ML17335A368: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ATTACHMENT 2TOAEP:NRC:1291 CURRENTPAGESMARKED-UP TOSHOWPROPOSEDAMENDMENT TOTHETECHNICAL SPECIFICATIONS DISTRIBUTED IGNITIONSYSTEM981208006'P 981203PDRADOCK050003i5'PDR I  
{{#Wiki_filter:ATTACHMENT 2 TO AEP:NRC:1291 CURRENT PAGES MARKED-UP TO SHOW PROPOSED AMENDMENT TO THE TECHNICAL SPECIFICATIONS DISTRIBUTED IGNITION SYSTEM 981208006'P 981203 PDR ADOCK 050003i5'PDR I  
~IINDEX.jLIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REUIREMENTS SECTIONPAGE34.53/4.5.13/4.5.23/4.5.33/4.5.43/4.5.5EMERGENCY CORECOOLINGSYSTEMSECCSACCUMULATORS ECCSSUBSYSTEHS
~I INDEX.j LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE RE UIREMENTS SECTION PAGE 3 4.5 3/4.5.1 3/4.5.2 3/4.5.3 3/4.5.4 3/4.5.5 EMERGENCY CORE COOLING SYSTEMS ECCS ACCUMULATORS ECCS SUBSYSTEHS
-Tavggreaterthanoreoto350Fe~~~~~~~~~~~~~~~~~~~~~~~~~~~~ECCSSUBSYSTEMS' Tavglessthan350F..BORONINJECTION SYSTEMIntentionally LeftBlankIntencionally LeftBlankREFUELING WATERSTORAGETANKSqual3/45-13/45-33/45-73/45-93/45-103/45-1134.6CONTAINMENT SYSTE."fS 3/4.6.1PRIMLYCONTAINMENT Concainment Integrity Containment LeakageContainment AirLocks..InternalPressureAirTemperature Containmenc Structural Integrity Contai.nment Venti.lation Systems.3/4.6.2OEPRESSURI2ATION ANDCOOLINGSYSTE."iS 3/46-13/46-23/46-43/46-63/46-73/46-93/46-9a3/4.6.33/4.6.4Containment SpraySystem.5.ayAdditiveSystem..CONTAINMENT ISOLATION VALVESCOMBUSTIBLE GASCONTROLHydrogenAnalyzers ElectricHydrogenRecombiners
-Tavg greater than or e o to 350 Fe~~~~~~~~~~~~~~~~~~~~~~~~~~~~ECCS SUBSYSTEMS' Tavg less than 350 F..BORON INJECTION SYSTEM Intentionally Left Blank Intencionally Left Blank REFUELING WATER STORAGE TANKS qual 3/4 5-1 3/4 5-3 3/4 5-7 3/4 5-9 3/4 5-10 3/4 5-11 3 4.6 CONTAINMENT SYSTE."fS 3/4.6.1 PRIMLY CONTAINMENT Concainment Integrity Containment Leakage Containment Air Locks..Internal Pressure Air Temperature Containmenc Structural Integrity Contai.nment Venti.lation Systems.3/4.6.2 OEPRESSURI2ATION AND COOLING SYSTE."iS 3/4 6-1 3/4 6-2 3/4 6-4 3/4 6-6 3/4 6-7 3/4 6-9 3/4 6-9a 3/4.6.3 3/4.6.4 Containment Spray System.5.ay Additive System..CONTAINMENT ISOLATION VALVES COMBUSTIBLE GAS CONTROL Hydrogen Analyzers Electric Hydrogen Recombiners
-W3/46-103/46-123/46-143/46-233/46-24Sird~ia~ma'gni+io~
-W 3/4 6-10 3/4 6-12 3/4 6-14 3/4 6-23 3/4 6-24 Sird~ia~ma'gni+io~
SySA~......
SySA~......
S/<COOK'NUCLEAR PLANT-UNIT1VIIAMENDMENT No.gl,SitXN,15S 3.6.4.2Twoindependent containment hydrogenrecombiner systemsshallbeOPERABLE.
S/<COOK'NUCLEAR PLANT-UNIT 1 VII AMENDMENT No.gl, Sit XN,15S 3.6.4.2 Two independent containment hydrogen recombiner systems shall be OPERABLE.MODES 1 and 2.*hQXlQE-Vfth one hydrogen recombfner syseem fnoperable, reseore che inoperable syseem eo OPERABLE status within 30 days or be fn at least HOT STANDBY withfxt'Che nexe 6 hours.4.6.4.2 Each hydrogen recombfner syseem shall be demonstrated OPERABLE: a.At least once per 18 months by verifying during a recombiner system funceional test thae the minimum heater sheath temperature increases to 0 x 700 P within 90 minutes and is maintained for ae lease 2 hours.b.Ae lease once per 18 months by: PerfoxELLGg.a QfhNNEF CALIBRATION of.all recombfner fnsCreaentation and.'conerol"cfrcuf ts.'erf fyfng through a vfsual eximfnatfon chat there fs.no evfdence abnormal conditions within the recombfners (f.e., loose wiring or structural'connections, deposits of forefgn miterfals, etc.)~~>+<<7~Wzsri~~>Mu~~rc wwmcm,~~4'miiza~aZ rS S-Mrna 4.wNo~Z/~COOK NUCLFdB.PLANT-UNIT 1;j 1 3/4 6-24'.1 AMENDMENT NO.+M.~
MODES1and2.*hQXlQE-Vfthonehydrogenrecombfner syseemfnoperable, reseorecheinoperable syseemeoOPERABLEstatuswithin30daysorbefnatleastHOTSTANDBYwithfxt'Che nexe6hours.4.6.4.2Eachhydrogenrecombfner syseemshallbedemonstrated OPERABLE:
3/4 LIMITING CONiDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINiiIENT SYSTEMS Verifying during a rccombiner system functional test that the heater sheath temperature increases to~1200'F within 5 hours and is maintained for at least 4 hours.~A//T/r/5 Verifying the integrity of all heater electrical circuits by performing a continuity and resistance to ground test following the above required functional test.The resistance to ground for any heater phase shall be 2 10,000 ohms.~uuV~ra Wage QC@urrZEmaurg f H~+Z DISTRIBUTED IGNITION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.4.3 Both trains of the Distributed Ignition System shall be OPERABLE.APPLICABILITY:
a.Atleastonceper18monthsbyverifying duringarecombiner systemfunceional testthaetheminimumheatersheathtemperature increases to0x700Pwithin90minutesandismaintained foraelease2hours.b.Aeleaseonceper18monthsby:PerfoxELLGg.a QfhNNEFCALIBRATION of.allrecombfner fnsCreaentation and.'conerol"cfrcufts.'erffyfngthroughavfsualeximfnatfon chattherefs.noevfdenceabnormalconditions withintherecombfners (f.e.,loosewiringorstructural'connections, depositsofforefgnmiterfals, etc.)~~>+<<7~Wzsri~~>Mu~~rcwwmcm,~~4'miiza~aZ rSS-Mrna4.wNo~Z/~COOKNUCLFdB.PLANT-UNIT1;j13/46-24'.1AMENDMENT NO.+M.~
MODES 1 a11d 2.ACTION: With one train of the Distributed Ignition System inoperable:
3/4LIMITINGCONiDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.6CONTAINiiIENT SYSTEMSVerifying duringarccombiner systemfunctional testthattheheatersheathtemperature increases to~1200'Fwithin5hoursandismaintained foratleast4hours.~A//T/r/5Verifying theintegrity ofallheaterelectrical circuitsbyperforming acontinuity andresistance togroundtestfollowing theaboverequiredfunctional test.Theresistance togroundforanyheaterphaseshallbe210,000ohms.~uuV~raWageQC@urrZEmaurg fH~+ZDISTRIBUTED IGNITIONSYSTEMLIMITINGCONDITION FOROPERATION 3.6.4.3BothtrainsoftheDistributed IgnitionSystemshallbeOPERABLE.
Restore the inoperable train to OPERABLE status within 7 days, or b.Perform surveillance requirement 4.6.4.3a once per 7 days on the OPERABLE train until the inoperable train is restored to OPERABLE status.With no OPERABLE hydrogen igniter in one containment region, restore one hydrogen igniter in the affected containment region to OPERABLE status within 7 days, or be in HOT STANDBY within 6 hours.SURVEILLANCE RE UIREMENTS 4.6.4.3 Each train of the Distributed Ignition System shall be demonstrated OPERABLE: a.Once per 92 days by energizing the supply breakers and verifying that at least 34 of 35 igniters are energized.
APPLICABILITY:
b.Once per 92 days, verify at least one hydrogen igniter is OPERABLE in each containment region.c.Once per 18 months by verifying the temperature of each igniter is a minimum 1700'F.COOK NUCLEAR PLANT-UMT 1 Page 3/4 6-25 AMEND ME 223~Pa'W y'u Pscg yp g zg 3/4 BASES 3/4.6 COilTAINMENT SYSTEMS 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS 3/4.6.2.1 CONTAINMENT SPRAY SYSTEiVI The OPERABILITY of the containment spray system ensures that containment depressurization and cooling capability will be available in the event of a LOCA.The pressure reduction and resultant lower containment leakage rate are consistent with the assumptions used in the accident analyses.3/4.6.2.2 SPRAY ADDITIVE SYSTEM The OPERABILITY of the spray additive system ensures that sufficient NaOH is added to the containment spray in the event of a LOCA.The limits on NaOH minimum volume and concentration, ensure that I)the iodine removal efficiency of the spray water is maintained because of the increase in pH value, and 2)corrosion effects on components within containment are minimized.
MODES1a11d2.ACTION:WithonetrainoftheDistributed IgnitionSysteminoperable:
These assumptions are consistent with the iodine removal efficiency assumed in the accident analyses.3/4.6.3 CONTAINMENT ISOLATION VALVES The OPERABILITY of the containment isolation valves ensures that the containment atmosphere will be isolated from the outside environment in the event'f a release of radioactive material to the containment atmosphere or pressurization of the containment.
Restoretheinoperable traintoOPERABLEstatuswithin7days,orb.Performsurveillance requirement 4.6.4.3aonceper7daysontheOPERABLEtrainuntiltheinoperable trainisrestoredtoOPERABLEstatus.WithnoOPERABLEhydrogenigniterinonecontainment region,restoreonehydrogenigniterintheaffectedcontainment regiontoOPERABLEstatuswithin7days,orbeinHOTSTANDBYwithin6hours.SURVEILLANCE REUIREMENTS 4.6.4.3EachtrainoftheDistributed IgnitionSystemshallbedemonstrated OPERABLE:
Containment isolation within the time limits specified ensures that the release of radioactive material to the environment will be consistent with the assumptions used in the analyses for a LOCA.The opening of containment purge and exhaust valves and locked.sealed closed containment isolation valves on an intermittent basis under administrative control includes the following considerations: (I)stanoning a qualified individual, who is in constant communication with control room, at the valve controls, (2)instructing this individual to close these valves in an accident situation, and (3)assuring that environmental conditions will not preclude access to close the valves and that this action will prevent the release of radioactivity outside the containment.
a.Onceper92daysbyenergizing thesupplybreakersandverifying thatatleast34of35ignitersareenergized.
3/4.6.4 COMBUSTIBLE GAS CONTROL The OPERABILITY of the equipment and systems required for the detection and control of hydrogen gas ensures that this equipment will be available to maintain the hydrogen concentration within containment below its flammable limit during post-LOCA conditions.
b.Onceper92days,verifyatleastonehydrogenigniterisOPERABLEineachcontainment region.c.Onceper18monthsbyverifying thetemperature ofeachigniterisaminimum1700'F.COOKNUCLEARPLANT-UMT 1Page3/46-25AMENDME223~Pa'Wy'uPscgypgzg 3/4BASES3/4.6COilTAINMENT SYSTEMS3/4.6.2DEPRESSURIZATION ANDCOOLINGSYSTEMS3/4.6.2.1 CONTAINMENT SPRAYSYSTEiVITheOPERABILITY ofthecontainment spraysystemensuresthatcontainment depressurization andcoolingcapability willbeavailable intheeventofaLOCA.Thepressurereduction andresultant lowercontainment leakagerateareconsistent withtheassumptions usedintheaccidentanalyses.
Either recombiner unit is capable of controlling the expected hydrogen generation associated with: I)zirconium-water reactions; 2)radiolytic decomposition of water;and 3)corrosion of metals within containment.
3/4.6.2.2 SPRAYADDITIVESYSTEMTheOPERABILITY ofthesprayadditivesystemensuresthatsufficient NaOHisaddedtothecontainment sprayintheeventofaLOCA.ThelimitsonNaOHminimumvolumeandconcentration, ensurethatI)theiodineremovalefficiency ofthespraywaterismaintained becauseoftheincreaseinpHvalue,and2)corrosion effectsoncomponents withincontainment areminimized.
The acceptance criterion of 10,000 ohms is based on the test being performed with the heater element at an ambient temperature, but can be conservatively applied when the element is at a temperature above ambient.+ycYr oy<n Anal'drs Nrro PMrrrc5iner z Pg>N@7 fP W~&ayr>uZ ro w 8'Z/4>-SH 0 COOK NUCLEAR PLANT-UNIT I Page B 3/4 6-3 AMENDMENT 48k,~3-Distributed Ignition System (DIS)The DIS permits controlled burning of the excessive hydrogen generated during degraded core LOCAs postulated by 10CFR50.44"Standards for combustible gas control system in light-water-cooled power reactors." The postulated amount of hydrogen is equivalent to that generated from the reaction of 75%of the fuel cladding with water.Controlled burning at low hydrogen concentrations precludes containment damage that could result from random ignition at high concentrations.
Theseassumptions areconsistent withtheiodineremovalefficiency assumedintheaccidentanalyses.
An extensive program of testing and analysis has demonstrated that a system of strategically placed hydrogen igniters (the DIS)can be relied upon for controlled burns of the hydrogen gas postulated for degraded cores.Furthermore, it has been shown that this can be accomplished at combustion temperatures and pressures that will not challenge the integrity of the containment structure or the operability of containment equipment necessary to shutdown (and maintain shutdown)the reactor.The hydrogen igniters are not included for mitigation of a Design Basis Accident (DBA)because an amount of hydrogen equivalent to that generated from the reaction of 75%of the fuel cladding with water is far in excess of the hydrogen calculated for the limiting DBA loss of coolant accident (LOCA).The hydrogen concentration resulting from a DBA can be maintained less than the flammability.
3/4.6.3CONTAINMENT ISOLATION VALVESTheOPERABILITY ofthecontainment isolation valvesensuresthatthecontainment atmosphere willbeisolatedfromtheoutsideenvironment intheevent'fareleaseofradioactive materialtothecontainment atmosphere orpressurization ofthecontainment.
limit using the hydrogen recombiners.
Containment isolation withinthetimelimitsspecified ensuresthatthereleaseofradioactive materialtotheenvironment willbeconsistent withtheassumptions usedintheanalysesforaLOCA.Theopeningofcontainment purgeandexhaustvalvesandlocked.sealedclosedcontainment isolation valvesonanintermittent basisunderadministrative controlincludesthefollowing considerations:
The DIS consists of two independent trains of 35 igniters located throughout containmcnt.
(I)stanoning aqualified individual, whoisinconstantcommunication withcontrolroom,atthevalvecontrols, (2)instructing thisindividual toclosethesevalvesinanaccidentsituation, and(3)assuringthatenvironmental conditions willnotprecludeaccesstoclosethevalvesandthatthisactionwillpreventthereleaseofradioactivity outsidethecontainment.
The igniters in each train are further divided into six groups per train powered from different phases of two separate three phase transformers.
3/4.6.4COMBUSTIBLE GASCONTROLTheOPERABILITY oftheequipment andsystemsrequiredforthedetection andcontrolofhydrogengasensuresthatthisequipment willbeavailable tomaintainthehydrogenconcentration withincontainment belowitsflammable limitduringpost-LOCA conditions.
It is the transformer phase that uniquely defines a group.Operation in Modes 1 and 2 with both trains available ensures the capability for controlled burning of hydrogen gas inside containment during degraded core LOCA events.In Modes 3 and 4 both the hydrogen production rate and the total hydrogen production afler a LOCA would be significantly less than that calculated for the DBA LOCA.Also, because of the limited time in these MODES, the probability of an accident requiring the DIS is low.Therefore the DIS is not required in Modes 3 and 4.In Modes 5 and 6, the probability and consequences of a LOCA are reduced due to the pressure and temperature limitations of these Modes.Therefore, the DIS is not required to be OPERABLE in Modes 5 and 6.The 7 day Completion Time for restoration of an inoperable DIS train in Modes 1 or 2 is based on the low probability of occurrence of a degraded core event that would generate hydrogen in amounts equivalent to a metal water reaction of 75%of the core cladding and the low probability of failure of the OPERABLE DIS train.This justification also applies to the 7 day Completion Time allowed for redundant igniters being inoperable in the same containment region.For this case there would also be ignition capability from adjacent containment regions by flame propagation to the region with no OPERABLE igniters.Confidence in system OPERABILITY is demonstrated by surveillance testing.Since many igniters are inaccessible at power, surveillance testing in Mode 1 is limited to measurement of igniter current when the DIS is energized by groups.Measured currents are compared with baseline data for the group.Igniter temperature measurements for all igniters can only be performed during shutdown and is performed every 18 months.This testing energizes all igniters and confirms the ability of each igniter to obtain a surface temperature of at least 1700'F.This temperature is conservatively above the temperature necessary to ignite hydrogen mixtures at concentrations near the lower flammability limit.Test experience indicates that individual igniter failures are generally total failures and do not involve the inability to reach the required temperature when an igniter is drawing normal amperage.This observed failure mode provides reasonable confidence that an igniter failing to reach the required temperature would also be detected by reduced group current measurements during the Mode 1 surveillances.
Eitherrecombiner unitiscapableofcontrolling theexpectedhydrogengeneration associated with:I)zirconium-water reactions; 2)radiolytic decomposition ofwater;and3)corrosion ofmetalswithincontainment.
Therefore the 18 month frequency for actual temperature measurements is acceptable.
Theacceptance criterion of10,000ohmsisbasedonthetestbeingperformed withtheheaterelementatanambienttemperature, butcanbeconservatively appliedwhentheelementisatatemperature aboveambient.+ycYroy<nAnal'drsNrroPMrrrc5iner zPg>N@7fPW~&ayr>uZrow8'Z/4>-SH0COOKNUCLEARPLANT-UNIT IPageB3/46-3AMENDMENT 48k,~3-Distributed IgnitionSystem(DIS)TheDISpermitscontrolled burningoftheexcessive hydrogengenerated duringdegradedcoreLOCAspostulated by10CFR50.44 "Standards forcombustible gascontrolsysteminlight-water-cooled powerreactors."
INDEX LIMITINC CONDITIONS FOR OPERATION AND SURVEILLANCE UIRBQBiTS SECTION PhCE 3/4,5.2 ECCS SUbSYSTEMS
Thepostulated amountofhydrogenisequivalent tothatgenerated fromthereactionof75%ofthefuelcladdingwithwater.Controlled burningatlowhydrogenconcentrations precludes containment damagethatcouldresultfromrandomignitionathighconcentrations.
-Tave greater than orequal to 3/4.5.3 ECCS SUbSYSTEMS
Anextensive programoftestingandanalysishasdemonstrated thatasystemofstrategically placedhydrogenigniters(theDIS)canberelieduponforcontrolled burnsofthehydrogengaspostulated fordegradedcores.Furthermore, ithasbeenshownthatthiscanbeaccomplished atcombustion temperatures andpressures thatwillnotchallenge theintegrity ofthecontainment structure ortheoperability ofcontainment equipment necessary toshutdown(andmaintainshutdown) thereactor.Thehydrogenignitersarenotincludedformitigation ofaDesignBasisAccident(DBA)becauseanamountofhydrogenequivalent tothatgenerated fromthereactionof75%ofthefuelcladdingwithwaterisfarinexcessofthehydrogencalculated forthelimitingDBAlossofcoolantaccident(LOCA).Thehydrogenconcentration resulting fromaDBAcanbemaintained lessthantheflammability.
-Tave leea chan 350 F.........3/4.5.4 bORON IHJECTION SYSTEM 350 F.3 4.5 EMERCENCY CORE COOLINC SYSTEMS ECCS 4 I C]'E I4 c AC CUMUKATORS
limitusingthehydrogenrecombiners.
~~~~~~~~~~~~~~~~~~~~i~~~~~~~~~~~s~~~~s~~~3/4 5-1 3/4 5 3 3/4 5-7 3/4.5.5 Intentionally Left blank.............
TheDISconsistsoftwoindependent trainsof35igniterslocatedthroughout containmcnt.
Intentionally Left blank.....
Theignitersineachtrainarefurtherdividedintosixgroupspertrainpoweredfromdifferent phasesoftwoseparatethreephasetransformers.
REFUELINC VATER STORAGE TANK....~*~~3/4 5 9 3/4 5-10 3/4 5-11 3 4.6 CONThINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT 3/4.6.2 3/4.6.3 3/4.6.4 Containaent Integrity~~4~~~~~~~~~~~~~~~~~~~~Containment Leakage>>Conte izcNnt Air Locks~~~~~~~~~~~~~~~~~~~i~~~~~~~~~~~~~~Internal Preeaure.~s~s~s~~~s~~~~~ii~~i~~~~~~~hir Temperature
Itisthetransformer phasethatuniquelydefinesagroup.Operation inModes1and2withbothtrainsavailable ensuresthecapability forcontrolled burningofhydrogengasinsidecontainment duringdegradedcoreLOCAevents.InModes3and4boththehydrogenproduction rateandthetotalhydrogenproduction afleraLOCAwouldbesignificantly lessthanthatcalculated fortheDBALOCA.Also,becauseofthelimitedtimeintheseMODES,theprobability ofanaccidentrequiring theDISislow.Therefore theDISisnotrequiredinModes3and4.InModes5and6,theprobability andconsequences ofaLOCAarereducedduetothepressureandtemperature limitations oftheseModes.Therefore, theDISisnotrequiredtobeOPERABLEinModes5and6.The7dayCompletion Timeforrestoration ofaninoperable DIStraininModes1or2isbasedonthelowprobability ofoccurrence ofadegradedcoreeventthatwouldgeneratehydrogeninamountsequivalent toametalwaterreactionof75%ofthecorecladdingandthelowprobability offailureoftheOPERABLEDIStrain.Thisjustification alsoappliestothe7dayCompletion Timeallowedforredundant ignitersbeinginoperable inthesamecontainment region.Forthiscasetherewouldalsobeignitioncapability fromadjacentcontainment regionsbyflamepropagation totheregionwithnoOPERABLEigniters.
.Concainlent Struccural Integrity.Concainaenc Ventilation Syecea......................,..
Confidence insystemOPERABILITY isdemonstrated bysurveillance testing.Sincemanyignitersareinaccessible atpower,surveillance testinginMode1islimitedtomeasurement ofignitercurrentwhentheDISisenergized bygroups.Measuredcurrentsarecomparedwithbaselinedataforthegroup.Ignitertemperature measurements foralligniterscanonlybeperformed duringshutdownandisperformed every18months.Thistestingenergizes allignitersandconfirmstheabilityofeachignitertoobtainasurfacetemperature ofatleast1700'F.Thistemperature isconservatively abovethetemperature necessary toignitehydrogenmixturesatconcentrations nearthelowerflammability limit.Testexperience indicates thatindividual igniterfailuresaregenerally totalfailuresanddonotinvolvetheinability toreachtherequiredtemperature whenanigniterisdrawingnormalamperage.
DEPRESSURIZATION AND COOLINC SYSTEMS Containlent Spray Syetaa 0~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Spray Additive Syacea.CONTAIHMEHT ISOIATIOH VALVES COMbUSTIbLE CAS COHTML Hydropn hnalyrer~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Electric Hydrogen Recoabinere
Thisobservedfailuremodeprovidesreasonable confidence thatanigniterfailingtoreachtherequiredtemperature wouldalsobedetectedbyreducedgroupcurrentmeasurements duringtheMode1surveillances.
Therefore the18monthfrequency foractualtemperature measurements isacceptable.
INDEXLIMITINCCONDITIONS FOROPERATION ANDSURVEILLANCE UIRBQBiTS SECTIONPhCE3/4,5.2ECCSSUbSYSTEMS
-Tavegreaterthanorequalto3/4.5.3ECCSSUbSYSTEMS
-Taveleeachan350F.........
3/4.5.4bORONIHJECTION SYSTEM350F.34.5EMERCENCY CORECOOLINCSYSTEMSECCS4IC]'EI4cACCUMUKATORS
~~~~~~~~~~~~~~~~~~~~i~~~~~~~~~~~s~~~~s~~~3/45-13/4533/45-73/4.5.5Intentionally Leftblank.............
Intentionally Leftblank.....
REFUELINC VATERSTORAGETANK....~*~~3/4593/45-103/45-1134.6CONThINMENT SYSTEMS3/4.6.1PRIMARYCONTAINMENT 3/4.6.23/4.6.33/4.6.4Containaent Integrity
~~4~~~~~~~~~~~~~~~~~~~~Containment Leakage>>ConteizcNntAirLocks~~~~~~~~~~~~~~~~~~~i~~~~~~~~~~~~~~InternalPreeaure.
~s~s~s~~~s~~~~~ii~~i~~~~~~~hirTemperature
.Concainlent Struccural Integrity
.Concainaenc Ventilation Syecea......................,..
DEPRESSURIZATION ANDCOOLINCSYSTEMSContainlent SpraySyetaa0~~~~~~~~~~~~~~~~~~~~~~~~~~~~~SprayAdditiveSyacea.CONTAIHMEHT ISOIATIOH VALVESCOMbUSTIbLE CASCOHTMLHydropnhnalyrer~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ElectricHydrogenRecoabinere
-W......................
-W......................
3/46-13/46-23/46-43/46-63/46-73/46-93/46-9a3/46-103/46-113/46-133/46-333/46-34COOKNUCLEARPLANT-UNIT2VIIAMZgleENT NO.I~.~<>,142 INDEXBASESSECTION.~3/4.4REACTORCOOLANTSYSTEMContinued 3/4.4.9PRESSURE/TEMPERATURE LIMITS.3/4.4.10STRUCTURAL INTEGRITY 3/4.4.11RELIEFVALVES..3/4.4.12REACTORCOOLANTVENTSYSTEMPAGEB3/44-6B3/44-10B3/44-11B3/44-113/4.5EMERGENCY CORECOOLINGSYSTEMSECCS3/4.5.1ACCUMULATORS 3/4.5.2and3/4.5.3ECCSSUBSYSTEMS 3/4.5.4BORONINJECTION SYSTEM3/4.5.5REFUELING WATERSTORAGETANK(RWST).B3/45-1B3/45-1B3/45-2B3/45-33/4.6CONTAINMENT SYSTEMS'.4.6.1PRIMARYCONTAINMENT 3/4.6.2DEPRESSURIZATION ANDCOOLINGSYSTEMS.3/4.6.3CONTAINMENT ISOLATION VALVES3/4.6.4COMBUSTIBLE GASCONTROL'/4.6.5 ICECONDENSER B3/46-1B3/46-33/4.7PLANTSYSTEMS3/4.7.1TURBINECYCLE3/4.7.2STEAMGENERATOR PRESSURE/1'EMPERATURE LIMITATION
3/4 6-1 3/4 6-2 3/4 6-4 3/4 6-6 3/4 6-7 3/4 6-9 3/4 6-9a 3/4 6-10 3/4 6-11 3/4 6-13 3/4 6-33 3/4 6-34 COOK NUCLEAR PLANT-UNIT 2 VII AMZgleENT NO.I~.~<>, 142 INDEX BASES SECTION.~3/4.4 REACTOR COOLANT SYSTEM Continued 3/4.4.9 PRESSURE/TEMPERATURE LIMITS.3/4.4.10 STRUCTURAL INTEGRITY 3/4.4.11 RELIEF VALVES..3/4.4.12 REACTOR COOLANT VENT SYSTEM PAGE B 3/4 4-6 B 3/4 4-10 B 3/4 4-11 B 3/4 4-11 3/4.5 EMERGENCY CORE COOLING SYSTEMS ECCS 3/4.5.1 ACCUMULATORS 3/4.5.2 and 3/4.5.3 ECCS SUBSYSTEMS 3/4.5.4 BORON INJECTION SYSTEM 3/4.5.5 REFUELING WATER STORAGE TANK (RWST).B 3/4 5-1 B 3/4 5-1 B 3/4 5-2 B 3/4 5-3 3/4.6 CONTAINMENT SYSTEMS'.4.6.1 PRIMARY CONTAINMENT 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS.3/4.6.3 CONTAINMENT ISOLATION VALVES 3/4.6.4 COMBUSTIBLE GAS CONTROL'/4.6.5 ICE CONDENSER B 3/4 6-1 B 3/4 6-3 3/4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE 3/4.7.2 STEAM GENERATOR PRESSURE/1'EMPERATURE LIMITATION
.......3/4.7.3COMPONENT COOLINGWATERSYSTEM3/4.7.4ESSENTIAL SERVICEWATERSYSTEM...
.......3/4.7.3 COMPONENT COOLING WATER SYSTEM 3/4.7.4 ESSENTIAL SERVICE WATER SYSTEM..."~..B 3/4 7-1 B 3/4 74 B 3/4 74 B 3/4 74 3/4.7.5 CONTROL ROOM EMERGENCY VENTILATION SYSTEM...........
"~..B3/47-1B3/474B3/474B3/4743/4.7.5CONTROLROOMEMERGENCY VENTILATION SYSTEM...........
B 3/4 74a 3/4.7.6 ESF VENTILATION SYSTEM..3/4.7.7 HYDRAULIC SNUBBERS B 3/4 7-5 B 3/4 7-5 COOK NUCLEAR PLANT-UNIT 2 AMENDMENT 407, 4$6, 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLAi ICE REQUIREtWIENTS 3/4.6 CONTAINMENT SYSTEMS DISTRIBUTED IGNITION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.4.3 Both trains of the Distributed Ignition System shall be OPERABLE.APPLICABILITY:
B3/474a3/4.7.6ESFVENTILATION SYSTEM..3/4.7.7HYDRAULIC SNUBBERSB3/47-5B3/47-5COOKNUCLEARPLANT-UNIT 2AMENDMENT 407,4$6, 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLAi ICEREQUIREtWIENTS 3/4.6CONTAINMENT SYSTEMSDISTRIBUTED IGNITIONSYSTEMLIMITINGCONDITION FOROPERATION 3.6.4.3BothtrainsoftheDistributed IgnitionSystemshallbeOPERABLE.
MODES 1 and 2.ACTION: With one train of the Distributed Ignition System inoperable:
APPLICABILITY:
Restore the inoperable train to OPERABLE status within 7 days, or Perform surveillance requirement 4.6.4.3a once per 7 days on the OPERABLE train until the inoperable train is restored to OPERABLE status.With no OPERABLE hydrogen igniter in one containment region, restore one hydrogen igniter in the affected containment region to OPERABLE status within 7 days, or be in HOT STANDBY within 6 hours.SURVEILLANCE RE UIREMENTS 4.6.4.3 Each train of the Distributed Ignition System shall be demonstrated OPERABLE: Once per 92 days by energizing the supply breakers and verifying that at least 34 of 35 igniters are energized.
MODES1and2.ACTION:WithonetrainoftheDistributed IgnitionSysteminoperable:
Once per 92 days, verify at least one hydrogen igniter is OPERABLE in each containment region.Once per Ig months by verifying the temperature of each igniter is a minimum 1700'F.~~~C/mi7~COOK NUCLEAR PLANT-UNIT 2 Page 3/4 6-34a 3/4 BASES 3/4.6 CONTAINMENT SYSTEM IS 3/4 6.4 COMBUSTIBLE GAS CONTROL The OPERABILITY of the equipment and systems required for the detection and control of hydrogen gas ensures that this equipment will be available to maintain the hydrogen concentration within containment below its flammable limit during post-LOCA conditions.
Restoretheinoperable traintoOPERABLEstatuswithin7days,orPerformsurveillance requirement 4.6.4.3aonceper7daysontheOPERABLEtrainuntiltheinoperable trainisrestoredtoOPERABLEstatus.WithnoOPERABLEhydrogenigniterinonecontainment region,restoreonehydrogenigniterintheaffectedcontainment regiontoOPERABLEstatuswithin7days,orbeinHOTSTANDBYwithin6hours.SURVEILLANCE REUIREMENTS 4.6.4.3EachtrainoftheDistributed IgnitionSystemshallbedemonstrated OPERABLE:
Either recombiner unit is capable of controlling the expected hydrogen generation associated with: I)'zirconium-water reactions; 2)radiolytic decomposition of water;and 3)corrosion of metals wittun containment.
Onceper92daysbyenergizing thesupplybreakersandverifying thatatleast34of35ignitersareenergized.
These hydrogen control systems are consistent with the recommendations of Regulatory Guide 1.7,"Control of Combustible Gas Concentrations in Containment Following a LOCA," March 1971.'he acceptance criterion of 10,000 ohms is based on the test being performed with the heater element at an ambient temperature, but can be conservatively applied when the heater element is at a temperature above ambient.3/4.6.5 ICE CONDENSER The requirements associated with each of the components of the ice condenser ensure that the overall system will be available to provide sufficient pressure suppression capability to limit the containment peak pressure transient to less than 12 psig during LOCA conditions.
Onceper92days,verifyatleastonehydrogenigniterisOPERABLEineachcontainment region.OnceperIgmonthsbyverifying thetemperature ofeachigniterisaminimum1700'F.~~~C/mi7~COOKNUCLEARPLANT-UNIT 2Page3/46-34a 3/4BASES3/4.6CONTAINMENT SYSTEMIS3/46.4COMBUSTIBLE GASCONTROLTheOPERABILITY oftheequipment andsystemsrequiredforthedetection andcontrolofhydrogengasensuresthatthisequipment willbeavailable tomaintainthehydrogenconcentration withincontainment belowitsflammable limitduringpost-LOCA conditions.
3/4.6.5.1 ICE BED The OPERABILITY of the ice bed ensures that the required ice inventory will 1)be distributed evenly through the containment bays, 2)contain sufficient boron to preclude dilution of the containment sump following the LOCA and 3)contain sufficient heat removal capability to condense the reactor system volume released during a LOCA.These conditions are consistent with the assumptions used in the accident analyses.The minimum weight figure of 1333 pounds of ice per basket contains a 5%conservative allowance for ice loss through sublimation.
Eitherrecombiner unitiscapableofcontrolling theexpectedhydrogengeneration associated with:I)'zirconium-water reactions; 2)radiolytic decomposition ofwater;and3)corrosion ofmetalswittuncontainment.
In the event that observed sublimation rates are equal to or lower than design predictions after, g',>%i!I three years of operation, the minimum ice baskets weight may be adjusted downward.In addition, the number of ice baskets required to be weighed each 18 months may be reduced after 3 years of operation if such a reduction is supported by observed sublimation data.3/4.6.5.2 ICE BED TEMPERATURE MONITORING SYSTEM The OPERABILITY of the ice bed temperature monitoring system ensures that the capability is available for monitoring the ice temperature.
Thesehydrogencontrolsystemsareconsistent withtherecommendations ofRegulatory Guide1.7,"ControlofCombustible GasConcentrations inContainment Following aLOCA,"March1971.'heacceptance criterion of10,000ohmsisbasedonthetestbeingperformed withtheheaterelementatanambienttemperature, butcanbeconservatively appliedwhentheheaterelementisatatemperature aboveambient.3/4.6.5ICECONDENSER Therequirements associated witheachofthecomponents oftheicecondenser ensurethattheoverallsystemwillbeavailable toprovidesufficient pressuresuppression capability tolimitthecontainment peakpressuretransient tolessthan12psigduringLOCAconditions.
In the event the monitoring system is inoperable, the ACTION requirements provide assurance that the ice bed heat removal capacity will be retained within the speciifiied time limits.~p'>+<g~~~
3/4.6.5.1 ICEBEDTheOPERABILITY oftheicebedensuresthattherequirediceinventory will1)bedistributed evenlythroughthecontainment bays,2)containsufficient borontoprecludedilutionofthecontainment sumpfollowing theLOCAand3)containsufficient heatremovalcapability tocondensethereactorsystemvolumereleasedduringaLOCA.Theseconditions areconsistent withtheassumptions usedintheaccidentanalyses.
+<>>ye~~a K~&~~~o~c5~n~~~C~~~~r g+~+~~++rnid 56@Wrens gp,$, 5 ZAP COuy&rsdrZ p)+,y, y g g~,4~~ZHry Ww~~n+rrru~o'n m~~~/Zing 8-<W COOK NUCLEAR PLANT-UNIT 2 Page B3/4~AMENDMENT 4, 444, A4, 207 J~'I'P I Distributed Ignition System (DIS)The DIS permits controlled burning of the excessive hydrogen generated during degraded core LOCAs postulated by 10CFR50.44"Standards for combustible gas control system in light-water-cooled power reactors." The postulated amount of hydrogen is equivalent to that generated from the reaction of 75'/o of the fuel cladding with water.Controlled burning at low hydrogen concentrations precludes containment damage that could result from random ignition at high concentrations.
Theminimumweightfigureof1333poundsoficeperbasketcontainsa5%conservative allowance foricelossthroughsublimation.
An extensive program of testing and analysis has demonstrated that a system of strategically placed hydrogen igniters (the DIS)can be relied upon for controlled burns of the hydrogen gas postulated for degraded cores.Furthermore, it has been shown that this can be accomplished at combustion temperatures and pressures that will not challenge the integrity of the containment structure or the operability of containment equipment necessary to shutdown (and maintain shutdown)the reactor.The hydrogen igniters are not included for mitigation of a Design Basis Accident (DBA)because an amount of hydrogen equivalent to that generated from the reaction of 75~/o of the fuel cladding with water is far in excess of the hydrogen calculated for the limiting DBA loss of coolant accident (LOCA).The hydrogen concentration resulting from a DBA can be maintained less than the flammability limit using the hydrogen recombiners.
Intheeventthatobservedsublimation ratesareequaltoorlowerthandesignpredictions after,g',>%i!Ithreeyearsofoperation, theminimumicebasketsweightmaybeadjusteddownward.
The DIS consists of two independent trains of 35 igniters located throughout containmcnt.
Inaddition, thenumberoficebasketsrequiredtobeweighedeach18monthsmaybereducedafter3yearsofoperation ifsuchareduction issupported byobservedsublimation data.3/4.6.5.2 ICEBEDTEMPERATURE MONITORING SYSTEMTheOPERABILITY oftheicebedtemperature monitoring systemensuresthatthecapability isavailable formonitoring theicetemperature.
The igniters in each train are further divided into six groups per train powered from different phases of two separate three phase transformers.
Intheeventthemonitoring systemisinoperable, theACTIONrequirements provideassurance thattheicebedheatremovalcapacitywillberetainedwithinthespeciifiied timelimits.~p'>+<g~~~
It is the transformer phase that uniquely defines a group.Operation in Modes 1 and 2 with both trains available ensures the capability for controlled burning of hydrogen gas inside containment during degraded core LOCA events.I In Modes 3 and 4 both the hydrogen production rate and the total hydrogen production afler a LOCA would be significantly less than that calculated for the DBA LOCA.Also, because of the limited time in these MODES, the probability of an accident requiring the DIS is low.Therefore the DIS is not required in Modes 3 and 4.In Modes 5 and 6, the probability and consequences of a LOCA are reduced due to the pressure and temperature limitations of these Modes.Therefore, the DIS is not required to be OPERABLE in Modes 5 and 6.The 7 day Completion Time for restoration of an inoperable DIS train in Modes 1 or 2 is based on the low probability of occurrence of a degraded core event that would generate hydrogen in amounts equivalent to a metal water reaction of 75~/o of the core cladding and the low probability of failure of the OPERABLE DIS train.This justification also applies to the 7 day Completion Time allowed for redundant igniters being inoperable in the same containment region.For this case there would also be ignition capability from adjacent containment regions by flame propagation to the region with no OPERABLE igniters.Confidence in system OPERABILITY is demonstrated by surveillance testing.Since many igniters are inaccessible at power, surveillance testing in Mode 1 is limited to measurement of igniter current when the DIS is energized by groups.Measured currents are compared with baseline data for the group.Igniter temperature measurements for all igniters can only be performed during shutdown and is performed every 18 months.This testing energizes all igniters and confirms the ability of each igniter to obtain a surface temperature of at least 1700'F.This temperature is conservatively above the temperature necessary to ignite hydrogen mixtures at concentrations near the lower flammability limit.Test experience indicates that individual igniter failures are generally total failures and do not involve the inability to reach the required temperature when an igniter is drawing normal amperage.This observed failure mode provides reasonable confidence that an igniter failing to reach the required temperature would also be detected by reduced group current measurements during the Mode 1 surveillances.
+<>>ye~~aK~&~~~o~c5~n~~~C~~~~rg+~+~~++rnid56@Wrensgp,$,5ZAPCOuy&rsdrZ p)+,y,ygg~,4~~ZHryWw~~n+rrru~o'n m~~~/Zing8-<WCOOKNUCLEARPLANT-UNIT 2PageB3/4~AMENDMENT 4,444,A4,207 J~'I'PI Distributed IgnitionSystem(DIS)TheDISpermitscontrolled burningoftheexcessive hydrogengenerated duringdegradedcoreLOCAspostulated by10CFR50.44 "Standards forcombustible gascontrolsysteminlight-water-cooled powerreactors."
Therefore the 18 month frequency for actual temperature measurements is acceptable.
Thepostulated amountofhydrogenisequivalent tothatgenerated fromthereactionof75'/oofthefuelcladdingwithwater.Controlled burningatlowhydrogenconcentrations precludes containment damagethatcouldresultfromrandomignitionathighconcentrations.
ATTACHMENT 3 TO AEP:NRC:1291 PROPOSED AMENDMENT TO THE TECHNICAL SPECIFICATIONS DISTRIBUTED IGNITION SYSTEM I
Anextensive programoftestingandanalysishasdemonstrated thatasystemofstrategically placedhydrogenigniters(theDIS)canberelieduponforcontrolled burnsofthehydrogengaspostulated fordegradedcores.Furthermore, ithasbeenshownthatthiscanbeaccomplished atcombustion temperatures andpressures thatwillnotchallenge theintegrity ofthecontainment structure ortheoperability ofcontainment equipment necessary toshutdown(andmaintainshutdown) thereactor.Thehydrogenignitersarenotincludedformitigation ofaDesignBasisAccident(DBA)becauseanamountofhydrogenequivalent tothatgenerated fromthereactionof75~/oofthefuelcladdingwithwaterisfarinexcessofthehydrogencalculated forthelimitingDBAlossofcoolantaccident(LOCA).Thehydrogenconcentration resulting fromaDBAcanbemaintained lessthantheflammability limitusingthehydrogenrecombiners.
UNIT 1 INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE 3/4.5 EMERGENCY CORE COOLING SYSTEMS ECCS 3/4;5".1 ACCUMUL'ATORS 3/4 5-1 3/4.5.3 3/4.5.4 ECCS SUBSYSTEMS
TheDISconsistsoftwoindependent trainsof35igniterslocatedthroughout containmcnt.
-Tavg less than 350'F BORON INJECTION SYSTEM 3/4.5.2 ECCS SUBSYSTEMS-Tavg greater than or equal to 350'F..3/4 5-3 3/4 5-7 3/4.5.5 Intentionally Left Blank Intentionally Left Blank REFUELING WATER STORAGE TANK 3/4 5-9 3/4 5-10 3/4 5-11 3/4:6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT Containment Integrity Containment-Leakage
Theignitersineachtrainarefurtherdividedintosixgroupspertrainpoweredfromdifferent phasesoftwoseparatethreephasetransformers.
-........Containment Air Locks Internal Pressure Air Temperature Containment Structural Integrity Containment Ventilation Systems.3/4.6.2.DEPRESSURIZATION AND COOLING SYSTEMS 3/4 6-1 3/4 6-2 3/4 64 3/4 6-6 3/4 6-7 3/4 6-9 3/4 6-9a 3/4.6.3 3/4.6.4 Containment Spray System Spray Additive System CONTAINMENT ISOLATION VALVES COMBUSTIBLE GAS CONTROL 3/4 6-10 3/4 6-12 3/4 6-14 Hydrogen Analyzers.Electric Hydrogen Recombiners
Itisthetransformer phasethatuniquelydefinesagroup.Operation inModes1and2withbothtrainsavailable ensuresthecapability forcontrolled burningofhydrogengasinsidecontainment duringdegradedcoreLOCAevents.IInModes3and4boththehydrogenproduction rateandthetotalhydrogenproduction afleraLOCAwouldbesignificantly lessthanthatcalculated fortheDBALOCA.Also,becauseofthelimitedtimeintheseMODES,theprobability ofanaccidentrequiring theDISislow.Therefore theDISisnotrequiredinModes3and4.InModes5and6,theprobability andconsequences ofaLOCAarereducedduetothepressureandtemperature limitations oftheseModes.Therefore, theDISisnotrequiredtobeOPERABLEinModes5and6.The7dayCompletion Timeforrestoration ofaninoperable DIStraininModes1or2isbasedonthelowprobability ofoccurrence ofadegradedcoreeventthatwouldgeneratehydrogeninamountsequivalent toametalwaterreactionof75~/oofthecorecladdingandthelowprobability offailureoftheOPERABLEDIStrain.Thisjustification alsoappliestothe7dayCompletion Timeallowedforredundant ignitersbeinginoperable inthesamecontainment region.Forthiscasetherewouldalsobeignitioncapability fromadjacentcontainment regionsbyflamepropagation totheregionwithnoOPERABLEigniters.
-W Distributed Ignition System 3/4 6-23 3/4 6-24 3/4 6-25 COOING NUCLEAR PLANT-UNIT 1 VII AMENDMENT QR, 36, k%)AS, 4I  
Confidence insystemOPERABILITY isdemonstrated bysurveillance testing.Sincemanyignitersareinaccessible atpower,surveillance testinginMode1islimitedtomeasurement ofignitercurrentwhentheDISisenergized bygroups.Measuredcurrentsarecomparedwithbaselinedataforthegroup.Ignitertemperature measurements foralligniterscanonlybeperformed duringshutdownandisperformed every18months.Thistestingenergizes allignitersandconfirmstheabilityofeachignitertoobtainasurfacetemperature ofatleast1700'F.Thistemperature isconservatively abovethetemperature necessary toignitehydrogenmixturesatconcentrations nearthelowerflammability limit.Testexperience indicates thatindividual igniterfailuresaregenerally totalfailuresanddonotinvolvetheinability toreachtherequiredtemperature whenanigniterisdrawingnormalamperage.
~~3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS ELECTRIC HYDROGEN RECOMBINERS
Thisobservedfailuremodeprovidesreasonable confidence thatanigniterfailingtoreachtherequiredtemperature wouldalsobedetectedbyreducedgroupcurrentmeasurements duringtheMode1surveillances.
-W LIMITING CONDITION FOR OPERATION 3.6.4.2 Two independent containment hydrogen recombiner systems shall be OPERABLE.APPLICABILITY:
Therefore the18monthfrequency foractualtemperature measurements isacceptable.
MODES 1 and 2.ACTION: I With one hydrogen recombiner system inoperable, restore the inoperable system to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours.SURVEILLANCE RE UIREMENTS 4.6.4.2 Each hydrogen recombiner system shall be demonstrated OPERABLE: At least once per 18 months by verifying during a recombiner system functional test that the minimum heater sheath temperature increases to 2 700'F within 90 minutes and is maintained for at least 2 hours.b.At least once per 18 months by: 1.Performing a CHANNEL CALIBRATION of all recombiner instrumentation and control circuits.2.Verifying through a visual examination that there is no evidence of abnormal conditions within the recombiners (i.e., loose wiring or structural connections, deposits of foreign materials, etc.)Verifying during a recombiner system functional test that the heater sheath temperature increases to 2 1200'F within 5 hours and is maintained for at least 4 hours.4, Verifying the integrity of all heater electrical circuits by performing a continuity and resistance to ground test following the above required functional test.The resistance to ground for any heater phase shall be R 10,000 ohms.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 6-24 AMENDMENT 4Q, R2S, 0 R~w'N1 d 8'I I t t 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS DISTRIBUTED IGNITION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.4.3 Both trains of the Distributed Ignition System shall be OPERABLE.APPLICABILITY:
ATTACHMENT 3TOAEP:NRC:1291 PROPOSEDAMENDMENT TOTHETECHNICAL SPECIFICATIONS DISTRIBUTED IGNITIONSYSTEM I
MODES 1 and 2.ACTION: With one train of the Distributed Ignition System inoperable:
UNIT1 INDEXLIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS SECTIONPAGE3/4.5EMERGENCY CORECOOLINGSYSTEMSECCS3/4;5".1ACCUMUL'ATORS 3/45-13/4.5.33/4.5.4ECCSSUBSYSTEMS
a.Restore the inoperable train to OPERABLE status within 7 days, or b.Perform surveillance requirement 4.6.4.3a once per 7 days on the OPERABLE train until the inoperable train is restored to OPERABLE status.With no OPERABLE hydrogen igniter in one containment region, restore one hydrogen igniter in the affected containment region to OPERABLE status within 7 days, or be in HOT STANDBY within 6 hours.SURVEILLANCE RE UIREMENTS 4.6.4.3 Each train of the Distributed Ignition System shall be demonstrated OPERABLE: ao b.C.Once per 92 days by energizing the supply breakers and verifying that at least 34 of 35 igniters are energized, Once per 92 days, verify at least one hydrogen igniter is OPERABLE in each containment region.Once per 18 months by verifying the temperature of each igniter'is a minimum 1700'F.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 6-25 3/4 BASES 3/4.6 CONTAINMENT SYSTEMS 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS 3/4.6.2.1 CONTAINMENT SPRAY SYSTEM The OPERABILITY of the containment spray system ensures that containment depressurization and cooling capability will be available in the event of a LOCA.The pressure reduction and resultant lower containment leakage rate are consistent with the assumptions used in the accident analyses.3/4.6.2.2 SPRAY ADDITIVE SYSTEM The OPERABILITY of the spray additive system ensures that sufficient NaOH is added to the containment spray in the event of a LOCA.The limits on NaOH minimum volume and concentration, ensure that 1)the iodine removal efficiency of the spray water is maintained because of the increase in pH value, and 2)corrosion effects on components within containment are minimized.
-Tavglessthan350'FBORONINJECTION SYSTEM3/4.5.2ECCSSUBSYSTEMS
These assumptions are consistent with the iodine removal efficiency assumed in the accident analyses.3/4.6.3 CONTAINMENT ISOLATION VALVES The OPERABILITY of the containment isolation valves ensures that the containment atmosphere will be isolated from the outside environment in the event of a release of radioactive material to the containment atmosphere or pressurization of the containment.
-Tavggreaterthanorequalto350'F..3/45-33/45-73/4.5.5Intentionally LeftBlankIntentionally LeftBlankREFUELING WATERSTORAGETANK3/45-93/45-103/45-113/4:6CONTAINMENT SYSTEMS3/4.6.1PRIMARYCONTAINMENT Containment Integrity Containment-Leakage
Containment isolation within the time limits specified ensures that the release of radioactive material to the environment will be consistent with the assumptions used in the analyses for a LOCA.The opening of containment purge and exhaust valves and locked or sealed closed containment isolation valves on an intermittent basis under administrative control includes the following considerations:
-........
(1)stationing a qualified individual, who is in constant communication with control room, at the valve controls, (2)instructing this individual to close these valves in an accident situation, and (3)assuring that environmental conditions will not preclude access to close the valves and that this action will prevent the release of radioactivity outside the containment.
Containment AirLocksInternalPressureAirTemperature Containment Structural Integrity Containment Ventilation Systems.3/4.6.2.DEPRESSURIZATION ANDCOOLINGSYSTEMS3/46-13/46-23/4643/46-63/46-73/46-93/46-9a3/4.6.33/4.6.4Containment SpraySystemSprayAdditiveSystemCONTAINMENT ISOLATION VALVESCOMBUSTIBLE GASCONTROL3/46-103/46-123/46-14HydrogenAnalyzers
3/4.6.4 COMBUSTIBLE GAS CONTROL Hydrogen Analyzers and Recombiners The OPERABILITY of the equipment and systems required for the detection and control of hydrogen gas ensures that this equipment will be available to maintain the hydrogen concentration within containment below its flammable limit during post-LOCA conditions.
.ElectricHydrogenRecombiners
Either recombiner unit is capable of controlling the expected hydrogen generation associated with 1)zirconium-water reactions, 2)radiolytic decomposition of water and 3)corrosion of metals within containment.
-WDistributed IgnitionSystem3/46-233/46-243/46-25COOINGNUCLEARPLANT-UNIT 1VIIAMENDMENT QR,36,k%)AS, 4I  
The acceptance criteria of 10,000 ohms is based on the test being performed with the heater element at an ambient temperature, but can be conservatively applied when the heater element is at a temperature above ambient.Distributed Ignition System (DIS)The DIS permits controlled burning of the excessive hydrogen generated during degraded core LOCAs postulated by 10CFR50.44,"Standards for combustible gas control system in light-water-cooled power reactors." The postulated amount of hydrogen is equivalent to that generated from the reaction of 75%of the fuel cladding with water.ControHed burning at low hydrogen concentrations precludes containment damage that could result from random ignition at high concentrations.
~~3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.6CONTAINMENT SYSTEMSELECTRICHYDROGENRECOMBINERS
An extensive program of testing and analysis has demonstrated that a system of strategically placed hydrogen igniters (the DIS)can be relied upon for controlled burns of the hydrogen gas postulated COOK NUCLEAR PLANT-UNIT 1 Page B 3/4 6-3 AMENDMENT 4R,~,
-WLIMITINGCONDITION FOROPERATION 3.6.4.2Twoindependent containment hydrogenrecombiner systemsshallbeOPERABLE.
CJ e 3/4 BASES 3/4.6 CONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL continued for degraded cores.Furthermore, it has been shown that this can be accomplished at combustion temperatures and pressures that will not challenge the integrity of the containment structure or the operability of containment equipment necessary to shutdown (and maintain shutdown)the reactor.The hydrogen igniters are not included for mitigation of a Design Basis Accident (DBA)because an amount of hydrogen equivalent to that generated from the reaction of 75%of the fuel cladding with water is far in excess of the hydrogen calculated for the limiting DBA loss of coolant accident (LOCA).The hydrogen concentration resulting from a DBA can be maintained less than the flammability limit using the hydrogen recombiners.
APPLICABILITY:
The DIS consists of two independent trains of 35 igniters located throughout containment.
MODES1and2.ACTION:IWithonehydrogenrecombiner systeminoperable, restoretheinoperable systemtoOPERABLEstatuswithin30daysorbeinatleastHOTSTANDBYwithinthenext6hours.SURVEILLANCE REUIREMENTS 4.6.4.2Eachhydrogenrecombiner systemshallbedemonstrated OPERABLE:
The igniters in each train are further divided into six groups per train powered from different phases of two separate three phase transformers.
Atleastonceper18monthsbyverifying duringarecombiner systemfunctional testthattheminimumheatersheathtemperature increases to2700'Fwithin90minutesandismaintained foratleast2hours.b.Atleastonceper18monthsby:1.Performing aCHANNELCALIBRATION ofallrecombiner instrumentation andcontrolcircuits.
It is the transformer phase that uniquely defines a group.Operation in MODES 1 and 2 with both trains available ensures the capability for controlled burning of hydrogen gas inside containment during degraded core LOCA events.In MODES 3 and 4 both the hydrogen production rate and the total hydrogen production after a LOCA would be significantly less than that calculated for the DBA LOCA.Also, because of the limited time in these MODES, the probability of an accident requiring the DIS is low.Therefore the DIS is not required in MODES 3 and 4.In MODES 5 and 6, the probability and consequences of a LOCA are reduced due to the pressure and temperature limitations of these MODES.Therefore, the DIS is not required to be OPERABLE in MODES 5 and 6.The 7 day Completion Time for restoration of an inoperable DIS train in MODES 1 or 2 is based on the low probability of occurrence of a degraded core event that would generate hydrogen in amounts equivalent to a metal water reaction of 75%of the core cladding and the low probability of failure of the OPERABLE DIS train.This justification also applies to the 7 day Completion Time allowed for redundant igniters being inoperable in the same containment region.For this case there would also be ignition capability from adjacent containment regions by flame propagation to the region with no OPERABLE igniters.Confidence in system OPERABILITY is demonstrated by surveillance testing.Since many igniters are inaccessible at power, surveillance testing in MODE 1 is limited to measurement of igniter current when the DIS is energized by groups.Measured currents are compared with baseline data for the group.Igniter temperature measurements for all igniters can only be performed during shutdown and is performed every 18 months.This testing energizes all igniters and confirms the ability of each igniter to obtain a surface temperature of at least 1700'F.This temperature is conservatively above the temperature necessary to ignite hydrogen mixtures at concentrations near the lower flammability limit.Test experience indicates that individual igniter failures are generally total failures and do not involve the inability to reach the required temperature when an igniter is drawing normal amperage.This observed failure mode provides reasonable confidence that an igniter failing to reach the required temperature would also be detected by reduced group current measurements during the MODE 1 surveillances.
2.Verifying throughavisualexamination thatthereisnoevidenceofabnormalconditions withintherecombiners (i.e.,loosewiringorstructural connections, depositsofforeignmaterials, etc.)Verifying duringarecombiner systemfunctional testthattheheatersheathtemperature increases to21200'Fwithin5hoursandismaintained foratleast4hours.4,Verifying theintegrity ofallheaterelectrical circuitsbyperforming acontinuity andresistance togroundtestfollowing theaboverequiredfunctional test.Theresistance togroundforanyheaterphaseshallbeR10,000ohms.COOKNUCLEARPLANT-UNIT 1Page3/46-24AMENDMENT 4Q,R2S, 0R~w'N1d8'II tt3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.6CONTAINMENT SYSTEMSDISTRIBUTED IGNITIONSYSTEMLIMITINGCONDITION FOROPERATION 3.6.4.3BothtrainsoftheDistributed IgnitionSystemshallbeOPERABLE.
Therefore the 18 month frequency for actual temperature measurements is acceptable.
APPLICABILITY:
COOK NUCLEAR PLANT-UNIT 1 Page B 3/4 6-3a 0 INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE 3/4.5 EMERGENCY CORE COOLING SYSTEMS ECCS 3/4.5.1 ACCUMULATORS 3/4 5-1 3/4.5.2 ECCS SUBSYSTEMS
MODES1and2.ACTION:WithonetrainoftheDistributed IgnitionSysteminoperable:
-Tavg greater than or equal to 350'F..3/4.5.3 ECCS SUBSYSTEMS
a.Restoretheinoperable traintoOPERABLEstatuswithin7days,orb.Performsurveillance requirement 4.6.4.3aonceper7daysontheOPERABLEtrainuntiltheinoperable trainisrestoredtoOPERABLEstatus.WithnoOPERABLEhydrogenigniterinonecontainment region,restoreonehydrogenigniterintheaffectedcontainment regiontoOPERABLEstatuswithin7days,orbeinHOTSTANDBYwithin6hours.SURVEILLANCE REUIREMENTS 4.6.4.3EachtrainoftheDistributed IgnitionSystemshallbedemonstrated OPERABLE:
-Tavg less than 350'F 3/4.5.4 BORON INJECTION SYSTEM Intentionally Left Blank Intentionally Left Blank 3/4.5.5 REFUELING WATER STORAGE TANK 3/4.6 CONTAINMENT SYSTEMS 3/4 5-3 3/4 5-7 3/4 5-9 3/4 5-10 3/4 5-11 3/4.6.1 PRIMARY CONTAINMENT Containment Integrity Containment Leakage Containment Air Locks Internal Pressure Air Temperature Containment Structural Integrity Containment Ventilation System 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS Containment Spray System Spray Additive System 3/4.6.3 CONTAINMENT ISOLATION VALVES 3/4 6-1 3/4 6-2 3/4 6P 3/4 6-6 3/4 6-7 3/4 6-9 3/4 6-9a 3/4 6-10 3/4 6-11 3/4 6-13 3/4.6.4 COMBUSTIBLE GAS CONTROL Hydrogen Analyzer..Electric Hydrogen Recom(iners
aob.C.Onceper92daysbyenergizing thesupplybreakersandverifying thatatleast34of35ignitersareenergized, Onceper92days,verifyatleastonehydrogenigniterisOPERABLEineachcontainment region.Onceper18monthsbyverifying thetemperature ofeachigniter'is aminimum1700'F.COOKNUCLEARPLANT-UNIT 1Page3/46-25 3/4BASES3/4.6CONTAINMENT SYSTEMS3/4.6.2DEPRESSURIZATION ANDCOOLINGSYSTEMS3/4.6.2.1 CONTAINMENT SPRAYSYSTEMTheOPERABILITY ofthecontainment spraysystemensuresthatcontainment depressurization andcoolingcapability willbeavailable intheeventofaLOCA.Thepressurereduction andresultant lowercontainment leakagerateareconsistent withtheassumptions usedintheaccidentanalyses.
-W Distributed Ignition System 3/4 6-33 3/4 6-34 3/4 6-34a COOK NUCLEAR PLANT-UNIT 2 AMENDMENT 48, QQ, 445, l c INDEX BASES SECTION PAGE 3/4.4 REACTOR COOLANT SYSTEM Continued 3/4.4.9 PRESSURE/TEMPERATURE LIMITS 3/4.4.10 STRUCTURAL INTEGRITY 3/4.4.11 RELIEF VALVES..3/4.4.12 REACTOR COOLANT VENT SYSTEM B 3/4 4-6 B 3/4 4-10 B 3/4 4-11 B 3/4 4-11 3/4.5 EMERGENCY CORE COOLING SYSTEMS ECCS 3/4.5.1 ACCUMULATORS 3/4.5.2 and 3/4.5.3 ECCS SUBSYSTEMS 3/4.5.4 BORON INJECTION SYSTEM..3/4.5.5 REFUELING WATER STORAGE TANK (RWST)..B 3/4 5-1 B 3/4 5-1 B 3/4 5-2 B 3/4 5-3 3/4.6 CONTAINMENT SYSTEMS 3.4.6.1 PRIMARY CONTAINMENT 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS 3/4.6.3 CONTAINMENT ISOLATION VALVES 3/4.6.4 COMBUSTIBLE GAS CONTROL....3/4.6.5 ICE CONDENSER B 3/4 6-1 B 3/4 6-3 B 3/4 6-3 B 3/4 64 B 3/4 64a 3/4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE 3/4.7.2 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATION 3/4.7.3 COMPONENT COOLING WATER SYSTEM 3/4.7.4 ESSENTIAL SERVICE WATER SYSTEM..3/4:7.5 CONTROL ROOM EMERGENCY VENTILATION SYSTEM 3/4.7.6 ESF VENTILATION SYSTEM.3/4.7.7 HYDRAULIC SNUBBERS B 3/4 7-1 B 3/4 7-4 B 3/4 74 B 3/4 7-4 B 3/4 74a B 3/4 7-5 B 3/4 7-5 COOK NUCLEAR PLANT-UNIT 2 XII AMENDMENT 4P, 4', IVY, 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS DISTRIBUTED IGNITION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.4.3 Both trains of the Distributed Ignition System shall be OPERABLE.APPLICABILITY:
3/4.6.2.2 SPRAYADDITIVESYSTEMTheOPERABILITY ofthesprayadditivesystemensuresthatsufficient NaOHisaddedtothecontainment sprayintheeventofaLOCA.ThelimitsonNaOHminimumvolumeandconcentration, ensurethat1)theiodineremovalefficiency ofthespraywaterismaintained becauseoftheincreaseinpHvalue,and2)corrosion effectsoncomponents withincontainment areminimized.
MODES 1 and 2.ACTION: With one train of the Distributed Ignition System inoperable:
Theseassumptions areconsistent withtheiodineremovalefficiency assumedintheaccidentanalyses.
Restore the inoperable train to OPERABLE status within 7 days, or Perform surveillance requirement 4.6.4.3a once per 7 days on the OPERABLE train until the inoperable train is restored to OPERABLE status.With no OPERABLE hydrogen igniter in one containment region, restore one hydrogen igniter in the affected containment region to OPERABLE status within 7 days, or be in HOT STANDBY within 6 hours.SURVEILLANCE RE UIREMENTS 4.6.4.3 Each train of the Distributed Ignition System shall be demonstrated OPERABLE: Once per 92 days by energizing the supply breakers and verifying that at least 34 of 35 igniters are energized.
3/4.6.3CONTAINMENT ISOLATION VALVESTheOPERABILITY ofthecontainment isolation valvesensuresthatthecontainment atmosphere willbeisolatedfromtheoutsideenvironment intheeventofareleaseofradioactive materialtothecontainment atmosphere orpressurization ofthecontainment.
Once per 92 days, verify at least one hydrogen igniter is OPERABLE in each containment region.Once per-18 months by verifying the temperature of each igniter is a minimum 1700'F.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 6-34a AMENDMENT 3/4'ASES 3/4.6 CONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL Hydrogen Analyzers and Recombiners The OPERABILITY of the equipment and systems required for the detection and control of hydrogen gas ensures that this equipment will be available to maintain the hydrogen concentration within containment below its flammable limit during post-LOCA conditions.
Containment isolation withinthetimelimitsspecified ensuresthatthereleaseofradioactive materialtotheenvironment willbeconsistent withtheassumptions usedintheanalysesforaLOCA.Theopeningofcontainment purgeandexhaustvalvesandlockedorsealedclosedcontainment isolation valvesonanintermittent basisunderadministrative controlincludesthefollowing considerations:
Either recombiner unit is capable of controlling the expected hydrogen generation associated with 1)zirconium-water reactions, 2)radiolytic decomposition of water and 3)corrosion of metals within containment.
(1)stationing aqualified individual, whoisinconstantcommunication withcontrolroom,atthevalvecontrols, (2)instructing thisindividual toclosethesevalvesinanaccidentsituation, and(3)assuringthatenvironmental conditions willnotprecludeaccesstoclosethevalvesandthatthisactionwillpreventthereleaseofradioactivity outsidethecontainment.
These hydrogen control systems are consistent with the recommendations of Regulatory Guide 1.7,"Control of Combustible Gas Concentrations in Containment Following a LOCA," March 1971.The acceptance criterion of 10,000 ohms is based on the test being performed with the heater element at an ambient temperature, but can be conservatively applied when the heater element is at a temperature above ambient.Distributed Ignition System (DIS)The DIS permits controlled burning of the excessive hydrogen generated during degraded core LOCAs postulated by 10CFR50.44,"Standards for combustible gas control system in light-waterwooled power reactors." The postulated amount of hydrogen is equivalent to that generated from the reaction of 75%of the fuel cladding with water.Controlled burning at low hydrogen concentrations precludes containment damage that could result from random ignition at high concentrations.
3/4.6.4COMBUSTIBLE GASCONTROLHydrogenAnalyzers andRecombiners TheOPERABILITY oftheequipment andsystemsrequiredforthedetection andcontrolofhydrogengasensuresthatthisequipment willbeavailable tomaintainthehydrogenconcentration withincontainment belowitsflammable limitduringpost-LOCA conditions.
An extensive program of testing and analysis has demonstrated that a system of strategically placed hydrogen igniters (the DIS)can be relied upon for controlled burns of the hydrogen gas postulated for degraded cores.Furthermore, it has been shown that this can be accomplished at combustion temperatures and pressures that will not challenge the integrity of the containment structure or the operability of containment equipment necessary to shutdown (and maintain shutdown)the reactor.The hydrogen igniters are not included for mitigation of a Design Basis Accident (DBA)because an amount of hydrogen equivalent to that generated from the reaction of 75%of the fuel cladding with water is far in excess of the hydrogen calculated for the limiting DBA loss of coolant accident (LOCA).The hydrogen concentration resulting from a DBA can be maintained less than the flammability limit using the hydrogen recombiners.
Eitherrecombiner unitiscapableofcontrolling theexpectedhydrogengeneration associated with1)zirconium-water reactions, 2)radiolytic decomposition ofwaterand3)corrosion ofmetalswithincontainment.
The DIS consists of two independent trains of 35 igniters located throughout containment.
Theacceptance criteriaof10,000ohmsisbasedonthetestbeingperformed withtheheaterelementatanambienttemperature, butcanbeconservatively appliedwhentheheaterelementisatatemperature aboveambient.Distributed IgnitionSystem(DIS)TheDISpermitscontrolled burningoftheexcessive hydrogengenerated duringdegradedcoreLOCAspostulated by10CFR50.44, "Standards forcombustible gascontrolsysteminlight-water-cooled powerreactors."
The igniters in each train are further divided into six groups per train powered from different phases of two separate three phase transformers.
Thepostulated amountofhydrogenisequivalent tothatgenerated fromthereactionof75%ofthefuelcladdingwithwater.ControHed burningatlowhydrogenconcentrations precludes containment damagethatcouldresultfromrandomignitionathighconcentrations.
It is the transformer phase that uniquely defines a group.Operation in MODES 1 and 2 with both trains available ensures the capability for controlled burning of hydrogen gas inside containment during degraded core LOCA events.In MODES 3 and 4 both the hydrogen production rate and the total hydrogen production after a LOCA would be significantly less than that calculated for the DBA LOCA.Also, because of the limited time in these MODES, the probability of an accident requiring the DIS is low.Therefore the DIS is not required in MODES 3 and 4.In MODES 5 and 6, the probability and consequences of a LOCA are reduced due to the pressure and temperature limitations of these MODES.Therefore, the DIS is not required to be OPERABLE in MODES 5 and 6.The 7 day Completion Time for restoration of an inoperable DIS train in MODES 1 or 2 is based on the low probability of occurrence of a degraded core event that would generate hydrogen in amounts equivalent to a metal water reaction of 75%of the core cladding and the low probability of failure of the OPERABLE DIS train.This justification also applies to the 7 day Completion Time allowed for redundant igniters being inoperable in the same COOK NUCLEAR PLANT-UNIT 2 Page B 3/4 M AMENDMENT Q%,
Anextensive programoftestingandanalysishasdemonstrated thatasystemofstrategically placedhydrogenigniters(theDIS)canberelieduponforcontrolled burnsofthehydrogengaspostulated COOKNUCLEARPLANT-UNIT 1PageB3/46-3AMENDMENT 4R,~,
CJe 3/4BASES3/4.6CONTAINMENT SYSTEMS3/4.6.4COMBUSTIBLE GASCONTROLcontinued fordegradedcores.Furthermore, ithasbeenshownthatthiscanbeaccomplished atcombustion temperatures andpressures thatwillnotchallenge theintegrity ofthecontainment structure ortheoperability ofcontainment equipment necessary toshutdown(andmaintainshutdown) thereactor.Thehydrogenignitersarenotincludedformitigation ofaDesignBasisAccident(DBA)becauseanamountofhydrogenequivalent tothatgenerated fromthereactionof75%ofthefuelcladdingwithwaterisfarinexcessofthehydrogencalculated forthelimitingDBAlossofcoolantaccident(LOCA).Thehydrogenconcentration resulting fromaDBAcanbemaintained lessthantheflammability limitusingthehydrogenrecombiners.
TheDISconsistsoftwoindependent trainsof35igniterslocatedthroughout containment.
Theignitersineachtrainarefurtherdividedintosixgroupspertrainpoweredfromdifferent phasesoftwoseparatethreephasetransformers.
Itisthetransformer phasethatuniquelydefinesagroup.Operation inMODES1and2withbothtrainsavailable ensuresthecapability forcontrolled burningofhydrogengasinsidecontainment duringdegradedcoreLOCAevents.InMODES3and4boththehydrogenproduction rateandthetotalhydrogenproduction afteraLOCAwouldbesignificantly lessthanthatcalculated fortheDBALOCA.Also,becauseofthelimitedtimeintheseMODES,theprobability ofanaccidentrequiring theDISislow.Therefore theDISisnotrequiredinMODES3and4.InMODES5and6,theprobability andconsequences ofaLOCAarereducedduetothepressureandtemperature limitations oftheseMODES.Therefore, theDISisnotrequiredtobeOPERABLEinMODES5and6.The7dayCompletion Timeforrestoration ofaninoperable DIStraininMODES1or2isbasedonthelowprobability ofoccurrence ofadegradedcoreeventthatwouldgeneratehydrogeninamountsequivalent toametalwaterreactionof75%ofthecorecladdingandthelowprobability offailureoftheOPERABLEDIStrain.Thisjustification alsoappliestothe7dayCompletion Timeallowedforredundant ignitersbeinginoperable inthesamecontainment region.Forthiscasetherewouldalsobeignitioncapability fromadjacentcontainment regionsbyflamepropagation totheregionwithnoOPERABLEigniters.
Confidence insystemOPERABILITY isdemonstrated bysurveillance testing.Sincemanyignitersareinaccessible atpower,surveillance testinginMODE1islimitedtomeasurement ofignitercurrentwhentheDISisenergized bygroups.Measuredcurrentsarecomparedwithbaselinedataforthegroup.Ignitertemperature measurements foralligniterscanonlybeperformed duringshutdownandisperformed every18months.Thistestingenergizes allignitersandconfirmstheabilityofeachignitertoobtainasurfacetemperature ofatleast1700'F.Thistemperature isconservatively abovethetemperature necessary toignitehydrogenmixturesatconcentrations nearthelowerflammability limit.Testexperience indicates thatindividual igniterfailuresaregenerally totalfailuresanddonotinvolvetheinability toreachtherequiredtemperature whenanigniterisdrawingnormalamperage.
Thisobservedfailuremodeprovidesreasonable confidence thatanigniterfailingtoreachtherequiredtemperature wouldalsobedetectedbyreducedgroupcurrentmeasurements duringtheMODE1surveillances.
Therefore the18monthfrequency foractualtemperature measurements isacceptable.
COOKNUCLEARPLANT-UNIT 1PageB3/46-3a 0INDEXLIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS SECTIONPAGE3/4.5EMERGENCY CORECOOLINGSYSTEMSECCS3/4.5.1ACCUMULATORS 3/45-13/4.5.2ECCSSUBSYSTEMS
-Tavggreaterthanorequalto350'F..3/4.5.3ECCSSUBSYSTEMS
-Tavglessthan350'F3/4.5.4BORONINJECTION SYSTEMIntentionally LeftBlankIntentionally LeftBlank3/4.5.5REFUELING WATERSTORAGETANK3/4.6CONTAINMENT SYSTEMS3/45-33/45-73/45-93/45-103/45-113/4.6.1PRIMARYCONTAINMENT Containment Integrity Containment LeakageContainment AirLocksInternalPressureAirTemperature Containment Structural Integrity Containment Ventilation System3/4.6.2DEPRESSURIZATION ANDCOOLINGSYSTEMSContainment SpraySystemSprayAdditiveSystem3/4.6.3CONTAINMENT ISOLATION VALVES3/46-13/46-23/46P3/46-63/46-73/46-93/46-9a3/46-103/46-113/46-133/4.6.4COMBUSTIBLE GASCONTROLHydrogenAnalyzer..ElectricHydrogenRecom(iners
-WDistributed IgnitionSystem3/46-333/46-343/46-34aCOOKNUCLEARPLANT-UNIT 2AMENDMENT 48,QQ,445, lc INDEXBASESSECTIONPAGE3/4.4REACTORCOOLANTSYSTEMContinued 3/4.4.9PRESSURE/TEMPERATURE LIMITS3/4.4.10STRUCTURAL INTEGRITY 3/4.4.11RELIEFVALVES..3/4.4.12REACTORCOOLANTVENTSYSTEMB3/44-6B3/44-10B3/44-11B3/44-113/4.5EMERGENCY CORECOOLINGSYSTEMSECCS3/4.5.1ACCUMULATORS 3/4.5.2and3/4.5.3ECCSSUBSYSTEMS 3/4.5.4BORONINJECTION SYSTEM..3/4.5.5REFUELING WATERSTORAGETANK(RWST)..B3/45-1B3/45-1B3/45-2B3/45-33/4.6CONTAINMENT SYSTEMS3.4.6.1PRIMARYCONTAINMENT 3/4.6.2DEPRESSURIZATION ANDCOOLINGSYSTEMS3/4.6.3CONTAINMENT ISOLATION VALVES3/4.6.4COMBUSTIBLE GASCONTROL....3/4.6.5ICECONDENSER B3/46-1B3/46-3B3/46-3B3/464B3/464a3/4.7PLANTSYSTEMS3/4.7.1TURBINECYCLE3/4.7.2STEAMGENERATOR PRESSURE/TEMPERATURE LIMITATION 3/4.7.3COMPONENT COOLINGWATERSYSTEM3/4.7.4ESSENTIAL SERVICEWATERSYSTEM..3/4:7.5CONTROLROOMEMERGENCY VENTILATION SYSTEM3/4.7.6ESFVENTILATION SYSTEM.3/4.7.7HYDRAULIC SNUBBERSB3/47-1B3/47-4B3/474B3/47-4B3/474aB3/47-5B3/47-5COOKNUCLEARPLANT-UNIT 2XIIAMENDMENT 4P,4',IVY, 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.6CONTAINMENT SYSTEMSDISTRIBUTED IGNITIONSYSTEMLIMITINGCONDITION FOROPERATION 3.6.4.3BothtrainsoftheDistributed IgnitionSystemshallbeOPERABLE.
APPLICABILITY:
MODES1and2.ACTION:WithonetrainoftheDistributed IgnitionSysteminoperable:
Restoretheinoperable traintoOPERABLEstatuswithin7days,orPerformsurveillance requirement 4.6.4.3aonceper7daysontheOPERABLEtrainuntiltheinoperable trainisrestoredtoOPERABLEstatus.WithnoOPERABLEhydrogenigniterinonecontainment region,restoreonehydrogenigniterintheaffectedcontainment regiontoOPERABLEstatuswithin7days,orbeinHOTSTANDBYwithin6hours.SURVEILLANCE REUIREMENTS 4.6.4.3EachtrainoftheDistributed IgnitionSystemshallbedemonstrated OPERABLE:
Onceper92daysbyenergizing thesupplybreakersandverifying thatatleast34of35ignitersareenergized.
Onceper92days,verifyatleastonehydrogenigniterisOPERABLEineachcontainment region.Onceper-18monthsbyverifying thetemperature ofeachigniterisaminimum1700'F.COOKNUCLEARPLANT-UNIT 2Page3/46-34aAMENDMENT 3/4'ASES3/4.6CONTAINMENT SYSTEMS3/4.6.4COMBUSTIBLE GASCONTROLHydrogenAnalyzers andRecombiners TheOPERABILITY oftheequipment andsystemsrequiredforthedetection andcontrolofhydrogengasensuresthatthisequipment willbeavailable tomaintainthehydrogenconcentration withincontainment belowitsflammable limitduringpost-LOCA conditions.
Eitherrecombiner unitiscapableofcontrolling theexpectedhydrogengeneration associated with1)zirconium-water reactions, 2)radiolytic decomposition ofwaterand3)corrosion ofmetalswithincontainment.
Thesehydrogencontrolsystemsareconsistent withtherecommendations ofRegulatory Guide1.7,"ControlofCombustible GasConcentrations inContainment Following aLOCA,"March1971.Theacceptance criterion of10,000ohmsisbasedonthetestbeingperformed withtheheaterelementatanambienttemperature, butcanbeconservatively appliedwhentheheaterelementisatatemperature aboveambient.Distributed IgnitionSystem(DIS)TheDISpermitscontrolled burningoftheexcessive hydrogengenerated duringdegradedcoreLOCAspostulated by10CFR50.44, "Standards forcombustible gascontrolsysteminlight-waterwooled powerreactors."
Thepostulated amountofhydrogenisequivalent tothatgenerated fromthereactionof75%ofthefuelcladdingwithwater.Controlled burningatlowhydrogenconcentrations precludes containment damagethatcouldresultfromrandomignitionathighconcentrations.
Anextensive programoftestingandanalysishasdemonstrated thatasystemofstrategically placedhydrogenigniters(theDIS)canberelieduponforcontrolled burnsofthehydrogengaspostulated fordegradedcores.Furthermore, ithasbeenshownthatthiscanbeaccomplished atcombustion temperatures andpressures thatwillnotchallenge theintegrity ofthecontainment structure ortheoperability ofcontainment equipment necessary toshutdown(andmaintainshutdown) thereactor.Thehydrogenignitersarenotincludedformitigation ofaDesignBasisAccident(DBA)becauseanamountofhydrogenequivalent tothatgenerated fromthereactionof75%ofthefuelcladdingwithwaterisfarinexcessofthehydrogencalculated forthelimitingDBAlossofcoolantaccident(LOCA).Thehydrogenconcentration resulting fromaDBAcanbemaintained lessthantheflammability limitusingthehydrogenrecombiners.
TheDISconsistsoftwoindependent trainsof35igniterslocatedthroughout containment.
Theignitersineachtrainarefurtherdividedintosixgroupspertrainpoweredfromdifferent phasesoftwoseparatethreephasetransformers.
Itisthetransformer phasethatuniquelydefinesagroup.Operation inMODES1and2withbothtrainsavailable ensuresthecapability forcontrolled burningofhydrogengasinsidecontainment duringdegradedcoreLOCAevents.InMODES3and4boththehydrogenproduction rateandthetotalhydrogenproduction afteraLOCAwouldbesignificantly lessthanthatcalculated fortheDBALOCA.Also,becauseofthelimitedtimeintheseMODES,theprobability ofanaccidentrequiring theDISislow.Therefore theDISisnotrequiredinMODES3and4.InMODES5and6,theprobability andconsequences ofaLOCAarereducedduetothepressureandtemperature limitations oftheseMODES.Therefore, theDISisnotrequiredtobeOPERABLEinMODES5and6.The7dayCompletion Timeforrestoration ofaninoperable DIStraininMODES1or2isbasedonthelowprobability ofoccurrence ofadegradedcoreeventthatwouldgeneratehydrogeninamountsequivalent toametalwaterreactionof75%ofthecorecladdingandthelowprobability offailureoftheOPERABLEDIStrain.Thisjustification alsoappliestothe7dayCompletion Timeallowedforredundant ignitersbeinginoperable inthesameCOOKNUCLEARPLANT-UNIT 2PageB3/4MAMENDMENT Q%,
C'I~
C'I~
3/4BASES3/4.6CONTAINMENT SYSTEMS3/4.f~.4COMBUSTIBLE GASCONTROLcontinued containment region.Forthiscasetherewouldalsobeignitioncapability fromadjacentcontainment regionsbyflamepropagation totheregionwithnoOPERABLEigniters.
3/4 BASES 3/4.6 CONTAINMENT SYSTEMS 3/4.f~.4 COMBUSTIBLE GAS CONTROL continued containment region.For this case there would also be ignition capability from adjacent containment regions by flame propagation to the region with no OPERABLE igniters.Confidence in system OPERABILITY is demonstrated by surveillance testing.Since many igniters are inaccessible at power, surveillance testing in MODE 1 is limited to measurement of igniter current when the DIS is energized by groups.Measured currents are compared with baseline data for the group.Igniter temperature measurements for all igniters can only be performed during shutdown and i5 performed every 18 months.Thisitesting energizes all igniters and confirms the ability of each igniter to obtain a surface temperature of at least 1700'F.This temperature is conservatively above the temperature necessary to ignite hydrogen mixtures at concentrations near the lower flammability limit.Test experience indicates that individual igniter failures are generally total failures and do not involve the inability to reach the required temperature when an igniter is drawing normal amperage.This observed failure mode provides reasonable confidence that an igniter failing to reach the required temperature would also be detected by reduced group current measurements during the MODE 1 surveillances.
Confidence insystemOPERABILITY isdemonstrated bysurveillance testing.Sincemanyignitersareinaccessible atpower,surveillance testinginMODE1islimitedtomeasurement ofignitercurrentwhentheDISisenergized bygroups.Measuredcurrentsarecomparedwithbaselinedataforthegroup.Ignitertemperature measurements foralligniterscanonlybeperformed duringshutdownandi5performed every18months.Thisitesting energizes allignitersandconfirmstheabilityofeachignitertoobtainasurfacetemperature ofatleast1700'F.Thistemperature isconservatively abovethetemperature necessary toignitehydrogenmixturesatconcentrations nearthelowerflammability limit.Testexperience indicates thatindividual igniterfailuresaregenerally totalfailuresanddonotinvolvetheinability toreachtherequiredtemperature whenanigniterisdrawingnormalamperage.
Therefore the 18 month frequency for actual temperature measurements is acceptable.
Thisobservedfailuremodeprovidesreasonable confidence thatanigniterfailingtoreachtherequiredtemperature wouldalsobedetectedbyreducedgroupcurrentmeasurements duringtheMODE1surveillances.
3/4.6.5 ICE CONDENSER The requirements associated with each of the components of the ice condenser ensure that the overall system will be available to provide sufficient pressure suppression capability to limit the containment peak pressure transient to less than 12 psig during LOCA conditions.
Therefore the18monthfrequency foractualtemperature measurements isacceptable.
3/4.6.5.1 ICE BED The OPERABILITY of the ice bed ensures that the required ice inventory will 1)be distributed evenly through the containment bays, 2)contain sufficient boron to preclude dilution of the containment sump following the LOCA and 3)contain sufficient heat removal capability to condense the reactor system volume released during a LOCA.These conditions are consistent with the assumptions used in the accident analyses.The minimum weight figure of 1333 pounds of ice per basket contains a 5%conservative allowance for ice loss through'sublimation.
3/4.6.5ICECONDENSER Therequirements associated witheachofthecomponents oftheicecondenser ensurethattheoverallsystemwillbeavailable toprovidesufficient pressuresuppression capability tolimitthecontainment peakpressuretransient tolessthan12psigduringLOCAconditions.
In the event that observed sublimation rates are equal to or lower than design predictions after three years of operation, the minimum ice baskets weight may be adjusted downward.In addition, the number of ice baskets required to be weighed each 18 months may be reduced after 3 years of operation if such a reduction is supported by observed sublimation data.3/4.6.5.2 ICE BED TEMPERATURE MONITORING SYSTEM The OPERABILITY of the ice bed temperature monitoring system ensures that the capability is available for monitoring the ice temperature.
3/4.6.5.1 ICEBEDTheOPERABILITY oftheicebedensuresthattherequirediceinventory will1)bedistributed evenlythroughthecontainment bays,2)containsufficient borontoprecludedilutionofthecontainment sumpfollowing theLOCAand3)containsufficient heatremovalcapability tocondensethereactorsystemvolumereleasedduringaLOCA.Theseconditions areconsistent withtheassumptions usedintheaccidentanalyses.
In the event the monitoring system is inoperable, the ACTION requirements provide assurance that the ice bed heat removal capacity will be retained within the specified time limits.COOK NUCLEAR PLANT-UNIT 2 Page B 3/4&4a  
Theminimumweightfigureof1333poundsoficeperbasketcontainsa5%conservative allowance foricelossthrough'sublimation.
~~5 P I (e'h\}}
Intheeventthatobservedsublimation ratesareequaltoorlowerthandesignpredictions afterthreeyearsofoperation, theminimumicebasketsweightmaybeadjusteddownward.
Inaddition, thenumberoficebasketsrequiredtobeweighedeach18monthsmaybereducedafter3yearsofoperation ifsuchareduction issupported byobservedsublimation data.3/4.6.5.2 ICEBEDTEMPERATURE MONITORING SYSTEMTheOPERABILITY oftheicebedtemperature monitoring systemensuresthatthecapability isavailable formonitoring theicetemperature.
Intheeventthemonitoring systemisinoperable, theACTIONrequirements provideassurance thattheicebedheatremovalcapacitywillberetainedwithinthespecified timelimits.COOKNUCLEARPLANT-UNIT 2PageB3/4&4a  
~~5PI(e'h\}}

Revision as of 07:05, 6 July 2018

Proposed Tech Specs,Adding New TS Re Distributed Ignition Sys
ML17335A368
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/03/1998
From:
INDIANA MICHIGAN POWER CO.
To:
Shared Package
ML17335A367 List:
References
NUDOCS 9812080069
Download: ML17335A368 (32)


Text

ATTACHMENT 2 TO AEP:NRC:1291 CURRENT PAGES MARKED-UP TO SHOW PROPOSED AMENDMENT TO THE TECHNICAL SPECIFICATIONS DISTRIBUTED IGNITION SYSTEM 981208006'P 981203 PDR ADOCK 050003i5'PDR I

~I INDEX.j LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE RE UIREMENTS SECTION PAGE 3 4.5 3/4.5.1 3/4.5.2 3/4.5.3 3/4.5.4 3/4.5.5 EMERGENCY CORE COOLING SYSTEMS ECCS ACCUMULATORS ECCS SUBSYSTEHS

-Tavg greater than or e o to 350 Fe~~~~~~~~~~~~~~~~~~~~~~~~~~~~ECCS SUBSYSTEMS' Tavg less than 350 F..BORON INJECTION SYSTEM Intentionally Left Blank Intencionally Left Blank REFUELING WATER STORAGE TANKS qual 3/4 5-1 3/4 5-3 3/4 5-7 3/4 5-9 3/4 5-10 3/4 5-11 3 4.6 CONTAINMENT SYSTE."fS 3/4.6.1 PRIMLY CONTAINMENT Concainment Integrity Containment Leakage Containment Air Locks..Internal Pressure Air Temperature Containmenc Structural Integrity Contai.nment Venti.lation Systems.3/4.6.2 OEPRESSURI2ATION AND COOLING SYSTE."iS 3/4 6-1 3/4 6-2 3/4 6-4 3/4 6-6 3/4 6-7 3/4 6-9 3/4 6-9a 3/4.6.3 3/4.6.4 Containment Spray System.5.ay Additive System..CONTAINMENT ISOLATION VALVES COMBUSTIBLE GAS CONTROL Hydrogen Analyzers Electric Hydrogen Recombiners

-W 3/4 6-10 3/4 6-12 3/4 6-14 3/4 6-23 3/4 6-24 Sird~ia~ma'gni+io~

SySA~......

S/<COOK'NUCLEAR PLANT-UNIT 1 VII AMENDMENT No.gl, Sit XN,15S 3.6.4.2 Two independent containment hydrogen recombiner systems shall be OPERABLE.MODES 1 and 2.*hQXlQE-Vfth one hydrogen recombfner syseem fnoperable, reseore che inoperable syseem eo OPERABLE status within 30 days or be fn at least HOT STANDBY withfxt'Che nexe 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.4.6.4.2 Each hydrogen recombfner syseem shall be demonstrated OPERABLE: a.At least once per 18 months by verifying during a recombiner system funceional test thae the minimum heater sheath temperature increases to 0 x 700 P within 90 minutes and is maintained for ae lease 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.b.Ae lease once per 18 months by: PerfoxELLGg.a QfhNNEF CALIBRATION of.all recombfner fnsCreaentation and.'conerol"cfrcuf ts.'erf fyfng through a vfsual eximfnatfon chat there fs.no evfdence abnormal conditions within the recombfners (f.e., loose wiring or structural'connections, deposits of forefgn miterfals, etc.)~~>+<<7~Wzsri~~>Mu~~rc wwmcm,~~4'miiza~aZ rS S-Mrna 4.wNo~Z/~COOK NUCLFdB.PLANT-UNIT 1;j 1 3/4 6-24'.1 AMENDMENT NO.+M.~

3/4 LIMITING CONiDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINiiIENT SYSTEMS Verifying during a rccombiner system functional test that the heater sheath temperature increases to~1200'F within 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> and is maintained for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.~A//T/r/5 Verifying the integrity of all heater electrical circuits by performing a continuity and resistance to ground test following the above required functional test.The resistance to ground for any heater phase shall be 2 10,000 ohms.~uuV~ra Wage QC@urrZEmaurg f H~+Z DISTRIBUTED IGNITION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.4.3 Both trains of the Distributed Ignition System shall be OPERABLE.APPLICABILITY:

MODES 1 a11d 2.ACTION: With one train of the Distributed Ignition System inoperable:

Restore the inoperable train to OPERABLE status within 7 days, or b.Perform surveillance requirement 4.6.4.3a once per 7 days on the OPERABLE train until the inoperable train is restored to OPERABLE status.With no OPERABLE hydrogen igniter in one containment region, restore one hydrogen igniter in the affected containment region to OPERABLE status within 7 days, or be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.SURVEILLANCE RE UIREMENTS 4.6.4.3 Each train of the Distributed Ignition System shall be demonstrated OPERABLE: a.Once per 92 days by energizing the supply breakers and verifying that at least 34 of 35 igniters are energized.

b.Once per 92 days, verify at least one hydrogen igniter is OPERABLE in each containment region.c.Once per 18 months by verifying the temperature of each igniter is a minimum 1700'F.COOK NUCLEAR PLANT-UMT 1 Page 3/4 6-25 AMEND ME 223~Pa'W y'u Pscg yp g zg 3/4 BASES 3/4.6 COilTAINMENT SYSTEMS 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS 3/4.6.2.1 CONTAINMENT SPRAY SYSTEiVI The OPERABILITY of the containment spray system ensures that containment depressurization and cooling capability will be available in the event of a LOCA.The pressure reduction and resultant lower containment leakage rate are consistent with the assumptions used in the accident analyses.3/4.6.2.2 SPRAY ADDITIVE SYSTEM The OPERABILITY of the spray additive system ensures that sufficient NaOH is added to the containment spray in the event of a LOCA.The limits on NaOH minimum volume and concentration, ensure that I)the iodine removal efficiency of the spray water is maintained because of the increase in pH value, and 2)corrosion effects on components within containment are minimized.

These assumptions are consistent with the iodine removal efficiency assumed in the accident analyses.3/4.6.3 CONTAINMENT ISOLATION VALVES The OPERABILITY of the containment isolation valves ensures that the containment atmosphere will be isolated from the outside environment in the event'f a release of radioactive material to the containment atmosphere or pressurization of the containment.

Containment isolation within the time limits specified ensures that the release of radioactive material to the environment will be consistent with the assumptions used in the analyses for a LOCA.The opening of containment purge and exhaust valves and locked.sealed closed containment isolation valves on an intermittent basis under administrative control includes the following considerations: (I)stanoning a qualified individual, who is in constant communication with control room, at the valve controls, (2)instructing this individual to close these valves in an accident situation, and (3)assuring that environmental conditions will not preclude access to close the valves and that this action will prevent the release of radioactivity outside the containment.

3/4.6.4 COMBUSTIBLE GAS CONTROL The OPERABILITY of the equipment and systems required for the detection and control of hydrogen gas ensures that this equipment will be available to maintain the hydrogen concentration within containment below its flammable limit during post-LOCA conditions.

Either recombiner unit is capable of controlling the expected hydrogen generation associated with: I)zirconium-water reactions; 2)radiolytic decomposition of water;and 3)corrosion of metals within containment.

The acceptance criterion of 10,000 ohms is based on the test being performed with the heater element at an ambient temperature, but can be conservatively applied when the element is at a temperature above ambient.+ycYr oy<n Anal'drs Nrro PMrrrc5iner z Pg>N@7 fP W~&ayr>uZ ro w 8'Z/4>-SH 0 COOK NUCLEAR PLANT-UNIT I Page B 3/4 6-3 AMENDMENT 48k,~3-Distributed Ignition System (DIS)The DIS permits controlled burning of the excessive hydrogen generated during degraded core LOCAs postulated by 10CFR50.44"Standards for combustible gas control system in light-water-cooled power reactors." The postulated amount of hydrogen is equivalent to that generated from the reaction of 75%of the fuel cladding with water.Controlled burning at low hydrogen concentrations precludes containment damage that could result from random ignition at high concentrations.

An extensive program of testing and analysis has demonstrated that a system of strategically placed hydrogen igniters (the DIS)can be relied upon for controlled burns of the hydrogen gas postulated for degraded cores.Furthermore, it has been shown that this can be accomplished at combustion temperatures and pressures that will not challenge the integrity of the containment structure or the operability of containment equipment necessary to shutdown (and maintain shutdown)the reactor.The hydrogen igniters are not included for mitigation of a Design Basis Accident (DBA)because an amount of hydrogen equivalent to that generated from the reaction of 75%of the fuel cladding with water is far in excess of the hydrogen calculated for the limiting DBA loss of coolant accident (LOCA).The hydrogen concentration resulting from a DBA can be maintained less than the flammability.

limit using the hydrogen recombiners.

The DIS consists of two independent trains of 35 igniters located throughout containmcnt.

The igniters in each train are further divided into six groups per train powered from different phases of two separate three phase transformers.

It is the transformer phase that uniquely defines a group.Operation in Modes 1 and 2 with both trains available ensures the capability for controlled burning of hydrogen gas inside containment during degraded core LOCA events.In Modes 3 and 4 both the hydrogen production rate and the total hydrogen production afler a LOCA would be significantly less than that calculated for the DBA LOCA.Also, because of the limited time in these MODES, the probability of an accident requiring the DIS is low.Therefore the DIS is not required in Modes 3 and 4.In Modes 5 and 6, the probability and consequences of a LOCA are reduced due to the pressure and temperature limitations of these Modes.Therefore, the DIS is not required to be OPERABLE in Modes 5 and 6.The 7 day Completion Time for restoration of an inoperable DIS train in Modes 1 or 2 is based on the low probability of occurrence of a degraded core event that would generate hydrogen in amounts equivalent to a metal water reaction of 75%of the core cladding and the low probability of failure of the OPERABLE DIS train.This justification also applies to the 7 day Completion Time allowed for redundant igniters being inoperable in the same containment region.For this case there would also be ignition capability from adjacent containment regions by flame propagation to the region with no OPERABLE igniters.Confidence in system OPERABILITY is demonstrated by surveillance testing.Since many igniters are inaccessible at power, surveillance testing in Mode 1 is limited to measurement of igniter current when the DIS is energized by groups.Measured currents are compared with baseline data for the group.Igniter temperature measurements for all igniters can only be performed during shutdown and is performed every 18 months.This testing energizes all igniters and confirms the ability of each igniter to obtain a surface temperature of at least 1700'F.This temperature is conservatively above the temperature necessary to ignite hydrogen mixtures at concentrations near the lower flammability limit.Test experience indicates that individual igniter failures are generally total failures and do not involve the inability to reach the required temperature when an igniter is drawing normal amperage.This observed failure mode provides reasonable confidence that an igniter failing to reach the required temperature would also be detected by reduced group current measurements during the Mode 1 surveillances.

Therefore the 18 month frequency for actual temperature measurements is acceptable.

INDEX LIMITINC CONDITIONS FOR OPERATION AND SURVEILLANCE UIRBQBiTS SECTION PhCE 3/4,5.2 ECCS SUbSYSTEMS

-Tave greater than orequal to 3/4.5.3 ECCS SUbSYSTEMS

-Tave leea chan 350 F.........3/4.5.4 bORON IHJECTION SYSTEM 350 F.3 4.5 EMERCENCY CORE COOLINC SYSTEMS ECCS 4 I C]'E I4 c AC CUMUKATORS

~~~~~~~~~~~~~~~~~~~~i~~~~~~~~~~~s~~~~s~~~3/4 5-1 3/4 5 3 3/4 5-7 3/4.5.5 Intentionally Left blank.............

Intentionally Left blank.....

REFUELINC VATER STORAGE TANK....~*~~3/4 5 9 3/4 5-10 3/4 5-11 3 4.6 CONThINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT 3/4.6.2 3/4.6.3 3/4.6.4 Containaent Integrity~~4~~~~~~~~~~~~~~~~~~~~Containment Leakage>>Conte izcNnt Air Locks~~~~~~~~~~~~~~~~~~~i~~~~~~~~~~~~~~Internal Preeaure.~s~s~s~~~s~~~~~ii~~i~~~~~~~hir Temperature

.Concainlent Struccural Integrity.Concainaenc Ventilation Syecea......................,..

DEPRESSURIZATION AND COOLINC SYSTEMS Containlent Spray Syetaa 0~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Spray Additive Syacea.CONTAIHMEHT ISOIATIOH VALVES COMbUSTIbLE CAS COHTML Hydropn hnalyrer~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Electric Hydrogen Recoabinere

-W......................

3/4 6-1 3/4 6-2 3/4 6-4 3/4 6-6 3/4 6-7 3/4 6-9 3/4 6-9a 3/4 6-10 3/4 6-11 3/4 6-13 3/4 6-33 3/4 6-34 COOK NUCLEAR PLANT-UNIT 2 VII AMZgleENT NO.I~.~<>, 142 INDEX BASES SECTION.~3/4.4 REACTOR COOLANT SYSTEM Continued 3/4.4.9 PRESSURE/TEMPERATURE LIMITS.3/4.4.10 STRUCTURAL INTEGRITY 3/4.4.11 RELIEF VALVES..3/4.4.12 REACTOR COOLANT VENT SYSTEM PAGE B 3/4 4-6 B 3/4 4-10 B 3/4 4-11 B 3/4 4-11 3/4.5 EMERGENCY CORE COOLING SYSTEMS ECCS 3/4.5.1 ACCUMULATORS 3/4.5.2 and 3/4.5.3 ECCS SUBSYSTEMS 3/4.5.4 BORON INJECTION SYSTEM 3/4.5.5 REFUELING WATER STORAGE TANK (RWST).B 3/4 5-1 B 3/4 5-1 B 3/4 5-2 B 3/4 5-3 3/4.6 CONTAINMENT SYSTEMS'.4.6.1 PRIMARY CONTAINMENT 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS.3/4.6.3 CONTAINMENT ISOLATION VALVES 3/4.6.4 COMBUSTIBLE GAS CONTROL'/4.6.5 ICE CONDENSER B 3/4 6-1 B 3/4 6-3 3/4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE 3/4.7.2 STEAM GENERATOR PRESSURE/1'EMPERATURE LIMITATION

.......3/4.7.3 COMPONENT COOLING WATER SYSTEM 3/4.7.4 ESSENTIAL SERVICE WATER SYSTEM..."~..B 3/4 7-1 B 3/4 74 B 3/4 74 B 3/4 74 3/4.7.5 CONTROL ROOM EMERGENCY VENTILATION SYSTEM...........

B 3/4 74a 3/4.7.6 ESF VENTILATION SYSTEM..3/4.7.7 HYDRAULIC SNUBBERS B 3/4 7-5 B 3/4 7-5 COOK NUCLEAR PLANT-UNIT 2 AMENDMENT 407, 4$6, 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLAi ICE REQUIREtWIENTS 3/4.6 CONTAINMENT SYSTEMS DISTRIBUTED IGNITION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.4.3 Both trains of the Distributed Ignition System shall be OPERABLE.APPLICABILITY:

MODES 1 and 2.ACTION: With one train of the Distributed Ignition System inoperable:

Restore the inoperable train to OPERABLE status within 7 days, or Perform surveillance requirement 4.6.4.3a once per 7 days on the OPERABLE train until the inoperable train is restored to OPERABLE status.With no OPERABLE hydrogen igniter in one containment region, restore one hydrogen igniter in the affected containment region to OPERABLE status within 7 days, or be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.SURVEILLANCE RE UIREMENTS 4.6.4.3 Each train of the Distributed Ignition System shall be demonstrated OPERABLE: Once per 92 days by energizing the supply breakers and verifying that at least 34 of 35 igniters are energized.

Once per 92 days, verify at least one hydrogen igniter is OPERABLE in each containment region.Once per Ig months by verifying the temperature of each igniter is a minimum 1700'F.~~~C/mi7~COOK NUCLEAR PLANT-UNIT 2 Page 3/4 6-34a 3/4 BASES 3/4.6 CONTAINMENT SYSTEM IS 3/4 6.4 COMBUSTIBLE GAS CONTROL The OPERABILITY of the equipment and systems required for the detection and control of hydrogen gas ensures that this equipment will be available to maintain the hydrogen concentration within containment below its flammable limit during post-LOCA conditions.

Either recombiner unit is capable of controlling the expected hydrogen generation associated with: I)'zirconium-water reactions; 2)radiolytic decomposition of water;and 3)corrosion of metals wittun containment.

These hydrogen control systems are consistent with the recommendations of Regulatory Guide 1.7,"Control of Combustible Gas Concentrations in Containment Following a LOCA," March 1971.'he acceptance criterion of 10,000 ohms is based on the test being performed with the heater element at an ambient temperature, but can be conservatively applied when the heater element is at a temperature above ambient.3/4.6.5 ICE CONDENSER The requirements associated with each of the components of the ice condenser ensure that the overall system will be available to provide sufficient pressure suppression capability to limit the containment peak pressure transient to less than 12 psig during LOCA conditions.

3/4.6.5.1 ICE BED The OPERABILITY of the ice bed ensures that the required ice inventory will 1)be distributed evenly through the containment bays, 2)contain sufficient boron to preclude dilution of the containment sump following the LOCA and 3)contain sufficient heat removal capability to condense the reactor system volume released during a LOCA.These conditions are consistent with the assumptions used in the accident analyses.The minimum weight figure of 1333 pounds of ice per basket contains a 5%conservative allowance for ice loss through sublimation.

In the event that observed sublimation rates are equal to or lower than design predictions after, g',>%i!I three years of operation, the minimum ice baskets weight may be adjusted downward.In addition, the number of ice baskets required to be weighed each 18 months may be reduced after 3 years of operation if such a reduction is supported by observed sublimation data.3/4.6.5.2 ICE BED TEMPERATURE MONITORING SYSTEM The OPERABILITY of the ice bed temperature monitoring system ensures that the capability is available for monitoring the ice temperature.

In the event the monitoring system is inoperable, the ACTION requirements provide assurance that the ice bed heat removal capacity will be retained within the speciifiied time limits.~p'>+<g~~~

+<>>ye~~a K~&~~~o~c5~n~~~C~~~~r g+~+~~++rnid 56@Wrens gp,$, 5 ZAP COuy&rsdrZ p)+,y, y g g~,4~~ZHry Ww~~n+rrru~o'n m~~~/Zing 8-<W COOK NUCLEAR PLANT-UNIT 2 Page B3/4~AMENDMENT 4, 444, A4, 207 J~'I'P I Distributed Ignition System (DIS)The DIS permits controlled burning of the excessive hydrogen generated during degraded core LOCAs postulated by 10CFR50.44"Standards for combustible gas control system in light-water-cooled power reactors." The postulated amount of hydrogen is equivalent to that generated from the reaction of 75'/o of the fuel cladding with water.Controlled burning at low hydrogen concentrations precludes containment damage that could result from random ignition at high concentrations.

An extensive program of testing and analysis has demonstrated that a system of strategically placed hydrogen igniters (the DIS)can be relied upon for controlled burns of the hydrogen gas postulated for degraded cores.Furthermore, it has been shown that this can be accomplished at combustion temperatures and pressures that will not challenge the integrity of the containment structure or the operability of containment equipment necessary to shutdown (and maintain shutdown)the reactor.The hydrogen igniters are not included for mitigation of a Design Basis Accident (DBA)because an amount of hydrogen equivalent to that generated from the reaction of 75~/o of the fuel cladding with water is far in excess of the hydrogen calculated for the limiting DBA loss of coolant accident (LOCA).The hydrogen concentration resulting from a DBA can be maintained less than the flammability limit using the hydrogen recombiners.

The DIS consists of two independent trains of 35 igniters located throughout containmcnt.

The igniters in each train are further divided into six groups per train powered from different phases of two separate three phase transformers.

It is the transformer phase that uniquely defines a group.Operation in Modes 1 and 2 with both trains available ensures the capability for controlled burning of hydrogen gas inside containment during degraded core LOCA events.I In Modes 3 and 4 both the hydrogen production rate and the total hydrogen production afler a LOCA would be significantly less than that calculated for the DBA LOCA.Also, because of the limited time in these MODES, the probability of an accident requiring the DIS is low.Therefore the DIS is not required in Modes 3 and 4.In Modes 5 and 6, the probability and consequences of a LOCA are reduced due to the pressure and temperature limitations of these Modes.Therefore, the DIS is not required to be OPERABLE in Modes 5 and 6.The 7 day Completion Time for restoration of an inoperable DIS train in Modes 1 or 2 is based on the low probability of occurrence of a degraded core event that would generate hydrogen in amounts equivalent to a metal water reaction of 75~/o of the core cladding and the low probability of failure of the OPERABLE DIS train.This justification also applies to the 7 day Completion Time allowed for redundant igniters being inoperable in the same containment region.For this case there would also be ignition capability from adjacent containment regions by flame propagation to the region with no OPERABLE igniters.Confidence in system OPERABILITY is demonstrated by surveillance testing.Since many igniters are inaccessible at power, surveillance testing in Mode 1 is limited to measurement of igniter current when the DIS is energized by groups.Measured currents are compared with baseline data for the group.Igniter temperature measurements for all igniters can only be performed during shutdown and is performed every 18 months.This testing energizes all igniters and confirms the ability of each igniter to obtain a surface temperature of at least 1700'F.This temperature is conservatively above the temperature necessary to ignite hydrogen mixtures at concentrations near the lower flammability limit.Test experience indicates that individual igniter failures are generally total failures and do not involve the inability to reach the required temperature when an igniter is drawing normal amperage.This observed failure mode provides reasonable confidence that an igniter failing to reach the required temperature would also be detected by reduced group current measurements during the Mode 1 surveillances.

Therefore the 18 month frequency for actual temperature measurements is acceptable.

ATTACHMENT 3 TO AEP:NRC:1291 PROPOSED AMENDMENT TO THE TECHNICAL SPECIFICATIONS DISTRIBUTED IGNITION SYSTEM I

UNIT 1 INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE 3/4.5 EMERGENCY CORE COOLING SYSTEMS ECCS 3/4;5".1 ACCUMUL'ATORS 3/4 5-1 3/4.5.3 3/4.5.4 ECCS SUBSYSTEMS

-Tavg less than 350'F BORON INJECTION SYSTEM 3/4.5.2 ECCS SUBSYSTEMS-Tavg greater than or equal to 350'F..3/4 5-3 3/4 5-7 3/4.5.5 Intentionally Left Blank Intentionally Left Blank REFUELING WATER STORAGE TANK 3/4 5-9 3/4 5-10 3/4 5-11 3/4:6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT Containment Integrity Containment-Leakage

-........Containment Air Locks Internal Pressure Air Temperature Containment Structural Integrity Containment Ventilation Systems.3/4.6.2.DEPRESSURIZATION AND COOLING SYSTEMS 3/4 6-1 3/4 6-2 3/4 64 3/4 6-6 3/4 6-7 3/4 6-9 3/4 6-9a 3/4.6.3 3/4.6.4 Containment Spray System Spray Additive System CONTAINMENT ISOLATION VALVES COMBUSTIBLE GAS CONTROL 3/4 6-10 3/4 6-12 3/4 6-14 Hydrogen Analyzers.Electric Hydrogen Recombiners

-W Distributed Ignition System 3/4 6-23 3/4 6-24 3/4 6-25 COOING NUCLEAR PLANT-UNIT 1 VII AMENDMENT QR, 36, k%)AS, 4I

~~3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS ELECTRIC HYDROGEN RECOMBINERS

-W LIMITING CONDITION FOR OPERATION 3.6.4.2 Two independent containment hydrogen recombiner systems shall be OPERABLE.APPLICABILITY:

MODES 1 and 2.ACTION: I With one hydrogen recombiner system inoperable, restore the inoperable system to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.SURVEILLANCE RE UIREMENTS 4.6.4.2 Each hydrogen recombiner system shall be demonstrated OPERABLE: At least once per 18 months by verifying during a recombiner system functional test that the minimum heater sheath temperature increases to 2 700'F within 90 minutes and is maintained for at least 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.b.At least once per 18 months by: 1.Performing a CHANNEL CALIBRATION of all recombiner instrumentation and control circuits.2.Verifying through a visual examination that there is no evidence of abnormal conditions within the recombiners (i.e., loose wiring or structural connections, deposits of foreign materials, etc.)Verifying during a recombiner system functional test that the heater sheath temperature increases to 2 1200'F within 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> and is maintained for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.4, Verifying the integrity of all heater electrical circuits by performing a continuity and resistance to ground test following the above required functional test.The resistance to ground for any heater phase shall be R 10,000 ohms.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 6-24 AMENDMENT 4Q, R2S, 0 R~w'N1 d 8'I I t t 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS DISTRIBUTED IGNITION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.4.3 Both trains of the Distributed Ignition System shall be OPERABLE.APPLICABILITY:

MODES 1 and 2.ACTION: With one train of the Distributed Ignition System inoperable:

a.Restore the inoperable train to OPERABLE status within 7 days, or b.Perform surveillance requirement 4.6.4.3a once per 7 days on the OPERABLE train until the inoperable train is restored to OPERABLE status.With no OPERABLE hydrogen igniter in one containment region, restore one hydrogen igniter in the affected containment region to OPERABLE status within 7 days, or be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.SURVEILLANCE RE UIREMENTS 4.6.4.3 Each train of the Distributed Ignition System shall be demonstrated OPERABLE: ao b.C.Once per 92 days by energizing the supply breakers and verifying that at least 34 of 35 igniters are energized, Once per 92 days, verify at least one hydrogen igniter is OPERABLE in each containment region.Once per 18 months by verifying the temperature of each igniter'is a minimum 1700'F.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 6-25 3/4 BASES 3/4.6 CONTAINMENT SYSTEMS 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS 3/4.6.2.1 CONTAINMENT SPRAY SYSTEM The OPERABILITY of the containment spray system ensures that containment depressurization and cooling capability will be available in the event of a LOCA.The pressure reduction and resultant lower containment leakage rate are consistent with the assumptions used in the accident analyses.3/4.6.2.2 SPRAY ADDITIVE SYSTEM The OPERABILITY of the spray additive system ensures that sufficient NaOH is added to the containment spray in the event of a LOCA.The limits on NaOH minimum volume and concentration, ensure that 1)the iodine removal efficiency of the spray water is maintained because of the increase in pH value, and 2)corrosion effects on components within containment are minimized.

These assumptions are consistent with the iodine removal efficiency assumed in the accident analyses.3/4.6.3 CONTAINMENT ISOLATION VALVES The OPERABILITY of the containment isolation valves ensures that the containment atmosphere will be isolated from the outside environment in the event of a release of radioactive material to the containment atmosphere or pressurization of the containment.

Containment isolation within the time limits specified ensures that the release of radioactive material to the environment will be consistent with the assumptions used in the analyses for a LOCA.The opening of containment purge and exhaust valves and locked or sealed closed containment isolation valves on an intermittent basis under administrative control includes the following considerations:

(1)stationing a qualified individual, who is in constant communication with control room, at the valve controls, (2)instructing this individual to close these valves in an accident situation, and (3)assuring that environmental conditions will not preclude access to close the valves and that this action will prevent the release of radioactivity outside the containment.

3/4.6.4 COMBUSTIBLE GAS CONTROL Hydrogen Analyzers and Recombiners The OPERABILITY of the equipment and systems required for the detection and control of hydrogen gas ensures that this equipment will be available to maintain the hydrogen concentration within containment below its flammable limit during post-LOCA conditions.

Either recombiner unit is capable of controlling the expected hydrogen generation associated with 1)zirconium-water reactions, 2)radiolytic decomposition of water and 3)corrosion of metals within containment.

The acceptance criteria of 10,000 ohms is based on the test being performed with the heater element at an ambient temperature, but can be conservatively applied when the heater element is at a temperature above ambient.Distributed Ignition System (DIS)The DIS permits controlled burning of the excessive hydrogen generated during degraded core LOCAs postulated by 10CFR50.44,"Standards for combustible gas control system in light-water-cooled power reactors." The postulated amount of hydrogen is equivalent to that generated from the reaction of 75%of the fuel cladding with water.ControHed burning at low hydrogen concentrations precludes containment damage that could result from random ignition at high concentrations.

An extensive program of testing and analysis has demonstrated that a system of strategically placed hydrogen igniters (the DIS)can be relied upon for controlled burns of the hydrogen gas postulated COOK NUCLEAR PLANT-UNIT 1 Page B 3/4 6-3 AMENDMENT 4R,~,

CJ e 3/4 BASES 3/4.6 CONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL continued for degraded cores.Furthermore, it has been shown that this can be accomplished at combustion temperatures and pressures that will not challenge the integrity of the containment structure or the operability of containment equipment necessary to shutdown (and maintain shutdown)the reactor.The hydrogen igniters are not included for mitigation of a Design Basis Accident (DBA)because an amount of hydrogen equivalent to that generated from the reaction of 75%of the fuel cladding with water is far in excess of the hydrogen calculated for the limiting DBA loss of coolant accident (LOCA).The hydrogen concentration resulting from a DBA can be maintained less than the flammability limit using the hydrogen recombiners.

The DIS consists of two independent trains of 35 igniters located throughout containment.

The igniters in each train are further divided into six groups per train powered from different phases of two separate three phase transformers.

It is the transformer phase that uniquely defines a group.Operation in MODES 1 and 2 with both trains available ensures the capability for controlled burning of hydrogen gas inside containment during degraded core LOCA events.In MODES 3 and 4 both the hydrogen production rate and the total hydrogen production after a LOCA would be significantly less than that calculated for the DBA LOCA.Also, because of the limited time in these MODES, the probability of an accident requiring the DIS is low.Therefore the DIS is not required in MODES 3 and 4.In MODES 5 and 6, the probability and consequences of a LOCA are reduced due to the pressure and temperature limitations of these MODES.Therefore, the DIS is not required to be OPERABLE in MODES 5 and 6.The 7 day Completion Time for restoration of an inoperable DIS train in MODES 1 or 2 is based on the low probability of occurrence of a degraded core event that would generate hydrogen in amounts equivalent to a metal water reaction of 75%of the core cladding and the low probability of failure of the OPERABLE DIS train.This justification also applies to the 7 day Completion Time allowed for redundant igniters being inoperable in the same containment region.For this case there would also be ignition capability from adjacent containment regions by flame propagation to the region with no OPERABLE igniters.Confidence in system OPERABILITY is demonstrated by surveillance testing.Since many igniters are inaccessible at power, surveillance testing in MODE 1 is limited to measurement of igniter current when the DIS is energized by groups.Measured currents are compared with baseline data for the group.Igniter temperature measurements for all igniters can only be performed during shutdown and is performed every 18 months.This testing energizes all igniters and confirms the ability of each igniter to obtain a surface temperature of at least 1700'F.This temperature is conservatively above the temperature necessary to ignite hydrogen mixtures at concentrations near the lower flammability limit.Test experience indicates that individual igniter failures are generally total failures and do not involve the inability to reach the required temperature when an igniter is drawing normal amperage.This observed failure mode provides reasonable confidence that an igniter failing to reach the required temperature would also be detected by reduced group current measurements during the MODE 1 surveillances.

Therefore the 18 month frequency for actual temperature measurements is acceptable.

COOK NUCLEAR PLANT-UNIT 1 Page B 3/4 6-3a 0 INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE 3/4.5 EMERGENCY CORE COOLING SYSTEMS ECCS 3/4.5.1 ACCUMULATORS 3/4 5-1 3/4.5.2 ECCS SUBSYSTEMS

-Tavg greater than or equal to 350'F..3/4.5.3 ECCS SUBSYSTEMS

-Tavg less than 350'F 3/4.5.4 BORON INJECTION SYSTEM Intentionally Left Blank Intentionally Left Blank 3/4.5.5 REFUELING WATER STORAGE TANK 3/4.6 CONTAINMENT SYSTEMS 3/4 5-3 3/4 5-7 3/4 5-9 3/4 5-10 3/4 5-11 3/4.6.1 PRIMARY CONTAINMENT Containment Integrity Containment Leakage Containment Air Locks Internal Pressure Air Temperature Containment Structural Integrity Containment Ventilation System 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS Containment Spray System Spray Additive System 3/4.6.3 CONTAINMENT ISOLATION VALVES 3/4 6-1 3/4 6-2 3/4 6P 3/4 6-6 3/4 6-7 3/4 6-9 3/4 6-9a 3/4 6-10 3/4 6-11 3/4 6-13 3/4.6.4 COMBUSTIBLE GAS CONTROL Hydrogen Analyzer..Electric Hydrogen Recom(iners

-W Distributed Ignition System 3/4 6-33 3/4 6-34 3/4 6-34a COOK NUCLEAR PLANT-UNIT 2 AMENDMENT 48, QQ, 445, l c INDEX BASES SECTION PAGE 3/4.4 REACTOR COOLANT SYSTEM Continued 3/4.4.9 PRESSURE/TEMPERATURE LIMITS 3/4.4.10 STRUCTURAL INTEGRITY 3/4.4.11 RELIEF VALVES..3/4.4.12 REACTOR COOLANT VENT SYSTEM B 3/4 4-6 B 3/4 4-10 B 3/4 4-11 B 3/4 4-11 3/4.5 EMERGENCY CORE COOLING SYSTEMS ECCS 3/4.5.1 ACCUMULATORS 3/4.5.2 and 3/4.5.3 ECCS SUBSYSTEMS 3/4.5.4 BORON INJECTION SYSTEM..3/4.5.5 REFUELING WATER STORAGE TANK (RWST)..B 3/4 5-1 B 3/4 5-1 B 3/4 5-2 B 3/4 5-3 3/4.6 CONTAINMENT SYSTEMS 3.4.6.1 PRIMARY CONTAINMENT 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS 3/4.6.3 CONTAINMENT ISOLATION VALVES 3/4.6.4 COMBUSTIBLE GAS CONTROL....3/4.6.5 ICE CONDENSER B 3/4 6-1 B 3/4 6-3 B 3/4 6-3 B 3/4 64 B 3/4 64a 3/4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE 3/4.7.2 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATION 3/4.7.3 COMPONENT COOLING WATER SYSTEM 3/4.7.4 ESSENTIAL SERVICE WATER SYSTEM..3/4:7.5 CONTROL ROOM EMERGENCY VENTILATION SYSTEM 3/4.7.6 ESF VENTILATION SYSTEM.3/4.7.7 HYDRAULIC SNUBBERS B 3/4 7-1 B 3/4 7-4 B 3/4 74 B 3/4 7-4 B 3/4 74a B 3/4 7-5 B 3/4 7-5 COOK NUCLEAR PLANT-UNIT 2 XII AMENDMENT 4P, 4', IVY, 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS DISTRIBUTED IGNITION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.4.3 Both trains of the Distributed Ignition System shall be OPERABLE.APPLICABILITY:

MODES 1 and 2.ACTION: With one train of the Distributed Ignition System inoperable:

Restore the inoperable train to OPERABLE status within 7 days, or Perform surveillance requirement 4.6.4.3a once per 7 days on the OPERABLE train until the inoperable train is restored to OPERABLE status.With no OPERABLE hydrogen igniter in one containment region, restore one hydrogen igniter in the affected containment region to OPERABLE status within 7 days, or be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.SURVEILLANCE RE UIREMENTS 4.6.4.3 Each train of the Distributed Ignition System shall be demonstrated OPERABLE: Once per 92 days by energizing the supply breakers and verifying that at least 34 of 35 igniters are energized.

Once per 92 days, verify at least one hydrogen igniter is OPERABLE in each containment region.Once per-18 months by verifying the temperature of each igniter is a minimum 1700'F.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 6-34a AMENDMENT 3/4'ASES 3/4.6 CONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL Hydrogen Analyzers and Recombiners The OPERABILITY of the equipment and systems required for the detection and control of hydrogen gas ensures that this equipment will be available to maintain the hydrogen concentration within containment below its flammable limit during post-LOCA conditions.

Either recombiner unit is capable of controlling the expected hydrogen generation associated with 1)zirconium-water reactions, 2)radiolytic decomposition of water and 3)corrosion of metals within containment.

These hydrogen control systems are consistent with the recommendations of Regulatory Guide 1.7,"Control of Combustible Gas Concentrations in Containment Following a LOCA," March 1971.The acceptance criterion of 10,000 ohms is based on the test being performed with the heater element at an ambient temperature, but can be conservatively applied when the heater element is at a temperature above ambient.Distributed Ignition System (DIS)The DIS permits controlled burning of the excessive hydrogen generated during degraded core LOCAs postulated by 10CFR50.44,"Standards for combustible gas control system in light-waterwooled power reactors." The postulated amount of hydrogen is equivalent to that generated from the reaction of 75%of the fuel cladding with water.Controlled burning at low hydrogen concentrations precludes containment damage that could result from random ignition at high concentrations.

An extensive program of testing and analysis has demonstrated that a system of strategically placed hydrogen igniters (the DIS)can be relied upon for controlled burns of the hydrogen gas postulated for degraded cores.Furthermore, it has been shown that this can be accomplished at combustion temperatures and pressures that will not challenge the integrity of the containment structure or the operability of containment equipment necessary to shutdown (and maintain shutdown)the reactor.The hydrogen igniters are not included for mitigation of a Design Basis Accident (DBA)because an amount of hydrogen equivalent to that generated from the reaction of 75%of the fuel cladding with water is far in excess of the hydrogen calculated for the limiting DBA loss of coolant accident (LOCA).The hydrogen concentration resulting from a DBA can be maintained less than the flammability limit using the hydrogen recombiners.

The DIS consists of two independent trains of 35 igniters located throughout containment.

The igniters in each train are further divided into six groups per train powered from different phases of two separate three phase transformers.

It is the transformer phase that uniquely defines a group.Operation in MODES 1 and 2 with both trains available ensures the capability for controlled burning of hydrogen gas inside containment during degraded core LOCA events.In MODES 3 and 4 both the hydrogen production rate and the total hydrogen production after a LOCA would be significantly less than that calculated for the DBA LOCA.Also, because of the limited time in these MODES, the probability of an accident requiring the DIS is low.Therefore the DIS is not required in MODES 3 and 4.In MODES 5 and 6, the probability and consequences of a LOCA are reduced due to the pressure and temperature limitations of these MODES.Therefore, the DIS is not required to be OPERABLE in MODES 5 and 6.The 7 day Completion Time for restoration of an inoperable DIS train in MODES 1 or 2 is based on the low probability of occurrence of a degraded core event that would generate hydrogen in amounts equivalent to a metal water reaction of 75%of the core cladding and the low probability of failure of the OPERABLE DIS train.This justification also applies to the 7 day Completion Time allowed for redundant igniters being inoperable in the same COOK NUCLEAR PLANT-UNIT 2 Page B 3/4 M AMENDMENT Q%,

C'I~

3/4 BASES 3/4.6 CONTAINMENT SYSTEMS 3/4.f~.4 COMBUSTIBLE GAS CONTROL continued containment region.For this case there would also be ignition capability from adjacent containment regions by flame propagation to the region with no OPERABLE igniters.Confidence in system OPERABILITY is demonstrated by surveillance testing.Since many igniters are inaccessible at power, surveillance testing in MODE 1 is limited to measurement of igniter current when the DIS is energized by groups.Measured currents are compared with baseline data for the group.Igniter temperature measurements for all igniters can only be performed during shutdown and i5 performed every 18 months.Thisitesting energizes all igniters and confirms the ability of each igniter to obtain a surface temperature of at least 1700'F.This temperature is conservatively above the temperature necessary to ignite hydrogen mixtures at concentrations near the lower flammability limit.Test experience indicates that individual igniter failures are generally total failures and do not involve the inability to reach the required temperature when an igniter is drawing normal amperage.This observed failure mode provides reasonable confidence that an igniter failing to reach the required temperature would also be detected by reduced group current measurements during the MODE 1 surveillances.

Therefore the 18 month frequency for actual temperature measurements is acceptable.

3/4.6.5 ICE CONDENSER The requirements associated with each of the components of the ice condenser ensure that the overall system will be available to provide sufficient pressure suppression capability to limit the containment peak pressure transient to less than 12 psig during LOCA conditions.

3/4.6.5.1 ICE BED The OPERABILITY of the ice bed ensures that the required ice inventory will 1)be distributed evenly through the containment bays, 2)contain sufficient boron to preclude dilution of the containment sump following the LOCA and 3)contain sufficient heat removal capability to condense the reactor system volume released during a LOCA.These conditions are consistent with the assumptions used in the accident analyses.The minimum weight figure of 1333 pounds of ice per basket contains a 5%conservative allowance for ice loss through'sublimation.

In the event that observed sublimation rates are equal to or lower than design predictions after three years of operation, the minimum ice baskets weight may be adjusted downward.In addition, the number of ice baskets required to be weighed each 18 months may be reduced after 3 years of operation if such a reduction is supported by observed sublimation data.3/4.6.5.2 ICE BED TEMPERATURE MONITORING SYSTEM The OPERABILITY of the ice bed temperature monitoring system ensures that the capability is available for monitoring the ice temperature.

In the event the monitoring system is inoperable, the ACTION requirements provide assurance that the ice bed heat removal capacity will be retained within the specified time limits.COOK NUCLEAR PLANT-UNIT 2 Page B 3/4&4a

~~5 P I (e'h\