Letter Sequence RAI |
---|
EPID:L-2018-LLA-0233, License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-shift Staff Tables (Open) |
|
MONTHYEARML18226A1082018-04-10010 April 2018, 9 August 2018 License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-shift Staff Tables Project stage: Request RC-18-0091, License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions2018-08-29029 August 2018 License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions Project stage: Request ML18270A0182018-09-27027 September 2018 NRR E-mail Capture - V. C. Summer, Unit 1 - Acceptance of License Amendment Request Related to NFPA-805 Revision Project stage: Acceptance Review ML18337A4032018-12-0606 December 2018 Request for Additional Information Revise Technical Specification 5.2.2.G and Updating Emergency Plan Minimum On-Shift Staff Tables Project stage: RAI ML18355A4772019-01-0404 January 2019 Request for Additional Information Revise TS 5.2.2.g and Update Emergency Plan Minimum On-Shift Staff Tables Project stage: RAI ML19072A1442019-03-13013 March 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 Program Revisions Project stage: RAI ML19095A6532019-04-0404 April 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information NFPA-805 Program Revisions LAR Project stage: RAI ML19119A3652019-04-29029 April 2019 (Vcsns), Unit 1 - License Amendment Request - LAR-16-01490, NFPA 805 Program Revisions: Response to Request for Additional Information Project stage: Response to RAI ML19179A1262019-06-27027 June 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 Program Revisions Project stage: RAI ML19211D5102019-07-30030 July 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 (Supplement to PRA RAI 03) Project stage: RAI ML19196A2112019-08-0202 August 2019 July 23, 2019, Meeting Summary Regarding National Fire Protection Association 805 Supplement License Amendment Request Project stage: Meeting 2019-03-13
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24026A2802024-01-25025 January 2024 Acceptance Review for Virgil C. Summer Relief Requests RR-5-V1, RR-5-V2, and RR-5-V3 (EPIDs L-2023-LLR-0067, L-2023-LLR-0068, and L-2023-LLR-0069) (Email) ML23270B8712023-09-27027 September 2023 NRR E-mail Capture - Draft RAIs for License Amendment Request (LAR) to Revise the Virgil C. Summer Nuclear Station (VCSNS) Unit 1 Emergency Plan (L-2023-LLA-0083) ML23193A9552023-07-12012 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029) ML23186A1392023-07-0505 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer Emergency Plan (EP) License Amendment Request (LAR) (L-2023-LLA-0083) ML23131A1492023-05-10010 May 2023 2023 V.C. Summer Commercial Grade Dedication Inspection Information Request ML23044A3392023-02-13013 February 2023 NRR E-mail Capture - Acceptance Review for Change to Reactor Vessel Surveillance Capsule Schedule (L-2023-LLL-0002) ML23027A0122023-01-26026 January 2023 002 Radiation Safety Baseline Inspection Information Request ML23026A0152023-01-23023 January 2023 NRR E-mail Capture - Feb 14, 2023 Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal to Relocate the Emergency Operations Facility for the VC Summer Power Station - Dominion Slides ML22263A0502022-09-19019 September 2022 NRR E-mail Capture - Draft Request for Additional Information for Proposed Alternative Request RR-4-26 Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval V.C. Summer Unit 1 ML22194A9422022-07-13013 July 2022 NRC 50.59 Inspection (IP 71111.17T) Information Request ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22173A0292022-06-17017 June 2022 NRR E-mail Capture - Acceptance Review for Summer to Defer Weld Examinations (L-2022-LLR-0052) ML22139A2302022-05-19019 May 2022 NRR E-mail Capture - Acceptance Review for Summer TS 4.6.2.1.d LAR (L-2022-LLR-0060) ML22139A2322022-05-19019 May 2022 NRR E-mail Capture - Acceptance Review for Summer TSTF-491 LAR (L-2022-LLR-0059) ML22084A4052022-03-25025 March 2022 NRR E-mail Capture - Acceptance Review for Summer Dissimilar Metal Weld Inspection Interval (L-2022-LLR-0033) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21333A1892021-11-29029 November 2021 NRR E-mail Capture - Draft RAI for Summer LAR Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, (TSTF-425) ML21253A1352021-09-0808 September 2021 Document Request for VC Summer Nuclear Station - Radiation Protection Inspection - Inspection Report 2021-04 ML21197A0432021-07-15015 July 2021 VCS ISI 2021004 RFI - Combined ML21187A1242021-06-28028 June 2021 10CFR Part 21 Update - Deviation Identified in the Bolting Utilized to Maintain Seismic Qualification ML21173A1782021-06-22022 June 2021 NRR E-mail Capture - Acceptance Review - Summer LAR Unit Staff Qualification Relocation TS to Quality Assurance Program Description (QAPD) ML21145A0222021-05-24024 May 2021 003 Radiation Safety Baseline Inspection Information Request ML21131A0402021-05-11011 May 2021 NRR E-mail Capture - V.C. Summer, Unit 1 - Final RAI for the Spring 2020 RFO Sgtir Review ML21125A1942021-05-0505 May 2021 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2021-LLA-0064) ML21020A0562021-01-20020 January 2021 Email Capture Upcoming V.C. Summer POV Inspection (IP71111.21N.02) Information Request ML20342A1822020-12-0707 December 2020 NRR E-mail Capture - Final RAI for Summer LAR - TS 3.6.4 ML20342A3822020-12-0707 December 2020 NRR E-mail Capture - Final RAIs for Summer Fs LOCA LAR ML20321A2112020-11-16016 November 2020 NRR E-mail Capture - Summer, Unit 1 - Final RAIs for the SG Tube Inspection Report Review ML20316A0122020-11-0404 November 2020 NRR E-mail Capture - V.C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2020-LLR-0141) ML20302A2032020-10-28028 October 2020 NRR E-mail Capture - V.C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2020-LLR-0141) ML20260H4262020-09-0303 September 2020 NRR E-mail Capture - Acceptance Review for Fleet Relief Request for Code Case N-885 ML20178A5892020-06-26026 June 2020 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit 1 - Acceptance Review of the Fsloca LAR (L-2020-LLA-0124) ML20178A5932020-06-23023 June 2020 NRR E-mail Capture - VC Summer Unit Alternate Request RR-4-19 ML20178A5912020-06-23023 June 2020 NRR E-mail Capture - VC Summer Unit Alternate Request RR-4-21 ML20149K4262020-05-21021 May 2020 NRR E-mail Capture - V. C. Summer, Unit 1 - Acceptance of License Amendment Request (LAR-20-142) Related to TS 3.6.4, Containment Isolation Valves (L-2020-LLA-0092) ML19218A3742019-08-0606 August 2019 NRR E-mail Capture - Virgil C. Summer, Unit 1 -Acceptance of Relief Request (RR-4-20), Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML19214A2732019-08-0202 August 2019 NRR E-mail Capture - Virgil C. Summer, Unit 1 - Acceptance of License Amendment Request to Change Company Name ML19211D5102019-07-30030 July 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 (Supplement to PRA RAI 03) ML19179A1262019-06-27027 June 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 Program Revisions ML19155A2752019-06-0404 June 2019 VC Summer 2019003 Rad Safety Inspection Document Request ML19140A2692019-05-17017 May 2019 Acceptance of Alternative Request (RR-4-23)to Utilize Code Case N-513-4 ML19105B1652019-04-15015 April 2019 NRR E-mail Capture - VC Summer SPRA Review - Clarification Questions on Credit for the Abeyance RCP Seals ML19102A0702019-04-11011 April 2019 NRR E-mail Capture - V.C. Summer, Unit 1: Relief Request (RR-4-22) Verbal Authorization Script ML19095A6532019-04-0404 April 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information NFPA-805 Program Revisions LAR ML19072A1442019-03-13013 March 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 Program Revisions ML19095A6582019-03-0404 March 2019 NRR E-mail Capture - VC Summer SPRA Review - Clarification Questions on Peer Review Findings and Plant Modifications ML19095A6672019-01-30030 January 2019 NRR E-mail Capture - VC Summer SPRA Clarification Questions on Circuit Analysis and Relay Replacement ML19031B4332019-01-29029 January 2019 Email Regarding VC Summer Units 2 & 3 Letter from Santee Cooper on Termination of COL ML19009A1052019-01-0909 January 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-10-02395, TS 3.8.2, D.C. Sources - Operating ML19009A5362019-01-0909 January 2019 NRR E-mail Capture - VC Summer Clarification Question on Fussell-Vesely Values 2024-01-25
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23270B8712023-09-27027 September 2023 NRR E-mail Capture - Draft RAIs for License Amendment Request (LAR) to Revise the Virgil C. Summer Nuclear Station (VCSNS) Unit 1 Emergency Plan (L-2023-LLA-0083) ML22263A0502022-09-19019 September 2022 NRR E-mail Capture - Draft Request for Additional Information for Proposed Alternative Request RR-4-26 Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval V.C. Summer Unit 1 ML22194A9422022-07-13013 July 2022 NRC 50.59 Inspection (IP 71111.17T) Information Request ML22075A0482022-03-16016 March 2022 V.C. Summer Nuclear Station - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000395/2022401 ML21333A1892021-11-29029 November 2021 NRR E-mail Capture - Draft RAI for Summer LAR Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, (TSTF-425) ML21253A1352021-09-0808 September 2021 Document Request for VC Summer Nuclear Station - Radiation Protection Inspection - Inspection Report 2021-04 ML21154A2792021-06-0303 June 2021 Requalification Program Inspection 05000395/2021003 - Virgil C. Summer Nuclear Station, Unit 1, ML21145A0222021-05-24024 May 2021 003 Radiation Safety Baseline Inspection Information Request ML21131A0402021-05-11011 May 2021 NRR E-mail Capture - V.C. Summer, Unit 1 - Final RAI for the Spring 2020 RFO Sgtir Review ML21020A0562021-01-20020 January 2021 Email Capture Upcoming V.C. Summer POV Inspection (IP71111.21N.02) Information Request ML20342A1822020-12-0707 December 2020 NRR E-mail Capture - Final RAI for Summer LAR - TS 3.6.4 ML20342A3822020-12-0707 December 2020 NRR E-mail Capture - Final RAIs for Summer Fs LOCA LAR ML20321A2112020-11-16016 November 2020 NRR E-mail Capture - Summer, Unit 1 - Final RAIs for the SG Tube Inspection Report Review ML20196L7782020-07-13013 July 2020 Notification of Virgil C. Summer Nuclear Station Design Bases Assurance Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000395/2020010 ML20106E8902020-04-15015 April 2020 Program Inspection RFI ML20056E3042020-02-25025 February 2020 VC Summer 2020-002 Radiation Safety Baseline Inspection Information Request ML19211D5102019-07-30030 July 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 (Supplement to PRA RAI 03) ML19179A1262019-06-27027 June 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 Program Revisions ML19095A6532019-04-0404 April 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information NFPA-805 Program Revisions LAR ML19072A1442019-03-13013 March 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 Program Revisions ML19009A1052019-01-0909 January 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-10-02395, TS 3.8.2, D.C. Sources - Operating ML18249A1932018-09-0505 September 2018 TS 4.3.3.6 SR LAR - Request for Additional Information ML18225A0932018-08-13013 August 2018 Notification of Inspection and Request for Information ML18218A2622018-08-0101 August 2018 Emergency Preparedness Program Inspection Request for Information ML18066A0002018-03-0808 March 2018 Request for Additional Information Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change ML18023B0692018-02-15015 February 2018 Request for Additional Information Relief Request (RR-4-13), Use of Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds ML17095A2842017-05-11011 May 2017 Request for Additional Information License Amendment Request for Implementation of TSTF-411 (WCAP-15376-P-A), Revision 1 ML17067A5322017-03-0808 March 2017 Notification of Radiation Protection Baseline Inspection and Request for Information ML17059C5382017-02-23023 February 2017 Notification of Inspection and Request for Information ML16302A1252016-11-0808 November 2016 Request for Additional Information License Amendment Request for Implementation of TSTF-411 and WCAP-15376-P-A, Revision 1 RC-16-0112, NRC Request Information Baseline Radiation Safety Inspection2016-07-0707 July 2016 NRC Request Information Baseline Radiation Safety Inspection ML16111A0912016-05-0303 May 2016 Request for Additional Information Regarding the Station Physical Security Plan, Revision 14 ML16097A0812016-04-0808 April 2016 Request for Additional Information ML16064A0332016-03-0303 March 2016 NRR E-mail Capture - Request for Additional Information Related to the March 1, 2016, Exigent Amendment Request ML16042A4712016-02-18018 February 2016 Request for Additional Information ML15320A3382015-12-0101 December 2015 Request for Additional Information Regarding License Basis Changes in Steam Generator Tube Rupture Analysis RC-15-0177, Submits LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis Response to Response for Additional Information2015-11-0505 November 2015 Submits LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis Response to Response for Additional Information ML15261A0512015-09-22022 September 2015 Request for Additional Information Regarding License Basis Changes in Steam Generator Tube Rupture Analysis ML15118A4592015-05-19019 May 2015 Request for Additional Information Regarding Alternative Request ML15118A3802015-05-0505 May 2015 Request for Additional Information Regarding Snubber Program Alternative Request ML15076A1182015-04-13013 April 2015 Request for Additional Information Regarding License Basis Changes in Steam Generator Tube Rupture Analysis ML15079A0992015-03-26026 March 2015 Request for Additional Information ML14339A0302015-01-0909 January 2015 Request for Additional Information Regarding License Basis Changes in Steam Generator Tube Rupture Analysis ML14268A5162014-10-23023 October 2014 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Re-evaluation Related to Southeastern Catalog Changes ML14226A2552014-08-29029 August 2014 Request for Additional Information ML14182A4732014-07-11011 July 2014 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML14071A1692014-03-24024 March 2014 Request for Additional Information ML14023A7402014-01-30030 January 2014 (VCSNS) - Request for Additional Information ML13347B0492013-12-19019 December 2013 (VCSNS) - Request for Additional Information ML13340A3772013-12-11011 December 2013 (VCSNS) - Request for Additional Information 2023-09-27
[Table view] |
Text
NRR-DRMAPEm Resource From: Williams, Shawn Sent: Thursday, June 27, 2019 7:36 AM To: MOORE, MICHAEL S Cc: DALICK, SARA BETH ; JUSTIN.BOUKNIGHT@scana.com
Subject:
Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information RE:
LAR-16-01490 NFPA-805 Program Revisions (EPID No. L-2018-LLA-0233)
Attachments: Summer NFPA 805 followup Question.docx
Dear Mr. Moore,
By letter dated August 29, 2018, as supplemented by letters dated April 29, 2019, and May 22, 2019, South Carolina Electric & Gas Company submitted a license amendment request for the Virgil C. Summer Nuclear Station, Unit 1, to make changes to its approved fire protection program under 10 CFR 50.48(c), including changes to plant modifications, use of performance-based alternatives to the requirements of NFPA 805, Chapter 3, and several clarifications and editorial corrections.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the submittal and supplements, and determined that additional information is needed to complete its review as discussed in the attachment. Please note that the NRC staff's review is continuing and further requests for information may be developed.
If you have any questions, please contact me at 301-415-1009 or Shawn.Williams@nrc.gov.
Sincerely, Shawn A. Williams, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.: 50-395
Enclosure:
Request for Additional Information cc: Listserv 1
Hearing Identifier: NRR_DRMA Email Number: 69 Mail Envelope Properties (BL0PR0901MB3154D7F8753BC04963C9530790FD0)
Subject:
Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information RE: LAR-16-01490 NFPA-805 Program Revisions (EPID No. L-2018-LLA-0233)
Sent Date: 6/27/2019 7:36:04 AM Received Date: 6/27/2019 7:36:07 AM From: Williams, Shawn Created By: Shawn.Williams@nrc.gov Recipients:
"DALICK, SARA BETH " <SARA.DALICK@scana.com>
Tracking Status: None "JUSTIN.BOUKNIGHT@scana.com" <JUSTIN.BOUKNIGHT@scana.com>
Tracking Status: None "MOORE, MICHAEL S" <MICHAEL.S.MOORE@scana.com>
Tracking Status: None Post Office: BL0PR0901MB3154.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1248 6/27/2019 7:36:07 AM Summer NFPA 805 followup Question.docx 24753 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO REVISE NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 FIRE PROTECTION PROGRAM VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO. 1 DOCKET NO. 50-395 By letter dated August 29, 2018 (Agencywide Document Access and Management System (ADAMS) Package Accession No. ML18242A657), and supplemented by letters dated April 29, 2019 (ADAMS Accession No. ML19119A365) and May 22, 2019 (ADAMS Accession No. ML19150A696), South Carolina Electric and Gas (SCE&G) submitted a license amendment request (LAR) for the Virgil C. Summer Nuclear Station, Unit 1 (VCSNS), to make changes to its approved fire protection program (FPP) under 10 CFR 50.48(c). In its LAR, the licensee proposed to make several changes to its FPP including changes to plant modifications, use of performance-based alternatives to the requirements of NFPA 805, Chapter 3, and several clarifications and editorial corrections.
The U.S. Nuclear Regulatory Commission (NRC) staff identified the below follow-up question based on the information in the supplement dated May 22, 2019.
Follow-up Question PRA RAI 03:
Section 2.4.3.3 of NFPA 805 states that the probabilistic risk assessment (PRA) approach, methods, and data shall be acceptable to the NRC. Section 2.4.4.1 of NFPA 805 further states that the change in public health risk arising from transition from the current fire protection program to an NFPA 805 based program, and all future plant changes to the program, shall be acceptable to the NRC.
In the letter dated May 22, 2019, the licensee responded to PRA Request for Additional Information (RAI) 03 and stated, in part:
The longer the seals can withstand loss of seal cooling, the more time is available for operators to trip the RCPs [reactor coolant pumps], and the lower the failure probability of that action. Dynamic loss-of-seal-cooling tests of N-9000 RCP seals have shown that RCPs can operate in excess of 60 minutes with no measurable change in seal leakage. The Human Reliability Analysis (HRA) that supports the 2018 VCSNS FPRA [fire PRA] models a 60-minute system time window for the operator action to trip RCPs. The 60-minute system time window is retained in the current FPRA.
In the safety evaluation associated with Amendment No. 199, dated February 11, 2015 (ADAMS Accession No. ML14287A289), the NRC staff found acceptable the licensee's N-9000 RCP seal failure model applied in the FPRA, which is based on the RCP seal failure model and associated failure probabilities used in WCAP-16175-A, "Model for Failure of RCP Seals Given Loss of Seal Cooling in CE NSSS Plants (ADAMS Accession No. ML071130383). WCAP-16175-A indicates that the N-9000 RCP seals have been designed to survive 30 minutes of
continued RCP operation without RCP seal cooling. Also, the response to RAI 1.15.1 documented in WCAP-16175-A states, [a]s data for RCP seal operation without seal cooling for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> is not available, this event will be redefined to require tripping the RCP within 20 minutes. Therefore, it appears that the licensees use of a 60-minute system time window for operator action to trip RCPs in the FPRA to support the LAR dated August 29, 2018 is not consistent with that used in the NRC-accepted RCP seal model (i.e., FPRA RCP seal failure model accepted in the safety evaluation associated with Amendment No. 199, which is based on WCAP-16175-A). Also, the basis for using the 60-minute system time window provided in the response to PRA RAI 03 is unclear to the NRC staff.
(i) Provide the technical basis for use of a 60-minute system time window for operator action to trip RCPs without seal cooling for the N-9000 RCP seals installed at VCSNS. If results of any tests or performance data are used to support this basis, discuss these results and data, including how this information is used to substantiate the 60-minute system time window and is applicable for the VCSNS RCP seal design and operating conditions that can affect seal performance. Also discuss the sensitivity of the risk results to the system time window for operator action to trip RCPs (e.g., compare the total risk and change-in-risk of using a 60-minute system time window with that used in the FPRA RCP seal failure model accepted in the safety evaluation associated with Amendment No. 199). OR (ii) Alternatively to part (i), provide updated risk results in Table PRA RAI 03-1 of letter dated May 22, 2019 that uses the system time window for operator action to trip RCPs based on the FPRA RCP seal failure model accepted in the safety evaluation associated with Amendment No. 199, and discuss how the updated risk results align with the risk acceptance guidelines of Regulatory Guide 1.205. Propose a mechanism that ensures an NRC-accepted RCP seal failure model is used in the FPRA for self-approval of post-transition changes.REQ