ML20084M294: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20084M294
| number = ML20084M294
| issue date = 03/30/1984
| issue date = 03/30/1984
| title = Updates 820728 Response to NRC 810203 Ltr Re Violations Noted in IE Insp Rept 50-363/80-02.Corrective Actions: Stabilization & Revegetation of Dredge Spoil Slope North of Firepond Completed on 830615
| title = Updates 820728 Response to NRC Re Violations Noted in IE Insp Rept 50-363/80-02.Corrective Actions: Stabilization & Revegetation of Dredge Spoil Slope North of Firepond Completed on 830615
| author name = Fiedler P
| author name = Fiedler P
| author affiliation = GENERAL PUBLIC UTILITIES CORP.
| author affiliation = GENERAL PUBLIC UTILITIES CORP.
Line 27: Line 27:
==Subject:==
==Subject:==
Forked River Nuclear Station (FRNS)
Forked River Nuclear Station (FRNS)
Docket No. 50-363 Licensing No. CPPR-96 Inspection No. 80-02 This letter is to provide you with a further update of the soil erosion control and stabilization projects being undertaken at the Forked River Site as stated in our July 28, 1982 letter. Below is a listing, by area, of the progress made since July 28, 1982:
Docket No. 50-363 Licensing No. CPPR-96 Inspection No. 80-02 This letter is to provide you with a further update of the soil erosion control and stabilization projects being undertaken at the Forked River Site as stated in our {{letter dated|date=July 28, 1982|text=July 28, 1982 letter}}. Below is a listing, by area, of the progress made since July 28, 1982:
: 1) Dredge spoil slope north of the firepond and south of sedimentation basin #3. Stabilization and revegetation of area was completed on June 15, 1983.
: 1) Dredge spoil slope north of the firepond and south of sedimentation basin #3. Stabilization and revegetation of area was completed on June 15, 1983.
: 2) The banks of Oyster Creek between the southern access road to FRNS and the Oyster Creek Nuclear Generating Station (OCNGS)
: 2) The banks of Oyster Creek between the southern access road to FRNS and the Oyster Creek Nuclear Generating Station (OCNGS)

Latest revision as of 23:36, 25 September 2022

Updates 820728 Response to NRC Re Violations Noted in IE Insp Rept 50-363/80-02.Corrective Actions: Stabilization & Revegetation of Dredge Spoil Slope North of Firepond Completed on 830615
ML20084M294
Person / Time
Site: 05000363
Issue date: 03/30/1984
From: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20084M287 List:
References
NUDOCS 8405150302
Download: ML20084M294 (1)


Text

e

. -o

s. ,

GPU Nuclear Corporation NLiwm d

u

' '"" *" '"* v Parsippany, New Jersey 07054 201 263-6500 TELEX 136-482 Writer's Direct Dial Number:

March 30, 1984 Regional Administrator Region I United States Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Gentlemen:

Subject:

Forked River Nuclear Station (FRNS)

Docket No. 50-363 Licensing No. CPPR-96 Inspection No. 80-02 This letter is to provide you with a further update of the soil erosion control and stabilization projects being undertaken at the Forked River Site as stated in our July 28, 1982 letter. Below is a listing, by area, of the progress made since July 28, 1982:

1) Dredge spoil slope north of the firepond and south of sedimentation basin #3. Stabilization and revegetation of area was completed on June 15, 1983.
2) The banks of Oyster Creek between the southern access road to FRNS and the Oyster Creek Nuclear Generating Station (OCNGS)

Discharge Canal. Revised permit app 11 cations have been filed with the Ocean County Soil Conservation District for work to be conducted in this area. Work will be initiated upon receipt of required permits; area to be revegetated in 1984-85.

3) The backfill soil stockpile. The stockpiled soil is to be used as fill to backfill the Forked River excavation site. After completion of this activity, the pile site wf11 be revegetated.

Future updates on the work will be provided as the work is completed. In the meantime, should you have any questions, please contact Mr. Douglas F. Moore of our Environmental Licensing Section at (609) 971-4630.

Very truly yours,

^

8405150302 040511 F S >> J PDR ADOCK 05000363 G . . 1edler PDR Vice President / Director Oyster Creek dis:0444f:0012f GPU Nuclear Corporation is a subsidiary of the General Pubhc Utikties Corporahon