{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL  60532-4352 December 18, 2014 Mr. Joseph Plona Senior Vice President and CNO DTE Energy Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI  48166  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL  60532-4352 December 18, 2014  
 
Mr. Joseph Plona Senior Vice President and CNO DTE Energy Company Fermi 2 - 210 NOC 6400 North Dixie Highway  
 
Newport, MI  48166  


==SUBJECT:==
==SUBJECT:==
FERMI UNIT 1 MASTER INSPECTION PLAN - CALENDAR YEAR 2015
FERMI UNIT 1 MASTER INSPECTION PLAN - CALENDAR YEAR 2015  


==Dear Mr. Plona:==
==Dear Mr. Plona:==


In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2561, "Decommissioning Power Reactor Inspection Program," the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for Fermi Unit 1. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for the period of January 2015 through December 2015 (CY15).
In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2561, "Decommissioning Power Reactor Inspection Program," the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for Fermi Unit 1. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for the period of January 2015 through December 2015 (CY15).
The plan outlines how we intend to focus our regional inspection resources to provide oversight for any significant decommissioning activities.
The plan outlines how we intend to focus our regional inspection resources to provide oversight for any significant decommissioning activities.  
 
Because this MIP is based, in part, on your proposed schedule of significant decommissioning activities for CY15, the plan and focus of the NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Fermi  Unit 1 Inspection Schedule.   
Because this MIP is based, in part, on your proposed schedule of significant decommissioning activities for CY15, the plan and focus of the NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Fermi  Unit 1 Inspection Schedule.   


We currently project the region will conduct approximately one inspection at Fermi Unit 1 through December 2015 to evaluate the on-going passive monitoring SAFTOR. The following is a list of the inspection procedures we expect to use during our inspection. Inspection Procedure  Title  IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure     In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.       
We currently project the region will conduct approximately one inspection at Fermi Unit 1 through December 2015 to evaluate the on-going passive monitoring SAFTOR. The following is a list of the inspection procedures we expect to use during our inspection.
Inspection Procedure  Title  IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be av ailable electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html
.       
 
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Peter Lee at 630-829-9870.
Sincerely,
  /RA/
Robert J. Orlikowski, Chief
 
Materials Control, ISFSI and Decommissioning Branch
 
Division of Nuclear Materials Safety
 
Docket No. 050-00016 License No. DPR-9
 
cc:  Distribution via LISTSERV
 
ML14353A275  Publicly Available Non-Publicly Available Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII DNMS E RIII DNMS E RIII  RIII  NAME RJOrlikowski for PJLee:rj RJOrlikowski  DATE 12/18/14 12/18/14 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL  60532-4352 December 18, 2014


We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Peter Lee at 630-829-9870. Sincerely,  /RA/
Mr. Joseph Plona Senior Vice President and CNO DTE Energy Company Fermi 2 - 210 NOC 6400 North Dixie Highway
Robert J. Orlikowski, Chief Materials Control, ISFSI and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00016 License No. DPR-9 cc:  Distribution via LISTSERV 


ML14353A275  Publicly Available  Non-Publicly Available  Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII DNMS E RIII DNMS E RIII  RIII  NAME RJOrlikowski for PJLee:rj RJOrlikowski  DATE 12/18/14 12/18/14 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL  60532-4352  December 18, 2014 Mr. Joseph Plona Senior Vice President and CNO DTE Energy Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI  48166  
Newport, MI  48166  


==SUBJECT:==
==SUBJECT:==
FERMI UNIT 1 MASTER INSPECTION PLAN - CALENDAR YEAR 2015
FERMI UNIT 1 MASTER INSPECTION PLAN - CALENDAR YEAR 2015  


==Dear Mr. Plona:==
==Dear Mr. Plona:==


In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2561, "Decommissioning Power Reactor Inspection Program," the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for Fermi Unit 1. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for the period of January 2015 through December 2015 (CY15).
In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2561, "Decommissioning Power Reactor Inspection Program," the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for Fermi Unit 1. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for the period of January 2015 through December 2015 (CY15).
The plan outlines how we intend to focus our regional inspection resources to provide oversight for any significant decommissioning activities.
The plan outlines how we intend to focus our regional inspection resources to provide oversight for any significant decommissioning activities.  
 
Because this MIP is based, in part, on your proposed schedule of significant decommissioning activities for CY15, the plan and focus of the NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Fermi  Unit 1 Inspection Schedule.   
Because this MIP is based, in part, on your proposed schedule of significant decommissioning activities for CY15, the plan and focus of the NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Fermi  Unit 1 Inspection Schedule.   


We currently project the region will conduct approximately one inspection at Fermi Unit 1 through December 2015 to evaluate the on-going passive monitoring SAFTOR. The following is a list of the inspection procedures we expect to use during our inspection. Inspection Procedure  Title  IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure     In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.       
We currently project the region will conduct approximately one inspection at Fermi Unit 1 through December 2015 to evaluate the on-going passive monitoring SAFTOR. The following is a list of the inspection procedures we expect to use during our inspection.
Inspection Procedure  Title  IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be av ailable electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html
.       
 
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Peter Lee at 630-829-9870.
Sincerely,
  /RA/
Robert J. Orlikowski, Chief
 
Materials Control, ISFSI and Decommissioning Branch
 
Division of Nuclear Materials Safety
 
Docket No. 050-00016 License No. DPR-9


We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Peter Lee at 630-829-9870. Sincerely,  /RA/
cc:  Distribution via LISTSERV
Robert J. Orlikowski, Chief Materials Control, ISFSI and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00016 License No. DPR-9 cc:  Distribution via LISTSERV


ML14353A275  Publicly Available Non-Publicly Available Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII DNMS E RIII DNMS E RIII  RIII  NAME RJOrlikowski for PJLee:rj RJOrlikowski  DATE 12/18/14 12/18/14}}
ML14353A275  Publicly Available Non-Publicly Available Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII DNMS E RIII DNMS E RIII  RIII  NAME RJOrlikowski for PJLee:rj RJOrlikowski  DATE 12/18/14 12/18/14}}

Revision as of 06:37, 1 July 2018

Fermi Unit 1 Master Inspection Plan - Calendar Year 2015
ML14353A275
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/18/2014
From: Orlikowski R J
NRC/RGN-III/DNMS/MCID
To: Plona J
DTE Energy
References
Download: ML14353A275 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 December 18, 2014

Mr. Joseph Plona Senior Vice President and CNO DTE Energy Company Fermi 2 - 210 NOC 6400 North Dixie Highway

Newport, MI 48166

SUBJECT:

FERMI UNIT 1 MASTER INSPECTION PLAN - CALENDAR YEAR 2015

Dear Mr. Plona:

In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2561, "Decommissioning Power Reactor Inspection Program," the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for Fermi Unit 1. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for the period of January 2015 through December 2015 (CY15).

The plan outlines how we intend to focus our regional inspection resources to provide oversight for any significant decommissioning activities.

Because this MIP is based, in part, on your proposed schedule of significant decommissioning activities for CY15, the plan and focus of the NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Fermi Unit 1 Inspection Schedule.

We currently project the region will conduct approximately one inspection at Fermi Unit 1 through December 2015 to evaluate the on-going passive monitoring SAFTOR. The following is a list of the inspection procedures we expect to use during our inspection.

Inspection Procedure Title IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be av ailable electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html

.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Peter Lee at 630-829-9870.

Sincerely,

/RA/

Robert J. Orlikowski, Chief

Materials Control, ISFSI and Decommissioning Branch

Division of Nuclear Materials Safety

Docket No. 050-00016 License No. DPR-9

cc: Distribution via LISTSERV

ML14353A275 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII DNMS E RIII DNMS E RIII RIII NAME RJOrlikowski for PJLee:rj RJOrlikowski DATE 12/18/14 12/18/14 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 December 18, 2014

Mr. Joseph Plona Senior Vice President and CNO DTE Energy Company Fermi 2 - 210 NOC 6400 North Dixie Highway

Newport, MI 48166

SUBJECT:

FERMI UNIT 1 MASTER INSPECTION PLAN - CALENDAR YEAR 2015

Dear Mr. Plona:

In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2561, "Decommissioning Power Reactor Inspection Program," the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for Fermi Unit 1. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for the period of January 2015 through December 2015 (CY15).

The plan outlines how we intend to focus our regional inspection resources to provide oversight for any significant decommissioning activities.

Because this MIP is based, in part, on your proposed schedule of significant decommissioning activities for CY15, the plan and focus of the NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Fermi Unit 1 Inspection Schedule.

We currently project the region will conduct approximately one inspection at Fermi Unit 1 through December 2015 to evaluate the on-going passive monitoring SAFTOR. The following is a list of the inspection procedures we expect to use during our inspection.

Inspection Procedure Title IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be av ailable electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html

.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Peter Lee at 630-829-9870.

Sincerely,

/RA/

Robert J. Orlikowski, Chief

Materials Control, ISFSI and Decommissioning Branch

Division of Nuclear Materials Safety

Docket No. 050-00016 License No. DPR-9

cc: Distribution via LISTSERV

ML14353A275 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII DNMS E RIII DNMS E RIII RIII NAME RJOrlikowski for PJLee:rj RJOrlikowski DATE 12/18/14 12/18/14