ML18051A175

From kanterella
Jump to navigation Jump to search

Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy 2/20/2018
ML18051A175
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/20/2018
From:
Northern States Power Co, Xcel Energy
To: Robert Kuntz
Plant Licensing Branch III
Kuntz R
References
Download: ML18051A175 (12)


Text

Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy (XE)

Prairie Island Nuclear Generating Plant 02-20-2018 1

Agenda

  • Background & Schedule
  • Discuss

- Variations from TSTF-425

- Site-specific TS SR 3.0.2

- Probabilistic Risk Assessment (PRA)

  • Fire Model
  • Questions and Feedback 2

Background & Schedule

- Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Initiative 5b)

- Licensee controlled program called the Surveillance Frequency Control Program (SFCP) and is in accordance with NEI 04-10

- Planned submittal first quarter 2018

- Requesting approval by April 2019

- Implement prior to Fall 2019 Refueling Outage (RFO) 3

Variations

  • Variations for the application include:

- Revised (clean) TS pages not included

- TS Bases insert consistent with the April 14, 2010 NRC letter removing the frequency basis

- Cross-reference list for TSTF-425 (NUREG-1431) markups to PINGP site specific TS SRs provided

- Administrative changes

  • An expired one-time frequency extension is deleted
  • Two minor formatting changes 4

PINGPs TS SR 3.0.2

- NUREG-1431 SR 3.0.2 permits a 25% extension of the interval specified in the Frequency

- PINGP SR 3.0.2 also permits a 25% extension of the specified interval, except for Frequencies specified as 24 months

  • Not a variation to the TSTF
  • Applies to 50 TS SR
  • One exception - TS SR 3.8.1.8 amended in 2010 to allow the application of the 25% extension to its 24 month surveillance requirement 5

PINGPs TS SR 3.0.2

- Site specific SR 3.0.2 is applied to the SFCP as described in TSTF-425

- No affect on TSTF-425

  • Model License Amendment Request (LAR) unchanged
  • Model No Significant Hazards Consideration determination unchanged
  • NRC Model Safety Evaluation (SE) unchanged
  • Not considered a variation to the TSTF 6

PRA Technical Adequacy

- RG 1.200 peer reviewed with Appendix X to NEI 05-04 finding closure review complete

  • Seismic

- IPEEE Seismic Margins Analysis (SMA)

  • Other External Hazards

- PINGP IPEEE concluded other external hazards to be negligible contributors to overall plant risk

  • Shutdown Events

- Shutdown risk management program consistent with NUMARC 91-06 7

PRA Technical Adequacy

  • Fire

- Fire PRA developed for NFPA-805

  • Fire PRA reflects future state of the as-built/as-operated plant following NFPA-805 modifications

- Unit 1 - Fall 2020 RFO, Unit 2 - Fall 2019 RFO

  • Fire PRA is RG 1.200 peer reviewed with an Appendix X closure review
  • Fire PRA Open F&Os provided in the Technical Adequacy Section of the SFCP LAR

- During transition, the SFCP evaluations use IPEEE FIVE results supplemented by sensitivities from Fire PRA in accordance with NEI 04-10

- Following implementation of NFPA-805, evaluations use the Fire PRA in accordance with NEI 04-10 8

PRA Technical Adequacy

  • Conclusion

- PINGP PRA models sufficiently robust and suitable for SFCP 9

Questions and Feedback

?

10

Acronyms

  • CLB - Current Licensing Basis
  • F&O - Finding and Observations
  • FIVE - Fire Induced Vulnerability Evaluation
  • LAR - License Amendment Request
  • IPEEE - Individual Plant Examination of External Events
  • NEI - Nuclear Energy Institute
  • NSHC - No Significant Hazards Determination
  • PINGP - Prairie Island Nuclear Generating Plant
  • RFO - Refueling Outage
  • SE - Safety Evaluation 11

Acronyms

  • SMA - Seismic Margins Analysis
  • TS - Technical Specification
  • TS SR - Technical Specification Surveillance Requirement
  • TSTF - Technical Specification Task Force
  • XE - Xcel Energy 12