Similar Documents at Cook |
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML17335A5551999-10-12012 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5591999-10-11011 October 1999 Supplement to Application for Amends to Licenses DPR-58 & DPR-74,replacing Correct TS Pages Inadvertently Included in 990923 Submittal.Attached Pages Also Include Appropriate Administrative Changes ML17335A5411999-10-0101 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Containment Recirculation Sump Water Inventory.Calculation & non-proprietary WCAP-15302 Rept Also Encl ML17326A1571999-09-23023 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,involving Movement of Loads in Excess of Design Basis Seismic Capability of Auxiliary Bldg Load Handling Equipment & Structures ML17326A1421999-09-17017 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,to Allow Credit of Rod Cluster Control Assemblies for Cold Leg Large Break LOCA Subcriticality.Ts Pages & non-proprietary Versions of WCAP-15246 Encl.Proprietary Version Withheld ML17326A1161999-09-10010 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0921999-08-17017 August 1999 Application for Amend to License DPR-58,to Change TS 3/4.4.5 & Bases for TS 3/4.4.5,3/4.4.6.2 & 3/4.4.8 to Remove voltage-based Repair Criteria,F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarify Bases Sections ML17325B6041999-05-21021 May 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Limitations of Positive Reactivity Additions in Several TS Action Statements ML17325B5511999-04-19019 April 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3/4.8.1.2, Electrical Power Systems & Associated Bases to Provide one-time Extension of 18-month Surveillance Interval for Specific SRs ML17335A3661998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,adding TS for Distributed Ignition Sys ML17335A3631998-12-0303 December 1998 Application for Amend to License DPR-58,revising TS 3/4.7.7, Sealed Source Contamination & Associated Bases to Address Testing Requirements for Fission Detectors ML17335A3591998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,making Administrative Changes to Remove Obsolete Info,To Provide Consistency Between Units 1 & 2,to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17335A3561998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases to Reflect Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A2631998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Containment Sys Bases 3/4.6.1.4 Re Internal Pressure & 3/4.6.1.5 Re Air Temp ML17335A2761998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2671998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3.4.1.3, RCS - Shutdown & Associated Bases to Provide Separate Requirements for Modes 4 & 5 with Loops Filled & Mode 5 with Loops Not Filled ML17335A2311998-09-14014 September 1998 Application for Amends to Licenses DPR-58 & DPR-74,changing Runout Limits for Safety Injection Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A1901998-08-28028 August 1998 Application for Amend to License DPR-58,requesting Extension of SG Surveillance,Which TSs Require to Be Performed on or Before 990408,until End of Current Refuel Cycle Currently Scheduled for Mar 2000.W/assessment of SG Degradation & TSs ML17334A7471998-06-10010 June 1998 Application for Amends to Licenses DPR-54 & DPR-78,changing Implementation Date to Reduce Boric Acid Concentration in Boric Acid Storage Sys.Attachment 1 to Ltr Contains Description of Proposed Change & Justification for Change ML17334B7011998-03-0303 March 1998 Application for Amends to TS for Licenses DPR-58 & DPR-74, Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Plants TS 3/4.6.4 Bases ML17334B6561997-10-0808 October 1997 Application for Amends to Licenses DPR-58 & DPR-78,changing TSs 3/4.6.5 & 3/4.5.5 to Increase Both Minimum Required Ice Mass Per Ice Basket & Total Minimum Required Ice Mass. Proprietary Summary of Sump Inventory Calculations,Encl ML17333B0431997-09-19019 September 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9831997-08-11011 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2101997-08-0101 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig from TS ML17333A8281997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74, Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8311997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74,changing Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted ML17333A7121996-12-20020 December 1996 Application for Amends to Licenses DPR-58 & DPR-74, Requesting Rev of Reactor Coolant Pump Flywheel Insp Frequency ML17334B5941996-07-11011 July 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Support Operation of Unit 2 at Increased Core Rated Thermal Power of 3,588 Mwt.Rev 1 to WCAP-14489, ...Unit 2 3,600 Mwt Uprating Program Licensing Rept Encl ML17334B5901996-06-19019 June 1996 Application for Amend to License DPR-58,addressing Applicable Requirements of NRC GL 95-05, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking. ML17334B5891996-06-11011 June 1996 Application for Amends to Licenses DPR-58 & DPR-74,removing TSs Certain Requirements for Administrative Controls,Related to QA Requirements,Per Administrative Ltr 96-05 ML17333A4201996-04-0808 April 1996 Application for Amends to Licenses DPR-58 & DPR-74,moving TS 4.0.4 Exemption Statement for MSSVs Into Section 4.7.1.1 ML17333A3551996-03-12012 March 1996 Application for Amend to License DPR-74,removing TSs Re Shutdown & Control Rod Position Indication While in Modes 3, 4 & 5 ML17334B5751996-02-29029 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Reduce Boric Acid Concentration in Boric Acid Storage Sys from Approx 12 Percent to Approx 4 Percent by Weight. Technical Rept Presenting Justificaion for Changes Encl ML17334B5741996-02-26026 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.6.2 to Increase Current Limit on Nominal Fuel Assembly Enrichment for New,Westinghouse - Fabricated Fuel Stored in New Fuel Storage Racks ML17333A3201996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Remove Requirement That Operations Superintendent Must Hold or Have Held Sol at Plant or Similar Reactor ML17333A3151996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying Table 4.8-1,DG Test Schedule by Ref Rg 1.9,Rev 3 Rather than Rg 1.108,Rev 1 Criteria for Determination of Valid DG Test ML17333A2641996-01-12012 January 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Section 4.4.11 to Eliminate SR Demonstrating Operability of Emergency Power Supply for Pressurizer PORVs & Block Valves ML17333A2391995-12-19019 December 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 3/4.6.1.2,3/4.6.1.3,3/4.6.1.6 & 3/4.6.1.6 to Require Types A,B & C Tests (Overall Integrated & Local Containment Leakage Rate) to Be Performed Per 10CFR50,App J Option B ML17332B0111995-11-10010 November 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising Ts,By Modifying Surveillance Testing of EDG During Refueling & Normal Operations ML17332A9971995-10-20020 October 1995 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Add Exemption to TS 4.0.4 in Surveillance Requirements for MSIV ML17332A9111995-08-0606 August 1995 Application for Amends to Licenses DPR-58 & DPR-74,informing That Licensee Has 45 Days from Date of Issuance to Implement Amend Unless Otherwise Specified ML17334B5561995-08-0404 August 1995 Application for Exigent Amend to License DPR-58,modifying TS 4.4.5.4 & 4.4.5.5 for Repair of Hybrid Expansion Joint Sleeved SG Tubes.Proprietary W Rept WCAP-14446, Repair...Of Hybrid Expansion Joint...Tubes Encl.W Rept Withheld ML17332A8271995-06-30030 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,changing TS Section 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02, Suppl 1 ML17334B5501995-06-20020 June 1995 License Amend Request to Licenses DPR-58 & DPR-74,to Remove Requirements for Fire Protection Systems from Licenses & Guidance in GL 86-10,GL 88-12 & GL 93-07 ML17332A7991995-06-15015 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.8.1.1.2.e.7 to Reduce Duration of Surveillance Testing for EDGs During Refueling Operations from 24 H to 8 H ML17334B5481995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Support Operation of Unit 1 at SG Tube Plugging Levels Up to 30%,make One Unit 1 TS More Nearly Like Corresponding Unit 2 TS & Maintain Consistency of Unit 2 Criteria ML17334B5461995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying Tech Specs 3/4.3.1 (Reactor Trip Sys Instrumentation) & 3/4.3.2 (ESFAS Instrumentation) & Bases to Relocate Tables of Response Time Limits to Ufsar,Per GL 93-08 ML17332A7661995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Incorporate Cycle & Burnup Dependent Peaking Factor Penalty ML17332A7741995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02,Suppl 1 ML17332A7771995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Table 4.3-2 to Change Main Steam Line Isolation Valve Manual Actuation Sys Surveillance Frequency from Monthly to Quarterly 1999-09-23
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17335A5551999-10-12012 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5591999-10-11011 October 1999 Supplement to Application for Amends to Licenses DPR-58 & DPR-74,replacing Correct TS Pages Inadvertently Included in 990923 Submittal.Attached Pages Also Include Appropriate Administrative Changes ML17335A5411999-10-0101 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Containment Recirculation Sump Water Inventory.Calculation & non-proprietary WCAP-15302 Rept Also Encl ML17326A1571999-09-23023 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,involving Movement of Loads in Excess of Design Basis Seismic Capability of Auxiliary Bldg Load Handling Equipment & Structures ML17326A1421999-09-17017 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,to Allow Credit of Rod Cluster Control Assemblies for Cold Leg Large Break LOCA Subcriticality.Ts Pages & non-proprietary Versions of WCAP-15246 Encl.Proprietary Version Withheld ML17326A1161999-09-10010 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0921999-08-17017 August 1999 Application for Amend to License DPR-58,to Change TS 3/4.4.5 & Bases for TS 3/4.4.5,3/4.4.6.2 & 3/4.4.8 to Remove voltage-based Repair Criteria,F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarify Bases Sections ML17325B6041999-05-21021 May 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Limitations of Positive Reactivity Additions in Several TS Action Statements ML17325B5511999-04-19019 April 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3/4.8.1.2, Electrical Power Systems & Associated Bases to Provide one-time Extension of 18-month Surveillance Interval for Specific SRs ML17335A3661998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,adding TS for Distributed Ignition Sys ML17335A3631998-12-0303 December 1998 Application for Amend to License DPR-58,revising TS 3/4.7.7, Sealed Source Contamination & Associated Bases to Address Testing Requirements for Fission Detectors ML17335A3591998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,making Administrative Changes to Remove Obsolete Info,To Provide Consistency Between Units 1 & 2,to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17335A3561998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases to Reflect Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A2631998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Containment Sys Bases 3/4.6.1.4 Re Internal Pressure & 3/4.6.1.5 Re Air Temp ML17335A2761998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2671998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3.4.1.3, RCS - Shutdown & Associated Bases to Provide Separate Requirements for Modes 4 & 5 with Loops Filled & Mode 5 with Loops Not Filled ML17335A2311998-09-14014 September 1998 Application for Amends to Licenses DPR-58 & DPR-74,changing Runout Limits for Safety Injection Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A1901998-08-28028 August 1998 Application for Amend to License DPR-58,requesting Extension of SG Surveillance,Which TSs Require to Be Performed on or Before 990408,until End of Current Refuel Cycle Currently Scheduled for Mar 2000.W/assessment of SG Degradation & TSs ML17334A7471998-06-10010 June 1998 Application for Amends to Licenses DPR-54 & DPR-78,changing Implementation Date to Reduce Boric Acid Concentration in Boric Acid Storage Sys.Attachment 1 to Ltr Contains Description of Proposed Change & Justification for Change ML17334B7011998-03-0303 March 1998 Application for Amends to TS for Licenses DPR-58 & DPR-74, Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Plants TS 3/4.6.4 Bases ML17334B6561997-10-0808 October 1997 Application for Amends to Licenses DPR-58 & DPR-78,changing TSs 3/4.6.5 & 3/4.5.5 to Increase Both Minimum Required Ice Mass Per Ice Basket & Total Minimum Required Ice Mass. Proprietary Summary of Sump Inventory Calculations,Encl ML17333B0431997-09-19019 September 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9831997-08-11011 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2101997-08-0101 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig from TS ML17333A8281997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74, Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8311997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74,changing Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted ML17333A7121996-12-20020 December 1996 Application for Amends to Licenses DPR-58 & DPR-74, Requesting Rev of Reactor Coolant Pump Flywheel Insp Frequency ML17334B5941996-07-11011 July 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Support Operation of Unit 2 at Increased Core Rated Thermal Power of 3,588 Mwt.Rev 1 to WCAP-14489, ...Unit 2 3,600 Mwt Uprating Program Licensing Rept Encl ML17334B5901996-06-19019 June 1996 Application for Amend to License DPR-58,addressing Applicable Requirements of NRC GL 95-05, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking. ML17334B5891996-06-11011 June 1996 Application for Amends to Licenses DPR-58 & DPR-74,removing TSs Certain Requirements for Administrative Controls,Related to QA Requirements,Per Administrative Ltr 96-05 ML17333A4201996-04-0808 April 1996 Application for Amends to Licenses DPR-58 & DPR-74,moving TS 4.0.4 Exemption Statement for MSSVs Into Section 4.7.1.1 ML17333A3551996-03-12012 March 1996 Application for Amend to License DPR-74,removing TSs Re Shutdown & Control Rod Position Indication While in Modes 3, 4 & 5 ML17334B5751996-02-29029 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Reduce Boric Acid Concentration in Boric Acid Storage Sys from Approx 12 Percent to Approx 4 Percent by Weight. Technical Rept Presenting Justificaion for Changes Encl ML17334B5741996-02-26026 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.6.2 to Increase Current Limit on Nominal Fuel Assembly Enrichment for New,Westinghouse - Fabricated Fuel Stored in New Fuel Storage Racks ML17333A3201996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Remove Requirement That Operations Superintendent Must Hold or Have Held Sol at Plant or Similar Reactor ML17333A3151996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying Table 4.8-1,DG Test Schedule by Ref Rg 1.9,Rev 3 Rather than Rg 1.108,Rev 1 Criteria for Determination of Valid DG Test ML17333A2641996-01-12012 January 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Section 4.4.11 to Eliminate SR Demonstrating Operability of Emergency Power Supply for Pressurizer PORVs & Block Valves ML17333A2391995-12-19019 December 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 3/4.6.1.2,3/4.6.1.3,3/4.6.1.6 & 3/4.6.1.6 to Require Types A,B & C Tests (Overall Integrated & Local Containment Leakage Rate) to Be Performed Per 10CFR50,App J Option B ML17332B0111995-11-10010 November 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising Ts,By Modifying Surveillance Testing of EDG During Refueling & Normal Operations ML17332A9971995-10-20020 October 1995 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Add Exemption to TS 4.0.4 in Surveillance Requirements for MSIV ML17332A9111995-08-0606 August 1995 Application for Amends to Licenses DPR-58 & DPR-74,informing That Licensee Has 45 Days from Date of Issuance to Implement Amend Unless Otherwise Specified ML17334B5561995-08-0404 August 1995 Application for Exigent Amend to License DPR-58,modifying TS 4.4.5.4 & 4.4.5.5 for Repair of Hybrid Expansion Joint Sleeved SG Tubes.Proprietary W Rept WCAP-14446, Repair...Of Hybrid Expansion Joint...Tubes Encl.W Rept Withheld ML17332A8271995-06-30030 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,changing TS Section 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02, Suppl 1 ML17334B5501995-06-20020 June 1995 License Amend Request to Licenses DPR-58 & DPR-74,to Remove Requirements for Fire Protection Systems from Licenses & Guidance in GL 86-10,GL 88-12 & GL 93-07 ML17332A7991995-06-15015 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.8.1.1.2.e.7 to Reduce Duration of Surveillance Testing for EDGs During Refueling Operations from 24 H to 8 H ML17334B5481995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Support Operation of Unit 1 at SG Tube Plugging Levels Up to 30%,make One Unit 1 TS More Nearly Like Corresponding Unit 2 TS & Maintain Consistency of Unit 2 Criteria ML17334B5461995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying Tech Specs 3/4.3.1 (Reactor Trip Sys Instrumentation) & 3/4.3.2 (ESFAS Instrumentation) & Bases to Relocate Tables of Response Time Limits to Ufsar,Per GL 93-08 ML17332A7661995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Incorporate Cycle & Burnup Dependent Peaking Factor Penalty ML17332A7741995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02,Suppl 1 ML17332A7771995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Table 4.3-2 to Change Main Steam Line Isolation Valve Manual Actuation Sys Surveillance Frequency from Monthly to Quarterly 1999-09-23
[Table view] |
Text
CATEGORY 1 REGULATORY INFORMATION DISTRIBUTIOh SYSTEM (RIDS)
ACCESSION NBR:9812080068 DOC.DATE: 98/12/03 NOTARIZED: YES DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH.NAME AUTHOR AFFILIATION POWERS,R.P. Indiana Michigan Power,Co.
RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
SUBJECT:
Application for amends to licenses DPR-58 & DPR-74,adding TS for distributed ignition sys.
DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR 1 ENCL ( SIZE: /0 TITLE: OR Submittal: General Distribution NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 LA 1 1 PD3-3 PD 1 1 STANG,J 1 1 INTERNAL. E CENTER 01 1 1 NRR/DE/ECGB/A . 1 1 NRR/DE/EMCB 1 1 NRR/DRCH/HICB 1. 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 EXTERNAL: NOAC 1 1 NRC PDR
~~. ~any NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTZON LlSTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 12
Indiana Michiga~
Power Company 500 Circle Drive
~
Buchanan, Ml 491071373 INSMNAl MICNI6'AM PWAR December 3, 1998 AEP:NRC:1291 10 CFR 50.92 Docket Nos.: 50-315 50-316 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop 0-Pl-17 Washington, D.C. 20555-0001 Gentlemen:
Donald C. Cook Nuclear Plant Units 1 and 2 TECHNICAL SPECIFICATION AMENDMENT DISTRIBUTED IGNITION SYSTEM TECHNICAL SPECIFICATION AND ASSOCIATED BASES This letter and its attachments constitute an application for amendment to the technical specifications (T/Ss) for Cook Nuclear Plant units 1 and 2. This amendment will add a new T/S for the distributed, ignition system (DIS). As described in attachment 1, previous submittals on a proposed T/S for the DIS are superceded by this submittal.
Background information relevant to the T/S and our analyses concerning significant hazards considerations are contained in attachment 1 to this letter. Attachment 2 contains current T/S pages, marked up to show where the new T/S will be inserted.
Attachment 3 contains the new proposed T/S pages.
Our supporting analysis, provided in attachment 1, indicates that the proposed DIS T/S will not result in a significant change in the types of effluents or a significant increase in the amounts of any effluents that may be released offsite, or a significant increase in individual or cumulative occupational radiation exposure.
The proposed change has been reviewed by the plant nuclear safety review committee and the nuclear safety and design review committee. We request that the approved T/S amendment be effective thirty days from issuance.
98i2080068 98i203" "
PDR P
ADQCK 05000Si5
'DR
U. S. Nuclear Regulatory Commission AEP:NRC:1291 Page 2
~ ~
In accordance with the requirements of 10 CFR 50.91(b)(1), copies of this letter and its attachments have been transmitted to the Michigan Public Service Commission and the Michigan Department of Public Health.
gg R. P. Powers Vice President SWORN TO AND SUBSCRIBED BEFORE ME THIS Q/'J DAY OF 1998 Notary Public My Commission Expires /
/jmc
)P,NtCE M. BICKERS Attachments Notary Pub(to, Bemen Cotrnty,
~
Feb. 16, 2001 My Commission Expfes c: J. A. Abramson, w/attachments J. L. Caldwell, w/attachments MDEQ DW & RPD, w/attachments NRC Resident Inspector, w/ attachments J. R. Sampson, w/attachments
U. ST Nuclear Regulatory Commission AEP:NRC:1291 Page 3 bc: T ~ P. Beilman w/attachments J. J. Euto FOLIO w/attachments D. F. Kunsemiller/J. B. Kingseed/G. P. Arent/ M. J. Gumns M. W. Rencheck/E. R. Eckstein/D. F. Powell/D. R. Hafer/
K. R. Baker J. F. Stang, Jr., NRC Washington, DC - w/attachments
ATTACHMENT 1 TO AEP:NRC:1291 SUPPORTING ANALYSES FOR AMENDMENT TO THE TECHNICAL SPECIFICATIONS DISTRIBUTED IGNITION SYSTEM
~
~
I to AEP:NRC:1291 Page 1 Backcaround 10 CFR 50.44, "Standards for Combustible Gas Control System in Light-Water-Cooled Power Reactors", requires the design and installation of systems to control the concentration of combustible gas inside containment following design basis loss-of-coolant accidents (LOCAs). In addition, for ice condenser containments, a system is required to control an amount of hydrogen associated with degraded core scenarios that go beyond design basis LOCAs. In this scenario, the regulation assumes, for design purposes, that the requirements of 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors", were not met by the emergency core cooling system, resulting in a degraded core. The regulation further postulates that the extent of core damage results in hydrogen generation in an amount equal to that from a metal-water reaction involving 75% of the fuel cladding surrounding the active fuel region (excluding the cladding in the plenum volume). The regulation is concerned about the potential for high concentrations of hydrogen gas inside containment to be ignited by a random ignition source with consequent containment failure.
An extensive program of testing and analysis has demonstrated that a system of strategically placed igniters can be relied upon for controlled burns of the hydrogen gas postulated for degraded cores by 10 CFR 50.44. At Cook Nuclear Plant, these igniters are called the distributed ignition system (DIS).
The controlled burning approach to mitigation of the hydrogen postulated by 10 CFR 50.44, for degraded core LOCAs, was jointly developed by American Electric Power with other owners of Westinghouse Pressurized Water Reactors utilizing ice condenser containments. Other owners included the Duke Power Company (Catawba and McGuire) and the Tennessee Valley Authority (Watts Bar and Sequoyah). This collaboration resulted in hydrogen ignition systems that shared many common design features and were
~
frequently based on test results applicable to all of the owners.
Safety evaluation reports (SERs), for each of the nuclear plants involved, often referred to SERs of the other plants. By 1982 virtually all of the owners had completed installation of their systems, although finalization of studies for equipment survivability during hydrogen burning generally remained an open issue. Lists of equipment required to survive hydrogen burning were developed by each of the owners and included the hydrogen igniters. At this time, 10 CFR 50.49, Environmental qualification of electric equipment important to safety for nuclear power plants, had not been issued. Industry requirements for equipment qualification were described by the provisions of two NRC documents the Division of Operating Reactors "Guidelines for Evaluating Environmental Qualification of Class 1E Electrical Equipment in Operating Reactors" (DOR Guidelines) or NUREG-0588,
V 1
to AEP:NRC:1291 Page 2 "Interim Staff Position on, Environmental Qualification of Safety-Related Electrical Equipment," December 1979. Extensive testing was performed to ensure the hydrogen igniters would perform properly in an environment of hydrogen burning, however the ice condenser owners did not include hydrogen ignition systems within the programs to meet the DOR Guidelines or NUREG-0588. This was best described in the McGuire SER for their final DIS (NUREG-0422, Supp. No.7, May 1983). This SER discussed the Duke equipment qualification program and noted "Hydrogen igniters are also not included in the qualification program. However, the functional capability of the igniters has been demonstrated in tests conducted at Fenwal and Whiteshell in an atmosphere of burning hydrogen. Moreover, similar igniter assemblies were recently qualified by Grand Gulf in,. accordance with NUREG-0588 Category I requirements. Based on these findings the staff concludes that there is adequate assurance that the hydrogen igniters will survive the hydrogen burn. event." Recent discussion with owners of ice condenser plants has indicated that the above description in the McGuire SER reflects the current practice of the owners including AEP. AEP believes that adequate assurance of DIS operability has been provided by the ice condenser containment owners without specifically including the DIS in the equipment qualification program. In addition, the DIS has been provided for degraded core events that go beyond the design basis LOCA and is being included in the .T/Ss due to the applicability of criterion 4 of 10 CFR 50. 36 (c) (2) (ii) (D) (See Justification for Amendment) .
This criterion may include structures, systems, or components that are not required for design basis accidents as addressed by Criterion 2 and 3 of the regulation. The provisions of 10 CFR 50.49 are directed to equipment involved in mitigating design basis events and are, therefore, not applicable to the DIS.
Nothing in this submittal is intended to establish a degraded core LOCA as a design basis accident for Cook Nuclear Plant.
The design, analysis, and testing of the Cook Nuclear Plant's DIS were the subject of numerous previous submittals to the NRC, commencing with AEP:NRC:0500, dated January 12, 1981, and ending with AEP:NRC:0500Y, dated February 26, 1993. The NRC's review of the system was documented in a safety evaluation report (SER) dated December 17, 1981. An NRC letter dated September 11, 1991, indicated that the December 1981 SER was expected to be final unless the NRC review of Cook Nuclear Plant's individual plant examination (IPE) results indicated that the SER should be supplemented. AEP:NRC:0500Y was a final summary document on the DIS, including analysis based on significant accident sequences identified by the IPE. Our submittal AEP:NRC:0500Y did not result in the issuance of a supplement to the December 1981 SER.
to AEP:NRC:1291 Page 3 Proposed technical specifications (T/Ss) for the DIS were initially described in attachment 2 to AEP:NRC:0500C dated May 29, 1981. The proposed T/S was modified by attachment 8 to AEP:NRC:0500G, dated February 17, 1982. The modification was made to reflect the addition (at the NRC's request) of 1 igniter per train in the containment instrument rooms. This current submittal supercedes all previous submittals involving a T/S for the DIS.
Descri tion of Amendment Re uest This proposed amendment adds a T/S and associated bases for, the DIS (no changes to 'an existing T/S are involved). The T/S being proposed for the DIS incorporates the technical requirements of the improved technical specifications (NUREG-1431, Revision 1, "Standard Technical Specifications, Westinghouse Plants", April 1995) however, the current format of our T/Ss is retained. It should also be noted that the improved technical specifications refer to this system as the hydrogen ignition system (HIS). The term DIS will be retained for Cook Nuclear Plant.
S stem Descri tion The DIS at Cook Nuclear Plant consists of two independent trains of resistance heating elements (igniters), power supply transformers, breakers, switches, interconnecting wiring, and control power annunciators. It is manually actuated when necessary and remains energized until no longer needed.
Each DIS train has 35 igniters, 18 igniters in upper containment and 17 in lower containment. The upper igniters in each train are further divided into three groups (or phases) and the lower igniters in each train are also divided into three groups (or phases). These six groups per train are each powered .from a different phase of two three-phase transformers. It is the transformer phase that uniquely defines a group. The design approach for location of the igniters was based on where hydrogen, was expected to be produced or accumulate, and also to burn as much hydrogen as possible in the lower volume of containment to prevent hydrogen migration to the top of containment. The lower compartment igniters are, in effect, the first level of defense for controlled burning of the hydrogen. It is anticipated that most unburned hydrogen escaping the lower volume will migrate to the upper volume via the ice condensers. The ice condenser upper plenum igniters minimize escape of this hydrogen to upper containment. Finally, hydrogen not burned in the lower containment or ice condenser plenums could be burned by the intermediate level igniters outside the steam generator and pressurizer cubicles or in the upper dome. Because of the general openness of the upper dome and the ability of the flame front from hydrogen burning to freely propagate to adjacent areas, it is
Attachment,l to AEP:NRC:1291 Page 4 expected that each igniter in the dome would be individually the least critical for the overall function of the DIS. Even in the lower containment, hydrogen burning by flame propagation is expected to occur between adjacent compartments/areas.
Justification for Amendment The DIS is the method selected to mitigate the hydrogen generation from degraded core scenarios postulated by 10 CFR 50.44. The DIS has generally been shown by probalistic risk analysis to be significant in limiting the severity of accident sequences that are commonly found to dominate risk for units with ice condenser containments. As such the system is considered significant to public health and safety and meets 10 CFR 50.36(c)(2)(ii)(D),
Criterion 4, for inclusion in the plant T/Ss.
Basis for No Si nificant Hazards Determination An extensive program of testing and analysis has demonstrated that a system of strategically placed igniters can be used for controlled burns of the hydrogen gas postulated by 10 CFR 50.44.
It has been shown that these burns can be accomplished at combustion temperatures and pressures that will not challenge the integrity of the containment structure or the operability of containment equipment necessary to shut down (and maintain shutdown) the reactor. Due consideration was given to the possibility of different accidents (such as a burn induced transition to hydrogen detonation) resulting from use of the system. As previously discussed above under "Background", the design, analysis, and testing of the DIS were the subject of numerous previous submittals to the NRC and the NRC's review and approval of the system has been previously documented in the SER dated December 17, 1981. This amendment request is the proposed T/Ss for the previously reviewed and approved DIS and no design bases changes to the DIS are being made as a result of this submittal.
In accordance with 10 CFR 50.92, this proposed amendment does not involve a significant hazards consideration if it does not:
involve a significant increase in the probability or consequences of an accident previously evaluated;
- 2. create the possibility of a new or different kind of accident from any accident previously evaluated; or
- 3. involve a significant reduction in a margin of safety.
Criterion 1 The T/S being proposed for the DIS is consistent with its design and operation as previously reviewed and approved, and therefore, does not involve a significant increase in the probability or to AEP:NRC:1291 Page 5 consequences of an accident previously evaluated. The amendments involve new requirements for the T/Ss and do not delete any existing requirements.
Criterion 2 The T/S being proposed for the DIS is consistent with its design and operation as previously reviewed and approved, and therefore, does not create the possibility of a new or different kind of accident from any accident previously evaluated.
Criterion 3 The T/S being proposed for the DIS is consistent with its design and operation as previously reviewed and approved, and therefore, does not involve a significant reduction in a margin of safety.
Compliance with the proposed T/S will provide additional assurance of system availability to maintain a margin of safety for containment integrity during degraded core events.
Based on the preceding, it is concluded that the proposed DIS T/S does not involve a significant hazards consideration as defined in 10 CFR 50.92.
Environmental Assessment This licensing amendment request has been evaluated against the criteria for identification of licensing actions requiring environmental assessment in accordance with 10 CFR 51.21. It has been determined that an environmental assessment is not required because the request meets the criteria for a categorical exclusi'on as described in 10 CFR 51.22(c)(9) ~ This determination is based on the fact that the proposal is an amendment to a license for a reactor pursuant to 10 CFR 50 involving a" change to a surveillance requirement and the amendment meets the following specific criteria:
(i) The amendment involves no significant hazards consideration.
As previously described above under Basis for No Si nificant Hazards Determination, this proposed amendment does not involve significant hazards consideration.
(ii) There is no significant change in the types or significant increase in the amounts of any effluent that may be released off site.
This proposal does not change the manner of DIS operation during potential degraded core, scenarios and, therefore, does not change the types or amounts of any effluents that may be released offsite.
to AEP:NRC:1291 Page 6 (iii) There is no significant increase in individual or cumulative occupational radiation exposure.
The proposed change will not result in changes in the operation or configuration of the facility. The proposed change will not result in changes to the level of controls or methodology used for processing of radioactive effluents or handling of solid radioactive waste, nor will the proposed change result in any changes in the normal radiation levels within the plant. Measurement of, igniter tip temperatures in accordance with the proposed 18-month surveillance may involve some personnel exposure for igniters located in radiation areas. However, normal good radiological work practices will minimize this exposure.
Therefore, it was concluded that there will be no significant increase in individual or cumulative occupational radiation exposure resulting from this change.