ML15062A087: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
=Text=
{{#Wiki_filter:MN No. 15-003    U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 4, 2015 
Licensee: Entergy Nuclear Operations, Inc. (Entergy) 
Facility:  Pilgrim Nuclear Power Station
Docket No: 50-293 Date/Time: Wednesday, March 18, 2015  6:30 p.m. to 9:00 p.m.
Location: Radisson Hotel Plymouth Harbor Grand Ballroom 180 Water St.
Plymouth, MA  02360 Purpose: The U. S. Nuclear Regulatory Commission (NRC) will meet with Entergy to discuss the NRC's assessment of safety performance at the Pilgrim Nuclear Power Station for 2014, as described in the annual assessment letter dated March 4, 2015, and to discuss the results of the Inspection Procedure (IP) 95002 supplemental inspection completed on December 12, 2014. The meeting will include a discussion of any new or existing programs that are designed to maintain or improve Entergy's current performance. Following the meeting with Entergy, the NRC will have a separate session to respond to questions on specific performance issues and results from the IP 95002 inspection at the plant and our role in ensuring safe plant operations. The agenda is enclosed. NRC Attendees: D. Dorman, Regional Administrator, Region I H. Nieh, Director, Division of Reactor Projects R. McKinley, Chief, Projects Branch 5, Division of Reactor Projects J. Noggle, Chief, Plant Support Branch 2, Division of Reactor Safety W. Schmidt, Senior Risk Analyst, Division of Reactor Safety J. McHale, Associate Director, Japan Lessons Learned Division    E. Miller, Acting Senior Resident Inspector J. Grieves, Senior Resident Inspector - IP 95002 Team Leader B. Scrabeck, Resident Inspector Public Participation: This is a Category 1 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation. Meeting Contact: Raymond R. McKinley, Chief, Projects Branch 5 610-337-5150 E-mail:  Raymond.McKinley@nrc.gov 2  The NRC's annual assessment letter regarding Pilgrim Nuclear Power Station performance during 2014 can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession Number ML15057A041. ADAMS is accessible from the NRC website at:  http://www.nrc.gov/reading-rm/adams.html. Additional information relative to the NRC's annual assessment process and the safety performance of Pilgrim Nuclear Power Station, can be found on the NRC's website at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective  May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.
Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances. Please confirm the meeting schedule on the NRC website under public meetings.
Approved by:    /RA/          Raymond R. McKinley, Chief      Projects Branch 5      Division of Reactor Projects 
==Enclosure:==
Agenda 
cc w/encl:    Distribution via ListServ
ML15062A087 SUNSI Review    Non-Sensitive  Sensitive  Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP    NAME JDeBoer/JPD RMcKinley/RRM    DATE 02/26/15 02/26/15 Enclosure Agenda  NRC's Annual Assessment Meeting and IP 95002 Inspection Results  Pilgrim Nuclear Power Station  March 18, 2014  6:30 p.m. - 9:00 p.m.        Radisson Hotel Plymouth Harbor  Mayflower Room    180 Water St        Plymouth, MA  02360  Formal Meeting  Introduction  Discussion of Pilgrim Nuclear Power Station's performance in 2014 and  IP 95002 Inspection Results ...................................................................................  (30 minutes)  Discussion of Pilgrim Nuclear Power Station's new or existing programs that are  designed to maintain or improve Entergy's current performance-------. ... (30 minutes)
Break ....................................................................................................................... (10 minutes)
NRC to address public questions ............................................................................. (75 minutes)
Closing Remarks ........................................................................................................ (5 minutes)}}

Revision as of 14:42, 14 June 2018

3/18/2015 - Notice of Category 1 Public Meeting - Pilgrim 2014 Annual Assessment Meeting
ML15062A087
Person / Time
Site: Pilgrim
Issue date: 03/04/2015
From: Raymond McKinley
NRC/RGN-I/DRP/PB5
To:
McKinley R R
References
MN 15-003
Download: ML15062A087 (4)


Text

MN No.15-003 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 4, 2015

Licensee: Entergy Nuclear Operations, Inc. (Entergy)

Facility: Pilgrim Nuclear Power Station

Docket No: 50-293 Date/Time: Wednesday, March 18, 2015 6:30 p.m. to 9:00 p.m.

Location: Radisson Hotel Plymouth Harbor Grand Ballroom 180 Water St.

Plymouth, MA 02360 Purpose: The U. S. Nuclear Regulatory Commission (NRC) will meet with Entergy to discuss the NRC's assessment of safety performance at the Pilgrim Nuclear Power Station for 2014, as described in the annual assessment letter dated March 4, 2015, and to discuss the results of the Inspection Procedure (IP) 95002 supplemental inspection completed on December 12, 2014. The meeting will include a discussion of any new or existing programs that are designed to maintain or improve Entergy's current performance. Following the meeting with Entergy, the NRC will have a separate session to respond to questions on specific performance issues and results from the IP 95002 inspection at the plant and our role in ensuring safe plant operations. The agenda is enclosed. NRC Attendees: D. Dorman, Regional Administrator, Region I H. Nieh, Director, Division of Reactor Projects R. McKinley, Chief, Projects Branch 5, Division of Reactor Projects J. Noggle, Chief, Plant Support Branch 2, Division of Reactor Safety W. Schmidt, Senior Risk Analyst, Division of Reactor Safety J. McHale, Associate Director, Japan Lessons Learned Division E. Miller, Acting Senior Resident Inspector J. Grieves, Senior Resident Inspector - IP 95002 Team Leader B. Scrabeck, Resident Inspector Public Participation: This is a Category 1 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation. Meeting Contact: Raymond R. McKinley, Chief, Projects Branch 5 610-337-5150 E-mail: Raymond.McKinley@nrc.gov 2 The NRC's annual assessment letter regarding Pilgrim Nuclear Power Station performance during 2014 can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession Number ML15057A041. ADAMS is accessible from the NRC website at: http://www.nrc.gov/reading-rm/adams.html. Additional information relative to the NRC's annual assessment process and the safety performance of Pilgrim Nuclear Power Station, can be found on the NRC's website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances. Please confirm the meeting schedule on the NRC website under public meetings.

Approved by: /RA/ Raymond R. McKinley, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

Agenda

cc w/encl: Distribution via ListServ

ML15062A087 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME JDeBoer/JPD RMcKinley/RRM DATE 02/26/15 02/26/15 Enclosure Agenda NRC's Annual Assessment Meeting and IP 95002 Inspection Results Pilgrim Nuclear Power Station March 18, 2014 6:30 p.m. - 9:00 p.m. Radisson Hotel Plymouth Harbor Mayflower Room 180 Water St Plymouth, MA 02360 Formal Meeting Introduction Discussion of Pilgrim Nuclear Power Station's performance in 2014 and IP 95002 Inspection Results ................................................................................... (30 minutes) Discussion of Pilgrim Nuclear Power Station's new or existing programs that are designed to maintain or improve Entergy's current performance-------. ... (30 minutes)

Break ....................................................................................................................... (10 minutes)

NRC to address public questions ............................................................................. (75 minutes)

Closing Remarks ........................................................................................................ (5 minutes)