Line 29: Line 29:
No findings or violations of more than minor significance were identified during this inspection.
No findings or violations of more than minor significance were identified during this inspection.


This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading- rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely, Jonathan E. Greives, Chief Projects Branch 4 Division of Operating Reactor Safety
Sincerely, Jonathan E. Greives, Chief Projects Branch 4 Division of Operating Reactor Safety


Docket Nos. 05000387 and 05000388 License Nos. NPF-14 and NPF- 22
Docket Nos. 05000387 and 05000388 License Nos. NPF-14 and NPF-22


===Enclosure:===
===Enclosure:===
Line 41: Line 41:
Docket Numbers: 05000387 and 05000388
Docket Numbers: 05000387 and 05000388


License Numbers: NPF-14 and NPF- 22
License Numbers: NPF-14 and NPF-22


Report Numbers: 05000387/2024001 and 05000388/2024001
Report Numbers: 05000387/2024001 and 05000388/2024001
Line 78: Line 78:


==INSPECTION SCOPES==
==INSPECTION SCOPES==
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp- manual/inspection-procedure/index.html.
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.


Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, conducted routine reviews using IP 71152, Problem Identific ation and Resolution, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, conducted routine reviews using IP 71152, Problem Identific ation and Resolution, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Line 150: Line 150:
===Surveillance Testing (IP Section 03.01) (3 Samples)===
===Surveillance Testing (IP Section 03.01) (3 Samples)===
: (1) Unit 1 SO-150-016, Reactor Core Isolation Cooling Functional Test at Remote Shutdown Panel (1C201A), on February 20, 2024
: (1) Unit 1 SO-150-016, Reactor Core Isolation Cooling Functional Test at Remote Shutdown Panel (1C201A), on February 20, 2024
: (2) Unit 1 SI-180- 305, Quarterly Calibration of Reactor Vessel Water Level Channels LIS- B21-1N024 A, B, C, D, on February 27, 2024
: (2) Unit 1 SI-180- 305, Quarterly Calibration of Reactor Vessel Water Level Channels LIS-B21-1N024 A, B, C, D, on February 27, 2024
: (3) Unit 1 SO-124-117, Division I Diesel Generator Loss-of-Coolant Accident Loss of Offsite Power Test (Infrequently Performed Test or Evolution), on March 27 and 28, 2024
: (3) Unit 1 SO-124-117, Division I Diesel Generator Loss-of-Coolant Accident Loss of Offsite Power Test (Infrequently Performed Test or Evolution), on March 27 and 28, 2024


Line 236: Line 236:
Procedure Date
Procedure Date
Plant Corrective Action AR-2024-02277
Plant Corrective Action AR-2024-02277
Status Documents CR- 2024- 01430
Status Documents CR-2024- 01430
Resulting from CR- 2024- 02110
Resulting from CR-2024- 02110
Inspection CR- 2024- 03947
Inspection CR-2024- 03947
CR- 2024- 03949
CR-2024- 03949
CR- 2024- 03951
CR-2024- 03951
CR- 2024- 03952
CR-2024- 03952
CR- 2024- 03953
CR-2024- 03953
CR- 2024- 04823
CR-2024- 04823
CR- 2024- 04824
CR-2024- 04824
CR-2024-06207
CR-2024-06207
71111.04 Corrective Action CR-2024-05081
71111.04 Corrective Action CR-2024-05081
Documents CR- 2024- 05082
Documents CR-2024- 05082
Resulting from
Resulting from
Inspection
Inspection
Line 260: Line 260:
Documents
Documents
Corrective Action CR-2024-00490
Corrective Action CR-2024-00490
Documents CR- 2024- 01447
Documents CR-2024- 01447
Resulting from CR- 2024- 02789
Resulting from CR-2024- 02789
Inspection
Inspection


Line 290: Line 290:
Withdrawal Block Channel Functional Test
Withdrawal Block Channel Functional Test
71111.12 Corrective Action CR-2024-01248
71111.12 Corrective Action CR-2024-01248
Documents CR- 2024- 01353
Documents CR-2024- 01353
CR-2024-03014
CR-2024-03014
71111.13 Corrective Action CR-2024-04720
71111.13 Corrective Action CR-2024-04720
Documents CR- 2024- 04791
Documents CR-2024- 04791
CR-2024-05203
CR-2024-05203


Line 304: Line 304:
Tagout 24-001 'B' Emergency DG - U123RIO
Tagout 24-001 'B' Emergency DG - U123RIO
71111.15 Corrective Action CR-2023-15041
71111.15 Corrective Action CR-2023-15041
Documents CR- 2024- 00849
Documents CR-2024- 00849
CR-2024-00919
CR-2024-00919
Corrective Action CR-2024-01752
Corrective Action CR-2024-01752
Documents CR- 2024- 04123
Documents CR-2024- 04123
Resulting from
Resulting from
Inspection
Inspection
Line 316: Line 316:
Work Orders 2261092
Work Orders 2261092
71111.20 Corrective Action CR-2024-04826
71111.20 Corrective Action CR-2024-04826
Documents CR- 2024- 04827
Documents CR-2024- 04827
Resulting from CR- 2024- 04829
Resulting from CR-2024- 04829
Inspection
Inspection
Miscellaneous Shutdown Safety Rick Management Plan Unit 1 23rd Revision 0
Miscellaneous Shutdown Safety Rick Management Plan Unit 1 23rd Revision 0
Line 324: Line 324:
Shutdown Level Instrument
Shutdown Level Instrument
71111.24 Corrective Action CR-2024-04694
71111.24 Corrective Action CR-2024-04694
Documents CR- 2024- 04695
Documents CR-2024- 04695
Resulting from
Resulting from
Inspection
Inspection
Line 350: Line 350:
DI-2023- 06217
DI-2023- 06217
DI-2023- 08562
DI-2023- 08562
DI-2023- 10392
DI-2023-10392
DI-2023- 11422
DI-2023-11422
DI-2023- 11503
DI-2023-11503
DI-2023- 12847
DI-2023-12847
DI-2023- 16148
DI-2023-16148
DI-2023- 17495
DI-2023-17495
DI-2023- 18867
DI-2023-18867
DPA-01- DI-2023-00427
DPA-01-DI-2023-00427
DPA-02- DI-2023-00427
DPA-02-DI-2023-00427
DPA-03- DI-2023-00427
DPA-03-DI-2023-00427
DPA-04- DI-2023-00427
DPA-04-DI-2023-00427
DPA-05- DI-2023-00427
DPA-05-DI-2023-00427
DPA-06-DI-2023-00427
DPA-06-DI-2023-00427


DPA-07-DI-2023-00427
DPA-07-DI-2023-00427
DPA-08- DI-2023-00427
DPA-08-DI-2023-00427
DPA-09- DI-2023-00427
DPA-09-DI-2023-00427
DPA-10- DI-2023-00427
DPA-10- DI-2023-00427
DPA-11- DI-2023-00427
DPA-11-DI-2023-00427
DPA-12-DI-2023-00427
DPA-12-DI-2023-00427


13
13
}}
}}

Latest revision as of 14:11, 4 October 2024

Integrated Inspection Report 05000387/2024001 and 05000388/2024001
ML24134A093
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/13/2024
From: Jon Greives
NRC/RGN-I/DORS
To: Berryman B
Susquehanna
References
IR 2024001
Download: ML24134A093 (1)


Text

May 13, 2024

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 -

INTEGRATED INSPECTION REPORT 05000387/2024001 AND 05000388/2024001

Dear Brad Berryman:

On March 31, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Susquehanna Steam Electric Station, Units 1 and 2. On April 29, 2024, the NRC inspectors discussed the results of this inspection with Edward Casulli, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jonathan E. Greives, Chief Projects Branch 4 Division of Operating Reactor Safety

Docket Nos. 05000387 and 05000388 License Nos. NPF-14 and NPF-22

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000387 and 05000388

License Numbers: NPF-14 and NPF-22

Report Numbers: 05000387/2024001 and 05000388/2024001

Enterprise Identifier: I-2024-001- 0053

Licensee: Susquehanna Nuclear, LLC

Facility: Susquehanna Steam Electric Station, Units 1 and 2

Location: 769 Salem Blvd., Berwick PA

Inspection Dates: January 1, 2024 to March 31, 2024

Inspectors: J. England, Senior Resident Inspector E. Brady, Resident Inspector H. Anagnostopoulos, Senior Health Physicist A. Kostick, Health Physicist

Approved By: Jonathan E. Greives, Chief Projects Branch 4 Division of Operating Reactor Safety

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Susquehanna Steam Electric Station,

Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period at rated thermal power and was at or near full rated thermal power with the following exceptions. On January 19, 2024, the unit was down powered to percent for a rod pattern adjustment and returned to rated thermal power. On February 2, 2024, the unit was down powered to approximately 81 percent for a rod pattern adjustment and channel distortion testing and returned to rated thermal power. On February 9, 2024, the unit was down powered to approximately 83 percent for a rod pattern adjustment and returned to rated thermal power. On February 23, 2024, the unit was down powered to approximately 92 percent for a rod pattern adjustment and returned to rated thermal power. On February 24, 2024, the unit commenced coast down and shut down for the refueling outage on March 25, 2024, and remained shut down for the remainder of the inspection period.

Unit 2 began the inspection period at rated thermal power and was at or near full rated thermal power with the following exception. On March 22, 2024, the unit was down powered to approximately 59 percent for a rod sequence exchange. The unit was returned to rated thermal power on March 23, 2024, and remained at or near rated thermal power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, conducted routine reviews using IP 71152, Problem Identific ation and Resolution, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1 residual heat removal on January 4, 2024
(2) Unit 2 'A' core spray during 'B' core spray surveillance testing on January 11, 2024
(3) Unit 1 standby gas treatment during 'C' essential service supply bus work and fuel moves (Yellow risk) on March 31, 2024

71111.05 - Fire Protection

Fire Area Walkdown and Inspection (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit Common control structure, 806-foot elevation, standby gas treatment room, fire zone (FZ) 0-30A, on January 3, 2024
(2) Unit 1 reactor building, 749-foot elevation, FZ 1-5A-N, 1-5A-S, and 1-5A-W, on January 8, 2024
(3) Units 1 and 2 reactor building, 818-foot elevation, refueling bay, FZ 0-8A, on January 24, 2024
(4) Unit 2 reactor building, 645-foot elevation, high-pressure coolant injection pump room, FZ 2-1C, on February 21, 2024
(5) Unit 1 turbine building, 656, 676, and 699-foot elevations, condenser gallery, mezzanine, pad 1 and 2, FZ 1-31D, 1-32D, and 1-33C on March 27, 2024

Fire Brigade Drill Performance (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated fire brigade performance during an unannounced fire drill on February 28, 2024.

71111.07A - Heat Exchanger/Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) Unit 1 'A' residual heat removal heat exchanger

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during shutdown and cooldown for the Unit 1 planned refueling outage on March 24 and 25, 2024.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed Unit 1 simulator and classroom training for plant shutdown and cooldown on March 20, 2024.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components remain capable of performing their intended function:

(1) Unit Common 'E' emergency diesel generator on January 22, 2024

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 1 division 1 planned work on core spray system on January 9, 2024
(2) Unit 2 division 1 planned work on residual heat removal heat exchanger bypass valve during the week of January 29, 2024
(3) Unit 1 elevated risk during reactor vessel disassembly during the week of March 25, 2024
(4) Unit 1 bus outage on 1A203 on March 30 and 31, 2024

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Unit 1 high-pressure coolant injection with water in lube oil system on January 11, 2024
(2) Unit 2 'B' core spray pump due to breaker instantaneous overcurrent flag on January 12, 2024
(3) Unit Common loss of 1D240 due to failure of uninterruptable power supply battery bank on March 28, 2024

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Partial)

(1) (Partial)

The inspectors evaluated Unit 1 refueling outage U123RIO activities from March 25 to 31, 2024. The inspectors completed sections a., b.1, b.2, c.3, c.4, c.6, c.7, and c.8.

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (IP Section 03.01) (2 Samples)

(1) Unit Common 'C' emergency diesel generator planned maintenance and unplanned fuel line replacement on January 25, 2024
(2) Unit Common emergency service water pipe replacement on February 15, 2024

Surveillance Testing (IP Section 03.01) (3 Samples)

(1) Unit 1 SO-150-016, Reactor Core Isolation Cooling Functional Test at Remote Shutdown Panel (1C201A), on February 20, 2024
(2) Unit 1 SI-180- 305, Quarterly Calibration of Reactor Vessel Water Level Channels LIS-B21-1N024 A, B, C, D, on February 27, 2024
(3) Unit 1 SO-124-117, Division I Diesel Generator Loss-of-Coolant Accident Loss of Offsite Power Test (Infrequently Performed Test or Evolution), on March 27 and 28, 2024

Inservice Testing (IP Section 03.01) (1 Sample)

(1) Unit 2 SO-250-002, Quarterly Reactor Core Isolation Cooling Flow Verification, on January 25, 2024

Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)

(1) Unit 1 SE-159-023, Local Leak-Rate Test of Main Steam Line Isolation Valves Penetration Number X-7C, on March 25, 2024

71114.06 - Drill Evaluation

Required Emergency Preparedness Drill (1 Sample)

(1) The inspectors evaluated the conduct of an emergency preparedness drill including a dropped fuel rod and a leak in the spent fuel pool on February 21,

RADIATION SAFETY

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

Permanent Ventilation Systems (IP Section 03.01) (1 Sample)

The inspectors evaluated the configuration of the following permanently installed ventilation systems:

(1) Unit 1 reactor building, zone 3, high-efficiency particulate air and charcoal filter units 1F216A, 1F217A, and 1F218A

Temporary Ventilation Systems (IP Section 03.02) (1 Sample)

The inspectors evaluated the configuration of the following temporary ventilation systems:

(1) High-efficiency particulate air ventilation unit servicing the down-draft step off pad system on the 818-foot elevation of the refueling floor

Use of Respiratory Protection Devices (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the licensees use of respiratory protection devices.

Self-Contained Breathing Apparatus for Emergency Use (IP Section 03.04) (1 Sample)

(1) The inspectors evaluated the licensees use and maintenance of self-contained breathing apparatuses.

71124.04 - Occupational Dose Assessment

Source Term Characterization (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated licensee performance as it pertains to radioactive source term characterization.

External Dosimetry (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated how the licensee processes, stores, and uses external dosimetry.

Internal Dosimetry (IP Section 03.03) (2 Samples)

The inspectors evaluated the following internal dose assessments:

(1) Internal dose calculation for employee Kxxxxx6 for an event on April 15, 2023
(2) Internal dose calculation for employee Jxxxxxxxxxx2 for an event on April 15, 2023

Special Dosimetric Situations (IP Section 03.04) (2 Samples)

The inspectors evaluated the following special dosimetric situations:

(1) Licensee procedures for limiting exposures for declared pregnant workers, including a review of completed declarations
(2) Shallow dose equivalent evaluation for a personnel contamination event on March 31,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours (IP Section 02.01)===

(1) Unit 1 January 1, 2023 through December 31, 2023
(2) Unit 2 January 1, 2023 through December 31, 2023

IE03: Unplanned Power Changes per 7000 Critical Hours (IP Section 02.02) (2 Samples)

(1) Unit 1 January 1, 2023 through December 31, 2023
(2) Unit 2 January 1, 2023 through December 31, 2023

IE04: Unplanned Scrams with Complications (IP Section 02.03) (2 Samples)

(1) Unit 1 January 1, 2023 through December 31, 2023
(2) Unit 2 January 1, 2023 through December 31, 2023

BI01: Reactor Coolant System Specific Activity (IP Section 02.10) (2 Samples)

(1) Unit 1 January 1, 2023 through December 31, 2023
(2) Unit 2 January 1, 2023 through December 31, 2023

BI02: Reactor Coolant System Leak Rate (IP Section 02.11) (2 Samples)

(1) Unit 1 January 1, 2023 through December 31, 2023
(2) Unit 2 January 1, 2023 through December 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On February 7, 2024, the inspectors presented the in-plant airborne radioactivity control and mitigation inspection results to Derek Jones, Plant Manager, and other members of the licensee staff.
  • On February 7, 2024, the inspectors presented the occupational dose assessment inspection results to Derek Jones, Plant Manager, and other members of the licensee staff.
  • On April 29, 2024, the inspectors presented the integrated inspection results to Edward Casulli, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

Plant Corrective Action AR-2024-02277

Status Documents CR-2024- 01430

Resulting from CR-2024- 02110

Inspection CR-2024- 03947

CR-2024- 03949

CR-2024- 03951

CR-2024- 03952

CR-2024- 03953

CR-2024- 04823

CR-2024- 04824

CR-2024-06207

71111.04 Corrective Action CR-2024-05081

Documents CR-2024- 05082

Resulting from

Inspection

Drawings E106256 Susquehanna SES Unit 1 P&ID Residual Heat Removal Revision 72

E106680 P&ID HVAC Control Diagram Reactor Building Standby Revision 35

Gas Treatment System, Sheet 3

M-2152 Unit 2 Core Spray P&ID Revision 31

Procedures CL-070-0012 Standby Gas Treatment System Mechanical Revision 11

SO-251-001A Monthly Core Spray A Loop Discharge Line Filled and Revision 2

Valve Alignment Verification

71111.05 Corrective Action CR-2024-03071

Documents

Corrective Action CR-2024-00490

Documents CR-2024- 01447

Resulting from CR-2024- 02789

Inspection

71111.05 Fire Plans FP-1-CS-806-A Control Structure - El. 806 Revision 0

FP-1-RB-749 Susquehanna SES Prefire Plan Unit 1 749 Revision 0

FP-1-RB-818 Susquehanna Prefire Plan Revision 0

FP-1-TB-656-13 Condenser Pad 1 (FZ 1-31D) Revision 0

FP-1-TB-656-14 Condenser Pad 2 (FZ 1-31D) Revision 0

FP-1-TB-676-12 Condenser Gallery (FZ 1-32D) Revision 0

FP-1-TB-699-8 Condenser Mezzanine (FZ 1-33C) Revision 0

FP-2-RB-818 Susquehanna Prefire Plan Revision 0

Procedures NDAP-QA-0409 Door Floor, Plug, and Hatch Control Revision 24

NDAP-QA-0440 Control of Transient/Combustible/Hazardous Material Revision 28

71111.07A Corrective Action CR-2024-04915

Documents

Resulting from

Inspection

Procedures M-1453 Nuclear Engineer Specification for Heat Revision 9

Exchanger Tube Plugging

MT-116-002 RHR Heat Exchanger Cleaning, Inspection, and Repair Revision 17

Work Orders 2576462

71111.11Q Procedures GO-100-004 Plant Shutdown to Minimum Power Revision 91

GO-100-005 Plant Shutdown to Hot/Cold Shutdown Revision 75

OP-103-001 13.8 KV Electrical System Revision 38

SI-178-215A Functional Test and Signal to Noise Ratio Test of Source Revision 13

Range Monitor (SRM) Channel 1A (SRM-C51-1K600A)

SO-156-009 Reactor Mode Switch in Shutdown Control Rod Revision 5

Withdrawal Block Channel Functional Test

71111.12 Corrective Action CR-2024-01248

Documents CR-2024- 01353

CR-2024-03014

71111.13 Corrective Action CR-2024-04720

Documents CR-2024- 04791

CR-2024-05203

71111.13 Procedures NDAP-QA-0340 Protected Equipment Program Revision 43

ON-YPNL-101 Loss of Instrument Bus Revision 14

Tagout 03-001 Outage Offsite Power - U123RIO

Tagout 04-001 1A203 - ESS Bus 1C OOS - U123RIO

Tagout 16-001 RHRSW 1B Pump - U123RIO

Tagout 24-001 'D' Emergency DG - U123RIO

Tagout 24-001 'B' Emergency DG - U123RIO

71111.15 Corrective Action CR-2023-15041

Documents CR-2024- 00849

CR-2024-00919

Corrective Action CR-2024-01752

Documents CR-2024- 04123

Resulting from

Inspection

Drawings E-156 Susquehanna SES Unit 2 Schematic Diagram Revision 19

Core Spray Pump 2B

Miscellaneous HPCI HV-155-F001 Adverse Condition Monitoring and Contingency Plan Revision 6

Unit 1 (Steam Admission Valve) Seat Leakage

Work Orders 2261092

71111.20 Corrective Action CR-2024-04826

Documents CR-2024- 04827

Resulting from CR-2024- 04829

Inspection

Miscellaneous Shutdown Safety Rick Management Plan Unit 1 23rd Revision 0

Refueling and Inspection Outage

Procedures IC-180-005 Installation and Removal of Temporary Unit 1 RPV Revision 10

Shutdown Level Instrument

71111.24 Corrective Action CR-2024-04694

Documents CR-2024- 04695

Resulting from

Inspection

71111.24 Procedures MT-024-024 Diesel Engine Analysis and Load Balancing Revision 23

SE-159-023 LLRT of Main Steam Line Isolation Valves Penetration Revision 24

Number X-7C

SI-180-305 Quarterly Calibration of Reactor Vessel Water Level Revision 37

Channels LIS-B21-1N024 A, B, C, D

SO-024-001C Monthly Diesel Generator 'C' Operability Test Revision 29

SO-124-117 Division I Diesel Generator LOCA LOOP Test Revision 11

(Infrequently Performed Test or Evolution)

SO-150-016 RCIC Functional Test at Remote Shutdown Panel Revision 2

(1C201A)

SO-250-002 Quarterly RCIC Flow Verification Revision 61

Work Orders 2511404

2575640-0

2669143

RTSV 2682036

71114.06 Procedures EP-104-1003 Drill and Exercise Evaluation Revision 2

71151 Corrective Action DI-2023-00514

Documents DI-2023- 02217

DI-2023- 03680

DI-2023- 04608

DI-2023- 06217

DI-2023- 08562

DI-2023-10392

DI-2023-11422

DI-2023-11503

DI-2023-12847

DI-2023-16148

DI-2023-17495

DI-2023-18867

DPA-01-DI-2023-00427

DPA-02-DI-2023-00427

DPA-03-DI-2023-00427

DPA-04-DI-2023-00427

DPA-05-DI-2023-00427

DPA-06-DI-2023-00427

DPA-07-DI-2023-00427

DPA-08-DI-2023-00427

DPA-09-DI-2023-00427

DPA-10- DI-2023-00427

DPA-11-DI-2023-00427

DPA-12-DI-2023-00427

13