Line 19: |
Line 19: |
| =Text= | | =Text= |
| {{#Wiki_filter:Robinson / NRC Pre-submittal Meeting: | | {{#Wiki_filter:Robinson / NRC Pre-submittal Meeting: |
| LAR to Remove 4.160 kV bus 2 from Surveillance Requirement 3.8.1.16 ( ~ DUKE | | LAR to Remove 4.160 kV bus 2 from Surveillance Requirement 3.8.1.16 ( ~ DUKE March 30, 2022 ~ ENERGY Duke Energy Attendees |
| ~ ENERGY March 30, 2022
| |
|
| |
|
| Duke Energy Attendees Lee Grzeck (Manager, Nuclear Fleet Licensing)
| | Lee Grzeck (Manager, Nuclear Fleet Licensing) |
| Joshua Duc (Nuclear Fleet Licensing) | | Joshua Duc (Nuclear Fleet Licensing) |
| Keith Beatty (RNP Engineering) | | Keith Beatty (RNP Engineering) |
| Alan Helms (RNP Engineering) | | Alan Helms (RNP Engineering) |
| David Zybak (RNP Operations) 2 2 | | David Zybak (RNP Operations) |
|
| |
|
| Agenda Current and Proposed Technical Specification (TS) / Surveillance Requirement (SR) | | 2 2 |
| | Agenda |
| | |
| | Current and Proposed Technical Specification (TS) / Surveillance Requirement (SR) |
| System Design and Operation Reason for the Proposed Change | | System Design and Operation Reason for the Proposed Change |
|
| |
|
| ===Background=== | | ===Background=== |
| Justification Schedule 3 | | Justification Schedule |
| | |
| | 3 Current and Proposed TS / SR |
| | |
| | 3.8. 1 AC Sour c es - Ope rating |
| | |
| | LCO 3.8.1 The fo llo w ing AC electrical sou rces shall b e OPERAB LE : |
| | |
| | a. Tw o q u a lified c irc u its be tween the o ffsite tra n smission ne twor k and the onsi te em erg en c y AC Electrica l Po w er Distribut ion Sy stem ; and |
| | |
| | b. Tw o d iesel gene rators (DGs) capa b le of su pplying the ons ite emergenc y po w er distrib u tion su bs y stem (s). |
| | |
| | A P PLICAB ILI T Y : MOD ES 1, 2, 3, an d 4. |
| | |
| | SR 3.8. 1.16 - -- ---- ---- ------ -------- NOT E----- --- ------- ---- ----- -- - ------ --- |
| | : 1. Th is Sur veillan ce shall not b e perform ed in MO DE 1or2. ~ |
| | |
| | 2. SR 3.8.1. 16 is no t req u ired to be me t if 1. 160 IN b 1,Js 2 OAS 480 V Emergenc y Bus 1 po w er supply is |
| | _ __ _ from a s tart up transformer. ~ low er case "b" I |
| | |
| | V erify a u tomatic transfer ca p ab ility of the 1.160 It'/ b1,Js In acco rdance w ith 2 OAS 11:le 4 8 0 V Eme rgenc y bus 1 loads from the U n it the Sur veillance au x iliar y transforme r to a sta rt u p tran sformer. Freq u en cy C on trol Progra m 4 |
| | 4 System Design and Operation |
| | |
| | TS 3.8.1 Bases Design of AC electrical power system ensures power to Engineered Safety Feature (ESF) systems Offsite circuit: equipment required to transmit power from offsite transmission network to ESF buses |
| | |
| | Normal 100% power lineup from Startup Transformers (SUT), Unit Auxiliary Transformer (UAT): |
| | 115 kV SUT 4.160 kV bus 6 480 V Emergency bus 1 (ESF bus E1) 230 kV SUT 4.160 kV bus 9 480 V Emergency bus 2 (ESF bus E2) |
| | UAT 4.160 kV bus 2 |
| | |
| | SR 3.8.1.16 automatic transfer from UAT to SUT Breakers 52/7 and 52/20 open; breakers 52/12 and 52/19 close |
| | |
| | 5 5 |
| | W-E ST \\Li:ikV ------ ------- E AST 11 kV OA:TH 230,c '-,} ------DA.9:LI NGT O CO UN T Y DAR LI NGTON OR TH LC E 2'3 0 k 'V SCP'S~ LI NE 2'30 k V 100% Power |
| | |
| | 11..,k\\l S T AllT UP T FI NS f Or.lMEFI 2j0:i!: 'i ST AR T U P' T Flttl'ISF OR ME ~ t-1AI T RANSF GH. ER BAN K 7 HV - 2 7/36 / 45/50. 4 MV A H 'i-2'7/ 3 6 / 45 / 50. "1 M VA 3 - 330 MVA lPH. 60 H Z |
| | ~ -0 L Y-13. 5 / 18 /22.5/25. 2 t-1V A CEAC H> L V - l':'.l. '5 /1 8/22.5 /2 5. 2' MY A (E ACHJ |
| | |
| | 2<1 - D! S C-S wY - SU T-11 5 |
| | |
| | GEN. DI SC. UN IT AUXILI AR't T R ANS F ORM ER # 2 H IJ44 /.C9. 2 MV A LI NK. L \\1-22/24. 6 MVA <E AC H) |
|
| |
|
| Current and Proposed TS / SR 3.8. 1 AC Sources - Operating LCO 3.8 .1 The following AC electrical sou rces shall be OPERABLE:
| | S'W - lCFR SS T-SH-2 J OFF O |
| : a. Two qualified circuits between the offsite transmission network and the onsite emergency AC Electrical Power Distribution System ; and
| |
| : b. Two diesel generators (DGs) capa ble of supplyi ng the onsite emergency power distribution subsystem (s).
| |
| APPLICAB ILI TY: MODES 1, 2, 3, and 4 .
| |
| SR 3.8. 1.16 --- ----------------------NOTE------------------------------------
| |
| : 1. This Surveillance shall not be performed in MO DE 1or2. ~
| |
| : 2. SR 3.8.1 .16 is not required to be met if 1.160 IN b1,Js 2 OAS 480 V Emergency Bus 1 power supply is
| |
| ___ _from a start up transformer. ~ low er case "b" I Verify automatic transfer capability of the 1.160 It'/ b1,Js In accordance with 2 OAS 11:le 480 V Emergency bus 1 loads fro m the Unit the Surveillance au xiliary transformer to a start up transformer. Frequency Con trol Program 4
| |
| 4
| |
|
| |
|
| System Design and Operation TS 3.8.1 Bases Design of AC electrical power system ensures power to Engineered Safety Feature (ESF) systems Offsite circuit: equipment required to transmit power from offsite transmission network to ESF buses Normal 100% power lineup from Startup Transformers (SUT), Unit Auxiliary Transformer (UAT):
| | S S T 20 |
| 115 kV SUT 4.160 kV bus 6 480 V Emergency bus 1 (ESF bus E1) 230 kV SUT 4.160 kV bus 9 480 V Emergency bus 2 (ESF bus E2)
| |
| UAT 4.160 kV bus 2 SR 3.8.1.16 automatic transfer from UAT to SUT Breakers 52/7 and 52/20 open; breakers 52/12 and 52/19 close 5
| |
| 5
| |
|
| |
|
| W-EST \Li:ik V - - - - - - - - - - - - - EAST 11 kV OA:TH 230,c '-,} - - - - - - DA.9:LINGTO COUNT Y DARLINGTON ORTH LC E 2'30 k 'V SCP'S~ LINE 2'30k V 100% Power 7~-0 11.., k\l S TAllTUP T FI NSf Or.lMEFI HV- 2 7/36/ 45/50. 4 MVA L Y- 13. 5 / 18 /22.5/25. 2 t-1 VA CEAC H>
| |
| 2j0:i!: 'i ST AR TUP' TFlttl'ISF ORME~
| |
| H'i- 2'7/3 6 / 45/ 50. "1 MVA L V- l':'.l. '5/18/22.5 /25 . 2' MYA (E ACHJ t-1 AI TRANSF GH. ER BANK 3 - 330 MVA l PH. 60HZ 2<1- D! SC- S w-Y- SUT-11 5 GEN. DISC . UNIT AUXILIAR't TRANS F ORMER # 2 LINK. HIJ44 /.C9. 2 MVA L \1 - 22/24. 6 MVA <EAC H)
| |
| S'W- lCFR-SS T- SH- 2 J OFFO SST 20
| |
| ( ~ | | ( ~ |
| SWITCHG EAR BUlLDING 46G
| |
| -* ADS 52 32 52 6)52 2B8
| |
| 'j'' 3ZB
| |
| -i- ---,.,i~0~5 I ) 52 I BB 9 !0v EMERGE CY 6~
| |
| WJJ IG OEDIC.OTEO SHUT DOWN TRANSF ORMER
| |
| !) 0 t*
| |
| ! )52 17~
| |
| 52 52 J;l?B 22B N. O.
| |
| DIESEL UENERAT OR 32'50 K'iA. 4160V , 30. 60H Z 298 6
| |
| 6 EMERGENCY DIESEL EMERGENCY []IE 5 EL
| |
| -' . JS.k V BUS 10 GE ERATOR A GENERATOR B 3125 KV A. 3 a 60HZ 31 25 K\I A. 30. 60Hl
| |
|
| |
|
| Reason for the Proposed Change SR 3.8.1.16 requires auto transfer capability for both 4.160 kV bus 2 and 480 V Emergency bus 1 Amendment 261 added 230 kV SUT and four 4.160 kV buses Direct 4.160 kV feed to 480 V Emergency bus 1 changed from bus 2 to bus 6 480 V Emergency bus 1 can now be aligned to SUT when 4.160 kV bus 2 is not Maintenance that prevents auto transfer of 4.160 kV bus 2 results in SR 3.8.1.16 not met 480 V Emergency bus 1 is aligned to offsite power, so there is no applicable TS 3.8.1 Condition SR 3.8.1.16 Note 2 does not alleviate this situation SR 3.8.1.16 -------------------------NOTE------------------------------------ | | BUlLDING 46G SWITCH G EAR |
| : 1. This Surveillance shall not be performed in MODE 1 or 2. | | - ADS 52 32 6 )52 52 2B8 |
| : 2. SR 3.8.1.16 is not required to be met if 4 .160 kV bus 2 and 480 V Emergency Bus 1 power supply is from a start up transformer.
| | 'j' ' 3ZB I I BB ) 52 WJJ OEDI C.OTE O SHU T DO WN |
| | -i----,.,i~0~ 5 9!0v EME R GE CY 6 ~ I G T RANSF ORM ER |
| | ! ) 52 52 ! ) 0 5 2 22B N. O. |
| | J; l?B U ENERAT OR DIESEL 298 17~ 32'5 0 K'iA. 4160V, 30. 60 H Z t* 6 6 |
| | EMER GE NCY DI E SEL E MERG E NC Y []IE 5 EL |
| | -'. JS.k V BUS 10 3125 KV A. 3 a 60 HZ GE ERA T OR A 31 25 K\\IA. 3 0. 60 Hl GE NERA T OR B Reason for the Proposed Change |
| | |
| | SR 3.8.1.16 requires auto transfer capability for both 4.160 kV bus 2 and 480 V Emergency bus 1 |
| | |
| | Amendment 261 added 230 kV SUT and four 4.160 kV buses Direct 4.160 kV feed to 480 V Emergency bus 1 changed from bus 2 to bus 6 480 V Emergency bus 1 can now be aligned to SUT when 4.160 kV bus 2 is not |
| | |
| | Maintenance that prevents auto transfer of 4.160 kV bus 2 results in SR 3.8.1.16 not met 480 V Emergency bus 1 is aligned to offsite power, so there is no applicable TS 3.8.1 Condition SR 3.8.1.16 Note 2 does not alleviate this situation |
| | |
| | SR 3.8.1.16 - -- -- -- --- --- -- --- ---- -- -NOTE- --- -- -------- -- --- -- -- -- --- --- -- --- |
| | : 1. T his Su rveillance sha ll no t be performed in MOD E 1 or 2. |
| | |
| | 2. SR 3.8.1.16 is no t req u ired to be met if 4.160 kV bus 2 a nd 48 0 V Emergency Bu s 1 po w e r sup ply is from a s ta rt up transformer. |
| 7 7 | | 7 7 |
|
| |
|
| ===Background=== | | ===Background=== |
| Amendment 176 (improved Standard TS) added SR 3.8.1.16 Prior to Amendment 261: | | Amendment 176 (improved Standard TS) added SR 3.8.1.16 Prior to Amendment 261: |
| ~
| |
| Unit AUXIiiary CEH. DI SC. .,l Transformer LJN~ ~
| |
| Ml.IN GEN . 2 22kV, 89 6,9 W A
| |
| ) ~ OS TRANS
| |
| )
| |
| 480V EIIIERCENCY BUS El N.0. N.O.
| |
| OS DtESEL GEN.
| |
| 8 8
| |
| EMERG. DI ESEL EMERG. Dl ESEL GEN . A GEN. B
| |
|
| |
|
| Justification TS 3.8.1 and associated Bases Required loads to consider offsite circuits operable are the ESF bus loads Amendment 176 justification for adding SR 3.8.1.16: | | Unit AUXI iiary CEH. DI SC..,l ~ |
| | Tra n sformer LJN~ ~ |
| | 22kV, 8 9 6,9 W A Ml.IN GEN. 2 |
| | |
| | ) ~ OS TRAN S ) |
| | 480V EIIIERC EN CY BUS El |
| | |
| | N.0. OS DtESEL GEN. N.O. |
| | 8 EMERG. DI ES EL GEN. A EME RG. Dl ESEL GEN. B 8 Justification |
| | |
| | TS 3.8.1 and associated Bases Required loads to consider offsite circuits operable are the ESF bus loads |
| | |
| | Amendment 176 justification for adding SR 3.8.1.16: |
| added to verify the automatic transfer of the emergency bus E1 loads from the unit auxiliary transformer to the startup transformer. | | added to verify the automatic transfer of the emergency bus E1 loads from the unit auxiliary transformer to the startup transformer. |
| Amendment 261 Direct 4.160 kV feed to 480 V Emergency bus 1 changed from 4.160 kV bus 2 to bus 6 Removal (vs. replacement) of the 4.160 kV bus better focuses SR 3.8.1.16 on the required ESF loads 9
| |
| 9
| |
|
| |
|
| Schedule Submit LAR by April 28, 2022 Implementation within 120 days of receipt of safety evaluation 10 10 | | Amendment 261 Direct 4.160 kV feed to 480 V Emergency bus 1 changed from 4.160 kV bus 2 to bus 6 |
| | |
| | Removal (vs. replacement) of the 4.160 kV bus better focuses SR 3.8.1.16 on the required ESF loads |
| | |
| | 9 9 |
| | Schedule |
| | |
| | Submit LAR by April 28, 2022 |
| | |
| | Implementation within 120 days of receipt of safety evaluation |
|
| |
|
| 11}} | | 10 10 11}} |
Letter Sequence Request |
---|
EPID:L-2022-LRM-0021, Presubmittal Licensee Presentation for SR 3.8.1.16 Proposed License Amendment Request (EPID L-2022-LRM-0021) (Slides) (Open) |
|
|
|
---|
Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24169A2712024-08-14014 August 2024 – Issuance of Amendment No. 280 to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification 5.7, High Radiation Area ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22083A1072022-03-30030 March 2022 Presubmittal Licensee Presentation for SR 3.8.1.16 Proposed License Amendment Request (EPID L-2022-LRM-0021) (Slides) ML21155A2132021-08-26026 August 2021 Plant ML20258A2712020-09-21021 September 2020 Correction Letter to Amendment Nos. 301, 329, 307, 303, 178, 317, 296, 416, 418, 417, and 268 ML20083F9272020-08-12012 August 2020 Issuance of Amendments to Relocate the Unit/Facility/Plant Staff Qualification Requirements to the Duke Energy Quality Assurance Program Description ML20058E8992020-06-18018 June 2020 Issuance of Amendment No. 267 Regarding Change to Surveillance Requirement 3.8.2.1 ML19205A2892019-09-24024 September 2019 Issuance of Amendment No. 266 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML19158A3072019-08-15015 August 2019 Issuance of Amendment No. 265, Regarding Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b RA-18-0245, License Amendment Request Proposing to Revise Technical Specification 3.8.2, AC Sources - Shutdown, Surveillance Requirement 3.8.2.12019-06-0404 June 2019 License Amendment Request Proposing to Revise Technical Specification 3.8.2, AC Sources - Shutdown, Surveillance Requirement 3.8.2.1 ML18288A1392019-04-29029 April 2019 Issuance of Amendments 171, 263 Revising Technical Specifications to Support Self Performance of Core Reload Design and Safety Analyses ML19050A2972019-04-18018 April 2019 McGuire Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, H B. Robinson Steam Electric Plant, Unit 2 - Issuance of Amendments Regarding Removal ML18200A0422018-08-16016 August 2018 Issuance of Amendment No. 260 Regarding Request to Revise Technical Specification Reactor Coolant System Pressure and Temperature Limits to Reflect 24-Month Fuel Cycles ML18172A1722018-08-15015 August 2018 Issuance of Amendments to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application ML18115A1502018-05-25025 May 2018 Issuance of Amendment 258 Regarding Request to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (CAC No. MF9544; EPID L-2017-LLA-0206) ML18060A4012018-04-10010 April 2018 Redacted Issuance of Amendments Revising TSs for Methodology Reports DPC-NE-3008-P, Revision 0, and DPC-NE-3009-P, Revision 0) (CAC Nos. MF8439 and MF8440; EPID L-2016-LLA-0012) ML17188A3872017-08-21021 August 2017 Issuance of Amendments Regarding Application to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes (CAC Nos. MF7650 Through MF7660) ML17102A9232017-05-18018 May 2017 Nonproprietary Issuance of Amendments Revising Technical Specifications for Methodology Reports DPC Ne 1008 P Revision 0, DPC Nf 2010 Revision 3 and DPC Ne 2011 P Revision 2 (CAC Nos. MF6648, MF6649, MF7693/MF7694) ML17055A6472017-05-0808 May 2017 Brunswick, Catawba, McGuire, Shearon Harris, and H. B. Robinson - Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-522, Revision 0 (CAC Nos. MF8422, MF8423, MF8424, MF8425, MF8426, MF8427, MF8428, and MF8429) ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML17039A1532017-03-23023 March 2017 H.B. Robinson, Unit 2 - Issuance of Amendment 250 to Adopt Technical Specification Task Force (TSTF) Change Traveler TSTF-339, Revision 2, "Relocate TS Parameters to the COLR," Consistent with WCAP-14483 (CAC No. MF7615) ML16337A2642017-02-0303 February 2017 Issuance of Amendments Regarding National Fire Protection Association Standard 805 ML16201A1952016-10-11011 October 2016 Issuance of Amendment to Extend Containment Leakage Test Frequencies ML16217A1182016-09-13013 September 2016 Steam Electric Plants, Shearon Harris Nuclear Power Plant,Unit 1 -Issuance of Amendments 271, 299, 152 and 246 Re Change in Corporate Form of Duke Energy Progress, Inc ML16061A4722016-04-28028 April 2016 Issuance of Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML16049A6302016-03-0808 March 2016 Issuance of Amendments Revising Technical Specifications for Methodology Report DPC-NE-2005-P Revision 5, Thermal-Hydraulic Statistical Core Design Methodology ML15222B1752015-09-0808 September 2015 Issuance of Amendment to Modify Technical Specification 3.8.1, Diesel Generator Testing Requirements ML14318A9292014-12-19019 December 2014 H. B. Robinson; Shearon Harris Nuclear Power Plant; and Crystal River, Unit 3 - Issuance of License Amendments Regarding Revision to Cyber Security Plan Implementation Schedule Completion Date (TAC Nos. MF3263 - MF3267) ML13267A2932013-10-21021 October 2013 Issuance of Amendments 263, 291, 142 and 236 Re Name Change (TAC Nos, MF1463-MF1466) ML13198A3672013-08-29029 August 2013 Issuance of an Amendment to Revise the Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*) ML13114A7142013-05-29029 May 2013 Issuance of an Amendment to Eliminate Steam Generator Water Level-Low Coincident with Steam Flow/Feedwater Flow Mismatch Function from TS Table 3.1.1-1. Reactor Protection System Instrumentation (ME9516) ML13101A3692013-05-16016 May 2013 Issuance of an Amendment on Technical Specification Changes Regarding an Additional of a Note to Limiting Conditions for Operation 3.1.4 and 3.1.7 Allowing 1-Hour Soak Time ML13017A3812013-02-26026 February 2013 Issuance of Amendments Technical Specification Change to Add Limiting Condition of Operation 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process ML13014A6412013-02-13013 February 2013 Issuance of an Amendment Request for Technical Specifications Change Regarding Corrections to Table 3.3.1 Note ML12339A0672012-12-18018 December 2012 Issuance of License Amendments Regarding Cyber Security ML12160A4092012-07-0606 July 2012 Issuance of an Amendment Regarding Technical Specifications Change for Missed Surveillances Requirements, Technical Specification Task Force (TSTF) - 358 Missed Surveillance Requirements ML11342A1652011-12-29029 December 2011 Issuance of an Amendment on Technical Specifications Related to Use of Areva'S M5 Advanced Alloy in Fuel Cladding and Fuel Assembly Components ML11193A0282011-07-29029 July 2011 Issuance of Amendments Approval of Cyber Security Plan ML1104700022011-03-0707 March 2011 Issuance of an Amendment Regarding 3.3.2 Engineered Safety Features Actuation System Instrumentation and Section 3.3.6 Containment Ventilation Isolation Instrumentation ML1009904052010-05-0707 May 2010 Issuance of Amendment Regarding Technical Specifications Changes Related to Steam Generator Alternate Repair Criteria ML1008303302010-03-25025 March 2010 Issuance of Amendment Regarding Technical Specifications Changes Related to the Chemical and Volume Control System ML1001200682010-03-17017 March 2010 Issuance of Amendment Regarding Changes to the Technical Specifications Related to the Turbine Trip Input to the Reactor Protection System ML0910302432009-05-0707 May 2009 Issuance of Amendment Regarding Elimination of Work Hour Controls to Support Compliance with Revised Part 26 of Title 10 of Code of Federal Regulations 2024-08-14
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24143A0612024-05-22022 May 2024 NRC Presentation Slides for Topical Reports to Support SLR (5-22-24 Public Meeting) V2 ML24136A2482024-05-22022 May 2024 NRC Presentation Slides for Topical Reports to Support SLR (5-22-24 Public Meeting) ML24134A0242024-05-22022 May 2024 Duke Presentation Slides Robinson-2 5-22-24 (Trs) ML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML23087A2922023-04-12012 April 2023 2022 Annual Assessment Meeting ML22301A1662022-09-29029 September 2022 Presentation 4 - Recent Biennial PI&R Team Inspection Insights ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22257A2392022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22151A2652022-05-31031 May 2022 Presubmittal Licensee Presentation for 3.3.2 ESFAS Proposed LAR ML22109A2122022-04-20020 April 2022 Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation ML22083A1072022-03-30030 March 2022 Presubmittal Licensee Presentation for SR 3.8.1.16 Proposed License Amendment Request (EPID L-2022-LRM-0021) (Slides) ML22007A2592022-02-0202 February 2022 Presubmittal Licensee Presentation for TS 3.5.3 PIV Testing LAR ML21322A3262021-11-29029 November 2021 Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request ML21174A3212021-06-24024 June 2021 Licensee Presentation for Robinson Presubmittal Meeting TSTF 577, Rev. 1 ML21167A0852021-06-24024 June 2021 Licensee Presentation for Robinson Pre-submittal Meeting TSTF-577 ML21105A7522021-04-15015 April 2021 2020 Robinson - EOC Presentation Slides ML21053A0472021-02-25025 February 2021 Duke Energy Pre-Submittal Meeting - February 25, 2021 - H. B. Robinson 3rd Interval Containment ISI Relief Request ML20132A0002020-05-11011 May 2020 EOC Presentation ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17244A2272017-09-0707 September 2017 Duke Energy Presentation - H.B. Robinson 2017-09-07 Pre-sub Transmission Upgrade Meeting ML17200C7802017-07-19019 July 2017 Duke Energy Pre-submittal Meeting Presentation, August 3, 2017, Harris and Robinson License Amendment Request to Support the Transition to Duke Non-LOCA Analysis Methods, MF9824, MF9825 ML16112A2932016-05-0202 May 2016 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) ML16105A3342016-04-20020 April 2016 H. B. Robinson Steam Electric Plant, Unit 2 - April 20, 2016, Duke Energy Presentation for 24-Month Fuel Cycle Pre-submittal Meeting (CAC No. MF7503) ML15231A6062015-08-19019 August 2015 Duke Energy Presentation - Robinson Nuclear Plant Transmission Upgrade Pre-submittal Meeting 08-26-2015 - MF6477 ML15099A5872015-04-14014 April 2015 Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson ML14181A0782014-06-30030 June 2014 June 30 NRC Slides for Public Meeting with Duke - NTTF 2.1 - Seismic Reevaluation - GMRS ML14154A0932014-06-0303 June 2014 May 28, 2014, Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13238A0542013-08-23023 August 2013 Meeting Summary - Category 1 Public Meeting Regulatory Conference, H.B. Robinson Steam Electric Plant, Docket No. 50-261 ML13150A0742013-05-29029 May 2013 Meeting Summary - Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML13127A0802013-04-18018 April 2013 Fleet Fire Protection Program NFPA 805 National Fire Protection Association NFPA 805 Pre-LAR Application for CNS, MNS, RNP ML12107A3552012-04-16016 April 2012 4/11/2012 Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML1124200662011-08-30030 August 2011 Meeting Summary - Robinson - NRC Slides ML1124200682011-08-30030 August 2011 Meeting Summary - Robinson - Progress Energy Slides ML1123601792011-08-24024 August 2011 8/25/2011- Robinson Nuclear Plant Regulatory Performance Meeting Slides ML1123603572011-08-24024 August 2011 Meeting Slides ML12083A0492011-07-20020 July 2011 Meeting Slides - Meeting with Carolina Power & Light Company to Discuss the H. B. Robinson Steam Electric Plant, Unit 2 Performance Improvement Plant and New Management ML1113703442011-05-11011 May 2011 05/11/2011 Meeting Slides Regarding Strategic Plan ML11102A0052011-04-12012 April 2011 Progress Energy - Slides for NFPA 805 Pre-LAR Application Meeting April 12, 2011 ML1108909072011-03-30030 March 2011 Slides of Meeting Regarding H.B. Robinson Annual Assessment Meeting ML1032006182010-11-16016 November 2010 Public Meeting Summary - Category One - Regulatory and Enforcement Conference Meeting (Robinson) ML1013904942010-05-12012 May 2010 Event Review for Robinson - Slides ML1011703342010-04-27027 April 2010 Summary of Category 1 Public Meeting with Carolina Power and Light Company Regarding NRC Reactor Oversight Process Annual Assessment H.B. Robinson Steam Electric Plant, Unit 2 ML0912706522009-05-0606 May 2009 Summary of Category 1 Public Meeting Discussed NRC Reactor Oversight Process Annual Assessment of H. B. Robinson, Unit 2 ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML0813706302008-05-0707 May 2008 Slides from H. B. Robinson Meeting Re. Robinson Steam Electric Plant Annual Assessment Meeting Reactor Oversight Program - Cy 2007 ML0722100412007-07-26026 July 2007 Meeting Slides NRC Region Meeting Robinson Nuclear Plant. 2024-05-22
[Table view] |
Text
Robinson / NRC Pre-submittal Meeting:
LAR to Remove 4.160 kV bus 2 from Surveillance Requirement 3.8.1.16 ( ~ DUKE March 30, 2022 ~ ENERGY Duke Energy Attendees
Lee Grzeck (Manager, Nuclear Fleet Licensing)
Joshua Duc (Nuclear Fleet Licensing)
Keith Beatty (RNP Engineering)
Alan Helms (RNP Engineering)
David Zybak (RNP Operations)
2 2
Agenda
Current and Proposed Technical Specification (TS) / Surveillance Requirement (SR)
System Design and Operation Reason for the Proposed Change
Background
Justification Schedule
3 Current and Proposed TS / SR
3.8. 1 AC Sour c es - Ope rating
LCO 3.8.1 The fo llo w ing AC electrical sou rces shall b e OPERAB LE :
a. Tw o q u a lified c irc u its be tween the o ffsite tra n smission ne twor k and the onsi te em erg en c y AC Electrica l Po w er Distribut ion Sy stem ; and
b. Tw o d iesel gene rators (DGs) capa b le of su pplying the ons ite emergenc y po w er distrib u tion su bs y stem (s).
A P PLICAB ILI T Y : MOD ES 1, 2, 3, an d 4.
SR 3.8. 1.16 - -- ---- ---- ------ -------- NOT E----- --- ------- ---- ----- -- - ------ ---
- 1. Th is Sur veillan ce shall not b e perform ed in MO DE 1or2. ~
2. SR 3.8.1. 16 is no t req u ired to be me t if 1. 160 IN b 1,Js 2 OAS 480 V Emergenc y Bus 1 po w er supply is
_ __ _ from a s tart up transformer. ~ low er case "b" I
V erify a u tomatic transfer ca p ab ility of the 1.160 It'/ b1,Js In acco rdance w ith 2 OAS 11:le 4 8 0 V Eme rgenc y bus 1 loads from the U n it the Sur veillance au x iliar y transforme r to a sta rt u p tran sformer. Freq u en cy C on trol Progra m 4
4 System Design and Operation
TS 3.8.1 Bases Design of AC electrical power system ensures power to Engineered Safety Feature (ESF) systems Offsite circuit: equipment required to transmit power from offsite transmission network to ESF buses
Normal 100% power lineup from Startup Transformers (SUT), Unit Auxiliary Transformer (UAT):
115 kV SUT 4.160 kV bus 6 480 V Emergency bus 1 (ESF bus E1) 230 kV SUT 4.160 kV bus 9 480 V Emergency bus 2 (ESF bus E2)
UAT 4.160 kV bus 2
SR 3.8.1.16 automatic transfer from UAT to SUT Breakers 52/7 and 52/20 open; breakers 52/12 and 52/19 close
5 5
W-E ST \\Li:ikV ------ ------- E AST 11 kV OA:TH 230,c '-,} ------DA.9:LI NGT O CO UN T Y DAR LI NGTON OR TH LC E 2'3 0 k 'V SCP'S~ LI NE 2'30 k V 100% Power
11..,k\\l S T AllT UP T FI NS f Or.lMEFI 2j0:i!: 'i ST AR T U P' T Flttl'ISF OR ME ~ t-1AI T RANSF GH. ER BAN K 7 HV - 2 7/36 / 45/50. 4 MV A H 'i-2'7/ 3 6 / 45 / 50. "1 M VA 3 - 330 MVA lPH. 60 H Z
~ -0 L Y-13. 5 / 18 /22.5/25. 2 t-1V A CEAC H> L V - l':'.l. '5 /1 8/22.5 /2 5. 2' MY A (E ACHJ
2<1 - D! S C-S wY - SU T-11 5
GEN. DI SC. UN IT AUXILI AR't T R ANS F ORM ER # 2 H IJ44 /.C9. 2 MV A LI NK. L \\1-22/24. 6 MVA <E AC H)
S'W - lCFR SS T-SH-2 J OFF O
S S T 20
( ~
BUlLDING 46G SWITCH G EAR
- ADS 52 32 6 )52 52 2B8
'j' ' 3ZB I I BB ) 52 WJJ OEDI C.OTE O SHU T DO WN
-i----,.,i~0~ 5 9!0v EME R GE CY 6 ~ I G T RANSF ORM ER
! ) 52 52 ! ) 0 5 2 22B N. O.
J; l?B U ENERAT OR DIESEL 298 17~ 32'5 0 K'iA. 4160V, 30. 60 H Z t* 6 6
EMER GE NCY DI E SEL E MERG E NC Y []IE 5 EL
-'. JS.k V BUS 10 3125 KV A. 3 a 60 HZ GE ERA T OR A 31 25 K\\IA. 3 0. 60 Hl GE NERA T OR B Reason for the Proposed Change
SR 3.8.1.16 requires auto transfer capability for both 4.160 kV bus 2 and 480 V Emergency bus 1
Amendment 261 added 230 kV SUT and four 4.160 kV buses Direct 4.160 kV feed to 480 V Emergency bus 1 changed from bus 2 to bus 6 480 V Emergency bus 1 can now be aligned to SUT when 4.160 kV bus 2 is not
Maintenance that prevents auto transfer of 4.160 kV bus 2 results in SR 3.8.1.16 not met 480 V Emergency bus 1 is aligned to offsite power, so there is no applicable TS 3.8.1 Condition SR 3.8.1.16 Note 2 does not alleviate this situation
SR 3.8.1.16 - -- -- -- --- --- -- --- ---- -- -NOTE- --- -- -------- -- --- -- -- -- --- --- -- ---
- 1. T his Su rveillance sha ll no t be performed in MOD E 1 or 2.
2. SR 3.8.1.16 is no t req u ired to be met if 4.160 kV bus 2 a nd 48 0 V Emergency Bu s 1 po w e r sup ply is from a s ta rt up transformer.
7 7
Background
Amendment 176 (improved Standard TS) added SR 3.8.1.16 Prior to Amendment 261:
Unit AUXI iiary CEH. DI SC..,l ~
Tra n sformer LJN~ ~
22kV, 8 9 6,9 W A Ml.IN GEN. 2
) ~ OS TRAN S )
480V EIIIERC EN CY BUS El
N.0. OS DtESEL GEN. N.O.
8 EMERG. DI ES EL GEN. A EME RG. Dl ESEL GEN. B 8 Justification
TS 3.8.1 and associated Bases Required loads to consider offsite circuits operable are the ESF bus loads
Amendment 176 justification for adding SR 3.8.1.16:
added to verify the automatic transfer of the emergency bus E1 loads from the unit auxiliary transformer to the startup transformer.
Amendment 261 Direct 4.160 kV feed to 480 V Emergency bus 1 changed from 4.160 kV bus 2 to bus 6
Removal (vs. replacement) of the 4.160 kV bus better focuses SR 3.8.1.16 on the required ESF loads
9 9
Schedule
Submit LAR by April 28, 2022
Implementation within 120 days of receipt of safety evaluation
10 10 11