| | Start date | Site | Title | Topic |
|---|
| ML25134A039 | 8 May 2025 | Columbia | Emergency Plan Implementing Procedure 13.14.11, Revision 019, EP Equipment | Health Physics Network Grab sample Met Tower Operating Basis Earthquake Cyber Security Emergency Lighting B.5.b Significance Determination Process Tone Alert Radio Earthquake Siren ANS Design Report |
| ML25077A247 | 18 March 2025 | FitzPatrick | 2025 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal | Aging Management Surveillance Frequency Control Program Turbine Missile Recently irradiated fuel Affidavit Pressure Temperature Limits Report |
| ML24311A020 | 24 October 2024 | Columbia | Energy Northwest, Emergency Preparedness Procedure 13.14.11, Revision 018, EP Equipment | Health Physics Network Grab sample Met Tower Cyber Security Emergency Lighting B.5.b Significance Determination Process Tone Alert Radio Earthquake Siren ANS Design Report |
| IR 05000416/2024012 | 17 September 2024 | Grand Gulf | License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 | Safe Shutdown High Radiation Area Fire Barrier Coatings Nondestructive Examination High Energy Line Break Aging Management Flow Accelerated Corrosion Intergranular Stress Corrosion Cracking Stress corrosion cracking Eddy Current Testing Operability Determination Moisture barrier License Renewal Subsequent License Renewal Fire Protection Program Dissimilar Metal Weld Grace period Power Uprate Thermography Spent fuel rack |
| IR 05000397/2024002 | 9 August 2024 | Columbia | Integrated Inspection Report 05000397/2024002 | Enforcement Discretion Squib Functionality Assessment FLEX Loss of Offsite Power Operability Determination Maintenance Rule Program Fire Protection Program Unidentified leak |
| ML24177A020 | 31 July 2024 | | Accident Sequence Precursor (ASP) Program Summary Description, Revision 2 | Boric Acid Ultimate heat sink Fire Barrier Probabilistic Risk Assessment Significance Determination Process Loss of Offsite Power Water hammer Reactive Inspection |
| NLS2024053, Licensee Guarantees of Payment of Deferred Premiums | 30 July 2024 | Cooper | Licensee Guarantees of Payment of Deferred Premiums | High winds Cyber Security Decommissioning Funding Plan License Renewal Uranium Hexafluoride |
| ML24176A120 | 29 July 2024 | Grand Gulf | Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b | Safe Shutdown High Radiation Area Ultimate heat sink Water Inventory Control Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Surveillance Frequency Control Program Large early release frequency Loss of Offsite Power Maintenance Rule Program Offsite Circuit |
| ML24159A027 | 30 May 2024 | Columbia | Energy Northwest, Emergency Preparedness Procedures | Health Physics Network Grab sample Met Tower Cyber Security Emergency Lighting B.5.b Significance Determination Process Tone Alert Radio Earthquake Siren ANS Design Report |
| ML24152A284 | 23 May 2024 | Grand Gulf | Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant - Redacted | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Tornado Missile Safe Shutdown Earthquake Post Accident Monitoring Operating Basis Earthquake Emergency Lighting Incorporated by reference Abnormal operational transient Tornado Missile Protection Feedwater Heater Scram Discharge Volume Sewage Treatment Plant Intergranular Stress Corrosion Cracking Feedwater Controller Failure MELLLA Stress corrosion cracking Loss of Offsite Power Excess Flow Check Valve Earthquake Fuel cladding Offsite Circuit Power Uprate Overexposure Water rod |