{{#Wiki_filter:1Pre-Application Meeting License Amendment for TSTF-425Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled ProgramXcel Energy (XE)Prairie Island Nuclear Generating Plant02-20-20181 2Agenda*Background & Schedule *Discuss-Variations from TSTF-425-Site-specific TSSR 3.0.2-Probabilistic Risk Assessment (PRA)*Fire Model*Questions and Feedback2 3Background & Schedule*TSTF-425-Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Initiative 5b)-Licensee controlled program called the Surveillance Frequency Control Program (SFCP) and is in accordance with NEI04-10-Planned submittal first quarter 2018-Requesting approval by April 2019-Implement prior to Fall 2019 Refueling Outage (RFO)3 4Variations*Variations for the application include:-Revised (clean) TSpages not included-TSBases insert consistent with the April 14, 2010 NRC letter removing the frequency basis-Cross-reference list for TSTF-425 (NUREG-1431) markups to PINGPsite specific TSSRs provided-Administrative changes*An expired one-time frequency extension is deleted*Two minor formatting changes 4 5PINGP'sTSSR 3.0.2*PINGPSR 3.0.2 contains a restriction not in NUREG-1431:-NUREG-1431 SR 3.0.2 permits a 25% extension of the interval specified in the Frequency-PINGPSR 3.0.2 also permits a 25% extension of the specified interval, except for Frequencies specified as 24 months*Not a variation to the TSTF*Applies to50TSSR*One exception -TSSR 3.8.1.8 amended in 2010 to allow the application of the 25% extension to its 24 month surveillance requirement5 6PINGP'sTSSR 3.0.2*PINGPTSSR 3.0.2 does not affect application of TSTF-425 nor does it affect implementation of the SFCP-Site specific SR 3.0.2 is applied to the SFCPas described in TSTF-425*SFCPAdministrative Controls maintained (TS5.5.17)*Current Licensing Basis (CLB) maintained (TSSR 3.0.2)-No affect on TSTF-425*Model License Amendment Request (LAR) unchanged*Model No Significant Hazards Consideration determination unchanged*NRC Model Safety Evaluation (SE) unchanged*Not considered a variation to the TSTF6 7PRA Technical Adequacy*Internal Events including internal flooding-RG1.200 peer reviewed with Appendix X to NEI05-04 finding closure review complete*Seismic-IPEEESeismic Margins Analysis (SMA)*Other External Hazards-PINGPIPEEEconcluded other external hazards to be negligible contributors to overall plant risk*Shutdown Events-Shutdown risk management program consistent with NUMARC91-067 8PRA Technical Adequacy*Fire -Fire PRA developed for NFPA-805 *NFPA-805 LAR approved August 8, 2017*Fire PRA reflects future state of the as-built/as-operated plant following NFPA-805 modifications-Unit 1 -Fall 2020 RFO, Unit 2 -Fall 2019 RFO*Fire PRA is RG1.200 peer reviewed with an Appendix X closure review*Fire PRA Open F&Osprovided in the Technical Adequacy Section of the SFCPLAR-During transition, the SFCPevaluations use IPEEEFIVE results supplemented by sensitivities from Fire PRA  in accordance with NEI04-10-Following implementation of NFPA-805, evaluations use the Fire PRA  in accordance with NEI04-108 9PRA Technical Adequacy*Conclusion-PINGPPRA models sufficiently robust and suitable for SFCP9 10Questions and Feedback10?
{{#Wiki_filter:1Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy (XE)Prairie Island Nuclear Generating Plant 02-20-2018 1
11Acronyms*CLB-Current Licensing Basis*F&O-Finding and Observations*FIVE -Fire Induced Vulnerability Evaluation *LAR -License Amendment Request *IPEEE-Individual Plant Examination of External Events *NEI-Nuclear Energy Institute*NSHC-No Significant Hazards Determination*NSPM-Northern States Power Minnesota*PINGP-Prairie Island Nuclear Generating Plant*PRA -Probabilistic Risk Assessment*RFO-Refueling Outage*SE -Safety Evaluation11 12Acronyms*SFCP-Surveillance Frequency Control Program*SMA-Seismic Margins Analysis*TS-Technical Specification*TSSR -Technical Specification Surveillance Requirement*TSTF-Technical Specification Task Force*XE-Xcel Energy12}}
2Agenda*Background & Schedule  
*Discuss-Variations from TSTF-425
-Site-specific TSSR 3.0.2
-Probabilistic Risk Assessment (PRA)
*Fire Model
*Questions and Feedback 2
3Background & Schedule
*TSTF-425-Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Initiative 5b)
-Licensee controlled program called the Surveillance Frequency Control Program (SFCP) and is in accordance with NEI04-10
-Planned submittal first quarter 2018
-Requesting approval by April 2019
-Implement prior to Fall 2019 Refueling Outage (RFO) 3 4Variations
*Variations for the application include
:-Revised (clean) TSpages not included
-TSBases insert consistent with the April 14, 2010 NRC letter removing the frequency basis
-Cross-reference list for TSTF-425 (NUREG-1431) markups to PINGPsite specific TSSRs provided
-Administrative changes
*An expired one-time frequency extension is deleted
*Two minor formatting changes 4
5PINGP'sTSSR 3.0.2
*PINGPSR 3.0.2 contains a restriction not in NUREG-1431:
-NUREG-1431 SR 3.0.2 permits a 25% extension of the interval specified in the Frequency
-PINGPSR 3.0.2 also permits a 25% extension of the specified interval, except for Frequencies specified as 24  
 
months*Not a variation to the TSTF
*Applies to50TSSR
*One exception -TSSR 3.8.1.8 amended in 2010 to allow the application of the 25% extension to its 24 month surveillance  
 
requirement 5
6PINGP'sTSSR 3.0.2
*PINGPTSSR 3.0.2 does not affect application of TSTF-425 nor does it affect implementation of the  
 
SFCP-Site specific SR 3.0.2 is applied to the SFCPas described in TSTF-425
*SFCPAdministrative Controls maintained (TS5.5.17)
*Current Licensing Basis (CLB) maintained (TSSR 3.0.2)
-No affect on TSTF-425
*Model License Amendment Request (LAR) unchanged
*Model No Significant Hazards Consideration determination unchanged
*NRC Model Safety Evaluation (SE) unchanged
*Not considered a variation to the TSTF 6
7PRA Technical Adequacy
*Internal Events including internal flooding
-RG1.200 peer reviewed with Appendix X to NEI05-04 finding closure review complete
*Seismic-IPEEESeismic Margins Analysis (SMA)
*Other External Hazards
-PINGPIPEEEconcluded other exter nal hazards to be negligible contributors to overall plant risk
*Shutdown Events
-Shutdown risk management program consistent with NUMARC 91-067 8PRA Technical Adequacy
*Fire -Fire PRA developed for NFPA-805  
*NFPA-805 LAR approved August 8, 2017
*Fire PRA reflects future state of the as-built/as-operated plant following NFPA-805 modifications
-Unit 1 -Fall 2020 RFO, Unit 2 -Fall 2019 RFO
*Fire PRA is RG1.200 peer reviewed with an Appendix X closure review*Fire PRA Open F&Osprovided in the Technical Adequacy Section of the SFCPLAR
-During transition, the SFCPevaluations use IPEEEFIVE results supplemented by sensitivities from Fire PRA  in accordance with NEI04-10-Following implementation of NFPA-805, evaluations use the Fire PRA  in accordance with NEI04-10 8
9PRA Technical Adequacy
*Conclusion
-PINGPPRA models sufficiently robust and suitable for SFCP9 10Questions and Feedback 10?
11Acronyms*CLB-Current Licensing Basis
*F&O-Finding and Observations
*FIVE -Fire Induced Vulnerability Evaluation  
*LAR -License Amendment Request  
*IPEEE-Individual Plant Examination of External Events  
*NEI-Nuclear Energy Institute
*NSHC-No Significant Hazards Determination
*NSPM-Northern States Power Minnesota
*PINGP-Prairie Island Nuclear Generating Plant
*PRA -Probabilistic Risk Assessment
*RFO-Refueling Outage
*SE -Safety Evaluation 11 12Acronyms*SFCP-Surveillance Frequency Control Program
*SMA-Seismic Margins Analysis
*TS-Technical Specification
*TSSR -Technical Specification Surveillance Requirement
*TSTF-Technical Specification Task Force
*XE-Xcel Energy 12}}

Revision as of 02:50, 29 June 2018

Prairie Island Nuclear Generating Plant - Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy 2/20/2018
ML18051A175
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/20/2018
From:
Northern States Power Co, Xcel Energy
To: Kuntz R F
Plant Licensing Branch III
Kuntz R F
References
Download: ML18051A175 (12)


Text

1Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy (XE)Prairie Island Nuclear Generating Plant 02-20-2018 1

2Agenda*Background & Schedule

-Site-specific TSSR 3.0.2

-Probabilistic Risk Assessment (PRA)

  • Fire Model
  • Questions and Feedback 2

3Background & Schedule

  • TSTF-425-Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Initiative 5b)

-Licensee controlled program called the Surveillance Frequency Control Program (SFCP) and is in accordance with NEI04-10

-Planned submittal first quarter 2018

-Requesting approval by April 2019

-Implement prior to Fall 2019 Refueling Outage (RFO) 3 4Variations

  • Variations for the application include
-Revised (clean) TSpages not included

-TSBases insert consistent with the April 14, 2010 NRC letter removing the frequency basis

-Cross-reference list for TSTF-425 (NUREG-1431) markups to PINGPsite specific TSSRs provided

-Administrative changes

  • An expired one-time frequency extension is deleted
  • Two minor formatting changes 4

5PINGP'sTSSR 3.0.2

  • PINGPSR 3.0.2 contains a restriction not in NUREG-1431:

-NUREG-1431 SR 3.0.2 permits a 25% extension of the interval specified in the Frequency

-PINGPSR 3.0.2 also permits a 25% extension of the specified interval, except for Frequencies specified as 24

months*Not a variation to the TSTF

  • Applies to50TSSR
  • One exception -TSSR 3.8.1.8 amended in 2010 to allow the application of the 25% extension to its 24 month surveillance

requirement 5

6PINGP'sTSSR 3.0.2

  • PINGPTSSR 3.0.2 does not affect application of TSTF-425 nor does it affect implementation of the

SFCP-Site specific SR 3.0.2 is applied to the SFCPas described in TSTF-425

  • SFCPAdministrative Controls maintained (TS5.5.17)

-No affect on TSTF-425

  • Model License Amendment Request (LAR) unchanged
  • Model No Significant Hazards Consideration determination unchanged
  • NRC Model Safety Evaluation (SE) unchanged
  • Not considered a variation to the TSTF 6

7PRA Technical Adequacy

-RG1.200 peer reviewed with Appendix X to NEI05-04 finding closure review complete

  • Seismic-IPEEESeismic Margins Analysis (SMA)
  • Other External Hazards

-PINGPIPEEEconcluded other exter nal hazards to be negligible contributors to overall plant risk

  • Shutdown Events

-Shutdown risk management program consistent with NUMARC 91-067 8PRA Technical Adequacy

  • NFPA-805 LAR approved August 8, 2017
  • Fire PRA reflects future state of the as-built/as-operated plant following NFPA-805 modifications

-Unit 1 -Fall 2020 RFO, Unit 2 -Fall 2019 RFO

  • Fire PRA is RG1.200 peer reviewed with an Appendix X closure review*Fire PRA Open F&Osprovided in the Technical Adequacy Section of the SFCPLAR

-During transition, the SFCPevaluations use IPEEEFIVE results supplemented by sensitivities from Fire PRA in accordance with NEI04-10-Following implementation of NFPA-805, evaluations use the Fire PRA in accordance with NEI04-10 8

9PRA Technical Adequacy

  • Conclusion

-PINGPPRA models sufficiently robust and suitable for SFCP9 10Questions and Feedback 10?

11Acronyms*CLB-Current Licensing Basis

  • F&O-Finding and Observations
  • FIVE -Fire Induced Vulnerability Evaluation
  • LAR -License Amendment Request
  • IPEEE-Individual Plant Examination of External Events
  • NEI-Nuclear Energy Institute
  • NSHC-No Significant Hazards Determination
  • PINGP-Prairie Island Nuclear Generating Plant
  • PRA -Probabilistic Risk Assessment
  • RFO-Refueling Outage
  • SE -Safety Evaluation 11 12Acronyms*SFCP-Surveillance Frequency Control Program
  • SMA-Seismic Margins Analysis
  • TS-Technical Specification
  • TSSR -Technical Specification Surveillance Requirement
  • TSTF-Technical Specification Task Force
  • XE-Xcel Energy 12