|
|
(One intermediate revision by the same user not shown) |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION | | {{#Wiki_filter:March 4, 2013 |
|
| |
|
| ==REGION III== | | ==SUBJECT:== |
| 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 4, 2013 M r. La rr y W e b e r S en i or Vi ce P r es ident a n d C h i ef N uc lear O ff icer I nd i ana M i ch i g an P o w er C o m pany N uc l ear G en e r a t i on G r o up O ne C o o k Place B r i dg man, M I 49106 SUB J EC T: ANNUA L ASSES S M E N T L E T T E R F O R D.C. C OO K NUCLEA R P O W E R P L A N T , UNI T S 1 AN D 2 , (REP O R T 050 0 0315/20 1 2 0 0 1 AND 05000316
| | ANNUAL ASSESSMENT LETTER FOR D.C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2, (REPORT 05000315/2012001 AND 05000316/2012001) |
| /20 1 2 0 0 1) D ear M r. W eb er: O n Fe b r ua r y 1 3, 20 1 3 , t he NR C c o m p l e t ed i t s en d-o f-c y c l e pe r f o r m ance r e v i ew of D.C. C o o k N uc l ear P o w er Pl an t , U n i t s 1 and The NR C r e v i e w ed t he most recent q ua r t e rly pe r f o rmance i nd i ca t o r s (P Is) i n add i t i on t o inspe c t i on resu l t s and e n f o r c e ment ac t ions from Janu a r y 1, 2 01 2 , t h r o u g h Dece m b er 31, 2 0 1 2. T h i s l e t ter i n f o rm s y ou o f t he NRC's assess m e n t o f y our f ac ili t y du r i ng t h i s pe r i od and i t s p l ans f or f u t u r e inspe c t ions at your f ac ili t T he NRC de t e rm i ned t h a t o v e r a ll , D.C. C o o k N uc l ear P o w er Plant , U n i t s 1 and 2, ope r a t ed i n a manner t h a t p rese r v ed p ub li c hea l t h and s a f e t y and m e t a l l c o r ne r s t one o b j ec t i ve T he NR C d e t e r m i ned t he pe r f o rm ance at D.C. C o o k N uc lear P o w er Plant U n i t s 1 an d 2 d u r i ng t he most recent q ua r ter w as w i t h i n t he L icensee Response C o l u m n o f t he NRC's Reac tor O v e r s i ght P rocess (R O P) A c t i on M a tr i x because a l l inspe c t i on f i nd ings had v e r y l o w (i.e., g reen) s a f e t y s i g n i f icanc e , and a l l P I s i nd i ca t ed t h a t y our pe r f o r mance w as w i t h i n t he n o m i na l , e x pec t ed r a n g e (i.e., g r een). T he r e f o r e , t he NR C p l a n s t o conduct R O P b a se li ne inspec t i ons a t your f ac ili t T he enc losed inspe c t i on p l an li s t s t he inspec t i ons schedu l ed t h r o u g h December 31 | |
| , 2 0 1 R ou t i ne inspec t i ons pe r f o r m ed b y r es i dent inspe c t o r s a r e not i nc l uded i n t he insp e c t i on p lan. The inspec t ions li s t ed d u r i n g t he last 12 m o n t hs o f t he inspec t i on p l an a r e t en t a ti v e and m ay be r e v ised at t he m i d-c y c l e pe r f o rmance r e v i e T h e NR C p r o v i des t he inspec t i on p l an t o a ll ow f o r t he reso l u t i on o f any sc h edu li ng co n f li c t s and pe rsonnel a v a il ab i li t y issue T he NR C w il l con tact y ou as soon as poss i b l e t o d i scu s s cha n ges t o t he inspec t i on p l an shou l d c i r cu m s tances w a rrant a ny chan g e This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondenc L. W e ber -2- W e a l so p l an on cond u c ti ng temporary instructions (TIs) and sp e c ial and i n f r e q ue n t l y pe r f o r m ed I nspec t i on P r ocedu r e s (I P s) which include
| |
| : TI 2515/182, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground piping and Tanks" and IP 71003, "Post-Approval Site Inspection for License Renewal."
| |
|
| |
|
| I n acc o rdance w i t h 10 CFR 2.390 o f t he NR C's "Rule s o f P r ac t i c e ," a co p y of t h i s l e tt e r w il l be a v a il ab l e e l ec tr on i ca l l y for pub li c inspec t i on i n t h e NR C P ub li c Docu ment Room or from t he P ub li c l y A v a il a b l e Reco r ds (PARS) c o m pon e nt o f document system (ADA M S). A D A M S i s access i b l e fr o m t he NR C W e b s i t e a t h tt p://ww w.n r c.g o v/r ea d i n g-r m/ada m s.h tm l (t he P ub li c El ec tr on i c R ead i ng R oo m). Please con t a c t m e a t 6 3 0-82 9-9619 w i t h any q u e s t i ons y ou ha v e r e ga r d i ng t h i s l e tt e Since r e l y , /RA/ John B. G iessn e r , Chi e f B ranch 4 Di v i s i on of R eac t o r P r o j e c t s D oc k e t N o s. 5 0-315 and 5 0-316 L icense Nos. DPR-58 a n d DPR-74 Enclosure: D.C. Cook Inspection/Activity Plan cc w/encl: Distribution via ListServ
| | ==Dear Mr. Weber:== |
| | On February 13, 2013, the NRC completed its end-of-cycle performance review of D.C. Cook Nuclear Power Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. |
|
| |
|
| L. W e ber -2- W e a l so p l an on cond u c ting temporary instructions (TIs) and sp e c ial and i n f r e q ue n t l y pe r f o r m ed I nspec t i on P r ocedu res (I Ps) which include: TI 2515/182, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground piping and Tanks" and IP 71003, "Post-Approval Site Inspection for License Renewal."
| | The NRC determined that overall, D.C. Cook Nuclear Power Plant, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at D.C. Cook Nuclear Power Plant Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. |
|
| |
|
| I n acc o rdance w i t h 10 CFR 2.390 o f t he NRC's "Rule s o f P r ac t i c e ," a co p y of t h i s l e tt e r w il l be a v a il ab l e e l ec tr on i ca l l y for pub li c inspec t i on i n t h e NR C P ub li c Docu ment Room or from t he P ub li c l y A v a il a b l e Reco r ds (PARS) c o m pon e nt o f document system (ADA M S). A D A M S i s access i b l e fr o m t he NR C W e b s i t e a t h tt p://ww w.n r c.g o v/r ea d i n g-r m/ada m s.h tm l (t he P ub li c El ec tr on i c R ead i ng R oo m). Please con t a c t m e a t 6 3 0-82 9-9619 w i t h any q u e s t i ons y ou ha v e r e ga r d i ng t h i s l e tt e Since r e l y , /RA/ John B. G iessn e r , Chi e f B ranch 4 Di v i s i on of R eac t o r P r o j e c t s D oc k e t N o s. 5 0-315 and 5 0-316 L icense Nos. DPR-58 a n d DPR-74 Enclosure: D.C. Cook Inspection/Activity Plan cc w/encl: Distribution via ListServ
| | The enclosed inspection plan lists the inspections scheduled through December 31, 2014. |
|
| |
|
| DOCUMENT NAME:
| | Routine inspections performed by resident inspectors are not included in the inspection plan. |
| G:\DRPIII\Branch TSS
| |
| \ALL EOC\EOC CY 2013 (Issued 2013) Letters
| |
| \DC Cook EOC 2012 Letter Combined.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME SShah:dtp JGiessner DATE 02/21/13 02/21/12 OFFICIAL RECORD COPY
| |
|
| |
|
| Letter to L. Weber from J. Giessner dated March 4, 201 SUB J EC T: ANNUA L ASSES S M E N T L E T T E R F O R D.C. C OO K NUCLEA R P O W E R P L A N T , UNI T S 1 AND 2, (REP O R T 050 0 0315/20 1 20 0 1 AN D 05000316/20 1 20 0 1) DISTRIBUTION:
| | The inspections listed during the last 12 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. We also plan on conducting temporary instructions (TIs) and special and infrequently performed Inspection Procedures (IPs) which include: TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground piping and Tanks and IP 71003, Post-Approval Site Inspection for License Renewal. |
| John Cassidy RidsNrrDorlLpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak ROPassessment.Resource@nrc.gov
| |
|
| |
|
| Page 1 of 2 02/27/2013 08:39:52 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site D.C. Cook Inspection / Activity Plan 03/01/2013-12/31/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/04/2013 03/08/2013 1 IP Occupational Dose Assessment 71124.04 03/04/2013 03/08/2013 BI EPX-EP EXERCISE INSPECTION / PI VERIFICATION 2 1 IP Performance Indicator Verification 71151 06/03/2013 06/07/2013 RENEWAL-LICENSE RENEWAL INSPECTION-71003 PHASE 1 3 1 IP Post-Approval Site Inspection for License Renewal 71003 03/25/2013 04/26/2013 BI ISI-INSERVICE INSPECTION - UNIT 1 1 1 IP Inservice Inspection Activities - PWR 7111108P 03/25/2013 04/28/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/08/2013 04/12/2013 1 IP Occupational ALARA Planning and Controls 71124.02 04/08/2013 04/12/2013 BI FIRE-FIRE PROTECTION INSPECTION & BAG TRIP 5 1 IP Fire Protection [Triennial]
| | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| 7111105T 05/27/2013 06/28/2013 TI 182-BURIED PIPING TI 182 1 1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 07/08/2013 07/12/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTIO 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 07/15/2013 07/19/2013 BI PI&R-BIENNIAL PI&R INSPECTION 5 1, 2 IP Problem Identification and Resolution 71152B 08/26/2013 09/13/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/12/2013 08/16/2013 1 IP Radiological Environmental Monitoring Program 71124.07 08/12/2013 08/16/2013 1 IP Reactor Coolant System Activity 71151-BI01 08/12/2013 08/16/2013 1 IP Occupational Exposure Control Effectiveness 71151-OR01 08/12/2013 08/16/2013 1 IP RETS/ODCM Radiological Effluent 71151-PR01 08/12/2013 08/16/2013 BI ISI-INSERVICE INSPECTION - UNIT 2 4 2 IP Inservice Inspection Activities - PWR 7111108P 10/07/2013 10/25/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/07/2013 10/11/2013 1 IP Occupational ALARA Planning and Controls 71124.02 10/07/2013 10/11/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 01/06/2014 01/10/2014 This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Page 2 of 2 02/27/2013 08:39:52 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site D.C. Cook Inspection / Activity Plan 03/01/2013-12/31/2014 BI OLRQ-BIENNIAL REQUAL PROGRAM INSPECTION 2 1, 2 IP Licensed Operator Requalification Program 7111111B 02/10/2014 02/14/2014 BI MODS-MODIFICATIONS/50.59 INSPECTION 3 1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 03/03/2014 03/21/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiation Monitoring Instrumentation 71124.05 03/10/2014 03/14/2014 RENEWAL-LICENSE RENEWAL U1 6 1 IP Post-Approval Site Inspection for License Renewal 71003 04/28/2014 05/16/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/05/2014 05/09/2014 BI EPR-EP ROUTINE INSPECTION / PI VERIFICATION 2 1 IP A lert and Notification System Testing 7111402 06/23/2014 06/27/2014 1 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 06/23/2014 06/27/2014 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/23/2014 06/27/2014 1 IP Performance Indicator Verification 71151 06/23/2014 06/27/2014 OL PREP-INITIAL EXAM - 08/2014 3 1 OL - INITIAL EXAM - 2014 APR/DEC - COOK W90305 06/30/2014 07/03/2014 OL EXAM-INIT EXAM FOR 07/2014 3 1 OL - INITIAL EXAM - 2014 APR/DEC - COOK W90305 07/21/2014 08/01/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Environmental Monitoring Program 71124.07 11/03/2014 11/07/2014 1 IP Reactor Coolant System Activity 71151-BI01 11/03/2014 11/07/2014 1 IP Occupational Exposure Control Effectiveness 71151-OR01 11/03/2014 11/07/2014 1 IP RETS/ODCM Radiological Effluent 71151-PR01 11/03/2014 11/07/2014 This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.
| | |
| | Please contact me at 630-829-9619 with any questions you have regarding this letter. |
| | |
| | Sincerely, |
| | /RA/ |
| | |
| | John B. Giessner, Chief Branch 4 Division of Reactor Projects |
| | |
| | Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 |
| | |
| | Enclosure: D.C. Cook Inspection/Activity Plan |
| | |
| | cc w/encl: Distribution via ListServ |
| }} | | }} |
Similar Documents at Cook |
---|
Category:Inspection Plan
MONTHYEARIR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 IR 05000315/20230062024-02-28028 February 2024 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2023006 and 05000316/2023006) ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 IR 05000315/20230052023-08-24024 August 2023 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2023005 and 05000316/2023005) ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220052022-08-24024 August 2022 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022005 and 05000316/2022005) ML22130A1722022-05-11011 May 2022 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection IR 05000315/20210062022-03-0202 March 2022 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2021006 and 05000316/2021006) ML21309A3322021-11-0505 November 2021 Notification of Nrc Fire Protection Team Inspection Request for Information IR 05000315/20210052021-09-0101 September 2021 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2021005 and 05000316/2021005) ML21146A2862021-05-26026 May 2021 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Donald C. Cook Nuclear Plant ML21068A3512021-03-0909 March 2021 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000315/2021002; 05000316/2021002 IR 05000315/20200062021-03-0404 March 2021 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2020006 and 05000316/2020006) IR 05000315/20214012021-01-12012 January 2021 Information Request for the Cyber-Seruity Full Implementation Inspection, Notification to Perform Inspection 05000315/2021401; 05000316/2021401 IR 05000315/20200112020-09-17017 September 2020 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000315/2020011; 05000316/2020011 IR 05000315/20200052020-09-0101 September 2020 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2020005 and 05000316/2020005) ML20133J9722020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection IR 05000315/20200202020-04-10010 April 2020 Units 1 and 2 - Information Request for NRC Triennial Evaluation of Changes, Tests, and Experiments (50.59) Baseline Inspection 05000315/2020020 and 05000316/2020020 IR 05000315/20190062020-03-0303 March 2020 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2019006 and 05000316/2019006) ML20016A3842020-01-16016 January 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000315/20204102019-11-19019 November 2019 Information Request for the Cyber Security Full Implementation Inspection, Notification to Perform Inspection 05000315/2020410; 05000316/2020410 IR 05000315/20190052019-08-28028 August 2019 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2019005 and 05000316/2019005) ML19192A1552019-07-11011 July 2019 Ltr. 07/11/19 Donald C. Cook Nuclear Power Plant, Unit 2 - Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000315/2019004; 05000316/2019004 (DRS-M.Holmberg) ML19128A3482019-05-0808 May 2019 Ltr. 05/08/19 Donald C. Cook Nuclear Power Plant, Units 1 and 2 - Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information; Inspection Report 05000315/2019012; 05000316/2019012 (DRS-A.Shaikh) ML19078A3732019-03-19019 March 2019 Information Request to Support Upcoming Problem Identification and Resolution Inspection at the Donald C. Cook Nuclear Power Plant, Units 1 and 2 IR 05000315/20180062019-03-0404 March 2019 Annual Assessment Letter for Donald C. Cook Nuclear Power Plant, Units 1 and 2 (Report 05000315/2018006 and 05000316/2018006) ML19037A3842019-02-0404 February 2019 Ltr. 02/04/19 Donald C. Cook Nuclear Power Plant, Unit 1 - Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000315/2019001; 05000316/2019001 (DRS-E.Fernandez) IR 05000315/20180052018-08-28028 August 2018 Updated Inspection Plan for Donald C. Cook Nuclear Power Plant, Units 1 and 2 (Report 05000315/2018005 and 05000316/2018005) IR 05000315/20170062018-03-0202 March 2018 Annual Assessment Letter for Donald C. Cook Nuclear Power Plant, Units 1 and 2 (Report 05000315/2017006; 05000316/2017006) IR 05000316/20180022018-02-27027 February 2018 Inspection Plan for Donald C. Cook, Unit 2, for Inservice Inspection Activities; Inspection Report 05000316/2018002 (DRS-L.Smith) IR 05000315/20170052017-08-28028 August 2017 Updated Inspection Plan for Donald C. Cook Nuclear Power Plant, Units 1 and 2 (Report 05000315/2017005; 05000316/2017005) ML17076A3592017-03-17017 March 2017 Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000315/2017002; 05000316/2017002 (Lnr) IR 05000315/20160062017-03-0101 March 2017 Annual Assessment Letter for Donald C. Cook Nuclear Power Plant, Units 1 and 2 (Report 05000315/2016006; 05000316/2016006) IR 05000315/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Donald C. Cook Nuclear Power Plant, Units 1 and 2 (Report 05000315/2016005; 05000316/2016005) ML16211A0322016-07-28028 July 2016 Request for Inforamtion for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000316/2016010 IR 05000315/20150062016-03-0202 March 2016 Annual Assessment Letter for Donald C. Cook Nuclear Power Plant, Units 1 and 2(Report 05000315/2015006 and 05000316/2015006) ML16013A1832016-01-12012 January 2016 Notification of NRC Inspection and Request for Information (Jen) IR 05000315/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Donald C. Cook Nuclear Power Plant, Units 1 and 2 (Report 05000315/2015005; 05000316/2015005) IR 05000315/20140012015-03-0404 March 2015 Annual Assessment Letter for Donald C. Cook Nuclear Power Plant, Units 1 and 2, (Report 05000315/2014001 and 05000316/2014001) ML14317A5892014-11-13013 November 2014 Notification of NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection 05000315/2015002; 05000316/2015002 ML14245A2562014-09-0202 September 2014 Mid-Cycle Assessment Letter for Donald C. Cook Nuclear Power Plant, Units 1 and 2 IR 05000316/20130012014-03-0404 March 2014 Annual Assessment Letter for Donald C. Cook Nuclear Power Plant, Unit 1 and 2 (Report 05000351/2013001; 05000316/2013001) ML14024A4762014-01-23023 January 2014 Information Request for a NRC Post-Approval Site Inspection for License Renewal 05000315-14-007 ML13246A2272013-09-0303 September 2013 2013 Donald C. Cook Mid-Cycle Letter Combined IR 05000315/20120012013-03-0404 March 2013 Annual Assessment Letter for D.C. Cook Nuclear Power Plant, Units 1 and 2, (Report 05000315/2012001 and 05000316/2012001) ML13032A5182013-02-0101 February 2013 IR 05000315-13-009 & 05000316-13-009, on 05/28-29/2013, 05/29-31/2013, 06/10-14/2013, & 06/24-28/2013, Donald C. Cook, Units 1 & 2- Notification to Perform a Triennial Fire Protection Baseline Inspection While Transition to 10 CFR 50.48(C) 2024-08-21
[Table view] Category:Letter
MONTHYEARIR 05000315/20240122024-12-23023 December 2024 Age-Related Degradation Inspection Report 05000315/2024012 and 05000316/2024012 IR 05000315/20240102024-12-19019 December 2024 Biennial Problem Identification and Resolution Inspection Report 05000315/2024010 and 05000316/2024010 AEP-NRC-2024-70, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2024-12-16016 December 2024 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000315/20240502024-12-11011 December 2024 Special Inspection Reactive Report 05000315/2024050 and 05000316/2024050 AEP-NRC-2024-86, Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation2024-12-0909 December 2024 Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation 05000316/LER-2024-004, AB Emergency Diesel Generator Inoperable for Longer than Allowed by Technical Specifications2024-11-11011 November 2024 AB Emergency Diesel Generator Inoperable for Longer than Allowed by Technical Specifications IR 05000315/20240032024-10-31031 October 2024 Integrated Inspection Report 05000315/2024003 05000316/2024003 07200072/2024001 and Exercise of Enforcement Discretion AEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal 2024-09-09
[Table view] |
Inspection Report - Cook - 2012001 |
---|
|
|
Text
March 4, 2013
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR D.C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2, (REPORT 05000315/2012001 AND 05000316/2012001)
Dear Mr. Weber:
On February 13, 2013, the NRC completed its end-of-cycle performance review of D.C. Cook Nuclear Power Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, D.C. Cook Nuclear Power Plant, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at D.C. Cook Nuclear Power Plant Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2014.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last 12 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. We also plan on conducting temporary instructions (TIs) and special and infrequently performed Inspection Procedures (IPs) which include: TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground piping and Tanks and IP 71003, Post-Approval Site Inspection for License Renewal.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 630-829-9619 with any questions you have regarding this letter.
Sincerely,
/RA/
John B. Giessner, Chief Branch 4 Division of Reactor Projects
Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74
Enclosure: D.C. Cook Inspection/Activity Plan
cc w/encl: Distribution via ListServ