLE.
APPLICABILITY:
APPLICABILITY:
MODES 4 and 5,  During movement of recently irradiated fuel assemblies in the secondary containment.
MODES 4 and 5,  During movement of recently irradiated fuel assemblies in the secondary containment.
Line 747: Line 699:
LCO 3.0.3 is not applicable.
LCO 3.0.3 is not applicable.
  -------------------------------------------------------------------------------------------------------------------------
  -------------------------------------------------------------------------------------------------------------------------
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required AC or 125 VDC electrical power distribution subsystems inoperable.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required AC or 125 VDC electrical power distribution subsystems inoperable.
A.1  Declare associated supported required feature(s) inoperable.
A.1  Declare associated supported required feature(s) inoperable.
OR  A.2.1  Suspend CORE ALTERATIONS.
OR  A.2.1  Suspend CORE ALTERATIONS.
Line 754: Line 706:


Distribution Systems
Distribution Systems
  - Shutdown  3.8.8  JAFNPP 3.8.8-2 Amendment 301315 ACTIONS (continued)
  - Shutdown  3.8.8  JAFNPP 3.8.8-2 Amendment 301 315 ACTIONS (continued)
A. (continued)
A. (continued)
A.2.3 Initiate action to suspend operations with a potential for draining the reactor vessel. AND  A.2.34 Initiate actions to restore required AC and 125 VDC electrical power distribution subsystems to OPERABLE status.
A.2.3 Initiate action to suspend operations with a potential for draining the reactor vessel. AND  A.2.3 4 Initiate actions to restore required AC and 125 VDC electrical power distribution subsystems to OPERABLE status.
AND  A.2.45 Declare associated required shutdown cooling subsystem(s) inoperable.
AND  A.2.4 5 Declare associated required shutdown cooling subsystem(s) inoperable.
Immediately Immediately Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR  3.8.8.1  Verify correct breaker alignments and voltage to required AC and 125 VDC electrical power distribution subsystems.
Immediately Immediately Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR  3.8.8.1  Verify correct breaker alignments and voltage to required AC and 125 VDC electrical power distribution subsystems.
In accordance with the Surveillance Frequency Control Program}}
In accordance with the Surveillance Frequency Control Program}}

Revision as of 14:30, 7 July 2018

Pre-Submittal Draft FitzPatrick TSTF-542 Combined Markups (Technical Specifications Only)
ML17261A743
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/18/2017
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Venkataraman, B, NRR/DORL/LPL1
References
Download: ML17261A743 (62)


Text

TABLE OF CONTENTS JAFNPP i Amendment 287 1.0 USE AND APPLICATION

1.1 Definitions

................................

................................

..........................

1.1-1 1.2 Logical Connectors

................................

................................

............

1.2-1 1.3 Completion Times

................................

................................

..............

1.3-1 1.4 Frequency ................................

................................

..........................

1.4-1 2.0 SAFETY LIMITS (SLs) 2.1 SLs ................................

................................

................................

... 2.0-1 2.2 SL Violations

................................

................................

......................

2.0-1 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY ..........

3.0-1 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY

.........................

3.0-3 3.1 REACTIVITY CONTROL SYSTEMS 3.1.1 SHUTDOWN MARGIN (SDM)

................................

...........................

3.1.1-1 3.1.2 Reactivity Anomalies

................................

................................

..........

3.1.2-1 3.1.3 Control Rod OPERABILITY

................................

...............................

3.1.3-1 3.1.4 Control Rod Scram Times

................................

................................

.. 3.1.4-1 3.1.5 Control Rod Scram Accumulators

................................

......................

3.1.5-1 3.1.6 Rod Pattern Control

................................

................................

...........

3.1.6-1 3.1.7 Standby Liquid Control (SLC) System

................................

................

3.1.7-1 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves

....................

3.1.8-1 3.2 POWER DISTRIBUTION LIMITS 3.2.1 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)3.2.1

-1 3.2.2 MINIMUM CRITICAL POWER RATIO (MCPR)

................................

.. 3.2.2-1 3.2.3 LINEAR HEAT GENERATION RATE (LHGR)

................................

... 3.2.3-1 3.3 INSTRUMENTATION 3.3.1.1 Reactor Protection System (RPS) Instrumentation

............................

3.3.1.1-1 3.3.1.2 Source Range Monitor (SRM)

Instrumentation

................................

... 3.3.1.2-1 3.3.2.1 Control Rod Block Instrumentation

................................

.....................

3.3.2.1-1 3.3.2.2 Feedwater and Main Turbine High Water Level Trip Instrumentation

................................

................................

... 3.3.2.2-1 3.3.3.1 Post Accident Monitoring (PAM) Instrumentation

...............................

3.3.3.1-1 3.3.3.2 Remote Shutdown System ................................

................................

. 3.3.3.2-1 3.3.4.1 Anticipated Transient Without Scram Recirculation Pump Trip (ATWS

-RPT) Instrumentation

................................

... 3.3.4.1-1 3.3.5.1 Emergency Core Cooling System (ECCS) Instrumentation

................

3.3.5.1-1 3.3.5.2 Reactor Pressure Vessel (RPV) Water Inventory Control -1 3.3.5.2 3 Reactor Core Isolation Cooling (RCIC) System Instrumentation

................................

................................

..........

3.3.5.2 3-1 3.3.6.1 Primary Containment Isolation Instrumentation

................................

.. 3.3.6.1-1 3.3.6.2 Secondary Containment Isolation Instrumentation .............................

3.3.6.2-1 3.3.7.1 Control Room Emergency Ventilation Air Supply (CREVAS)

System Instrumentation

................................

.............................

3.3.7.1-1 3.3.7.2 Condenser Air Removal Pump Isolation Instrumentation

...................

3.3.7.2-1 3.3.7.3 Emergency Service Water (ESW) System Instrumentation

................

3.3.7.3-1 TABLE OF CONTENTS JAFNPP i Amendment 287

(continued)

TABLE OF CONTENTS JAFNPP ii Amendment 274 3.3 INSTRUMENTATION (continued) 3.3.8.1 Loss of Power (LOP) Instrumentation

................................

........ 3.3.8.1-1 3.3.8.2 Reactor Protection System (RPS) Electric Power Monitoring

................................

................................

...........

3.3.8.2-1 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.1 Recirculation Loops Operating

................................

...................

3.4.1-1 3.4.2 Jet Pumps ................................

................................

..................

3.4.2-1 3.4.3 Safety/Relief Valves (S/RVs)

................................

......................

3.4.3-1 3.4.4 RCS Operational LEAKAGE

................................

.......................

3.4.4-1 3.4.5 RCS Leakage Detection Instrumentation

................................

... 3.4.5-1 3.4.6 RCS Specific Activity

................................

................................

.. 3.4.6-1 3.4.7 Residual Heat Removal (RHR) Shutdown Cooling System Hot Shutdown

................................

.....................

3.4.7-1 3.4.8 Residual Heat Removal (RHR) Shutdown Cooling System Cold Shutdown ................................

...................

3.4.8-1 3.4.9 RCS Pressure and Temperature (P/T) Limits

.............................

3.4.9-1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS), RPV WATER INVENTORY CONTROL, AND REACT OR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS Operating ................................

................................

..... 3.5.1-1 3.5.2 RPV Water Inventory Control ECCS Shutdown ........................

3.5.2-1 3.5.3 RCIC System

................................

................................

.............

3.5.3-1 3.6 CONTAINMENT SYSTEMS 3.6.1.1 Primary Containment

................................

................................

. 3.6.1.1-1 3.6.1.2 Primary Containment Air Locks

................................

..................

3.6.1.2-1 3.6.1.3 Primary Containment Isolation Valves (PCIVs)

..........................

3.6.1.3-1 3.6.1.4 Drywell Pressure

................................

................................

........ 3.6.1.4-1 3.6.1.5 Drywell Air Temperature

................................

.............................

3.6.1.5-1 3.6.1.6 Reactor Building

-to-Suppression Chamber Vacuum Breakers

... 3.6.1.6-1 3.6.1.7 Suppression Chamber

-to-Drywell Vacuum Breakers

..................

3.6.1.7-1 3.6.1.8 Main Steam Leakage Collection (MSLC) System

.......................

3.6.1.8-1 3.6.1.9 Residual Heat Removal (RHR) Containment Spray System

....... 3.6.1.9-1 3.6.2.1 Suppression Pool Average Temperature

................................

.... 3.6.2.1-1 3.6.2.2 Suppression Pool Water Level

................................

...................

3.6.2.2-1 3.6.2.3 Residual Heat Removal (RHR) Suppression Pool Cooling ......... 3.6.2.3-1 3.6.2.4 Drywell-to-Suppression Chamber Differential Pressure

..............

3.6.2.4-1 3.6.3.1 Primary Containment System Concentration

..............................

3.6.3.1-1 3.6.3.2 Containment Atmosphere Dilution (CAD) System

......................

3.6.3.2-1 3.6.4.1 Secondary Containment

................................

.............................

3.6.4.1-1 3.6.4.2 Secondary Containment Isolation Valves (SCIVs)

......................

3.6.4.2-1 3.6.4.3 Standby Gas Treatment (SGT) System

................................

...... 3.6.4.3-1 3.7 PLANT SYSTEMS 3.7.1 Residual Heat Removal Service Water (RHRSW) System

......... 3.7.1-1 3.7.2 Emergency Service Water (ESW) System and Ultimate Heat Sink (UMS)

................................

................................

. 3.7.2-1 (continued)

Formatted: Indent: Left: 0", Hanging: 1.08" TABLE OF CONTENTS JAFNPP ii Amendment 274

JAFNPP 1.1-2a Amendment 315 1.1 Definitions (continued)

DRAIN TIME The DRAIN TIME is the time it would take for the water inventory in and above the Reactor Pressure Vessel (RPV) to drain to the top of the active (TAF) seated in the RPV assuming: a) The water inventory above the TAF is divided by the limiting drain rate:

b) The limiting drain rate is the larger of the drain rate through a single penetration flow path with the highest flow rate, or the sum of the drain rates through multiple penetration flow paths susceptible to a common mode failure (e.g., seismic event, loss of normal power, single human error), for all penetration flow paths below the TAF except:

1. Penetration flow paths connected to an intact closed system, or isolated by manual or automatic valves that are locked, sealed or otherwise secured in the closed position, blank flanges, or other devices that prevent flow of reactor coolant through the penetration flow paths;
2. Penetration flow paths capable of being isolated by valves that will close automatically without offsite power prior to the RPV water level being equal to the TAF when actuated by RPV water level isolation instrumentation; or
3. Penetration flow paths with isolation devices that can be closed prior to the RPV water level being equal to the TAF by a dedicated operator trained in the task, who in continuous communication with the control room, is stationed at the controls, and is capable of closing the penetration flow path isolation device without offsite power.

c) The penetration flow paths required to be evaluated per paragraph b) are assumed to open instantaneously and are not subsequently isolated, and no water is assumed to be subsequently added to the RPV water inventory; d) No additional draining events occur; and e) Realistic cross-sectional areas and drain rates are used A Bounding DRAIN TIME may be used in lieu of a calculated value. (continued)

ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-1 Amendment 274 315 3.3 INSTRUMENTATION 3.3.5.1 Emergency Core Cooling System (ECCS) Instrumentation LCO 3.3.5.1 The ECCS instrumentation for each Function in Table 3.3.5.1

-1 shall be OPERABLE.

APPLICABILITY:

According to Table 3.3.5.1

-1. ACTIONS - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - NOTE- - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - Separate Condition entry is allowed for each channel.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels inoperable

. A.1 Enter the Condition referenced in Table 3.3.5.1

-1 for the channel.

Immediately B. As required by Required Action A.1 and referenced in Table 3.3.5.1

-1. B.1 - - - - - -NOTE S- - - - -- 1. Only applicable in MODES 1, 2, and 3. 2. Only applicable for functions 1.a, 1.b, 2.a, and 2.b. - - - - - - - - - - - - - - - - Declare supported feature(s) inoperable when its redundant feature ECCS initiation capability is inoperable.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery of loss of initiation capability for feature(s) in both divisions.

AND (continued)

ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-2 Amendment 274 315 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. (continued)

B.2 - - - - - -NOTE - - - - - - Only applicable for functions 3.a and 3.b. - - - - - - - - - - - - - - - - - Declare High Pressure Coolant Injection (HPCI) System inoperable.

AND B.3 Place cha nnel in trip. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery of loss of HPCI initiation capability 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> C. As required by Required Action A.1 and referenced in Table 3.3.5.1

-1. C.1 - - - - - -NOTE S- - - - - - 1. Only applicable in MODES 1, 2, and 3. 2. Only applicable for functions 1.c, 1.d, 2.c , 2.d, and 2.f. - - - - - - - - - - - - - - - - Declare supported feature(s) inoperable when its redundant feature ECCS initiation capability is inoperable.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery of loss of initiation capability for feature(s) in both divisions.

AND C.2 Restore channel to OPERABLE status.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (continued)

ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-3 Amendment 274 315 ACTIONS (continued CONDITION REQUIRED ACTION COMPLETION TIME D. As required by Required Action A.1 and referenced in Table 3.3.5.1-1. D.1 - - - - - -NOTE- - - - - - Only applicable if HPCI pump suction is not aligned to the suppression pool.

. - - - - - - - - - - - - - - - - - Declare HPCI System inoperable.

AND D.2.1 Place channel in trip. OR D.2.2 Align the HPCI pump suction to the suppression pool.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery of loss of HPCI initiation capability 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (continued)

ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-4 Amendment 274 315 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. As required by Required Action A.1 and referenced in Table 3.3.5.1

-1. E.1 - - - - - -NOTE S- - - - - - 1. Only Applicable in MODES 1, 2, and 3. 2. Only applicable for functions 1.e, 1.f, and 2.g. .. - - - - - - - - - - - - - - - - - Declare supported Feature(s) inoperable when its redundant feature ECCS Initiation capability Is inoperable AND E.2 Restore channel to OPERABLE status.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery of loss of initiation capability for subsystems in both divisions.

7 days (continu ed)

ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-5 Amendment 274 315 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME F. As required by Required Action A.1 and referenced in Table 3.3.5.1

-1. F.1 Declare Automatic Depressurization System (ADS) valves inoperable.

AND F.2 Place channel in trip. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery of loss of ADS initiation capability in both trip systems. 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> from discovery of inoperable channel concurrent with HPCI or reactor core isolation cooling (RCIC) inoperable.

AND 8 days G. As required by Required Action A.1 and referenced in Table 3.3.5.1

-1. G.1 Declare ADS valves inoperable.

AND 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery of loss of ADS initiation capability to both trip systems. (continued)

ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-6 Amendment 274 315 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME G. (continued)

G.2 Restore channel to OPERABLE status.

96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> from discovery of inoperable channel concurrent with HPCI or RCIC inoperable.

AND 8 days H. Required Action and associated Completion Time of Condition B, C, D, E, F, or G not met. H.1 Declare associated supported feature(s) inoperable.

Immediately

ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-7 Amendment 301 SURVEILLANCE REQUIREMENTS

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -NOTES- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1. Refer to Table 3.3.5.1

-1 to determine which SRs apply for each ECCS Function.

2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 3.c, 3.f, and 3.g; and (b) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions other than 3.c, 3.f, and 3.g provided the associated Function or the redundant Function maintains ECCS initiation capability.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SURVELLANCE FREQUENCY SR 3.3.5.1.1 Perform CHANNEL CHECK.

In accordance with the Surveillance Frequency Control Progra m SR 3.3.5.1.2 Perform CHANNEL FUNCTIONAL TEST.

In accordance with the Surveillance Frequency Control Progra m SR 3.3.5.1.3 Perform CHANNEL CALIBRATION.

In accordance with the Surveillance Frequency Control Progra m SR 3.3.5.1.4 Calibrate the trip units.

In accordance with the Surveillance Frequency Control Progra m SR 3.3.5.1.5 Perform CHANNEL CALIBRATION.

In accordance with the Surveillance Frequency Control Progra m SR 3.3.5.1.6 Perform LOGIC SYSTEM FUNCTIONAL TEST.

In accordanc e with the Surveillance Frequency Control Progra m ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-8 Amendment 274 315 Table 3.3.5.1

-1 (page 1 of 5)

Emergency Core Cooling System Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE 1. Core Spray System

a. Reactor Vessel Water Level Low Low Low (Level 1) 1, 2, 3, 4(a), 5(a) 4 (a b) B SR 3.3.5.1.1 SR 3.3.5.1.

2 SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6 18 inches

b. Drywell Pressure - High 1, 2, 3 4 (a b) B SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6
c. Reactor Pressure Low (Injection Permissive) 1, 2, 3 4 C SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6 and 90 psig 4 (a), 5(a) 4 B SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6 and 90 psig d. Core Spray Pump Start Time Delay Relay 1, 2, 3 , 4(a), 5(a) 1 per pump C SR 3.3.5.1.5 SR 3.3.5.1.6 seconds e. Core Spray Pump Discharge Flow Low (Bypass) 1, 2, 3 , 4(a), 5(a) 1 per pump E SR 3.3.5.1.5 SR 3.3.5.1.6 and f. Core Spray Pump Discharge Pressure High (Bypass) 1, 2, 3 , 4 (a), 5(a) 1 per pump E SR 3.3.5.1.3 SR 3.3.5.1.6 110 psig 2. Low Pressure Coolant Injection (LPCI) System
a. Reactor Vessel Water Level Low Low Low (Level 1) 1, 2, 3 , 4(a), 5(a) 4 (a b) B SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6 (continued) a) When associated ECCS subsystem(s) are required to be OPERABLE per LCO 3.5.2, ECCS Shutdown. b)a) Also required to initiate the associated emergency diesel generator subsystem.

ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-9 Amendment 274 315 Table 3.3.5.1

-1 (page 2 of 5)

Emergency Core Cooling System Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE 2. LPCI System (continued)

b. Drywell Pressure - High 1, 2, 3 , 4 (a b) B SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6
c. Reactor Pressure Low (Injection Permissive) 1, 2, 3 4 C SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6 and 4(a), 5(a) 4 B SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6 and d. Reactor Pressure Low (Recirculation Discharge Valve Permissive) 1 (b c), 2 (b c), 3 (b c) 4 C SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6 295 psig e. Reactor Vessel Shroud Level (Level 0) 1, 2, 3 2 B SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6 1.0 inches f. Low Pressure Coolant Injection Pump Start Time Delay Relay 1, 2, 3 , 4(a), 5(a) 1 per pump C SR 3.3.5.1.5 SR 3.3.5.1.6 Pumps A , D 1.51 seconds Pumps B , C 6.73 seconds (continued) a) When associated ECCS subsystem(s) are required to be OPERABLE per LCO 3.5.2.

b)a) Also required to initiate the associated emergency diesel generator subsystem.

c)b) With associated recirculation pump discharge valve open.

ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-10 Amendment 274 315 Table 3.3.5.1

-1 (page 3 of 5)

Emergency Core Cooling System Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE 2. LPCI System (continued)

g. Low Pressure Coolant Injection Pump Discharge Flow Low (Bypass) 1, 2, 3 , 4(a), 5(a) 1 per subsystem E SR 3.3.5.1.5 SR 3.3.5.1.6 040 gpm and h. Containment Pressure - High 1, 2, 3 4 B SR 3.3.5.1.

3 SR 3.3.5.1.6

3. High Pressure Coolant Injection (HPCI) System
a. Reactor Vessel Water Level Low Low (Level 2) 1, 2 (c d), 3 (c d) 4 B SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6 126.5 inches b. Drywell Pressure - High 1, 2 (c d), 3 (c d) 4 B SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6 2.7 psig c. Reactor Vessel Water Level High (Level 8) 1, 2 (c d), 3 (c d) 2 C SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6 222.5 inches d. Condensate Storage Tank Level - Low 1, 2 (c d), 3 (c d) 4 D SR 3.3.5.1.3 SR 3.3.5.1.6 59.5 inches
e. Suppression Pool Water Level High 1, 2 (c d), 3 (c d) 2 D SR 3.3.5.1.3 SR 3.3.5.1.6 14.5 ft f. High Pressure Coolant Injection Pump Discharge Flow

- :Low (Bypass) 1, 2 (c d), 3 (c d) 1 E SR 3.3.5.1.5 SR 3.3.5.1.6 and 800 gpm g. High Pressure Coolant Injection Pump Discharge Pressure High (Bypass) 1, 2 (c d), 3 (c d) 1 E SR 3.3.5.1.3 SR 3.3.5.1.6 and 80 psig (continued) a) When associated ECCS subsystem(s) are required to be OPERABLE per LCO 3.5.2.

c) With rector steam dose pressure > 150 psig.

ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-11 Amendment 274 315 Table 3.3.5.1

-1 (page 4 of 5)

Emergency Core Cooling System Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE 4. Automatic Depressurization System (ADS) Trip System A

a. Reactor Vessel Water Level Low Low Low (Level 1) 1, 2 (c d), 3 (c d) 2 F SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6 18 inches b. Automatic Depressurization System Initiation Timer 1, 2 (c d), 3 (c d) 1 G SR 3.3.5.1.5 SR 3.3.5.1.6 134 seconds
c. Reactor Vessel Water Level Low (Level
3) 1, 2 (c d), 3 (c d) 1 F SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6 177 inches d. Core Spray Pump Discharge Pressure - High 1, 2 (c d), 3 (c d) 2 G SR 3.3.5.1.3 SR 3.3.5.1.6 90 psig and 110 psig e. Low Pressure Coolant Injection Pump Discharge Pressure - High 1, 2 (c d), 3 (c d) 4 G SR 3.3.5.1.

3 SR 3.3.5.1.6 105 psig and 145 psig 5. ADS Trip System B

a. Reactor Vessel Water Level Low Low Low (Level 1) 1, 2 (c d), 3 (c d) 2 F SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6 18 inches b. Automatic Depressurization System Initiation Timer 1, 2 (c d), 3 (c d) 1 G SR 3.3.5.1.

5 SR 3.3.5.1.6 134 seconds (continued)

c. With rector steam dose pressure > 150 psig.

ECCS Instrumentation 3.3.5.1 JAFNPP 3.3.5.1-12 Amendment 274 315 Table 3.3.5.1

-1 (page 5 of 5)

Emergency Core Cooling System Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE 5. ADS Trip System B (continued)

c. Reactor Vessel Water Level Low (Level 3) 1, 2 (c d), 3 (c d) 1 F SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6
d. Core Spray Pump Discharge Pressure - High 1, 2 (c d), 3 (c d) 2 G SR 3.3.5.1.3 SR 3.3.5.1.6 90 psig and e. Low Pressure Coolant Injection Pump Discharge Pressure - High 1, 2 (c d), 3 (c d) 4 G SR 3.3.5.1.

3 SR 3.3.5.1.

6 105 psig and 145 psig (continued) d)c) With rector steam dose pressure > 150 psig.

RPV Water Inventory C ontrol Instrumentation 3.3.5.2 JAFNPP 3.3.5.2-1 Amendment 315 3.3 INSTRUMENTAT I O N 3.3.5.2 Reactor Pressure Vess e l (RPV) Wa t er Inventory Control Inst rumentation LCO 3.3.5.2 The RPV Water Inventory Control instrumentation for each Function in Table 3.3.5.2-1 shall be OPERABLE. APPLICAB ILITY: According to Table 3.3.5.2-1. ACTIONS ---------------




NO T E-----------




Separate Condition ent r y is allowed for each ch annel. ---------------








CONDITION REQUIR E D ACTION COMPLET I ON T I M E A. O ne or more channels inoperable.

A.1 Enter the Condition referenced in Table 3.3.5.2-1 for the channel. Immediately B. A s required by Required Action A.1 and referenced in Table 3.3.5.2-1. B.1 Declare associated penetration flow path(s) incapable of automatic isolation.

AND B.2 Calculate DRAIN T I M E. Immediately Immediately C. A s required by Required Action A.1 and referenced in Table 3.3.5.2-1. C.1 Place chan n el in trip. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> D. A s required by Required Action A.1 and referenced in Table 3.3.5.2-1. D.1 Restore ch a nnel to OP ERAB LE status. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> RPV Water Inventory C ontrol Instrumentation 3.3.5.2 JAFNPP 3.3.5.2-2 Amendment 315 ACTIONS (continued)

CONDITION REQUIR E D ACTION COMPLET I ON T I M E E. Required Action and associa t ed Completion Time of Condition C or D not met. E.1 Declare associated low pressure ECCS injection/sp r ay subsystem inoperable.

Immediately SUR VEILL ANCE REQU IREMENTS ---------------




NO T E-----------




Refer to Table 3.3.5.2-1 t o determine which SRs apply for each ECCS F unction. ---------------








SUR VEILL A NCE FREQUENCY SR 3.3.5.2.1 Perform CHANNEL CHECK. In accorda n ce with the Surveillance Frequency Control Program SR 3.3.5.2.2 Perform CHANNEL FUNCTIONAL TEST. In accorda n ce with the Surveillance Frequency Control Program SR 3.3.5.2.3 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accorda n ce with the Surveillance Frequency Control Program RPV Water Inventory C ontrol Instrumentation 3.3.5.2 JAFNPP 3.3.5.2-3 Amendment 315 Table 3.3.5.2-1 (page 1 of 1) RPV Water Inventory C ontrol Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE 1. Core Spray

a. a. Reactor Pressure Low (Injection Permissive) 4, 5 4 C SR 3.3.5.2.1 SR 3.3.5.2.2

< 490 psig b. b. Core Spray Pump Discharge Flow Low (Bypass) 4, 5 1 per pump (a) D SR 3.3.5.2.1 SR 3.3.5.2.2

> 510 gpm and < 980 gpm c. c. Manual Initiation 4, 5 1 per subsystem (a) D SR 3.3.5.2.3 NA 2. Low Pressure Coolant Injection (LPCI) System

a. a. Reactor Pressure Low (Injection Permissive) 4, 5 4 C SR 3.3.5.2.1 SR 3.3.5.2.2

< 490 psig b. b. Low Pressure Coolant Injection Pump Discharge Flow Low (Bypass) 4, 5 1 per pump (a) D SR 3.3.5.2.1 SR 3.3.5.2.2

> 1040 gpm and < 1665 gpm c. c. Manual Initiation 4, 5 1 per subsystem (a) D SR 3.3.5.2.3 NA 3. Residual Heat Removal System Isolation

a. a. Reactor Vessel Water Level Low, Level 3 (b) 2 in one trip system B SR 3.3.5.2.1 SR 3.3.5.2.2

> 177 inches

4. Reactor Water Cleanup System Isolation
a. a. Reactor Vessel Water Level Low Level 3 (b) 2 in one trip system B SR 3.3.5.2.1 SR 3.3.5.2.2

> 177 inches (b) When automatic isolation of the associated penetration flow path(s) is credited in calculating DRAIN TIME.

RCIC System Instrumentation 3.3.5.3 2 JAFNPP 3.3.5.3 2-1 Amendment 274 315 3.3 INSTRUMENTATION 3.3.5.3 2 Reactor Core Isolation Cooling (RCIC) System Instrumentation LCO 3.3.5.3 2 The RCIC System instrumentation for each Function in Table 3.3.5.

3 2-1 shall be OPERABLE. APPLICABILITY:

MODE 1, MODES 2 and 3 with reactor steam dome pressure > 150 psig ACTIONS - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - NOTE- - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - Separate Condition entry is allowed for each channel.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels inoperable

. A.1 Enter the Condition referenced in Table 3.3.5.

3 2-1 for the channel.

Immediately B. As required by Required Action A.1 and referenced in Table 3.3.5.

3 2-1. B.1 Declare RCIC System inoperable.

AND 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery of loss of RCIC initiation capability B.2 Place channel in Trip. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> C. As required by Required Action A.1 and referenced in Table 3.3.5.

3 2-1. C.1 Restore channel in OPERABLE status.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (continued)

RCIC System Instrumentation 3.3.5.3 2 JAFNPP 3.3.5.3 2-2 Amendment 274 315 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. As required by Required Action A.1 and referenced in Table 3.3.5.

3 2-1. D.1 - - - - - -NOTE- - - - - - - Only applicable if RCIC pump suction is not aligned to the suppression pool.

- - - - - - - - - - - - - - - - - Declare (R CI C) System inoperable.

AND 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery of loss of automatic R CI C initiation capability D.2.1 Place channel in trip. OR 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> D.2.2 Align RCIC pump suction to the suppression pool.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> E. Required Action and associated Completion Time of Condition B, C, or D not met.

E.1 Declare RCIC System inoperable.

Immediately

RCIC System Instrumentation 3.3.5.3 2 JAFNPP 3.3.5.3 2-3 Amendment 301 315 SURVEILLANCE REQUIREMENTS

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -NOTES- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1. Refer to Table 3.3.5.

3 2-1 to determine which SRs apply for each RCIC Function. 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 2 and 4; and (b) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> fo r Functions 1 and 3 provided the associated Function maintains RCIC initiation capability.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SURVELLANCE FREQUENCY SR 3.3.5.3 2.1 Perform CHANNEL CHECK.

In accordance with the Surveillance Frequency Control Progra m SR 3.3.5.3 2.2 Perform CHANNEL FUNCTIONAL TEST.

In accordance with the Surveillance Frequency Control Progra m SR 3.3.5.3 2.3 Perform CHANNEL CALIBRATION.

In accordance with the Surveillance Frequency Control Progra m SR 3.3.5.3 2.4 Calibrate the trip units.

In accordance with the Surveillance Frequency Control Progra m SR 3.3.5.3 2.5 Perform CHANNEL CALIBRATION.

In accordance with the Surveillance Frequency Control Progra m SR 3.3.5.3 2.6 Perform LOGIC SYSTEM FUNCTIONAL TEST.

In accordance with the Surveillance Frequency Control Progra m RCIC System Instrumentation 3.3.5.3 2 JAFNPP 3.3.5.3 2-4 Amendment 274 315 Table 3.3.5.

3 2-1 Reactor Core Isolation Cooling System Instrumentation (Page 1 of 1) FUNCTION REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE 1. Reactor Vessel Water Level Low Low (Level 2) 4 B SR 3.3.5.

3 2.1 SR 3.3.5.

3 2.2 SR 3.3.5.

3 2.4 SR 3.3.5.

3 2.5 SR 3.3.5.

3 2.6 2. Reactor Vessel Water Level High (Level 8) 2 C SR 3.3.5.

3 2.1 SR 3.3.5.

3 2.2 SR 3.3.5.

3 2.4 SR 3.3.5.

3 2.5 SR 3.3.5.

3 2.6 3. Condensate Storage Tank Level - Low 4 D SR 3.3.5.

3 2.3 SR 3.3.5.

3 2.6 4. Manual Initiat ion 1 C SR 3.3.5.

3 2.6 NA Primary Containment Isolation Instrumentation 3.3.6.1 JAFNPP 3.3.6.1-3 Amendment 274 315 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME H. Required Action and associated Completion Time of Condition F or G not met.

OR As required by Required Action C

.1 and referenced in Table 3.3.6.1

-1. H.1 Be in MODE 3.

AND H.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I. As required by Required Action C.1 and referenced in Table 3.3.6.1

-1. I.1 Declare associated standby liquid control subsystem (SLC) inoperable.

OR I.2 Isolate the Reactor Water Cleanup System.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> J. As required by Required Action C.1 and referenced in Table 3.3.6.1

-1. J.1 Initiate action to restore channel to OPERABLE status.

OR J.2 Initiate action to isolate the Residual Heat Removal (RHR) Shutdown Cooling System. Immediately Immediately

Primary Containment Isolation Instrumentation 3.3.6.1 JAFNPP 3.3.6.1-10 Amendment 298 315 Table 3.3.6.1-1 (page 5 of 6) Primary Containment Isolation Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER TRIP SYSTEM CONDITIONS REFERENCED FROM REQUIRED ACTION C.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE 5. Reactor Water Cleanup (RWCU) System Isolation

a. RWCU Suction Line Penetration Area TemperatureHigh 1,2,3 1 F SR 3.3.6.1.3 SR 3.3.6.1.7 144 F b. RWCU Pump Area TemperatureHigh 1,2,3 1 per room F SR 3.3.6.1.3 SR 3.3.6.1.7 165F for Pump Room A and 175F for Pump Room B c. RWCU Heat Exchanger Room Area TemperatureHigh 1,2,3 1 F SR 3.3.6.1.3 SR 3.3.6.1.7 155 F d. SLC System Initiation 1,2 2(d) I SR 3.3.6.1.7 NA e. Reactor Vessel Water LevelLow (Level
3) 1,2,3 2 F SR 3.3.6.1.1 SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.5 SR 3.3.6.1.7 177 inches
f. Drywell PressureHigh 1,2,3 2 F SR 3.3.6.1.1 SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.5 SR 3.3.6.1.7 2.7 psig 6. Shutdown Cooling System Isolation a. Reactor PressureHigh 1,2,3 1 F SR 3.3.6.1.1 SR 3.3.6.1.

2 SR 3.3.6.1.

4 SR 3.3.6.1.5 SR 3.3.6.1.7 74 psig b. Reactor Vessel Water LevelLow (Level 3) 3,4,5 2(e) J SR 3.3.6.1.1 SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.5 SR 3.3.6.1.7 177 inches (continued)

(d) SLC System Initiation only inputs into one of the two trip systems and only isolates one valve in the RWCU suction and return line. (e) Only one trip system required in MODES 4 and 5 when RHR Shutdown Cooling System integrity maintained.

Secondary Containment Isolation Instrumentation 3.3.6.2 JAFNPP 3.3.6.2-4 Amendment 27 6 315 ` Table 3.3.6.2

-1 (page 1 of 1)

Secondary Containment Isolation Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER TRIP SYSTEM SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE 1. Reactor Vessel Water Level Low (Level 3) 1, 2, 3, (a) 2 SR 3.3.6.2.1 SR 3.3.6.2.2 SR 3.3.6.2.4 SR 3.3.6.2.5 SR 3.3.6.2.6

2. Drywell Pressure - High 1, 2, 3 2 SR 3.3.6.2.1 SR 3.3.6.2.2 SR 3.3.6.2.4 SR 3.3.6.2.5 SR 3.3.6.2.6 3. Reactor Building Exhaust Radiation

- High 1, 2, 3 , (a), (b) 1 SR 3.3.6.2.1 SR 3.3.6.2.3 SR 3.3.6.2.6 24,800 cpa 4. Refueling Floor Exhaust Radiation

- High 1, 2, 3, (a), (b) 1 SR 3.3.6.2.1 SR 3.3.6.2.3 SR 3.3.6.2.6 (a) During operation with a potential for draining the reactor vessel.

(b)(a) During movement of recently irradiated fuel assemblies in secondary containment.

CREVAS System Instrumentation 3.3.7.1 JAFNPP 3.3.7.1-1 Amendment 276315 3.3 INSTRUMENTATION 3.3.7.1 Control Room Emergency Ventilation Air Supply (CREVAS)

System Instrumentation LCO 3.3.7.1 The Control Room Air Inlet RadiationHigh channel shall be OPERABLE. APPLICABILITY:

MODES 1, 2 and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Channel inoperable.

A.1 Place the CREVAS System in the isolate mode of operation.

OR A.2 Declare both CREVAS subsystems inoperable.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> CREVAS System Instrumentation 3.3.7.1 JAFNPP 3.3.7.1-2 Amendment 301 SURVEILLANCE REQUIREMENTS


NOTE-----------------------------------------------

When the channel is placed in an inoperable status solely for performance of required Surveillances, entry into the Condition and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. ------------------------------------------------------------------------------------------------------------------

SURVEILLANCE FREQUENCY SR 3.3.7.1.1 Perform CHANNEL CHECK.

In accordance with the Surveillance Frequency Control Program SR 3.3.7.1.2 Perform CHANNEL CALIBRATION. The Allowable Value shall be 4000 cpm. In accordance with the Surveillance Frequency Control Program

ECCS - Operating 3.5.1 JAFNPP 3.5.1-1 Amendment 284 315 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS), RPV WATER INVENTORY CONTROL, AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS-Operating LCO 3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of six safety/relief valves shall be OPERABLE.

APPLICABILITY:

MODE 1, MODES 2 and 3, except high pressure coolant injection (HPCI) and ADS valves are not required to be OPERABLE with reactor steam dome psig. ACTIONS ---------------------------------------------------------NOTE-------------------------------------------------------------

LCO 3.0.4.b is not applicable to HPCI.


- CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure ECCS injection/spray subsystem inoperable.

OR One low pressure coolant injection (LPCI) pump in both LPCI subsystems inoperable.

A.1 Restore low pressure ECCS injection/spray subsystem(s) to OPERABLE status.

7 days B. Required Action and associated Completion Time of Condition A not met. B.1 Be in MODE 3. AND B.2 Be in Mode 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)

RPV Water Inventory Control ECCS - Shutdown 3.5.2 JAFNPP 3.5.2-1 Amendment 274 315 3.5 EMERGENCY CORE COOLING SYSTEM (ECCS), RPV WATER INVENTORY CONTROL, AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.2 Reactor Pressure Vessel (RPV) Water Inventory Control E CCS - Shutdown LCO 3.5.2 DRAIN TIME of RPV water inventory to the top of act ive fuel (TAF) shall be > 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. AND OneTwo low pressure ECCS injection/spray subsystem s shall be OPERABLE. -------------------------------------NOTE------------------------------------------------

A Low Pressure Coolant Injection (LPCI) subsystem may be considered OPERABLE during alignment and operation for decay heat removal if capable of being manually realigned and not otherwise inoperable.


APPLICABILITY:

MODE S 4 and 5 MODES 5, except with the spent fuel storage pool gates the reactor pressure vessel flange.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One r Required low pressure ECCS injection/spray subsystem inoperable.

A.1 Restore required low pressure ECCS injection/spray subsystem to OPER ABLE status. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B. Required Action and associated Completion Time of Condition A not met. B.1 Initiate action to establish a method of water injection capable of operating without offsite electrical power. Initiate action to suspend operations with.a potential for draining the reactor vessel (OPDRVs).

Immediately

RPV Water Inventory Control ECCS - Shutdown 3.5.2 JAFNPP 3.5.2-2 Amendment 274 315 C. DRAIN TIME < 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> and 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. C.1 Verify secondary containment boundary is capable of being establish e d in less than t he DRAIN T IME. AND C.2 Verify each secondary containment penetration flow path is capable of being isol at ed in less t h an the DRAIN TIME. AND C.3 Verify one standby gas treatment subsystem is capable of being placed in operation in less than t h e DRAIN T IME. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> C. Two required low pressure ECCS injection/spray subsystems inoperable.

C.1 Initiate action to suspend OPDRVs.

AND Immediately C.2 Restore one required low pressure ECCS injection/spray subsystem to OPERBLE status. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> (continued)

RPV Water Inventory Control ECCS - Shutdown 3.5.2 JAFNPP 3.5.2-2 Amendment 274 315 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. DRAIN TIME < 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.Required Action C.2 and E. associated Completion F.D. Time not met. D.1 ------------- NOTE --------------Initiate Required ECCS injection/spray subsystem or additional method of water injection shall be capable of operating without offsite electrical power.


action to restore secondary containment to OPERABLE status.

Initiate action to establish an additional method of water injection with water sources capable of maintaining RPV water > TAF for > 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. AND Immediately D.2 Initiate action to establish secondary containment boundary. restore one standby gas treatment subsystem to OPERABLE status. AND Immediately D.3 Initiate action to isolate each secondary containment penetration flow path or verify it can be manually isolated from the control room.

restore Isolation capability in each required secondary containment penetration flow path not isolated.

Immediately AND RPV Water Inventory Control ECCS - Shutdown 3.5.2 JAFNPP 3.5.2-3 Amendment 274 315 D.4 Initiate action to verify o n e standby gas treatment subsystem is capable of being placed in operation.

E. Required Action and associa t ed Completion Time of Condition C or D not met. O R DRAIN T I ME < 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. E.1 Initiate ac t i o n to restore DRAIN T I ME to 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Immediately SURVEILLANCE REQUIREMENTS SURVELLANCE FREQUENCY SR 3.5.2.1 Verify DRA I N TIME 3 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. In accorda n ce with the Surveillance Frequency Control Program SR 3.5.2.1 2 Verify, for each required low pressure coolant injection (LPCI) subsystem, the suppression pool water level is 33 ft. In accordance with the Surveillance Frequency Control Program (continued)

RPV Water Inventory Control ECCS - Shutdown 3.5.2 JAFNPP 3.5.2-4 Amendment 274 315 SURVEILLANCE REQUIREMENTS (continued)

SURVELLANCE FREQUENCY SR 3.5.2.2 3 Verify for each a required C c ore s Spray (CS) subsystem, the: a. b. The water level in each condensate storage Tank is > 324 inches

- - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - - Only one required CS subsystem may take credit for this option during OPDRVs.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - The water level in each condensate storage Tank is In accordance with the Surveillance Frequency Control Progra m SR 3.5.2.3 4 Verify, for each the required ECCS injection/spray subsystem, the piping is filled with water from the pump discharge valve to the injection valve.

In accordance with the Surveillance Frequency Control Progra m SR 3.5.2.4 5 - - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - - - One LPCI subsystem may be considered OPERABLE during alignment and operation for decay heat removal if capable of being manually realigned and not otherwise inoperable.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Verify each for the required ECCS injection/spray subsystem

, each manual, power operated, and automatic valve in the flow path, that is not locked, seated, or otherwise secured in position, is in the correct position.

In accordance with the Surveillance Frequency Control Progra m (continued)

RPV Water Inventory Control ECCS - Shutdown 3.5.2 JAFNPP 3.5.2-5 Amendment 274 315 SURVEILLANCE REQUIREMENTS (continued)

SURVELLANCE FREQUENCY SR 3.5.2.5 6 Operate the required ECCS injection/spray subsystem through the recirculation line for > 10 minutes.Verify each required ECCS pump develops the specified flow rate against a system head corresponding to the specified reactor pressure above primary containment pressure. SYSTEM HEAD CORRESPONDING TO A REACTOR PRESSURE NO. ABOVE PRIMARY OF CONTAINMENT SYSTEM FLOW RATE PUMPS PRESSURE OF C S 1 LPCI 7700 gpm 1 In accordance with the Inservice Testing Program SR 3.5.2.7 Verify each valve credited for automatically isolating a penetration flow path actuates to the isolation position on an actual or simulated isolation signal.

In accordance with the Surveillance Frequency Control Program SR 3.5.2.6 8 - - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - - - Vessel injection/spray may be excluded.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Verify theeach required ECCS injection/spray subsystem actuates on an a manual actual or simulated automatic initiation signal.

In accordance with the Surveillance Frequency Control Program RCIC SYSTEM 3.5.3 JAFNPP 3.5.3-1 Amendment 2 84 315 3.5 EMERGENCY CORE COOLING SYSTEMS (E CCS), RPV WATER INVENTORY CONTROL, AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.3 RCIC System LCO 3.5.3 The RCIC System shall be OPERABLE.

APPLICABILITY:

MODE 1, MODES 2 and 3 with reactor steam dome pressure >

150 psig. ACTIONS NOTE LCO 3.0.4.b is not applicable to RCIC.

CONDITION REQUIRED ACTION COMPLETION TIME A. RCIC System inoperable.

A.1 Verify by administrative means High Pressure Coolant Injection System is OPERABLE. AND A.2 Restore RCIC System to OPERABLE status.

Immediately 14 days B. Required Action and associated Completion Time not met.

B.1 Be in MODE

3. AND B.2 Reduce reactor steam dome pressure to 50 psig. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> PCIVs 3.6.1.3 JAFNPP 3.6.1.3-6 Amendment 274 315 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME F. Required Action and associated Completion Time of Condition A, B, C, D, or E not met In MODE 1, 2, or 3.

F.1 Be in MODE 3.

AND F.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> G. Required Action and associated Completion Time of Condition A or B not met for PCIV(s) required to be OPERABLE during Mode 4 or 5. G.1 Initiate action to suspend operations with a potential for draining the reactor vessel. OR Immediately G.2 Initiate action to restore valve(s) to OPERABLE status.

Immediately

Secondary Containment 3.6.4.1 JAFNPP 3.6.4.1-1 Amendment 276 315 3.6 CONTAINMENT SYSTEMS 3.6.4.1 Secondary Containment LCO 3.6.4.1 The secondary containment shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Secondary containment inoperable in MODE 1, 2, or 3. A.1 Restore secondary containment to OPERABLE status. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B. Required Action and associated Completion Time of Condition A not met. B.1 Be in MODE

3. AND B.2 Be in MODE
4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> C. Secondary containment inoperable during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs

. C.1 ------------NOTE------------ LCO 3.0.3 is not applicable.


Suspend movement of recently irradiated fuel assemblies in the secondary containment.

AND Immediately (continued)

Secondary Containment 3.6.4.1 JAFNPP 3.6.4.1-2 Amendment 301 315 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. (continued)

C.2 Initiate action to suspend OPDVRVs. Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1.1 Verify secondary containment vacuum is 0.25 inch of vacuum water gauge.

In accordance with the Surveillance Frequency Control Program SR 3.6.4.1.2 Verify all secondary containment equipment hatches are closed and sealed.

In accordance with the Surveillance Frequency Control Program SR 3.6.4.1.3 Verify one secondary containment access door in each access opening is closed.

In accordance with the Surveillance Frequency Control Program SR 3.6.4.1.4 Verify the secondary containment can be maintained 0.25 inch of vacuum water gauge for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> using one SGT subsystem at a flow rate 6000 cfm. In accordance with the Surveillance Frequency Control Program SCIVs 3.6.4.2 JAFNPP 3.6.4.2-1 Amendment 27 6 315 3.6 CONTAINMENT SYSTEMS 3.6.4.2 Secondary Containment Isolation Valves (SCIVs)

LCO 3.6.4.2 Each SCIV shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS ----------------------------------------------------NOTES----------------------------------------------------

1. Penetration flow paths may be unisolated intermittently under administrative controls.
2. Separate Condition entry is allowed for each penetration flow path.
2. Enter applicable Conditions and Required Actions for systems made inoperable by SCIVs.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more penetration flow paths with one SCIV inoperable.

A.1 Isolate the affected penetration flow path by use of at least one closed and de-activated automatic valve, closed manual valve, or blind flange.

AND 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (continued)

SCIVs 3.6.4.2 JAFNPP 3.6.4.2-2 Amendment 27 4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued)

A.2 --------NOTES-------- 1. Isolation devices in high radiation areas may be verified by use of administrative means. 2. Isolation devices that are locked, sealed, or otherwise secured may be verified by use of administrative means. ----------------------------- Verify the affected penetration flow path is isolated. Once per 31 days.

B. ---------NOTE--------- Only applicable to penetration flow paths with two isolation valves. ----------------------

One or more penetration flow paths with two SCIVs inoperable.

B.1 Isolate the affected penetration flow path by use of at least one closed and de-activated automatic valve, closed manual valve, or blind flange.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> C. Required Action and associated Completion Time of Condition A or B not met in MODE 1, 2, or 3. C.1 Be in MODE

3. AND C.2 Be in MODE
4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)

SCIVs 3.6.4.2 JAFNPP 3.6.4.2-3 Amendment 276 315 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and associated Completion Time of Condition A or B not met during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs. D.1 --------NOTE--------- LCO 3.0.3 is not applicable.


Suspend movement of recently irradiated fuel assemblies in the secondary containment.

AND D.2Initiate action to suspend OPDRVs. Immediately Immediately

SCIVs 3.6.4.2 JAFNPP 3.6.4.2-4 Amendment 301 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.2.1 ------------------------NOTES------------------------- 1. Valves and blind flanges in high radiation areas may be verified by use of administrative means. 2. Not required to be met for SCIVs that are open under administrative controls.


Verify each secondary containment isolation manual valve and blind flange that is not locked, sealed, or otherwise secured and is required to be closed during accident conditions is closed.

In accordance With the Surveillance Frequency Control Program SR 3.6.4.2.2 Verify the isolation time of each power operated, automatic SCIV is within limits.

In accordance with the Surveillance Frequency Control Program SR 3.6.4.2.3 Verify each automatic SCIV actuates to the isolation position on an actual or simulated actuation signal.

In accordance with the Surve illance Frequ e ncy Control Program SGT System 3.6.4.3 JAFNPP 3.6.4.3-1 Amendment 276 315 3.6 CONTAINMENT SYSTEMS 3.6.4.3 Standby Gas Treatment (SGT) System LCO 3.6.4.3 Two SGT subsystems shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One SGT subsystem inoperable.

A.1 Restore SGT subsystem to OPERABLE status.

7 days B. Required Action and associated Completion Time of Condition A not met in MODE 1, 2, or 3. B.1 Be in MODE

3. AND B.2 Be in MODE
4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> C. Required Action and associated Completion Time of Condition A not met during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs

. ------------


NOTE---------------- LCO 3.0.3 is not applicable.


C.1 Place OPERABLE SGT subsystem in operation.

OR Immediately (continued)

SGT System 3.6.4.3 JAFNPP 3.6.4.3-2 Amendment 276 315 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. (continued)

C.2.1 Suspend movement of recently irradiated fuel assemblies in secondary containment.

AND C.2.2 Initiate action to suspend OPDRVs.

Immediately Immediately D. Two SGT subsystems inoperable in MODE 1, 2, or 3. D.1 Enter LCO 3.0.3.

Immediately E. Two SGT subsystems inoperable during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs.

E.1 --------NOTE--------- LCO 3.0.3 is not applicable.


Suspend movement of recently irradiated fuel assemblies in secondary containment.

AND E.2 Initiate action to suspend OPDRVs.

Immediately Immediately

SGT System 3.6.4.3 JAFNPP 3.6.4.3-3 Amendment 301 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.3.1 Operate each SGT subsystem for 10 continuous hours with heaters operating.

In accordance with the Surv eillance Freq uency Control Program SR 3.6.4.3.2 Perform required SGT filter testing in accordance with the Ventilation Filter Testing Program (VFTP).

In accordance with the VFTP SR 3.6.4.3.3 Verify each SGT subsystem actuates on an actual or simulated initiation signal. In accordance With the Surv eillance Freq uency Contr ol Program SR 3.6.4.3.4 Manually cycle each SGT subsystem filter cooling cross-tie valve.

In accordance With the Surv eillance Freq uency Control Program CREVAS System 3.7.3 JAFNPP 3.7.3-1 Amendment 2 89 315 3.7 PLANT SYSTEMS 3.7.3 Control Room Emergency Ventilation Air Supply (CREVAS) System LCO 3.7.3 Two CREVAS subsystems shall be OPERABLE.



NOTE ------------------------------


The control room envelope (CRE) boundary may be opened intermittently under administrative control.


APPLICABILITY:

MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CREVAS subsystem inoperable for reasons other than Condition B

. A.1 Restore CREVAS subsystem to OPERABLE status. 7 days B. One or more CREVAS subsystems inoperable due to inoperable CRE boundary in MODE 1, 2, or 3. B.1 Initiate action to implement mitigating actions. AND B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits. AND B.3 Restore CRE boundary to OPERABLE status.

Immediately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 90 days (continued)

CREVAS System 3.7.3 JAFNPP 3.7.3-2 Amendment 289 315 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and associated Completion Time of Condition A or B not met in MODE 1, 2, or 3. C.1 Be in MODE

3. AND C.2 Be in MODE
4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> D. Required Action and associated Completion Time of Condition A not met during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs. --------------

NOTE --------------

LCO 3.0.3 is not applicable.


D.1 Place OPERABLE CREVAS subsystem in isolate mode.

OR D.2.1 Suspend movement of recently irradiated fuel assemblies in the secondary containment.

AND D.2.2 Initiate action to suspend OPDRVs. Immediately Immediately Immediately E. Two CREVAS subsystems inoperable in MODE 1, 2, or 3 for reasons other than Condition B.

E.1 Enter LCO 3.0.3. Immediately (continued)

CREVAS System 3.7.3 JAFNPP 3.7.3-3 Amendment 301 315 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME F. Two CREVAS subsystems inoperable during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs. OR One or more CREVAS subsystems inoperable due to an inoperable CRE boundary during movement of recently irradiated fuel in the secondary containment or during OPDRVs.


-- NOTE ---------------

LCO 3.0.3 is not applicable.


F.1 Suspend movement of recently irradiated fuel assemblies in the secondary containment.

AND F.2 Initiate action to suspend OPDRVs. Immediately Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Operate each CREVAS subsystem for 15 minutes. In accordance with the Surveillance Frequency Control Program SR 3.7.3.2 Perform required CREVAS filter testing in accordance with the Ventilation Filter Testing Program (VFTP).

In accordance with the VFTP (continued)

CREVAS System 3.7.3 JAFNPP 3.7.3-4 Amendment 289 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.7.3.3 Perform required CRE unfiltered air in

-leakage testing in accordance with the control room Envelope Habitability Program. In accordance with the Control Room Envelope Habitability Program Control Room AC System 3.7.4 JAFNPP 3.7.4-1 Amendment 290 315 3.7 PLANT SYSTEMS 3.7.4 Control Room Air Conditioning (AC) System LCO 3.7.4 Two control room AC subsystems shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs). ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One control room AC subsystem inoperable.

A.1 Restore control room AC subsystem to OPERABLE status. 30 days B. Two control room AC subsystems inoperable.

B.1 Verify control room area temperature

< 90 °F. AND B.2 Restore one control room AC subsystem to OPERABLE status.

Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 72 hours C. Required Action and associated Completion Time of Condition A or B not met in MODE 1, 2, or 3. C.1 Be in MODE 3.

AND C.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)

Control Room AC System 3.7.4 JAFNPP 3.7.4-2 Amendment 290 315 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and associated Completion Time of Condition A not met during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs.

- - - - - - - - - NOTE - - - - - - - - - - LCO 3.0.3 is not applicable.

- - - - - - - - - - - - - - - - - - - - - - - - D.1 Place OPERABLE control room AC subsystem in operation.

OR D.2.1 Suspend movement of recently irradiated fuel assemblies in the secondary containment.

AND D.2.2 Initiate action to suspend OPDRVs. Immediately Immediately Immediately E. Required Action and associated Completion Time of Condition B not met during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs.

- - - - - - - - - NOTE - - - - - - - - - - LCO 3.0.3 is not applicable.

- - - - - - - - - - - - - - - - - - - - - - - - E.1 Suspend movement of recently irradiated fuel assemblies in the secondary containment.

AND E.2 Initiate action to suspend OPDRVs. Immediately Immediately SURVEILLANCE REQUIREMENTS

Control Room AC System 3.7.4 JAFNPP 3.7.4-3 Amendment 301 SURVEILLANCE FREQUENCY SR 3.7.4.1 Verify each control room AC subsystem has the capability to remove the assumed heat load.

In accordance with the Surveillance Frequency Control Program

AC Sources

- Shutdown 3.8.2 JAFNPP 3.8.2-1 Amendment 276 315 3.8 ELECTRICAL POWER SYSTEMS 3.8.2 AC Sources

- Shutdown LCO 3.8.2 The following AC electrical power sources shall be OPERABLE:

a. One qualified circuit between the offsite transmission network and one division of the plant Class 1E AC electrical power distribution subsystem(s) required by LCO 3.8.8, "Distribution Systems

-Shutdown";

b. One qualified circuit, which maybe the same circuit required by LCO 3.8.2.a, between the offsite transmission network and the other division of the plant Class 1E AC electrical power distribution subsystem(s), when a second division is required by LCO 3.8.8; and
c. One emergency diesel generator (EDG) subsystem capable of supplying one division of the plant Class 1E AC electrical power distribution subsystem(s) required by LCO 3.8.8. APPLICABILITY:

MODES 4 and 5, During movement of recently irradiated fuel assemblies in the secondary containment.

AC Sources

- Shutdown 3.8.2 JAFNPP 3.8.2-2 Amendment 276 315 ACTIONS -------------------------------------------------


NOTE-----------------------------------------------------------

LCO 3.0.3 is not applicable.


CONDITION REQUIRED ACTION COMPLETION TIME A. One or both required offsite circuits inoperable.


NOTE------------------

Enter applicable Condition and Required Actions of LCO 3.8.8, when any required division is de

-energized as a result of Condition A. --------------------------------------------

- A.1 Declare affected required feature(s), with no offsite power available, inoperable.

OR A.2.1 Suspend CORE ALTERATIONS.

AND A.2.2 Suspend movement of recently irradiated fuel assemblies in the secondary containment.

AND A.2.3 Initiate action to suspend operations with a potential for draining the reactor vessel (OPDRVs).

AND Immediately Immediately Immediately Immediately (continued)

AC Sources

- Shutdown 3.8.2 JAFNPP 3.8.2-3 Amendment 276 315 ACTIONSCONDITION REQUIRED ACTION COMPLETION TIME A. (continued)

A.2.3 4 Initiate action to restore required offsite power circuit(s) to OPERABLE status.

Immediately B. One required EDG subsystem inoperable.

B.1 Suspend CORE ALTERATIONS.

AND B.2 Suspend movement of recently irradiated fuel assemblies in secondary containment.

AND B.3 Initiate action to suspend OPDRVs.

AND B.3 4 Initiate action to restore required EDG subsystem to OPERABLE status. Immediately Immediately Immediately Immediately

AC SourcesShutdown 3.8.2 JAFNPP 3.8.2-4 Amendment 27 4 315 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.2.1 ---------------------------NOTES---------------------

1. The following SRs are not required to be performed: SR 3.8.1.3, SR 3.8.1.8, SR 3.8.1.9, SR 3.8.1.11, SR 3.8.1.12, and SR 3.8.1.13.
2. SR 3.8.1.10 and SR 3.8.1.12 are not required to be met when associated ECCS subsystem(s) are not required to be OPERABLE per LCO 3.5.2, " ECCS-ShutdownRPV Water Inventory Control

." ------------------------------------------------------------

For AC sources required to be OPERABLE the SRs of Specification 3.8.1, except SR 3.8.1.7, are applicable.

In accordance with applicable SRs DC Sources

- Shutdown 3.8.5 JAFNPP 3.8.5-1 Amendment 276 3.8 ELECTRICAL POWER SYSTEMS 3.8.5 DC SourcesShutdown LCO 3.8.5 One 125 VDC electrical power subsystem shall be OPERABLE to support one division of the plant Class IE DC Electrical Power Distribution System required by LCO 3.8.8, "Distribution Systems

-Shutdown." APPLICABILITY:

MODES 4 and 5, During movement of recently irradiated fuel assemblies in the secondary containment.

ACTIONS -----------------------------------------------------------NOTE----------------------------------------------------------

LCO 3.0.3 is not applicable.


CONDITION REQUIRED ACTION COMPLETION TIME A. Required DC electrical power subsystem inoperable.

A.1 Declare affected required feature(s) inoperable.

OR A.2.1 Suspend CORE ALTERATIONS.

AND A.2.2 Suspend movement of recently irradiated fuel assemblies in the secondary containment.

AND Immediately Immediately Immediately (continued)

DC Sources

-Shutdown 3.8.5 JAFNPP 3.8.5-2 Amendment 27 4 315 ACTIONS CONDITIONS REQUIRED ACTION COMPLETION TIME A. (continued)

A.2.3 Initiate action to suspend operations with a potential for draining the reactor vessel. AND A.2.3 4 Initiate action to restore required DC electrical power subsystem to OPERABLE status. Immediately Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.5.1 -----------------------NOTE--------------------

-- The following SRs are not required to be performed: SR 3.8.4.2, SR 3.8.4.3, and SR 3.8.4.4. ------------------------------------------------------

For DC electrical power subsystem required to be OPERABLE the following SRs are applicable:

SR 3.8.4.1, SR 3.8.4.2, SR 3.8.4.3, and SR 3.8.4.4. In accordance with applicable SRs Distribution Systems

- Shutdown 3.8.8 JAFNPP 3.8.8-1 Amendment 276 315 3.8 ELECTRICAL POWER SYSTEMS 3.8.8 Distribution SystemsShutdown LCO 3.8.8 The necessary portions of the AC and 125 VDC electrical power distribution subsystems shall be OPERABLE to support equipment required to be OPERABLE.

APPLICABILITY:

MODES 4 and 5, During movement of recently irradiated fuel assemblies in the secondary containment.

ACTIONS ------------------------------------------------------

-NOTE----------------------------------------------------------

LCO 3.0.3 is not applicable.


CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required AC or 125 VDC electrical power distribution subsystems inoperable.

A.1 Declare associated supported required feature(s) inoperable.

OR A.2.1 Suspend CORE ALTERATIONS.

AND A.2.2 Suspend movement of recently irradiated fuel assemblies in the secondary containment.

AND Immediately Immediately Immediately (continued)

Distribution Systems

- Shutdown 3.8.8 JAFNPP 3.8.8-2 Amendment 301 315 ACTIONS (continued)

A. (continued)

A.2.3 Initiate action to suspend operations with a potential for draining the reactor vessel. AND A.2.3 4 Initiate actions to restore required AC and 125 VDC electrical power distribution subsystems to OPERABLE status.

AND A.2.4 5 Declare associated required shutdown cooling subsystem(s) inoperable.

Immediately Immediately Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.8.1 Verify correct breaker alignments and voltage to required AC and 125 VDC electrical power distribution subsystems.

In accordance with the Surveillance Frequency Control Program