MONTHYEARML24029A0382024-01-31031 January 2024 January 31, 2024, Pre-application Meeting Presentation - Prairie Island ISFSI License Amendment Request to Add Grace to License Conditions ML23168A0032023-06-20020 June 2023 Handout for 6/23/2023 Pre-Application Public Meeting with Prairie Island Nuclear Generating Plant to Revise ISFSI TS 4.4 for TN-40HT Casks ML23156A2602023-06-0505 June 2023 2022 Prairie Island End-of-Cycle Meeting Presentation ML23102A1752023-04-14014 April 2023 April 14, 2023 TS 3.7.8 LAR Pre-Submittal Meeting Slides ML22130A5852022-05-10010 May 2022 2021 Monticello and Prairie Island Nuclear Generating Plant End-of-Cycle Meeting Presentation ML22048B1812022-02-18018 February 2022 Pre-Application Meeting for Prairie Island TS 5.6.6, PTLR, LAR ML21221A0202021-08-11011 August 2021 Nis Pr Bypass Test Panel License Amendment Request ML21166A3792021-06-15015 June 2021 Units 1 and 2 2020 End-of-Cycle Meeting Presentation ML21032A2632021-02-0303 February 2021 Slides for Public Meeting with Xcel Energy to Discuss a Planned Amendment to Combine the Emergency Plans and Create a Common Emergency Offsite Facility for Monticello and Prairie Island ML19347B0722019-12-12012 December 2019 TVA and Xcel Energy Slides for Joint Presubmittal Meeting to License Amendment Requests to Adopt WCAP-17661, Revision 1 ML19268A0422019-09-26026 September 2019 Pre-Application Meeting License Amendment Request Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML19210D4512019-07-22022 July 2019 Abeyance Seal Preapplication Meeting Slides ML18051A1752018-02-20020 February 2018 Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy 2/20/2018 ML17240A3382017-08-30030 August 2017 Non-Safety Related Digital Feedwater and Amsac/Dss Control Systems Replacement Project Presentation ML17198A2632017-07-17017 July 2017 Pre-Application Meeting ML17066A3732017-03-0909 March 2017 Spent Fuel Pool Criticality Technical Specification Changes Round 2 Request for Additional Information Public Meeting: March 9, 2017 ML17037D1172017-02-0707 February 2017 License Amendment Requests for Change in Emergency Plan Staff Augmentation Response Times Pre-Submittal Meeting for Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant: February 7, 2017 ML17023A0652017-01-24024 January 2017 Pre-Submittal Call Regarding License Amendment Requests for Prairie Island Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant Emergency Action Level Scheme Changes ML15140A3342015-05-13013 May 2015 Public Meeting 05132015 Licensee Slides Only ML15105A0372015-04-14014 April 2015 Xcel Energy Slide Presentation to Support Pre-Application Meeting on April 14, 2015, to Discuss Nuclear Fuel Design Transition to Include Integral Fuel Burnable Absorber (Ifba) at the Prairie Island Nuclear Generating Plant ML14323B0222014-11-19019 November 2014 Regcon, November 19-20, 2014: 03-Info-Session-2 Ronald Johnson - Tribal Perspective on Continued Storage ML14153A0242014-05-16016 May 2014 Xcel Energy'S Presentation Slides Supporting a May 16, 2014, Public Meeting to Discuss the Flood Hazard Reevaluation Schedule for the Monticello and Prairie Island Nuclear Generating Plants ML14058A1732014-02-19019 February 2014 Diesel Generator Steady State Voltage and Frequency Limits - Prairie Island Nuclear Generating Plant Meeting February 19, 2014 ML13210A2012013-07-29029 July 2013 2012 End-of-Cycle Slides - Licensee ML13210A2002013-07-11011 July 2013 2012 End-of-Cycle Slides ML13056A0262013-02-25025 February 2013 Regulatory Conference Slide Presentation ML12340A5402012-12-0606 December 2012 Reactor Core Cooling & Heat Removal FLEX Strategy - Phase 1 ML12326A9712012-11-21021 November 2012 Encl 3 (Handouts - Public) to Summary of October 24, 2012, Meeting with the Northern States Power Company, D/B/A Excel Energy Regarding Security Requirements and Changes Pertaining to Prairie Island TAC L24689 ML12277A1762012-10-0404 October 2012 Steam Generator Replacement Presentation ML12275A4652012-09-27027 September 2012 Meeting September 27, 2012 - Handouts ML12275A3782012-09-27027 September 2012 Xcel Energy Prairie Island Nuclear Generating Plant Meeting Presentation, Diesel Generator Voltage and Frequency Limits. ML12205A2172012-07-23023 July 2012 NRC 2011 End-of-Cycle Slides ML12205A2202012-07-17017 July 2012 Licensee 2012 End-of-Cycle Slides ML12115A3112012-04-24024 April 2012 Meeting Slides: 04/24/2012 Meeting with Xcel Energy NFPA 805 Presubmittal - Prairie Island Nuclear Generating Plant ML1207904792012-03-14014 March 2012 March 14, 2012 Telecon Slides ML1122803892011-08-18018 August 2011 Pre-Application Meeting for Prairie Island Nuclear Generating Plant (Ping) Extended Power Uprate (EPU) ML1119903462011-07-28028 July 2011 Meeting Presentation, Prairie Island Nuclear Generating Plant - Failure to Maintain the Train a and B Direct Current Electrical Power Subsystems Operable ML1117804242011-06-22022 June 2011 June 22, 2011, Meeting Handout #1 - NRC Meeting Diesel Fuel Oil LAR for Prairie Island Ngp ML1120701572011-06-22022 June 2011 June 22, 2011, Meeting Handout #2 - Proposed Technical Specification Changes for Prairie Island Ngp Diesel Fuel Oil LAR ML1106600792011-03-0303 March 2011 March 3, 2011 Meeting Handouts - Revise Footnote in TS 3.8.1, Prairie Island Nuclear Generating Plant ML1034701142010-12-14014 December 2010 Excel Energy Slides for Public Meeting 12/14/2010 to Discuss Human Performance Issues ML1027802642010-10-0404 October 2010 Session 4 - Heather Westra Presentation at October 4, 2010, Public Meeting on Groundwater Protection ML1023805712010-08-25025 August 2010 Meeting Presentation Alternative Source Term Steam Generator Tube Rupture Margin to Overfill Evaluation - Prairie Island Nuclear Generating Plant ML1014502432010-05-26026 May 2010 Responses to Questions from the Prairie Island Indian Community Concerning Issues Related to Prairie Island Nuclear Generating Plant ML1012604192010-05-20020 May 2010 Meeting Presentation Prairie Island Annual Assessment Meeting - Reactor Oversight Program - 2009 ML1012503422010-05-0505 May 2010 Regulatory Conference Slides ML1015801072010-04-28028 April 2010 2R26 Outage, SG Tube Inspection Telecon Slides ML1010604782010-04-15015 April 2010 April 15, 2010, Meeting Slides - Pre-Application Meeting for Prairie Island Ngp Extended Power Uprate ML0932901282009-12-0101 December 2009 Licensee Slides for Public Meeting ML0931003422009-11-0303 November 2009 HAB Drill Conference Call 2024-01-31
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24029A0382024-01-31031 January 2024 January 31, 2024, Pre-application Meeting Presentation - Prairie Island ISFSI License Amendment Request to Add Grace to License Conditions ML23168A0032023-06-20020 June 2023 Handout for 6/23/2023 Pre-Application Public Meeting with Prairie Island Nuclear Generating Plant to Revise ISFSI TS 4.4 for TN-40HT Casks ML23156A2602023-06-0505 June 2023 2022 Prairie Island End-of-Cycle Meeting Presentation ML23102A1752023-04-14014 April 2023 April 14, 2023 TS 3.7.8 LAR Pre-Submittal Meeting Slides ML22130A5852022-05-10010 May 2022 2021 Monticello and Prairie Island Nuclear Generating Plant End-of-Cycle Meeting Presentation ML22048B1812022-02-18018 February 2022 Pre-Application Meeting for Prairie Island TS 5.6.6, PTLR, LAR ML21166A3792021-06-15015 June 2021 Units 1 and 2 2020 End-of-Cycle Meeting Presentation ML21124A0652021-05-0606 May 2021 Xcel Energy Presentation for May 6, 2021 Public Meeting to Discuss 24-Month Cycles at Prairie Island Nuclear Generating Plant, Units 1 and 2 ML21032A2632021-02-0303 February 2021 Slides for Public Meeting with Xcel Energy to Discuss a Planned Amendment to Combine the Emergency Plans and Create a Common Emergency Offsite Facility for Monticello and Prairie Island ML20266F1052020-09-23023 September 2020 (PINGP) COVID-19 Exemption Request for the 2020 Biennial Emergency Preparedness Exercise ML20212L8622020-07-29029 July 2020 2019 Monticello and Prairie Island EOC Presentation from Webinar ML20098F0682020-04-0909 April 2020 Preapplication Teleconference Presentation: License Amendment Request to Adopt TSTF-569 ML20057D3082020-02-18018 February 2020 Slides Potential License Amendment to Remove Note from LCO 3.4.12 and LCO 3.4.13 ML19268A0422019-09-26026 September 2019 Pre-Application Meeting License Amendment Request Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML19210D4512019-07-22022 July 2019 Abeyance Seal Preapplication Meeting Slides ML19071A2782019-03-0707 March 2019 Enclosure 3: Meeting Slides (Summary of February 28, 2019, Public Meeting with Xcel Energy to Discuss Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island ISFSI (W/Enclosures 1 and 2)) ML18162A0262018-06-12012 June 2018 License Amendment Request to Reclassify Certain Fuel Handling Equipment ML18051A1752018-02-20020 February 2018 Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy 2/20/2018 ML17240A3382017-08-30030 August 2017 Non-Safety Related Digital Feedwater and Amsac/Dss Control Systems Replacement Project Presentation ML17198A2632017-07-17017 July 2017 Pre-Application Meeting ML17209A1192017-07-17017 July 2017 Summary of July 17, 2017, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request Related to Heavy Lifting Devices ML17066A3732017-03-0909 March 2017 Spent Fuel Pool Criticality Technical Specification Changes Round 2 Request for Additional Information Public Meeting: March 9, 2017 ML17037D1172017-02-0707 February 2017 License Amendment Requests for Change in Emergency Plan Staff Augmentation Response Times Pre-Submittal Meeting for Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant: February 7, 2017 ML17023A0652017-01-24024 January 2017 Pre-Submittal Call Regarding License Amendment Requests for Prairie Island Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant Emergency Action Level Scheme Changes ML16280A0352016-09-29029 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information (CAC Nos. MF7710 and MF7711) - Figure 1 of 3 ML16280A0372016-09-29029 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information (CAC Nos. MF7710 and MF7711) - Figure 2 of 3 ML16280A0422016-09-29029 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information (CAC Nos. MF7710 and MF7711) - Figure 3 of 3 ML15140A3342015-05-13013 May 2015 Public Meeting 05132015 Licensee Slides Only ML15127A6562015-05-0707 May 2015 PI EOC Mtg NRC Slides ML15105A0372015-04-14014 April 2015 Xcel Energy Slide Presentation to Support Pre-Application Meeting on April 14, 2015, to Discuss Nuclear Fuel Design Transition to Include Integral Fuel Burnable Absorber (Ifba) at the Prairie Island Nuclear Generating Plant ML14323B0222014-11-19019 November 2014 Regcon, November 19-20, 2014: 03-Info-Session-2 Ronald Johnson - Tribal Perspective on Continued Storage ML14162A5202014-06-11011 June 2014 Slides: Prairie Island Independent Spent Fuel Storage Installation - License Renewal Application - Discussion of Requests for Additional Information, for June 16, 2014, Public Meeting ML14153A0242014-05-16016 May 2014 Xcel Energy'S Presentation Slides Supporting a May 16, 2014, Public Meeting to Discuss the Flood Hazard Reevaluation Schedule for the Monticello and Prairie Island Nuclear Generating Plants ML14084A3242014-03-21021 March 2014 M140321: Slides - Presented by Multiple Participants at Commission Briefing on Waste Confidence Rulemaking ML13210A2012013-07-29029 July 2013 2012 End-of-Cycle Slides - Licensee ML13210A2002013-07-11011 July 2013 2012 End-of-Cycle Slides ML13056A0262013-02-25025 February 2013 Regulatory Conference Slide Presentation ML12340A5402012-12-0606 December 2012 Reactor Core Cooling & Heat Removal FLEX Strategy - Phase 1 ML12326A9712012-11-21021 November 2012 Encl 3 (Handouts - Public) to Summary of October 24, 2012, Meeting with the Northern States Power Company, D/B/A Excel Energy Regarding Security Requirements and Changes Pertaining to Prairie Island TAC L24689 ML12277A1762012-10-0404 October 2012 Steam Generator Replacement Presentation ML12275A3782012-09-27027 September 2012 Xcel Energy Prairie Island Nuclear Generating Plant Meeting Presentation, Diesel Generator Voltage and Frequency Limits. ML12205A2172012-07-23023 July 2012 NRC 2011 End-of-Cycle Slides ML12205A2202012-07-17017 July 2012 Licensee 2012 End-of-Cycle Slides ML12115A3112012-04-24024 April 2012 Meeting Slides: 04/24/2012 Meeting with Xcel Energy NFPA 805 Presubmittal - Prairie Island Nuclear Generating Plant ML1207904792012-03-14014 March 2012 March 14, 2012 Telecon Slides ML1122803892011-08-18018 August 2011 Pre-Application Meeting for Prairie Island Nuclear Generating Plant (Ping) Extended Power Uprate (EPU) ML1119903462011-07-28028 July 2011 Meeting Presentation, Prairie Island Nuclear Generating Plant - Failure to Maintain the Train a and B Direct Current Electrical Power Subsystems Operable ML1117804242011-06-22022 June 2011 June 22, 2011, Meeting Handout #1 - NRC Meeting Diesel Fuel Oil LAR for Prairie Island Ngp ML1110200652011-04-14014 April 2011 NRC Slides for EOC Meeting ML1106600792011-03-0303 March 2011 March 3, 2011 Meeting Handouts - Revise Footnote in TS 3.8.1, Prairie Island Nuclear Generating Plant 2024-01-31
[Table view] |
Text
Prairie Island 2R27 Outage NRC Phone Call and NRC Discussion Points March 14, 2012
2R27 NRC Phone Call March 14, 2012 z
Participants:
z Prairie Island (NSP MN) z Kari Den Herder (SG Program Engineer) z Jennie Eckholt (Licensing) z Mike Heller (SG Project Supervisor) z Scott Redner (ET Level III QDA) z Jeff Ricker (Inspection & Materials Supervisor) z Carl Lane (Engineering Programs Manager) z Richard Pearson (SGR Engineering Supervisor) z Ben Stephens (Contract SG Engineer) z AREVA (Lynchburg) z Jim Begley (CMOA analyst) 2
2R27 NRC Phone Call March 14, 2012 z The attached information has not been validated.
In many cases, it is preliminary information from ongoing activities. To our knowledge, it is the best information available as of 7 AM on the date prior to this report and may be changed following further review and analysis.
z NRC Discussion Points are provided in italic font and are used as a template for this presentation.
3
2R27 NRC Phone Call March 14, 2012 Current Status of 2R27 SG Inspection (As of 0700 on March 13, 2012)
Category 21 SG 22 SG ET Acquisition (% completed) 97 92 ET Analysis (% completed) 96 88
- of Pluggable Tubes 80 21
- of Re-Roll Candidates 330 215
- of In Situ Candidates 0 0 4
2R27 NRC Phone Call March 14, 2012 Q1: Discuss any trends in the amount of primary-to-secondary leakage observed during the recently completed cycle.
z 21 Steam Generator maximum steady state leakage by tritium was 0.5 GPD to < 3.5 GPD over the last cycle.
z 22 Steam Generator maximum steady state leakage by tritium was 0.5 GPD to < 4.0 gallon per day over the last cycle.
z Steam Generator Tube Leakage is slightly elevated as compared to leakage over the last three cycles.
5
2R27 NRC Phone Call March 14, 2012 6
2R27 NRC Phone Call March 14, 2012 Q2: Discuss whether any secondary side pressure tests were performed during the outage and the associated results.
z Due to the slightly elevated primary to secondary leakage, a hydrostatic pressure test is scheduled for each SG to look for tube leakage.
7
2R27 NRC Phone Call March 14, 2012 Q3: Discuss any exceptions taken to the industry guidelines.
z No exceptions were or will be taken from industry guidelines.
8
2R27 NRC Phone Call March 14, 2012 Q4: For each SG, provide a description of the inspections performed including the areas examined and the probes used, (e.g., dents/dings, sleeves, expansion-transition, U-bends with a rotating probe) the scope of the inspection (e.g., 100 percent of the dents/dings greater than 5 volts and a 20 percent sample between 2 and 5 volts), and the expansion criteria.
z Prairie Island 2R27 steam generator inspection plan is attached on the following sheet.
9
2R27 NRC Phone Call March 14, 2012 2R27 Steam Generator Inspection Plan SCOPE PROBE TYPE S/G 21 S/G 22 Full Length n Bobbin 100% 100%
Rows 1 through 4 U-Bends MRPC 100% 100%
Rows 5 through 8 U-Bends o MRPC 33% 33%
Hot Leg Tubesheet MRPC 100% 100%
I690 Hot Leg Roll Plugs p MRPC 25% 25%
Supplemental q MRPC 100% 100%
Post In Situ Pressure Test MRPC 100% 100%
Plug Visual N/A 100% 100%
Baseline New Re-Rolls MRPC 100% 100%
10
2R27 NRC Phone Call March 14, 2012 2R27 Steam Generator Inspection Plan (cont.)
n Except the bend portion of row 1 through 4 u-bends.
o Expansion plan defined in plant procedure 2H25.1.
p Plug samples are considered proactive informational sample plans that are not subject to the periodicity requirements of T.S.5.5.8.d.3.
q ADR, CUD, DEP, DNI, TSP DNT 2.0V, Freespan DNT 5.0V, DRI, DSI, DTI, TSP INR 1.5V, MBM, NQI, PLP (Bound MRPC PLPs), PSI, Cold Leg Thinning 40% or < 40% and 1.5V.
11
2R27 NRC Phone Call March 14, 2012 zQ5: For each area examined (e.g., tube supports, dents/dings, sleeves, etc), provide a summary of the number of indications identified to-date for each degradation mode (e.g., number of circumferential primary water stress corrosion cracking indications at the expansion transition). For the most significant indications in each area, provide an estimate of the severity of the indication (e.g., provide the voltage, depth, and length of the indication). In particular, address whether tube integrity (structural and accident induced leakage integrity) was maintained during the previous operating cycle. In addition, discuss whether any location exhibited a degradation mode that had not previously been observed at this location at this unit (e.g., observed circumferential primary water stress corrosion cracking at the expansion transition for the first time at this unit).
12
2R27 NRC Phone Call March 14, 2012 PI 2R27 Analysis Status Analysis Status (percent completed) as of SG 21 SG 22 0700 on March 13, 2012: Hot Cold Hot Cold Bobbin 100 95 100 90 U-Bend MRPC 89 N/A 75 N/A Tubesheet Crevice MRPC 100 N/A 91 N/A Hot Leg Roll Plug MRPC 83 N/A 90 N/A Supplemental MRPC 95 0 63 0 Post In Situ MRPC 0 0 0 0 Plug Visual 100 100 100 100 Baseline New Re-Rolls 0 0 0 0 13
SG 21 Analysis Results to Date Degradation Mode and Location (Indications) # Volt Depth Length New Excludes all indications below the F* and EF* Distance Mech.
Volumetric Wear at New Anti-Vibration Bars (AVB)(< + 1) 22 1.77 32 N/A N Volumetric Wear at Old AVBs (free span)(> 1) 48 2.63 40 N/A N Volumetric Wear at PLPs (1998 In Situ Neighbors) 2 0.81 34 N/A N Volumetric Thinning at Cold Leg Tube Support Plates 78 4.06/1.36 55/70 N/A N Volumetric Thinning at Cold Leg Top of Tubesheet 0 N/A N/A N/A N Volumetric Thinning at Hot Leg Tube Support Plates 0 N/A N/A N/A N Volumetric Thinning at Hot Leg Top of Tubesheet 0 N/A N/A N/A N Axial ODSCC at Hot Leg Sludge Pile 1 0.12 N/A 0.15 N Axial ODSCC at Hot Leg Crevice 9 0.41/0.15 N/A 0.51/1.34 N Axial ODSCC at Hot Leg Tube Support Plates 0 N/A N/A N/A N Axial PWSCC at Hot Leg Roll Expansions/Tube Ends 458 6.19/4.81 N/A 0.67/0.71 N Circ. PWSCC at Hot Leg Roll Expansions/Tube Ends 0 N/A N/A N/A N Circ. ODSCC at a Re-Roll Expansion 0 N/A N/A N/A N Axial PWSCC at U-bends 0 N/A N/A N/A N Circ. PWSCC at U-bends 0 N/A N/A N/A N ODSCC/PWSCC at Dents 0 N/A N/A N/A N ODSCC/PWSCC at Plugs 0 N/A N/A N/A N 14
SG 22 Analysis Results to Date Degradation Mode and Location (Indications) # Volt Depth Length New Excludes all indications below the F* and EF* Distance Mech.
Volumetric Wear at New Anti-Vibration Bars (AVB)(< + 1) 34 2.67 41 N/A N Volumetric Wear at Old AVBs (free span)(> 1) 34 2.45 40 N/A N Volumetric Wear at PLPs 0 N/A N/A N/A N Volumetric Thinning at Cold Leg Tube Support Plates 108 3.73/2.85 19/54 N/A N Volumetric Thinning at Cold Leg Top of Tubesheet 0 N/A N/A N/A N Volumetric Thinning at Hot Leg Tube Support Plates 0 N/A N/A N/A N Volumetric Thinning at Hot Leg Top of Tubesheet 0 N/A N/A N/A N Axial ODSCC at Hot Leg Sludge Pile 3 0.29/0.19 N/A 0.38/0.51 N Axial ODSCC at Hot Leg Crevice 1 0.17 N/A 0.16 N Axial ODSCC at Hot Leg Tube Support Plates 0 N/A N/A N/A N Axial PWSCC at Hot Leg Roll Expansions/Tube Ends 169 2.68/0.62 N/A 0.1/0.23 N Circ. PWSCC at Hot Leg Roll Expansions/Tube Ends 3 3.36 N/A 83º N Circ. ODSCC below Top of Tubesheet with 11.26 Volt Dent 1 0.18 N/A 49º Y Axial PWSCC at U-bends 0 N/A N/A N/A N Circ. PWSCC at U-bends 0 N/A N/A N/A N ODSCC/PWSCC at Dents 0 N/A N/A N/A N ODSCC/PWSCC at Plugs 0 N/A N/A N/A N 15
2R27 NRC Phone Call March 14, 2012 Analysis Status (Continued) z Structural and accident induced leakage integrity was maintained during the previous cycle.
16
2R27 NRC Phone Call March 14, 2012 Q6: Describe repair/plugging plans.
Pre Outage Predicted Repairs SCOPE S/G 21 S/G 22 In Situ Pressure Test 5 5 AR1 - 6 Re-Roll 270 288 AR2 - 8 Re-Roll 138 67 ARE - Elevated Re-Roll N/A N/A Hot Leg Roll Plugs 91 34 Cold Leg Roll Plugs 91 34 17
2R27 NRC Phone Call March 14, 2012 Planned Repairs (Based on 92% inspected)
SCOPE S/G 21 S/G 22 In Situ Pressure Test 0 0 AR1 - 6 Re-Roll 157 144 AR2 - 8 Re-Roll 173 52 ARE - Elevated Re-Roll N/A N/A Hot Leg Roll Plugs 80 21 Cold Leg Roll Plugs 80 21 18
2R27 NRC Phone Call March 14, 2012 Q7: Describe in-situ pressure test and tube pull plans and results (as applicable and if available).
z We have no plans to pull tubes for Unit 2, as part of a licensed repair program.
z Status - No tube pull is needed.
z We are planning on performing up to 10 In Situ tests based on inspection results.
z Status - No In Situ tests are needed.
19
2R27 NRC Phone Call March 14, 2012 Q8: Discuss the following regarding loose parts:
- 1) what inspections are performed to detect loose parts.
A) All bobbin data is evaluated for possible loose parts (PLP) and PLP wear using manual analysis by primary.
B) Secondary uses Computer Data Screening (CDS) with a PLP specific sort from TSH +
0.3 to 07H + 2.00 and from TSC + 0.3 to 07C + 2.00 and various wear detection sorts from TSH - 1.0 to TSC - 1.0.
C) Resolution tertiary review is conducted on all bobbin coil periphery tubes, two tubes deep for PLPs.
D) All MRPC data is evaluated for PLPs.
E) All bobbin PLP indications are tested with MRPC.
F) All MRPC PLP indications are bounded radially by one tube at the same elevation.
G) Any top of tubesheet PLP that cannot be resolved with ECT are inspected from the secondary side for resolution.
H) Top of Tubesheet Remote Visual Inspection: Peripheral & In-bundle.
20
2R27 NRC Phone Call March 14, 2012 Q8: Discuss the following regarding loose parts:
- 2) a description of any loose parts detected and their location within the SG (including the source or nature of the part, if known).
New MRPC PLP Indications:
SG HL Top of TSH CL Top of TSH 21 0 0 22 0 0 21
2R27 NRC Phone Call March 14, 2012 Q8: Discuss the following regarding loose parts:
- 3) if the loose parts were removed from the SG.
A). SG 21 secondary side FOSAR will be done this week.
B). SG 22 secondary side FOSAR is a contingency.
Q8: Discuss the following regarding loose parts:
- 4) indications of tube damage associated with the loose parts.
There is no wear associated with any of the PLP indications.
22
2R27 NRC Phone Call March 14, 2012 z Q9: Discuss the scope and results of any secondary side inspection and maintenance activities (e.g., in-bundle visual inspections, feedring inspections, sludge lancing, assessing deposit loading, etc.).
z FOSAR results previously discussed.
z SP 2534 Steam Generator Internals Inspection for 21 SG z SG Steam Drum Inspection planned this week:
z Tube Bundle Wrapper z Feedwater Ring/Thermal Sleeve z Moisture Separation Equipment z SG Feedwater Nozzle ISI Inspections of:
z Knuckle Region, Nozzle to Reducer and Reducer to Pipe Welds, Transition Cone Girth Weld, Feedwater Ring Hangers, and FAC Inspection of FW Tee 23
2R27 NRC Phone Call March 14, 2012 z Q10: Discuss any unexpected or unusual results.
z No unexpected or unusual conditions detected during 2R27.
24
2R27 NRC Phone Call March 14, 2012 z Q11: Provide the schedule for steam generator-related activities during the remainder of the current outage.
z ET examinations are scheduled to be completed later this week.
z In-situ testing is not required at this time.
z Repairs are projected to be completed by March 24.
z Manway installation is scheduled to be completed on April 4-5.