Letter Sequence Meeting |
---|
|
|
MONTHYEARML1113703982011-05-20020 May 2011 Notice of Forthcoming Pre-Application Meeting with Licensee for Prairie Island Nuclear Generation Plant, Units 1 and 2, to Discuss Proposed Technical Specification and Licensing Basis Changes to Diesel Fuel Oil System Project stage: Meeting ML1117804242011-06-22022 June 2011 June 22, 2011, Meeting Handout #1 - NRC Meeting Diesel Fuel Oil LAR for Prairie Island Ngp Project stage: Meeting ML1120701572011-06-22022 June 2011 June 22, 2011, Meeting Handout #2 - Proposed Technical Specification Changes for Prairie Island Ngp Diesel Fuel Oil LAR Project stage: Meeting ML1122005212011-08-10010 August 2011 6/22/2011 Summary of Pre-Application Meeting Regarding the Diesel Fuel Oil System License Amendment Request Project stage: Meeting ML1134301022011-12-16016 December 2011 Acceptance Letter Regarding Relief Requests PR-01, VR-01, and VR-02 for Fifth Inservice Testing Interval Project stage: Acceptance Review 2011-05-20
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24127A2402024-05-0707 May 2024 Presentation Slides for Prairie Island 2023 End-of-Cycle Meeting ML24029A0382024-01-31031 January 2024 January 31, 2024, Pre-application Meeting Presentation - Prairie Island ISFSI License Amendment Request to Add Grace to License Conditions ML23168A0032023-06-20020 June 2023 Handout for 6/23/2023 Pre-Application Public Meeting with Prairie Island Nuclear Generating Plant to Revise ISFSI TS 4.4 for TN-40HT Casks ML23156A2602023-06-0505 June 2023 2022 Prairie Island End-of-Cycle Meeting Presentation ML23102A1752023-04-14014 April 2023 April 14, 2023 TS 3.7.8 LAR Pre-Submittal Meeting Slides ML22130A5852022-05-10010 May 2022 2021 Monticello and Prairie Island Nuclear Generating Plant End-of-Cycle Meeting Presentation ML22048B1812022-02-18018 February 2022 Pre-Application Meeting for Prairie Island TS 5.6.6, PTLR, LAR ML21221A0202021-08-11011 August 2021 Nis Pr Bypass Test Panel License Amendment Request ML21166A3792021-06-15015 June 2021 Units 1 and 2 2020 End-of-Cycle Meeting Presentation ML21032A2632021-02-0303 February 2021 Slides for Public Meeting with Xcel Energy to Discuss a Planned Amendment to Combine the Emergency Plans and Create a Common Emergency Offsite Facility for Monticello and Prairie Island ML19347B0722019-12-12012 December 2019 TVA and Xcel Energy Slides for Joint Presubmittal Meeting to License Amendment Requests to Adopt WCAP-17661, Revision 1 ML19268A0422019-09-26026 September 2019 Pre-Application Meeting License Amendment Request Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML19210D4512019-07-22022 July 2019 Abeyance Seal Preapplication Meeting Slides ML18051A1752018-02-20020 February 2018 Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy 2/20/2018 ML17240A3382017-08-30030 August 2017 Non-Safety Related Digital Feedwater and Amsac/Dss Control Systems Replacement Project Presentation ML17198A2632017-07-17017 July 2017 Pre-Application Meeting ML17066A3732017-03-0909 March 2017 Spent Fuel Pool Criticality Technical Specification Changes Round 2 Request for Additional Information Public Meeting: March 9, 2017 ML17037D1172017-02-0707 February 2017 License Amendment Requests for Change in Emergency Plan Staff Augmentation Response Times Pre-Submittal Meeting for Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant: February 7, 2017 ML17023A0652017-01-24024 January 2017 Pre-Submittal Call Regarding License Amendment Requests for Prairie Island Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant Emergency Action Level Scheme Changes ML15140A3342015-05-13013 May 2015 Public Meeting 05132015 Licensee Slides Only ML15105A0372015-04-14014 April 2015 Xcel Energy Slide Presentation to Support Pre-Application Meeting on April 14, 2015, to Discuss Nuclear Fuel Design Transition to Include Integral Fuel Burnable Absorber (Ifba) at the Prairie Island Nuclear Generating Plant ML14323B0222014-11-19019 November 2014 Regcon, November 19-20, 2014: 03-Info-Session-2 Ronald Johnson - Tribal Perspective on Continued Storage ML14153A0242014-05-16016 May 2014 Xcel Energy'S Presentation Slides Supporting a May 16, 2014, Public Meeting to Discuss the Flood Hazard Reevaluation Schedule for the Monticello and Prairie Island Nuclear Generating Plants ML14058A1732014-02-19019 February 2014 Diesel Generator Steady State Voltage and Frequency Limits - Prairie Island Nuclear Generating Plant Meeting February 19, 2014 ML13210A2012013-07-29029 July 2013 2012 End-of-Cycle Slides - Licensee ML13210A2002013-07-11011 July 2013 2012 End-of-Cycle Slides ML13056A0262013-02-25025 February 2013 Regulatory Conference Slide Presentation ML12340A5402012-12-0606 December 2012 Reactor Core Cooling & Heat Removal FLEX Strategy - Phase 1 ML12326A9712012-11-21021 November 2012 Encl 3 (Handouts - Public) to Summary of October 24, 2012, Meeting with the Northern States Power Company, D/B/A Excel Energy Regarding Security Requirements and Changes Pertaining to Prairie Island TAC L24689 ML12277A1762012-10-0404 October 2012 Steam Generator Replacement Presentation ML12275A4652012-09-27027 September 2012 Meeting September 27, 2012 - Handouts ML12275A3782012-09-27027 September 2012 Xcel Energy Prairie Island Nuclear Generating Plant Meeting Presentation, Diesel Generator Voltage and Frequency Limits. ML12205A2172012-07-23023 July 2012 NRC 2011 End-of-Cycle Slides ML12205A2202012-07-17017 July 2012 Licensee 2012 End-of-Cycle Slides ML12115A3112012-04-24024 April 2012 Meeting Slides: 04/24/2012 Meeting with Xcel Energy NFPA 805 Presubmittal - Prairie Island Nuclear Generating Plant ML1207904792012-03-14014 March 2012 March 14, 2012 Telecon Slides ML1122803892011-08-18018 August 2011 Pre-Application Meeting for Prairie Island Nuclear Generating Plant (Ping) Extended Power Uprate (EPU) ML1119903462011-07-28028 July 2011 Meeting Presentation, Prairie Island Nuclear Generating Plant - Failure to Maintain the Train a and B Direct Current Electrical Power Subsystems Operable ML1117804242011-06-22022 June 2011 June 22, 2011, Meeting Handout #1 - NRC Meeting Diesel Fuel Oil LAR for Prairie Island Ngp ML1120701572011-06-22022 June 2011 June 22, 2011, Meeting Handout #2 - Proposed Technical Specification Changes for Prairie Island Ngp Diesel Fuel Oil LAR ML1106600792011-03-0303 March 2011 March 3, 2011 Meeting Handouts - Revise Footnote in TS 3.8.1, Prairie Island Nuclear Generating Plant ML1034701142010-12-14014 December 2010 Excel Energy Slides for Public Meeting 12/14/2010 to Discuss Human Performance Issues ML1027802642010-10-0404 October 2010 Session 4 - Heather Westra Presentation at October 4, 2010, Public Meeting on Groundwater Protection ML1023805712010-08-25025 August 2010 Meeting Presentation Alternative Source Term Steam Generator Tube Rupture Margin to Overfill Evaluation - Prairie Island Nuclear Generating Plant ML1014502432010-05-26026 May 2010 Responses to Questions from the Prairie Island Indian Community Concerning Issues Related to Prairie Island Nuclear Generating Plant ML1012604192010-05-20020 May 2010 Meeting Presentation Prairie Island Annual Assessment Meeting - Reactor Oversight Program - 2009 ML1012503422010-05-0505 May 2010 Regulatory Conference Slides ML1015801072010-04-28028 April 2010 2R26 Outage, SG Tube Inspection Telecon Slides ML1010604782010-04-15015 April 2010 April 15, 2010, Meeting Slides - Pre-Application Meeting for Prairie Island Ngp Extended Power Uprate ML0932901282009-12-0101 December 2009 Licensee Slides for Public Meeting 2024-05-07
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24127A2402024-05-0707 May 2024 Presentation Slides for Prairie Island 2023 End-of-Cycle Meeting ML24059A4042024-03-0606 March 2024 March 6, 2023, Presubmittal Meeting for License Amendment Request to Modify Technical Specifications Definitions & Approve Plant-Specific Methods for Response Time Testing (EPID L-2024-LRM-0034) - Slides ML24029A0382024-01-31031 January 2024 January 31, 2024, Pre-application Meeting Presentation - Prairie Island ISFSI License Amendment Request to Add Grace to License Conditions ML23168A0032023-06-20020 June 2023 Handout for 6/23/2023 Pre-Application Public Meeting with Prairie Island Nuclear Generating Plant to Revise ISFSI TS 4.4 for TN-40HT Casks ML23156A2602023-06-0505 June 2023 2022 Prairie Island End-of-Cycle Meeting Presentation ML23102A1752023-04-14014 April 2023 April 14, 2023 TS 3.7.8 LAR Pre-Submittal Meeting Slides ML22130A5852022-05-10010 May 2022 2021 Monticello and Prairie Island Nuclear Generating Plant End-of-Cycle Meeting Presentation ML22048B1812022-02-18018 February 2022 Pre-Application Meeting for Prairie Island TS 5.6.6, PTLR, LAR ML21166A3792021-06-15015 June 2021 Units 1 and 2 2020 End-of-Cycle Meeting Presentation ML21124A0652021-05-0606 May 2021 Xcel Energy Presentation for May 6, 2021 Public Meeting to Discuss 24-Month Cycles at Prairie Island Nuclear Generating Plant, Units 1 and 2 ML21032A2632021-02-0303 February 2021 Slides for Public Meeting with Xcel Energy to Discuss a Planned Amendment to Combine the Emergency Plans and Create a Common Emergency Offsite Facility for Monticello and Prairie Island ML20266F1052020-09-23023 September 2020 (PINGP) COVID-19 Exemption Request for the 2020 Biennial Emergency Preparedness Exercise ML20212L8622020-07-29029 July 2020 2019 Monticello and Prairie Island EOC Presentation from Webinar ML20098F0682020-04-0909 April 2020 Preapplication Teleconference Presentation: License Amendment Request to Adopt TSTF-569 ML20057D3082020-02-18018 February 2020 Slides Potential License Amendment to Remove Note from LCO 3.4.12 and LCO 3.4.13 ML19268A0422019-09-26026 September 2019 Pre-Application Meeting License Amendment Request Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML19210D4512019-07-22022 July 2019 Abeyance Seal Preapplication Meeting Slides ML19071A2782019-03-0707 March 2019 Enclosure 3: Meeting Slides (Summary of February 28, 2019, Public Meeting with Xcel Energy to Discuss Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island ISFSI (W/Enclosures 1 and 2)) ML18162A0262018-06-12012 June 2018 License Amendment Request to Reclassify Certain Fuel Handling Equipment ML18051A1752018-02-20020 February 2018 Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy 2/20/2018 ML17240A3382017-08-30030 August 2017 Non-Safety Related Digital Feedwater and Amsac/Dss Control Systems Replacement Project Presentation ML17209A1192017-07-17017 July 2017 Summary of July 17, 2017, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request Related to Heavy Lifting Devices ML17198A2632017-07-17017 July 2017 Pre-Application Meeting ML17066A3732017-03-0909 March 2017 Spent Fuel Pool Criticality Technical Specification Changes Round 2 Request for Additional Information Public Meeting: March 9, 2017 ML17037D1172017-02-0707 February 2017 License Amendment Requests for Change in Emergency Plan Staff Augmentation Response Times Pre-Submittal Meeting for Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant: February 7, 2017 ML17023A0652017-01-24024 January 2017 Pre-Submittal Call Regarding License Amendment Requests for Prairie Island Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant Emergency Action Level Scheme Changes ML16280A0372016-09-29029 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information (CAC Nos. MF7710 and MF7711) - Figure 2 of 3 ML16280A0422016-09-29029 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information (CAC Nos. MF7710 and MF7711) - Figure 3 of 3 ML16280A0352016-09-29029 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information (CAC Nos. MF7710 and MF7711) - Figure 1 of 3 ML15140A3342015-05-13013 May 2015 Public Meeting 05132015 Licensee Slides Only ML15127A6562015-05-0707 May 2015 PI EOC Mtg NRC Slides ML15105A0372015-04-14014 April 2015 Xcel Energy Slide Presentation to Support Pre-Application Meeting on April 14, 2015, to Discuss Nuclear Fuel Design Transition to Include Integral Fuel Burnable Absorber (Ifba) at the Prairie Island Nuclear Generating Plant ML14323B0222014-11-19019 November 2014 Regcon, November 19-20, 2014: 03-Info-Session-2 Ronald Johnson - Tribal Perspective on Continued Storage ML14162A5202014-06-11011 June 2014 Slides: Prairie Island Independent Spent Fuel Storage Installation - License Renewal Application - Discussion of Requests for Additional Information, for June 16, 2014, Public Meeting ML14153A0242014-05-16016 May 2014 Xcel Energy'S Presentation Slides Supporting a May 16, 2014, Public Meeting to Discuss the Flood Hazard Reevaluation Schedule for the Monticello and Prairie Island Nuclear Generating Plants ML14084A3242014-03-21021 March 2014 M140321: Slides - Presented by Multiple Participants at Commission Briefing on Waste Confidence Rulemaking ML13210A2012013-07-29029 July 2013 2012 End-of-Cycle Slides - Licensee ML13210A2002013-07-11011 July 2013 2012 End-of-Cycle Slides ML13056A0262013-02-25025 February 2013 Regulatory Conference Slide Presentation ML12340A5402012-12-0606 December 2012 Reactor Core Cooling & Heat Removal FLEX Strategy - Phase 1 ML12326A9712012-11-21021 November 2012 Encl 3 (Handouts - Public) to Summary of October 24, 2012, Meeting with the Northern States Power Company, D/B/A Excel Energy Regarding Security Requirements and Changes Pertaining to Prairie Island TAC L24689 ML12277A1762012-10-0404 October 2012 Steam Generator Replacement Presentation ML12275A3782012-09-27027 September 2012 Xcel Energy Prairie Island Nuclear Generating Plant Meeting Presentation, Diesel Generator Voltage and Frequency Limits. ML12205A2172012-07-23023 July 2012 NRC 2011 End-of-Cycle Slides ML12205A2202012-07-17017 July 2012 Licensee 2012 End-of-Cycle Slides ML12115A3112012-04-24024 April 2012 Meeting Slides: 04/24/2012 Meeting with Xcel Energy NFPA 805 Presubmittal - Prairie Island Nuclear Generating Plant ML1207904792012-03-14014 March 2012 March 14, 2012 Telecon Slides ML1122803892011-08-18018 August 2011 Pre-Application Meeting for Prairie Island Nuclear Generating Plant (Ping) Extended Power Uprate (EPU) ML1119903462011-07-28028 July 2011 Meeting Presentation, Prairie Island Nuclear Generating Plant - Failure to Maintain the Train a and B Direct Current Electrical Power Subsystems Operable ML1117804242011-06-22022 June 2011 June 22, 2011, Meeting Handout #1 - NRC Meeting Diesel Fuel Oil LAR for Prairie Island Ngp 2024-05-07
[Table view] |
Text
NRC Meeting Diesel Fuel Oil LAR June 22, 2011
Xcel Energy Participants Christopher Lethgo - Engineering Supervisor Dale Vincent - Licensing Engineer 2
Agenda Introductions - Vincent Meeting purpose - Vincent Background - Lethgo Unit 1 DFO System - Lethgo Unit 2 DFO System - Lethgo Current TS and Bases - Vincent Proposed TS and Bases - Vincent Proposed LAR Scope - Vincent Summary - Vincent 3
Meeting Goals Discuss diesel fuel oil issues Provide scope of proposed LAR and basis 4
Background
Issues Review of DFO storage system License basis Single failure design requirements Compensatory measures 5
Background
Issues continued CDBI (2007) identified EDG frequency issue Higher frequency - more DFO consumption Compensatory measures Limit frequency range Increase DFO storage requirement 6
Background
Issues continued 2010 identified single failure issue Each FOST has only one transfer pump Multiple transfer pumps have the same power supply A single failure could prevent access to fuel oil in multiple FOSTs until repairs were made.
Compensatory measures 7 days of fuel oil supply in each train 7
Background
DFO System Unit 1 Operation - 1973 Unit 2 Operation - 1974 Two emergency diesel generators (D1, D2)
Plant only had the safeguards DFO system now associated with Unit 1 8
Background
DFO System continued Unit 2 safeguard buses reconfigured - 1992 Unit 2 EDGs installed (D5, D6)
Address SBO requirements Unit 2 safeguards buses separated from Unit 1 EDGs Unit 2 DFO system installed Safeguards power to 121 MDCLP from Unit 2 EDGs 9
Unit 1 DFO System D1 - Fairbanks Morse EDG Train A Safeguards Bus D2 - Fairbanks Morse EDG Train B Safeguards Bus 12 DDCLP CL Train A header 22 DDCLP CL Train B header 10
Unit 1 DFO System Contributes to Cooling Water (CL) System Equivalent to service water and emergency service water systems at other plants System is shared between the units Five CL pumps Two safeguards DD pumps Separate TS DFO requirement One safeguards MD pump Powered by either Unit 2 EDG 11
Unit 1 DFO System Six Class I tanks All tanks interconnected Any tank can supply any Unit 1 or CL diesel Available volume - 17,500 gallons/tank Maximum volume - 19,500 gallons/tank 2 non-Class I tanks for heating boiler Volume - 35,000 gallons/tank 12
Unit 1 DFO System 13 Drawing For Information Only
Unit 1 DFO System Design features All tanks interconnected Seismic Designed for Probable Maximum Flood Buried Anchored Elevated vent 14
Unit 1 DFO System Transfer pumps One transfer pump per tank Pumps are safety-related 121 and 122 EDG FO storage tank pumps Train A safeguards bus 121 DDCLP tank pump Train A safeguards bus May also be powered from Unit 2 123 and 124 EDG FO storage tank pumps Train B safeguards bus 122 DDCLP tank pump Train B safeguards bus May also be powered from Unit 2 15
Unit 1 DFO System Transfer pumps continued Any tank can supply any Unit 1 or CL diesel 121 and 122 EDG FO storage tank pumps Provide automatic makeup for D1 121 DDCLP tank pump Provide automatic makeup for 12 DDCLP 123 and 124 EDG FO storage tank pumps Provide automatic makeup for D2 122 DDCLP tank pump Provide automatic makeup for 22 DDCLP 16
Unit 1 DFO System License basis 14 day supply for one EDG and one DDCLP Probable Maximum Flood duration 13 days Replenish supply after 14 days Single failure not a consideration for external flood event EDG loading Original license basis: FSAR Table 8.4-1 loads (one unit DBA, other unit hot shutdown)
Current license basis: USAR Table 8.4-1 loads (Unit 1 DBA) 17
Unit 1 DFO System Current volume requirements Approximately 42,000 gallons for one EDG Approximately 19,500 gallons for one DDCLP These volumes require minimum of 4 tanks 18
Unit 2 DFO System D5 - SACM* EDG Train A safeguards bus D6 - SACM EDG Train B safeguards bus
- Societe Alsacienne de Constructions Mecaniques de Mulhouse (SACM) 19
Unit 2 DFO System Four Class I tanks 21, 22, 23, and 24 Available volume - 30,800 gallons/tank Maximum volume - 32,800 gallons/tank One Non-Class 1 receiving tank Approximately 15,000 gallons 20
Unit 2 DFO System 21 Drawing For Information Only
Unit 2 DFO System Design features All tanks interconnected Seismic Designed for Probable Maximum Flood Underground concrete vault Anchored Elevated vent Emergency fill connection above flood level 22
Unit 2 DFO System Transfer pumps One transfer pump per tank Pumps are safety-related 21 and 23 tank pumps Train A safeguards bus 22 and 24 tank pumps Train B safeguards bus 23
Unit 2 DFO System License basis 14 day supply for one EDG Probable Maximum Flood duration 13 days Replenish supply after 14 days Single failure not a consideration for external flood event USAR Table 8.4-2 loads (Unit 2 DBA) 24
Unit 2 DFO System Current volume requirements Maintain 75,000 gallons for one EDG This volume requires a minimum of 3 tanks 25
Current TS and Bases Technical Specification Total supply within limits Total supply applicable - one or both EDGs operable Limits based on operation of one EDG for 14 days Basis: maximum probable flood 26
Current TS and Bases Bases Background discussion Mixed NUREG-1431 and old TS Bases Basis for requirements not clear ASA discussion Discusses DBA - confusing Good discussion of DFO system 27
Current TS and Bases Regulatory requirement - 10CFR 50.36(2)
(ii) A technical specification limiting condition for operation of a nuclear reactor must be established for each item meeting one or more of the following criteria:
(C) Criterion 3. A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
28
Proposed TS and Bases High level changes Replace current TS More alignment with standard TS 29
Proposed LAR Scope Add new license basis Supply to mitigate DBA+LOOP Assume single failure 7-day supply Make license basis same for both units 30
Proposed LAR Scope TS changes Implement proposed new license basis 7-day supply for each EDG Replace current TS Administrative changes 31
Proposed LAR Scope Basis for TS change Current TS Cope with external flood Does not meet 10CFR 50.36(2)(ii)(C)
Proposed TS Mitigate DBA with assumed single failure Meets 10CFR 50.36(2)(ii)(C) 32
Proposed LAR Scope Proposed TS consistent with regulatory guidance Regulatory Guide 1.137 NUREG-0800 NUREG-1431 33
Proposed LAR Scope Proposed TS improves safety 7-day supply available for each EDG More DFO required DFO supply can be replenished in 7 days System design supports proposed TS No modifications required 34
Proposed LAR Scope Relocate DFO volumes to Bases Resolve non-conservative TS issue Flexibility for future volume changes Per TSTF-501 Calculate volumes per RG 1.137 - both units 35
Proposed LAR Scope Improve TS alignment with NUREG-1431 New license basis Uniform interpretation and compliance Improve clarity for operator use Administrative changes 36
Proposed LAR Scope Bases Make consistent Reflect new license basis Include DFO volumes per TSTF-501 37
Questions / Comments Discussion 38
Summary Propose to add new license basis Propose new TS Relocate DFO volumes to Bases Current DFO system designs support the proposed license basis and TS Meets regulations for required TS Consistent with regulatory guidance Plant safety is improved 39