{{#Wiki_filter:March 16, 2022
{{#Wiki_filter:Daniel Stoddard, SVP
Daniel Stoddard, SVP
Dominion Energy
Dominion Energy
Innsbrook Technical Center
Innsbrook Technical Center
5000 Dominion Blvd., Floor: IN-2SW
5000 Dominion Blvd., Floor: IN-2SW
Glen Allen, VA 29060
Glen Allen, VA 29060
SUBJECT: V.C. SUMMER NUCLEAR STATION - INFORMATION REQUEST FOR THE
SUBJECT: V.C. SUMMER NUCLEAR STATION - INFORMATION REQUEST FOR THE  
              CYBER-SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM
CYBER-SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM  
              INSPECTION 05000395/2022401
INSPECTION 05000395/2022401
Dear Mr. Stoddard:
Dear Mr. Stoddard:
On June 27, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline
On June 27, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline  
inspection, in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0,
inspection, in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0,  
at your V.C. Summer Nuclear Station. The inspection will be performed to evaluate and verify
at your V.C. Summer Nuclear Station. The inspection will be performed to evaluate and verify  
your ability to provide assurance that your digital computer and communication systems and
your ability to provide assurance that your digital computer and communication systems and  
networks associated with safety, security, or emergency preparedness (SSEP) functions are
networks associated with safety, security, or emergency preparedness (SSEP) functions are  
adequately protected against cyber-attacks, in accordance with Title 10 of the Code of Federal
adequately protected against cyber-attacks, in accordance with Title 10 of the Code of Federal  
Regulations (10 CFR) 73.54 and the U.S. Nuclear Regulatory Commission (NRC) approved
Regulations (10 CFR) 73.54 and the U.S. Nuclear Regulatory Commission (NRC) approved  
cyber security plan (CSP). The onsite portion of the inspection will take place during the week
cyber security plan (CSP). The onsite portion of the inspection will take place during the week  
of June 27, 2022.
of June 27, 2022.
Experience has shown that baseline inspections are extremely resource intensive, both for the
Experience has shown that baseline inspections are extremely resource intensive, both for the  
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site  
and to ensure a productive inspection for both parties, we have enclosed a request for
and to ensure a productive inspection for both parties, we have enclosed a request for  
documents needed for the inspection. These documents have been divided into four groups.
documents needed for the inspection. These documents have been divided into four groups.
The first group specifies information necessary to assist the inspection team in choosing the
The first group specifies information necessary to assist the inspection team in choosing the  
focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should
focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should  
be made available electronically no later than April 8, 2022. The inspection team will review
be made available electronically no later than April 8, 2022. The inspection team will review  
this information and, by April 18, 2022, will request the specific items that should be provided
this information and, by April 18, 2022, will request the specific items that should be provided  
for review. The second group of additional requested documents will assist the inspection team
for review. The second group of additional requested documents will assist the inspection team  
in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive
in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive  
architecture, and the areas of the licensees CSP selected for the cyber-security inspection.
architecture, and the areas of the licensees CSP selected for the cyber-security inspection.
This information will be requested for review in the regional office prior to the inspection by
This information will be requested for review in the regional office prior to the inspection by  
May 30, 2022, as identified above.
May 30, 2022, as identified above.
March 16, 2022


D. Stoddard                                         2
D. Stoddard
The third group of requested documents consists of those items that the inspection team will
2
review, or need access to, during the inspection. Please have this information available by the
The third group of requested documents consists of those items that the inspection team will  
review, or need access to, during the inspection. Please have this information available by the  
first day of the onsite inspection, June 27, 2022.
first day of the onsite inspection, June 27, 2022.
The fourth group of information is necessary to aid the inspection team in tracking issues
The fourth group of information is necessary to aid the inspection team in tracking issues  
identified as a result of the inspection. It is requested that this information be provided to the
identified as a result of the inspection. It is requested that this information be provided to the  
lead inspector as the information is generated during the inspection. It is important that all of
lead inspector as the information is generated during the inspection. It is important that all of  
these documents are up to date and complete in order to minimize the number of additional
these documents are up to date and complete in order to minimize the number of additional  
documents requested during the preparation and/or the onsite portions of the inspection.
documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is William Monk. We understand that our regulatory
The lead inspector for this inspection is William Monk. We understand that our regulatory  
contact for this inspection is Michael Moore, Licensing Manager of your organization. If there
contact for this inspection is Michael Moore, Licensing Manager of your organization. If there  
are any questions about the inspection or the material requested, please contact the lead
are any questions about the inspection or the material requested, please contact the lead  
inspector at (404) 997-4579 or via e-mail at william.monk@nrc.gov.
inspector at (404) 997-4579 or via e-mail at william.monk@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
This letter does not contain new or amended information collection requirements subject to the  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
requirements were approved by the Office of Management and Budget, control number
requirements were approved by the Office of Management and Budget, control number  
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,  
a request for information or an information collection requirement, unless the requesting
a request for information or an information collection requirement, unless the requesting  
document displays a currently valid Office of Management and Budget control number.
document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,  
of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available
of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available  
electronically for public inspection in the NRCs Public Document Room or from the Publicly
electronically for public inspection in the NRCs Public Document Room or from the Publicly  
Available Records (PARS) component of the NRC's Agencywide Documents Access and
Available Records (PARS) component of the NRC's Agencywide Documents Access and  
Management System (ADAMS). ADAMS is accessible from the NRC Web site at
Management System (ADAMS). ADAMS is accessible from the NRC Web site at  
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                Sincerely,
Sincerely,
                                                /RA/
/RA/
                                                Gerry McCoy, Branch Chief
Gerry McCoy, Branch Chief  
                                                Engineering Branch 2
Engineering Branch 2
                                                Division of Reactor Safety
Division of Reactor Safety
Docket Nos. 50-395
Docket Nos. 50-395
License Nos. NPF-12
License Nos. NPF-12
Enclosure:
Enclosure:
V.C. Summer Nuclear Station Cyber-Security Inspection Document Request
V.C. Summer Nuclear Station Cyber-Security Inspection Document Request
cc w/encl: Distribution via LISTSERV
cc w/encl: Distribution via LISTSERV




  ML22075A048
  ML22075A048
                          X   Non-Sensitive               X Publicly Available
X
      X SUNSI Review
SUNSI Review
                            Sensitive                    Non-Publicly Available
X
OFFICE RII/DRS       RII/DRS             RII/DRS
Non-Sensitive
NAME   W. Monk       G. McCoy             J. Montgomery
 
DATE   03/16/2022     03/16/2022           03/16/2022
Sensitive
                             
X
  SUMMER NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
Publicly Available
Inspection Report:           05000395/2022401
 
Inspection Dates:           June 27-July 01, 2022
Non-Publicly Available
Inspection Procedure:       IP 71130.10, Cyber-Security, Revision 0 (Effective: 01/01/2022)
OFFICE RII/DRS
Reference:                   Guidance Document for Development of the Request for
RII/DRS
                            Information (RFI) and Notification Letter for Full-Implementation of
RII/DRS
                            the Cyber-Security Inspection, Rev. 2 (Issued: 11/22/2021)
NAME
NRC Inspectors:             William Monk, Lead                     Jonathan Montgomery
W. Monk
                            404-909-4579                           404-997-4880
G. McCoy
                            william.monk@nrc.gov                   jonathan.montgomery@nrc.gov
J. Montgomery
NRC Contractors:             Tim Marshall                           Balla Barro
DATE
                            301-415-7000                           301-415-7000
03/16/2022
                            timothy.marshall@nrc.gov               balla.barro@nrc.gov
03/16/2022
I.   Information Requested for In-Office Preparation
03/16/2022
      The initial request for information (i.e., first RFI) concentrates on providing the inspection
 
      team with the general information necessary to select appropriate components and CSP
SUMMER NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
      elements to develop a site-specific inspection plan. The first RFI is used to identify the
Enclosure
      list of critical systems and critical digital assets (CSs/CDAs) plus operational and
Inspection Report:
      management (O&M) security control portions of the CSP to be chosen as the sample
05000395/2022401
      set required to be inspected by the cyber-security IP. The first RFIs requested
Inspection Dates:
      information is specified below in Table: RFI #1. The Table RFI #1 information is
June 27-July 01, 2022
      requested to be provided electronically to the inspection team by April 8, 2022, or
Inspection Procedure:
      sooner, to facilitate the selection of the specific items that will be reviewed during the
IP 71130.10, Cyber-Security, Revision 0 (Effective: 01/01/2022)
      onsite inspection weeks.
Reference:
      The inspection team will examine the returned documentation from the first RFI and
Guidance Document for Development of the Request for  
      identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more
Information (RFI) and Notification Letter for Full-Implementation of  
      focused follow-up request to develop the second RFI. The inspection team will submit
the Cyber-Security Inspection, Rev. 2 (Issued: 11/22/2021)  
      the specific systems and equipment list to your staff by April 18, 2022, which will identify
NRC Inspectors:
      the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,
William Monk, Lead
      defensive architecture, and the areas of the licensees CSP selected for the cyber-
Jonathan Montgomery
      security inspection. We request that the additional information provided from the second
404-909-4579
      RFI be made available to the inspection team by May 30, 2022. All requests for
404-997-4880
      information shall follow the guidance document U.S. NRC - Guidance Document for
william.monk@nrc.gov
      Development of the Request for Information (RFI) and Notification Letter for Full
jonathan.montgomery@nrc.gov
      Implementation of the Cyber-Security Inspection, referenced above.
NRC Contractors:
                                                                                          Enclosure
Tim Marshall
Balla Barro
301-415-7000
301-415-7000
timothy.marshall@nrc.gov
balla.barro@nrc.gov
I.
Information Requested for In-Office Preparation
The initial request for information (i.e., first RFI) concentrates on providing the inspection  
team with the general information necessary to select appropriate components and CSP  
elements to develop a site-specific inspection plan. The first RFI is used to identify the  
list of critical systems and critical digital assets (CSs/CDAs) plus operational and  
management (O&M) security control portions of the CSP to be chosen as the sample  
set required to be inspected by the cyber-security IP. The first RFIs requested  
information is specified below in Table: RFI #1. The Table RFI #1 information is  
requested to be provided electronically to the inspection team by April 8, 2022, or  
sooner, to facilitate the selection of the specific items that will be reviewed during the  
onsite inspection weeks.
The inspection team will examine the returned documentation from the first RFI and  
identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more  
focused follow-up request to develop the second RFI. The inspection team will submit  
the specific systems and equipment list to your staff by April 18, 2022, which will identify  
the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,  
defensive architecture, and the areas of the licensees CSP selected for the cyber-
security inspection. We request that the additional information provided from the second  
RFI be made available to the inspection team by May 30, 2022. All requests for  
information shall follow the guidance document U.S. NRC - Guidance Document for  
Development of the Request for Information (RFI) and Notification Letter for Full  
Implementation of the Cyber-Security Inspection, referenced above.


SUMMER NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
SUMMER NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
    The required Table: RFI 1 information shall be provided electronically to the lead
2
    inspector by April 8, 2022. The preferred file format for all lists is a searchable Excel
The required Table: RFI 1 information shall be provided electronically to the lead  
    spreadsheet file. The information should be indexed and hyper-linked to facilitate ease
inspector by April 8, 2022. The preferred file format for all lists is a searchable Excel  
    of use. If you have any questions regarding this information, please call the inspection
spreadsheet file. The information should be indexed and hyper-linked to facilitate ease  
    team leader as soon as possible.
of use. If you have any questions regarding this information, please call the inspection  
                                          Table: RFI #1
team leader as soon as possible.
Paragraph Number/Title:                                                               IP Ref
Table: RFI #1
    A list of all Identified Critical Systems and Critical Digital Assets, -
Paragraph Number/Title:
    highlight/note any additions, deletions, reclassifications due to new
IP Ref
  1                                                                                  Overall
1
    guidance from white papers, changes to NEI 10-04, 13-10, etc. since
A list of all Identified Critical Systems and Critical Digital Assets, -  
    the last cyber security inspection.
highlight/note any additions, deletions, reclassifications due to new  
    A list of EP and Security onsite and offsite digital communication
guidance from white papers, changes to NEI 10-04, 13-10, etc. since  
  2                                                                                  Overall
the last cyber security inspection.
    systems.
Overall
    Network Topology Diagrams to include information and data flow for
2
  3                                                                                  Overall
A list of EP and Security onsite and offsite digital communication  
    critical systems in levels 2, 3, and 4 (If available).
systems.
  4 Ongoing Monitoring and Assessment program documentation.                       03.01(a)
Overall
  5 The most recent effectiveness analysis of the Cyber Security Program.           03.01(b)
3
  6 Vulnerability screening/assessment and scan program documentation.             03.01(c)
Network Topology Diagrams to include information and data flow for  
    Cyber Security Incident Response documentation, including incident
critical systems in levels 2, 3, and 4 (If available).
    detection, response, and recovery documentation as well as                       03.02(a)
Overall
  7 contingency plan development, implementation, and including any                     and
4
    program documentation that requires testing of security boundary                 03.04(b)
Ongoing Monitoring and Assessment program documentation.
    device functionality.
03.01(a)
  8 Device Access and Key Control program documentation.                             03.02(c)
5
  9 Password/Authenticator program documentation.                                   03.02(c)
The most recent effectiveness analysis of the Cyber Security Program.
10 User Account/Credential and Authentication program documentation.               03.02(d)
03.01(b)
    Portable Media and Mobile Device (PMMD) control documentation,
6
11                                                                                  03.02(e)
Vulnerability screening/assessment and scan program documentation.  
    including kiosk security control assessment/documentation.
03.01(c)
    Design change/ modification program documentation and a list of all
7
    design changes completed since the last cyber security inspection,
Cyber Security Incident Response documentation, including incident  
12                                                                                  03.03(a)
detection, response, and recovery documentation as well as  
    including either a summary of the design change or the 50.59
contingency plan development, implementation, and including any  
    documentation for the change.
program documentation that requires testing of security boundary  
    Supply Chain Management program documentation, including any                    03.03(a),
device functionality.
03.02(a)
and
03.04(b)
8
Device Access and Key Control program documentation.
03.02(c)
9
Password/Authenticator program documentation.  
03.02(c)
10
User Account/Credential and Authentication program documentation.  
03.02(d)
11 Portable Media and Mobile Device (PMMD) control documentation,  
including kiosk security control assessment/documentation.  
03.02(e)
12
Design change/ modification program documentation and a list of all  
design changes completed since the last cyber security inspection,  
including either a summary of the design change or the 50.59  
documentation for the change.  
03.03(a)
13
13
    security impact analysis for new acquisitions.                                 (b) and (c)
Supply Chain Management program documentation, including any
                                                  2
security impact analysis for new acquisitions.  
03.03(a),
(b) and (c)        


  SUMMER NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
SUMMER NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
                                            Table: RFI #1
3
  Paragraph Number/Title:                                                             IP Ref
Table: RFI #1
        Configuration Management documentation including any security
Paragraph Number/Title:
                                                                                      03.03(a)
IP Ref
    14 impact analysis performed due to configuration changes since the last
14
                                                                                        and (b)
Configuration Management documentation including any security  
      cyber inspection.
impact analysis performed due to configuration changes since the last  
        Cyber Security Plan and any 50.54(p) analysis to support changes to
cyber inspection.
    15                                                                                03.04(a)
03.03(a)
      the plan since the last inspection.
and (b)
    16 Cyber Security Performance Metrics tracked (if applicable).                     03.06(b)
15
        Provide documentation describing any cyber security changes to the
Cyber Security Plan and any 50.54(p) analysis to support changes to  
    17                                                                                  Overall
the plan since the last inspection.
      access authorization program since the last cyber security inspection.
03.04(a)
        Provide a list of all procedures and policies provided to the NRC with
16
    18                                                                                  Overall
Cyber Security Performance Metrics tracked (if applicable).
      their descriptive name and associated number (if available).
03.06(b)
    19 Performance testing report (if applicable).                                     03.06(a)
17
        In addition to the above information, please provide the following:
Provide documentation describing any cyber security changes to the  
            (1) electronic copy of the UFSAR and technical specifications
access authorization program since the last cyber security inspection.
            (2) name(s) and phone numbers for the regulatory and technical contacts
Overall
            (3) current management and engineering organizational charts
18
        Based on this information, the inspection team will identify and select specific systems
Provide a list of all procedures and policies provided to the NRC with  
        and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and
their descriptive name and associated number (if available).
        submit a list of specific systems and equipment to your staff by April 18, 2022, for the
Overall
        second RFI (i.e., RFI #2).
19
II.     Additional Information Requested to be Available Prior to Inspection.
Performance testing report (if applicable).
        As stated in Section I above, the inspection team will examine the returned
03.06(a)
        documentation requested from Table: RFI #1 and submit the list of specific systems and
In addition to the above information, please provide the following:
        equipment to your staff by April 18, 2022, for the second RFI (i.e., RFI #2). The second
(1) electronic copy of the UFSAR and technical specifications
        RFI will request additional information required to evaluate the CSs/CDAs, defensive
(2) name(s) and phone numbers for the regulatory and technical contacts
        architecture, and the areas of the licensees CSP selected for the cyber-security
(3) current management and engineering organizational charts
        inspection. The additional information requested for the specific systems and equipment
Based on this information, the inspection team will identify and select specific systems  
        is identified in Table: RFI #2. All requested information shall follow the guidance
and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and  
        document referenced above.
submit a list of specific systems and equipment to your staff by April 18, 2022, for the  
        The Table: RFI 2 information shall be provided to the lead inspector by May 30, 2022.
second RFI (i.e., RFI #2).
        The preferred file format for all lists is a searchable Excel spreadsheet. The information
II.
        should be indexed and hyper-linked to facilitate ease of use. If you have any questions
Additional Information Requested to be Available Prior to Inspection.
        regarding this information, please call the inspection team leader as soon as possible.
As stated in Section I above, the inspection team will examine the returned  
                                                    3
documentation requested from Table: RFI #1 and submit the list of specific systems and  
equipment to your staff by April 18, 2022, for the second RFI (i.e., RFI #2). The second  
RFI will request additional information required to evaluate the CSs/CDAs, defensive  
architecture, and the areas of the licensees CSP selected for the cyber-security  
inspection. The additional information requested for the specific systems and equipment  
is identified in Table: RFI #2. All requested information shall follow the guidance  
document referenced above.
The Table: RFI 2 information shall be provided to the lead inspector by May 30, 2022.
The preferred file format for all lists is a searchable Excel spreadsheet. The information  
should be indexed and hyper-linked to facilitate ease of use. If you have any questions  
regarding this information, please call the inspection team leader as soon as possible.


SUMMER NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
SUMMER NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
                                          Table: RFI #2
4
    Paragraph Number/Title:                                                       Items
Table: RFI #2
        For the system(s) chosen for inspection provide:
Paragraph Number/Title:
        Ongoing Monitoring and Assessment activity performed on the
Items
      1                                                                          03.01(a)
For the system(s) chosen for inspection provide:
        selected inspection samples system(s).
1
      2 All Security Control Assessments for the selected system(s).             03.01(a)
Ongoing Monitoring and Assessment activity performed on the  
        All vulnerability screenings/assessments associated with or scans
selected inspection samples system(s).
      3 performed on the selected system(s) since the last cyber security       03.01(c)
03.01(a)
        inspection.
2
        Documentation (including configuration files and rules sets) for
All Security Control Assessments for the selected system(s).
        Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),
03.01(a)
      4 Host-based Intrusion Detection Systems (HIDS), and Security             03.02(b)
3
        Information and Event Management (SIEM) systems for system(s)
All vulnerability screenings/assessments associated with or scans  
        chosen for inspection).
performed on the selected system(s) since the last cyber security  
        Documentation (including configuration files and rule sets) for intra-
inspection.
      5 security level firewalls and boundary devices used to protect the       03.02(c)
03.01(c)
        selected system(s).
4
        Copies of all periodic reviews of the access authorization list for the
Documentation (including configuration files and rules sets) for  
      6                                                                          03.02(d)
Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),  
        selected systems since the last cyber inspection.
Host-based Intrusion Detection Systems (HIDS), and Security  
      7 Baseline configuration data sheets for the selected CDAs.               03.03(a)
Information and Event Management (SIEM) systems for system(s)  
        Documentation on any changes, including Security Impact Analyses,
chosen for inspection).
      8                                                                          03.03(b)
03.02(b)
        performed on the selected system(s) since the last inspection.
5
        Copies of the purchase order documentation for any new equipment
Documentation (including configuration files and rule sets) for intra-
      9                                                                          03.03(c)
security level firewalls and boundary devices used to protect the  
        purchased for the selected systems since the last inspection.
selected system(s).
        Copies of any reports/assessment for cyber security drills performed   03.02(a)
03.02(c)
    10
6
        since the last inspection.                                              03.04(b)
Copies of all periodic reviews of the access authorization list for the  
        Copy of the individual recovery plan(s) for the selected system(s)      03.02(a)
selected systems since the last cyber inspection.
    11 including documentation of the results the last time the backups
03.02(d)
        were executed.                                                         03.04(b)
7
        Corrective actions taken as a result of cyber security incidents/issues
Baseline configuration data sheets for the selected CDAs.  
    12 to include previous NRC violations and Licensee Identified Violations     03.05
03.03(a)
        since the last cyber security inspection.
8
                                            4
Documentation on any changes, including Security Impact Analyses,  
performed on the selected system(s) since the last inspection.
03.03(b)
9
Copies of the purchase order documentation for any new equipment  
purchased for the selected systems since the last inspection.
03.03(c)
10
Copies of any reports/assessment for cyber security drills performed  
since the last inspection.
03.02(a)
03.04(b)
11
Copy of the individual recovery plan(s) for the selected system(s)  
including documentation of the results the last time the backups  
were executed.
03.02(a)
03.04(b)
12
Corrective actions taken as a result of cyber security incidents/issues  
to include previous NRC violations and Licensee Identified Violations  
since the last cyber security inspection.  
03.05


III. Information Requested to be Available on First Day of Inspection
5
    For the specific systems and equipment identified in Section II above, provide the
III.
    following RFI (i.e., Table: Week Onsite) to the team by June 27, 2022, the first day of
Information Requested to be Available on First Day of Inspection
    the inspection. All requested information shall follow the guidance document referenced
For the specific systems and equipment identified in Section II above, provide the  
    above.
following RFI (i.e., Table: Week Onsite) to the team by June 27, 2022, the first day of  
    The preferred file format for all lists is a searchable Excel spreadsheet file. The
the inspection. All requested information shall follow the guidance document referenced  
    information should be indexed and hyper-linked to facilitate ease of use. If you have any
above.
    questions regarding this information, please call the inspection team leader as soon as
The preferred file format for all lists is a searchable Excel spreadsheet file. The  
    possible.
information should be indexed and hyper-linked to facilitate ease of use. If you have any  
                                          Table: Week Onsite
questions regarding this information, please call the inspection team leader as soon as  
      Paragraph Number/Title:                                                           Items
possible.
            Any cyber security event reports submitted in accordance with
Table: Week Onsite
        1                                                                            03.04(a)
Paragraph Number/Title:
            10 CFR 73.77, since the last cyber security inspection.
Items
            Updated copies of corrective actions taken as a result of cyber
1
            security incidents/issues, to include previous NRC violations and
Any cyber security event reports submitted in accordance with  
        2                                                                              03.05
10 CFR 73.77, since the last cyber security inspection.
            Licensee Identified Violations since the last cyber security
03.04(a)
            inspection, as well as vulnerability-related corrective actions.
2
    In addition to the above information please provide the following:
Updated copies of corrective actions taken as a result of cyber  
          (1) Copies of the following documents do not need to be solely available to the
security incidents/issues, to include previous NRC violations and  
              inspection team as long as the inspectors have easy and unrestrained access
Licensee Identified Violations since the last cyber security  
              to them.
inspection, as well as vulnerability-related corrective actions.  
              a. updated Final Safety Analysis Report (UFSAR), if not previously provided
03.05
              b. original FSAR Volumes
In addition to the above information please provide the following:
              c. original SER and Supplements
(1) Copies of the following documents do not need to be solely available to the  
              d. FSAR Question and Answers
inspection team as long as the inspectors have easy and unrestrained access  
              e. Quality Assurance (QA) Plan
to them.
              f. Technical Specifications, if not previously provided
a.
              g. latest IPE/PRA Report
updated Final Safety Analysis Report (UFSAR), if not previously provided
          (2) Vendor Manuals, Assessment and Corrective Actions:
b.
              a. the most recent Cyber-Security Quality Assurance (QA) audit and/or
original FSAR Volumes
                  self-assessment
c.
              b. Corrective Action documents (e.g., condition reports, including status of
original SER and Supplements
                  corrective actions) generated as a result of the most recent Cyber-Security
d.
                  Quality Assurance (QA) audit and/or self-assessment
FSAR Question and Answers
                                                  5
e.
Quality Assurance (QA) Plan
f.
Technical Specifications, if not previously provided
g.
latest IPE/PRA Report
(2) Vendor Manuals, Assessment and Corrective Actions:
a.
the most recent Cyber-Security Quality Assurance (QA) audit and/or  
self-assessment
b.
Corrective Action documents (e.g., condition reports, including status of  
corrective actions) generated as a result of the most recent Cyber-Security  
Quality Assurance (QA) audit and/or self-assessment


  SUMMER NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
SUMMER NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
IV.     Information Requested to Be Provided Throughout the Inspection
6
            (1) copies of any corrective action documents generated as a result of the inspection
IV.
                teams questions or queries during the inspection
Information Requested to Be Provided Throughout the Inspection
            (2) copies of the list of questions submitted by the inspection team members and the
(1) copies of any corrective action documents generated as a result of the inspection  
                status/resolution of the information requested (provided daily during the
teams questions or queries during the inspection
                inspection to each inspection team member during daily de-brief meetings)
(2) copies of the list of questions submitted by the inspection team members and the  
If you have any questions regarding the information requested, please contact the inspection
status/resolution of the information requested (provided daily during the  
inspection to each inspection team member during daily de-brief meetings)
If you have any questions regarding the information requested, please contact the inspection  
team leader.
team leader.
                                                  6
}}
}}

Latest revision as of 17:45, 27 November 2024

V.C. Summer Nuclear Station - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000395/2022401
ML22075A048
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/16/2022
From: William Monk
NRC/RGN-II/DRS/EB2
To: Stoddard D
Dominion Energy South Carolina
References
IR 2022401
Download: ML22075A048 (9)


See also: IR 05000395/2022401

Text

Daniel Stoddard, SVP

Dominion Energy

Innsbrook Technical Center

5000 Dominion Blvd., Floor: IN-2SW

Glen Allen, VA 29060

SUBJECT: V.C. SUMMER NUCLEAR STATION - INFORMATION REQUEST FOR THE

CYBER-SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM

INSPECTION 05000395/2022401

Dear Mr. Stoddard:

On June 27, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection, in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0,

at your V.C. Summer Nuclear Station. The inspection will be performed to evaluate and verify

your ability to provide assurance that your digital computer and communication systems and

networks associated with safety, security, or emergency preparedness (SSEP) functions are

adequately protected against cyber-attacks, in accordance with Title 10 of the Code of Federal

Regulations (10 CFR) 73.54 and the U.S. Nuclear Regulatory Commission (NRC) approved

cyber security plan (CSP). The onsite portion of the inspection will take place during the week

of June 27, 2022.

Experience has shown that baseline inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site

and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should

be made available electronically no later than April 8, 2022. The inspection team will review

this information and, by April 18, 2022, will request the specific items that should be provided

for review. The second group of additional requested documents will assist the inspection team

in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive

architecture, and the areas of the licensees CSP selected for the cyber-security inspection.

This information will be requested for review in the regional office prior to the inspection by

May 30, 2022, as identified above.

March 16, 2022

D. Stoddard

2

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection. Please have this information available by the

first day of the onsite inspection, June 27, 2022.

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all of

these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is William Monk. We understand that our regulatory

contact for this inspection is Michael Moore, Licensing Manager of your organization. If there

are any questions about the inspection or the material requested, please contact the lead

inspector at (404) 997-4579 or via e-mail at william.monk@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement, unless the requesting

document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRC's Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Gerry McCoy, Branch Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-395

License Nos. NPF-12

Enclosure:

V.C. Summer Nuclear Station Cyber-Security Inspection Document Request

cc w/encl: Distribution via LISTSERV

ML22075A048

X

SUNSI Review

X

Non-Sensitive

Sensitive

X

Publicly Available

Non-Publicly Available

OFFICE RII/DRS

RII/DRS

RII/DRS

NAME

W. Monk

G. McCoy

J. Montgomery

DATE

03/16/2022

03/16/2022

03/16/2022

SUMMER NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Enclosure

Inspection Report: 05000395/2022401

Inspection Dates:

June 27-July 01, 2022

Inspection Procedure:

IP 71130.10, Cyber-Security, Revision 0 (Effective: 01/01/2022)

Reference:

Guidance Document for Development of the Request for

Information (RFI) and Notification Letter for Full-Implementation of

the Cyber-Security Inspection, Rev. 2 (Issued: 11/22/2021)

NRC Inspectors:

William Monk, Lead

Jonathan Montgomery

404-909-4579

404-997-4880

william.monk@nrc.gov

jonathan.montgomery@nrc.gov

NRC Contractors:

Tim Marshall

Balla Barro

301-415-7000

301-415-7000

timothy.marshall@nrc.gov

balla.barro@nrc.gov

I.

Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection

team with the general information necessary to select appropriate components and CSP

elements to develop a site-specific inspection plan. The first RFI is used to identify the

list of critical systems and critical digital assets (CSs/CDAs) plus operational and

management (O&M) security control portions of the CSP to be chosen as the sample

set required to be inspected by the cyber-security IP. The first RFIs requested

information is specified below in Table: RFI #1. The Table RFI #1 information is

requested to be provided electronically to the inspection team by April 8, 2022, or

sooner, to facilitate the selection of the specific items that will be reviewed during the

onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more

focused follow-up request to develop the second RFI. The inspection team will submit

the specific systems and equipment list to your staff by April 18, 2022, which will identify

the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,

defensive architecture, and the areas of the licensees CSP selected for the cyber-

security inspection. We request that the additional information provided from the second

RFI be made available to the inspection team by May 30, 2022. All requests for

information shall follow the guidance document U.S. NRC - Guidance Document for

Development of the Request for Information (RFI) and Notification Letter for Full

Implementation of the Cyber-Security Inspection, referenced above.

SUMMER NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST

2

The required Table: RFI 1 information shall be provided electronically to the lead

inspector by April 8, 2022. The preferred file format for all lists is a searchable Excel

spreadsheet file. The information should be indexed and hyper-linked to facilitate ease

of use. If you have any questions regarding this information, please call the inspection

team leader as soon as possible.

Table: RFI #1

Paragraph Number/Title:

IP Ref

1

A list of all Identified Critical Systems and Critical Digital Assets, -

highlight/note any additions, deletions, reclassifications due to new

guidance from white papers, changes to NEI 10-04, 13-10, etc. since

the last cyber security inspection.

Overall

2

A list of EP and Security onsite and offsite digital communication

systems.

Overall

3

Network Topology Diagrams to include information and data flow for

critical systems in levels 2, 3, and 4 (If available).

Overall

4

Ongoing Monitoring and Assessment program documentation.

03.01(a)

5

The most recent effectiveness analysis of the Cyber Security Program.

03.01(b)

6

Vulnerability screening/assessment and scan program documentation.

03.01(c)

7

Cyber Security Incident Response documentation, including incident

detection, response, and recovery documentation as well as

contingency plan development, implementation, and including any

program documentation that requires testing of security boundary

device functionality.

03.02(a)

and

03.04(b)

8

Device Access and Key Control program documentation.

03.02(c)

9

Password/Authenticator program documentation.

03.02(c)

10

User Account/Credential and Authentication program documentation.

03.02(d)

11 Portable Media and Mobile Device (PMMD) control documentation,

including kiosk security control assessment/documentation.

03.02(e)

12

Design change/ modification program documentation and a list of all

design changes completed since the last cyber security inspection,

including either a summary of the design change or the 50.59

documentation for the change.

03.03(a)

13

Supply Chain Management program documentation, including any

security impact analysis for new acquisitions.

03.03(a),

(b) and (c)

SUMMER NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST

3

Table: RFI #1

Paragraph Number/Title:

IP Ref

14

Configuration Management documentation including any security

impact analysis performed due to configuration changes since the last

cyber inspection.

03.03(a)

and (b)

15

Cyber Security Plan and any 50.54(p) analysis to support changes to

the plan since the last inspection.

03.04(a)

16

Cyber Security Performance Metrics tracked (if applicable).

03.06(b)

17

Provide documentation describing any cyber security changes to the

access authorization program since the last cyber security inspection.

Overall

18

Provide a list of all procedures and policies provided to the NRC with

their descriptive name and associated number (if available).

Overall

19

Performance testing report (if applicable).

03.06(a)

In addition to the above information, please provide the following:

(1) electronic copy of the UFSAR and technical specifications

(2) name(s) and phone numbers for the regulatory and technical contacts

(3) current management and engineering organizational charts

Based on this information, the inspection team will identify and select specific systems

and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and

submit a list of specific systems and equipment to your staff by April 18, 2022, for the

second RFI (i.e., RFI #2).

II.

Additional Information Requested to be Available Prior to Inspection.

As stated in Section I above, the inspection team will examine the returned

documentation requested from Table: RFI #1 and submit the list of specific systems and

equipment to your staff by April 18, 2022, for the second RFI (i.e., RFI #2). The second

RFI will request additional information required to evaluate the CSs/CDAs, defensive

architecture, and the areas of the licensees CSP selected for the cyber-security

inspection. The additional information requested for the specific systems and equipment

is identified in Table: RFI #2. All requested information shall follow the guidance

document referenced above.

The Table: RFI 2 information shall be provided to the lead inspector by May 30, 2022.

The preferred file format for all lists is a searchable Excel spreadsheet. The information

should be indexed and hyper-linked to facilitate ease of use. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

SUMMER NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST

4

Table: RFI #2

Paragraph Number/Title:

Items

For the system(s) chosen for inspection provide:

1

Ongoing Monitoring and Assessment activity performed on the

selected inspection samples system(s).

03.01(a)

2

All Security Control Assessments for the selected system(s).

03.01(a)

3

All vulnerability screenings/assessments associated with or scans

performed on the selected system(s) since the last cyber security

inspection.

03.01(c)

4

Documentation (including configuration files and rules sets) for

Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),

Host-based Intrusion Detection Systems (HIDS), and Security

Information and Event Management (SIEM) systems for system(s)

chosen for inspection).

03.02(b)

5

Documentation (including configuration files and rule sets) for intra-

security level firewalls and boundary devices used to protect the

selected system(s).

03.02(c)

6

Copies of all periodic reviews of the access authorization list for the

selected systems since the last cyber inspection.

03.02(d)

7

Baseline configuration data sheets for the selected CDAs.

03.03(a)

8

Documentation on any changes, including Security Impact Analyses,

performed on the selected system(s) since the last inspection.

03.03(b)

9

Copies of the purchase order documentation for any new equipment

purchased for the selected systems since the last inspection.

03.03(c)

10

Copies of any reports/assessment for cyber security drills performed

since the last inspection.

03.02(a)

03.04(b)

11

Copy of the individual recovery plan(s) for the selected system(s)

including documentation of the results the last time the backups

were executed.

03.02(a)

03.04(b)

12

Corrective actions taken as a result of cyber security incidents/issues

to include previous NRC violations and Licensee Identified Violations

since the last cyber security inspection.

03.05

5

III.

Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II above, provide the

following RFI (i.e., Table: Week Onsite) to the team by June 27, 2022, the first day of

the inspection. All requested information shall follow the guidance document referenced

above.

The preferred file format for all lists is a searchable Excel spreadsheet file. The

information should be indexed and hyper-linked to facilitate ease of use. If you have any

questions regarding this information, please call the inspection team leader as soon as

possible.

Table: Week Onsite

Paragraph Number/Title:

Items

1

Any cyber security event reports submitted in accordance with

10 CFR 73.77, since the last cyber security inspection.

03.04(a)

2

Updated copies of corrective actions taken as a result of cyber

security incidents/issues, to include previous NRC violations and

Licensee Identified Violations since the last cyber security

inspection, as well as vulnerability-related corrective actions.

03.05

In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be solely available to the

inspection team as long as the inspectors have easy and unrestrained access

to them.

a.

updated Final Safety Analysis Report (UFSAR), if not previously provided

b.

original FSAR Volumes

c.

original SER and Supplements

d.

FSAR Question and Answers

e.

Quality Assurance (QA) Plan

f.

Technical Specifications, if not previously provided

g.

latest IPE/PRA Report

(2) Vendor Manuals, Assessment and Corrective Actions:

a.

the most recent Cyber-Security Quality Assurance (QA) audit and/or

self-assessment

b.

Corrective Action documents (e.g., condition reports, including status of

corrective actions) generated as a result of the most recent Cyber-Security

Quality Assurance (QA) audit and/or self-assessment

SUMMER NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST

6

IV.

Information Requested to Be Provided Throughout the Inspection

(1) copies of any corrective action documents generated as a result of the inspection

teams questions or queries during the inspection

(2) copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provided daily during the

inspection to each inspection team member during daily de-brief meetings)

If you have any questions regarding the information requested, please contact the inspection

team leader.