Letter Sequence Supplement |
---|
|
|
MONTHYEARML20063C3101982-04-26026 April 1982 Forwards Response to Open Items Identified in 820225 Safety Evaluation Re NUREG-0612,control of Heavy Loads Project stage: Other ML20093K2491984-10-0909 October 1984 Forwards Supplemental Info to 820426 Response to SER Re Control of Heavy Loads.Info Includes Discussion of Special Lifting Devices & Tech Spec Restriction on Loads Carried Over Spent Fuel Pool Project stage: Supplement ML20100R6341984-11-27027 November 1984 Control of Heavy Loads,Duquesne Light Co,Beaver Valley Power Station Unit 1, Technical Evaluation Rept Project stage: Other 1984-10-09
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARIR 05000412/19990071999-10-21021 October 1999 Refers to Special Team Insp 50-412/99-07 Conducted from 990720-29 & Forwards Nov.Two Violations Identified.First Violation Involved Failure to Implement C/A to Prevent Biofouling of Service Water System ML20217M1591999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates L-99-143, Informs That Subsequent Review of Approval Ltrs & SE for Relief Requests 1TYP-2-B5.40-1 (Rev 0),BV1-RV-AUG (Rev 1), BV2-RV-AUG (Rev 1),BV3-IWA-1 (Rev 1) & BV3-IWA-2 (Rev 1) Identified Erroneous Statements Which Dl Wishes to Correct1999-10-11011 October 1999 Informs That Subsequent Review of Approval Ltrs & SE for Relief Requests 1TYP-2-B5.40-1 (Rev 0),BV1-RV-AUG (Rev 1), BV2-RV-AUG (Rev 1),BV3-IWA-1 (Rev 1) & BV3-IWA-2 (Rev 1) Identified Erroneous Statements Which Dl Wishes to Correct L-99-152, Submits Relief Request BV3-N-533-1,rev 0,requesting Use of ASME Approved Code Case N-553-1, Alternative Requirements for VT-2 Visual Examination of Class 1,2 & 3 Insulated Pressure Retaining Bolted Connections1999-10-11011 October 1999 Submits Relief Request BV3-N-533-1,rev 0,requesting Use of ASME Approved Code Case N-553-1, Alternative Requirements for VT-2 Visual Examination of Class 1,2 & 3 Insulated Pressure Retaining Bolted Connections ML20217C6741999-10-0808 October 1999 Forwards RAI Re Licensee 970128 Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, . Response Requested within 60 Days of Receipt of Ltr L-99-151, Responds to NRC Re Violations Noted in Insp Rept 50-412/99-07.Corrective Actions:Condition Repts Were Written for Listed Issues So That Repts Could Be Addressed Using BVPS Corrective Action Program1999-10-0707 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-412/99-07.Corrective Actions:Condition Repts Were Written for Listed Issues So That Repts Could Be Addressed Using BVPS Corrective Action Program ML20217E0301999-10-0707 October 1999 Forwards Insp Repts 50-334/99-06 & 50-412/99-06 on 990809-13 & 990823-27.Violation Noted Involving Failure to Correctly Translate Design Change Re Pertinent Operating Logs & Plant Equipment Labeling ML20212M2661999-09-30030 September 1999 Forwards Order Approving Transfer of Licenses for Beaver Valley from Dlc to Pennsylvania Power Co & Approving Conforming Amends in Response to 990505 Application ML20212K8071999-09-30030 September 1999 Informs That on 990916,NRC Staff Completed mid-cycle Plant Performance Review (PPR) of Facility.Staff Conducted Reviews of All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility ML20216J9621999-09-30030 September 1999 Forwards Insp Repts 50-334/99-05 & 50-412/99-05 on 990725-0904.Two Violations Noted & Being Treated as Ncvs.One Violation Re Failure to Follow Operation Manual Procedure Associated with Configuration Control Identified L-99-149, Informs NRC That Items Identified in 990629 Response to GL 98-01 Have Been Completed.Attached Table Submitted with Has Been Updated to Reflect Completion1999-09-28028 September 1999 Informs NRC That Items Identified in 990629 Response to GL 98-01 Have Been Completed.Attached Table Submitted with Has Been Updated to Reflect Completion L-99-148, Notifies NRC of License Withdrawal of M Linch,License SOP-11478 IAW 10CFR50.74.M Linch Resigned from Employment at Bvps,Effective 9908171999-09-24024 September 1999 Notifies NRC of License Withdrawal of M Linch,License SOP-11478 IAW 10CFR50.74.M Linch Resigned from Employment at Bvps,Effective 990817 ML20212G0601999-09-23023 September 1999 Forwards Answer of Duquesne Light Co to Petition to Waive Time Limits & Suppl Comments of Local 29, Intl Brotherhood of Electrical Workers.Copies of Answer Have Been Served to Parties & Petitioner by e-mail or Facsimile ML20212C5521999-09-21021 September 1999 Forwards for Filing,Answer to Firstenergy Nuclear Operating Co & Pennsylvania Power Co in Opposition to Petition to Waive Time Limits & Suppl Comments of Local 29 Intl Brotherhood of Electrical Workers L-99-144, Forwards NRC Form 536 Which Addresses Util Proposed Operator Licensing Exam Schedule,In Response to Administrative Ltr 99-031999-09-20020 September 1999 Forwards NRC Form 536 Which Addresses Util Proposed Operator Licensing Exam Schedule,In Response to Administrative Ltr 99-03 ML20212B3291999-09-16016 September 1999 Forwards for Filing,Petition to Waive Time Limits in 10CFR2.1305 & Supplemental Comments of Local 29,Intl Brotherhood of Electrical Workers Re Beaver Valley Power Station,Units 1 & 2 L-99-134, Provides Addl Info to Support 990617 LAR 127,proposing Mods to Heatup,Cooldown & Overpressure Protection Curves.Info Is Provided to Formally Docket Info Discussed During 990820 Telcon with NRC1999-09-15015 September 1999 Provides Addl Info to Support 990617 LAR 127,proposing Mods to Heatup,Cooldown & Overpressure Protection Curves.Info Is Provided to Formally Docket Info Discussed During 990820 Telcon with NRC ML20211Q3431999-09-0808 September 1999 Informs That During 990903 Telcon Between L Briggs & T Kuhar,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant,Unit 1.Insp Planned for Wk of 991115 ML20211Q5601999-09-0707 September 1999 Forwards Insp Rept 50-412/99-07 on 990720-29.Three Apparent Violations Noted & Being Considered for Escalated Ea. Violations Involve Failure to Implement C/As to Prevent bio- Fouling of Svc Water Sys L-99-138, Forwards Rev 37 to Issue 4 for BVPS Physical Security Plan (PSP) (Base Plan,Safeguards Contingency Plan & Training & Qualification Plan).Changes to Plan Are Listed.Encls Withheld Per 10CFR2.790(d)1999-09-0303 September 1999 Forwards Rev 37 to Issue 4 for BVPS Physical Security Plan (PSP) (Base Plan,Safeguards Contingency Plan & Training & Qualification Plan).Changes to Plan Are Listed.Encls Withheld Per 10CFR2.790(d) L-99-136, Forwards Data Point Library (Dpl) Changes,Iaw Provisions of 10CFR50,App E,Section VI.3.a & NUREG-1394,Rev 1,Section 3.6, Administrative Implementation Requirements. Ten Listed Dpls Have Specific Setpoint Values Removed,Per Unit 2 Dpls1999-09-0202 September 1999 Forwards Data Point Library (Dpl) Changes,Iaw Provisions of 10CFR50,App E,Section VI.3.a & NUREG-1394,Rev 1,Section 3.6, Administrative Implementation Requirements. Ten Listed Dpls Have Specific Setpoint Values Removed,Per Unit 2 Dpls L-99-098, Forwards Proposed Changes to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Change Would Reduce Operations QA Program Description Commitments by Limiting Required Onsite Safety Committee Reviews of Mods1999-09-0202 September 1999 Forwards Proposed Changes to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Change Would Reduce Operations QA Program Description Commitments by Limiting Required Onsite Safety Committee Reviews of Mods L-99-137, Forwards Issue 3,rev 3 to Bvps,Unit 1 Inservice Testing Program for Pumps & Valves. Encl 1 Provides Summary of IST Program Changes Which Have Been Incorporated Into Issue 3, Rev 31999-08-31031 August 1999 Forwards Issue 3,rev 3 to Bvps,Unit 1 Inservice Testing Program for Pumps & Valves. Encl 1 Provides Summary of IST Program Changes Which Have Been Incorporated Into Issue 3, Rev 3 L-99-022, Forwards Issue 2,Rev 1 to Bvps,Unit 2 Inservice Testing (IST) Program for Pumps & Valves. Summary of Changes,Encl1999-08-31031 August 1999 Forwards Issue 2,Rev 1 to Bvps,Unit 2 Inservice Testing (IST) Program for Pumps & Valves. Summary of Changes,Encl L-99-012, Forwards Proposed Change to Bvps,Units 1 & 2,operations QA Program Description,Per 10CFR50.54(a)(3)(ii),including Description of Proposed Change,Reason for Change & Basis for Concluding Revised Program Satisfy 10CFR50,App B1999-08-30030 August 1999 Forwards Proposed Change to Bvps,Units 1 & 2,operations QA Program Description,Per 10CFR50.54(a)(3)(ii),including Description of Proposed Change,Reason for Change & Basis for Concluding Revised Program Satisfy 10CFR50,App B L-99-037, Forwards Proposed Change to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Attachment 1 Further Describes Proposed Change & Identifies Reason for Change1999-08-30030 August 1999 Forwards Proposed Change to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Attachment 1 Further Describes Proposed Change & Identifies Reason for Change L-99-132, Forwards fitness-for-duty Program Six Month Rept for 990101-990630 for Bvps,Units 1 & 21999-08-26026 August 1999 Forwards fitness-for-duty Program Six Month Rept for 990101-990630 for Bvps,Units 1 & 2 05000412/LER-1999-007, Forwards LER 99-007-00, Forced Shutdown Due to Inoperable EDG, Per 10CFR50.73(a)(2)(i).Rept Is Delayed Due to Util Needing Addl Three Days to Address Event Issues on Reportability & Provide Addl Safety Implications Info1999-08-19019 August 1999 Forwards LER 99-007-00, Forced Shutdown Due to Inoperable EDG, Per 10CFR50.73(a)(2)(i).Rept Is Delayed Due to Util Needing Addl Three Days to Address Event Issues on Reportability & Provide Addl Safety Implications Info ML20211A5111999-08-18018 August 1999 Forwards Insp Repts 50-334/99-04 & 50-412/99-04 on 990613- 990724.One Violation Noted & Treated as Non-Cited Violation Involved Failure to Maintain Containment Equipment Hatch Closed During Fuel Movement L-99-127, Provides Response to NRC Ltr Requesting Review & Comment of NRC Reactor Vessel Structural Integrity Database by 990901.Inconsistencies Noted in Way Data Characterizes Condition of Reactor Vessel1999-08-17017 August 1999 Provides Response to NRC Ltr Requesting Review & Comment of NRC Reactor Vessel Structural Integrity Database by 990901.Inconsistencies Noted in Way Data Characterizes Condition of Reactor Vessel L-99-124, Requests Withdrawal of Editorial Changes That Do Not Pertain to Transfer of Operating Authority or Plant Ownership That Are Proposed in LARs 269 & 144.Revised mark-up License Pages Reflecting Changes,Attached1999-07-30030 July 1999 Requests Withdrawal of Editorial Changes That Do Not Pertain to Transfer of Operating Authority or Plant Ownership That Are Proposed in LARs 269 & 144.Revised mark-up License Pages Reflecting Changes,Attached L-99-121, Submits Data Point Library (Dpl) Changes,Iaw Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394,rev 1,Section 3.6, Administrative Implementation Reqiurements1999-07-28028 July 1999 Submits Data Point Library (Dpl) Changes,Iaw Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394,rev 1,Section 3.6, Administrative Implementation Reqiurements L-99-118, Forwards Response to NRC AL 99-02,request for Info Re Estimate of Number of New Licensing Actions Expected to Be Submitted in Fy 2000 & 20011999-07-25025 July 1999 Forwards Response to NRC AL 99-02,request for Info Re Estimate of Number of New Licensing Actions Expected to Be Submitted in Fy 2000 & 2001 L-99-120, Forwards Annual Rept of Facility Changes,Tests & Experiments for BVPS Unit 1,IAW 10CFR50.59.Rept Provides Brief Description of Each Facility & Procedure Change & Summary of Safety Evaluations1999-07-22022 July 1999 Forwards Annual Rept of Facility Changes,Tests & Experiments for BVPS Unit 1,IAW 10CFR50.59.Rept Provides Brief Description of Each Facility & Procedure Change & Summary of Safety Evaluations L-99-119, Forwards Rev 17 to UFSAR for Beaver Power Station,Unit 1. Submittal Reflects Changes to Facility & Procedures as Described in UFSAR That Were Completed During Annual Reporting Period Endinig 9901221999-07-20020 July 1999 Forwards Rev 17 to UFSAR for Beaver Power Station,Unit 1. Submittal Reflects Changes to Facility & Procedures as Described in UFSAR That Were Completed During Annual Reporting Period Endinig 990122 L-99-113, Forwards Final,Typed TS Pages for LARs 262 & 135,previously Submitted with Editorial Changes Identified by1999-07-15015 July 1999 Forwards Final,Typed TS Pages for LARs 262 & 135,previously Submitted with Editorial Changes Identified by L-99-111, Forwards Revised Final Typed Pages for LARs 109 & 115, Previously Submitted by 990615 & 28 Ltrs.Revised Pages Replace Those Previously Provided for LARs 109 & 115.With Summary of Editorial Changes1999-07-15015 July 1999 Forwards Revised Final Typed Pages for LARs 109 & 115, Previously Submitted by 990615 & 28 Ltrs.Revised Pages Replace Those Previously Provided for LARs 109 & 115.With Summary of Editorial Changes L-99-112, Responds to NRC Questions Made During 990518 Meeting with Util Re LARs 220 & 88,for Bvps,Units 1 & 2.Copy of Ltr DLC-99-743,which Is non-proprietary Version of DLC-96-310 & Westinghouse Technical Bulletin ESBU-TB-96-07-R0 Also Encl1999-07-14014 July 1999 Responds to NRC Questions Made During 990518 Meeting with Util Re LARs 220 & 88,for Bvps,Units 1 & 2.Copy of Ltr DLC-99-743,which Is non-proprietary Version of DLC-96-310 & Westinghouse Technical Bulletin ESBU-TB-96-07-R0 Also Encl L-99-110, Forwards Changes to ERDS for Unit 1,IAW Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394,Rev 1,Section 3.61999-07-14014 July 1999 Forwards Changes to ERDS for Unit 1,IAW Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394,Rev 1,Section 3.6 ML20209G5701999-07-12012 July 1999 Discusses Closure of TACs MA0525 & MA0526 Re Response to RAI Concerning GL 92-0,Rev 1,Suppl 1, Rv Structural Integrity. Info in Rvid Revised & Released as Ver 2 as Result of Review of Response ML20207H6621999-07-0808 July 1999 Forwards RAI Re Util 981112 Response to IPEEE Evaluations for Plant,Units 1 & 2.RAI Was Discussed During 990628 Telcon in Order to Ensure Clear Consistent Understanding by All Parties of Info Needed L-99-105, Forwards Response to NRC 990420 RAI Re Previous Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves1999-07-0808 July 1999 Forwards Response to NRC 990420 RAI Re Previous Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20209D8191999-07-0707 July 1999 Forwards Insp Repts 50-334/99-03 & 50-412/99-03 on 990502- 0612.No Violations Noted.Program for Maintaining Occupational Exposures as Low as Reasonably Achievable (ALARA) & for Training Personnel,Generally Effective L-99-109, Forwards Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999, IAW ASME Boiler & Pressure Vessel Code,Section Xi,Article IWA-62301999-07-0707 July 1999 Forwards Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999, IAW ASME Boiler & Pressure Vessel Code,Section Xi,Article IWA-6230 L-99-108, Requests Withdrawal of Change Proposed for TS Bases Page B 3/4 2-2 from LARs 1A-262 & 2A-135,originally Submitted by Licensee to NRC1999-07-0707 July 1999 Requests Withdrawal of Change Proposed for TS Bases Page B 3/4 2-2 from LARs 1A-262 & 2A-135,originally Submitted by Licensee to NRC L-99-104, Responds to GL 98-01,Suppl 1, Y2K Readiness at Nuclear Power Plants. Disclosure Rept Encl1999-06-29029 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness at Nuclear Power Plants. Disclosure Rept Encl L-99-093, Provides Response to RAI on Proposed Change to Operations QA Program Description.Attachment 2 Provides Revised Markup for Proposed Changes to Affected UFSAR Section 17.2.51999-06-25025 June 1999 Provides Response to RAI on Proposed Change to Operations QA Program Description.Attachment 2 Provides Revised Markup for Proposed Changes to Affected UFSAR Section 17.2.5 L-99-102, Forwards Typed,Final TS Pages for LARs 259 & 131.Summary of Description of Plant Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages,Encl1999-06-22022 June 1999 Forwards Typed,Final TS Pages for LARs 259 & 131.Summary of Description of Plant Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages,Encl L-99-101, Submits Response to NRC Oral RAI Concerning Qualifications for Senior Nuclear Executive Ref in 10CFR50.80 Submittal1999-06-22022 June 1999 Submits Response to NRC Oral RAI Concerning Qualifications for Senior Nuclear Executive Ref in 10CFR50.80 Submittal L-99-062, Forwards Final TS Pages for LARs 262 & 135,including Summary Description of Plants Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages1999-06-17017 June 1999 Forwards Final TS Pages for LARs 262 & 135,including Summary Description of Plants Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARL-99-152, Submits Relief Request BV3-N-533-1,rev 0,requesting Use of ASME Approved Code Case N-553-1, Alternative Requirements for VT-2 Visual Examination of Class 1,2 & 3 Insulated Pressure Retaining Bolted Connections1999-10-11011 October 1999 Submits Relief Request BV3-N-533-1,rev 0,requesting Use of ASME Approved Code Case N-553-1, Alternative Requirements for VT-2 Visual Examination of Class 1,2 & 3 Insulated Pressure Retaining Bolted Connections L-99-143, Informs That Subsequent Review of Approval Ltrs & SE for Relief Requests 1TYP-2-B5.40-1 (Rev 0),BV1-RV-AUG (Rev 1), BV2-RV-AUG (Rev 1),BV3-IWA-1 (Rev 1) & BV3-IWA-2 (Rev 1) Identified Erroneous Statements Which Dl Wishes to Correct1999-10-11011 October 1999 Informs That Subsequent Review of Approval Ltrs & SE for Relief Requests 1TYP-2-B5.40-1 (Rev 0),BV1-RV-AUG (Rev 1), BV2-RV-AUG (Rev 1),BV3-IWA-1 (Rev 1) & BV3-IWA-2 (Rev 1) Identified Erroneous Statements Which Dl Wishes to Correct L-99-151, Responds to NRC Re Violations Noted in Insp Rept 50-412/99-07.Corrective Actions:Condition Repts Were Written for Listed Issues So That Repts Could Be Addressed Using BVPS Corrective Action Program1999-10-0707 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-412/99-07.Corrective Actions:Condition Repts Were Written for Listed Issues So That Repts Could Be Addressed Using BVPS Corrective Action Program L-99-149, Informs NRC That Items Identified in 990629 Response to GL 98-01 Have Been Completed.Attached Table Submitted with Has Been Updated to Reflect Completion1999-09-28028 September 1999 Informs NRC That Items Identified in 990629 Response to GL 98-01 Have Been Completed.Attached Table Submitted with Has Been Updated to Reflect Completion L-99-148, Notifies NRC of License Withdrawal of M Linch,License SOP-11478 IAW 10CFR50.74.M Linch Resigned from Employment at Bvps,Effective 9908171999-09-24024 September 1999 Notifies NRC of License Withdrawal of M Linch,License SOP-11478 IAW 10CFR50.74.M Linch Resigned from Employment at Bvps,Effective 990817 ML20212G0601999-09-23023 September 1999 Forwards Answer of Duquesne Light Co to Petition to Waive Time Limits & Suppl Comments of Local 29, Intl Brotherhood of Electrical Workers.Copies of Answer Have Been Served to Parties & Petitioner by e-mail or Facsimile ML20212C5521999-09-21021 September 1999 Forwards for Filing,Answer to Firstenergy Nuclear Operating Co & Pennsylvania Power Co in Opposition to Petition to Waive Time Limits & Suppl Comments of Local 29 Intl Brotherhood of Electrical Workers L-99-144, Forwards NRC Form 536 Which Addresses Util Proposed Operator Licensing Exam Schedule,In Response to Administrative Ltr 99-031999-09-20020 September 1999 Forwards NRC Form 536 Which Addresses Util Proposed Operator Licensing Exam Schedule,In Response to Administrative Ltr 99-03 ML20212B3291999-09-16016 September 1999 Forwards for Filing,Petition to Waive Time Limits in 10CFR2.1305 & Supplemental Comments of Local 29,Intl Brotherhood of Electrical Workers Re Beaver Valley Power Station,Units 1 & 2 L-99-134, Provides Addl Info to Support 990617 LAR 127,proposing Mods to Heatup,Cooldown & Overpressure Protection Curves.Info Is Provided to Formally Docket Info Discussed During 990820 Telcon with NRC1999-09-15015 September 1999 Provides Addl Info to Support 990617 LAR 127,proposing Mods to Heatup,Cooldown & Overpressure Protection Curves.Info Is Provided to Formally Docket Info Discussed During 990820 Telcon with NRC L-99-138, Forwards Rev 37 to Issue 4 for BVPS Physical Security Plan (PSP) (Base Plan,Safeguards Contingency Plan & Training & Qualification Plan).Changes to Plan Are Listed.Encls Withheld Per 10CFR2.790(d)1999-09-0303 September 1999 Forwards Rev 37 to Issue 4 for BVPS Physical Security Plan (PSP) (Base Plan,Safeguards Contingency Plan & Training & Qualification Plan).Changes to Plan Are Listed.Encls Withheld Per 10CFR2.790(d) L-99-136, Forwards Data Point Library (Dpl) Changes,Iaw Provisions of 10CFR50,App E,Section VI.3.a & NUREG-1394,Rev 1,Section 3.6, Administrative Implementation Requirements. Ten Listed Dpls Have Specific Setpoint Values Removed,Per Unit 2 Dpls1999-09-0202 September 1999 Forwards Data Point Library (Dpl) Changes,Iaw Provisions of 10CFR50,App E,Section VI.3.a & NUREG-1394,Rev 1,Section 3.6, Administrative Implementation Requirements. Ten Listed Dpls Have Specific Setpoint Values Removed,Per Unit 2 Dpls L-99-098, Forwards Proposed Changes to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Change Would Reduce Operations QA Program Description Commitments by Limiting Required Onsite Safety Committee Reviews of Mods1999-09-0202 September 1999 Forwards Proposed Changes to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Change Would Reduce Operations QA Program Description Commitments by Limiting Required Onsite Safety Committee Reviews of Mods L-99-137, Forwards Issue 3,rev 3 to Bvps,Unit 1 Inservice Testing Program for Pumps & Valves. Encl 1 Provides Summary of IST Program Changes Which Have Been Incorporated Into Issue 3, Rev 31999-08-31031 August 1999 Forwards Issue 3,rev 3 to Bvps,Unit 1 Inservice Testing Program for Pumps & Valves. Encl 1 Provides Summary of IST Program Changes Which Have Been Incorporated Into Issue 3, Rev 3 L-99-022, Forwards Issue 2,Rev 1 to Bvps,Unit 2 Inservice Testing (IST) Program for Pumps & Valves. Summary of Changes,Encl1999-08-31031 August 1999 Forwards Issue 2,Rev 1 to Bvps,Unit 2 Inservice Testing (IST) Program for Pumps & Valves. Summary of Changes,Encl L-99-037, Forwards Proposed Change to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Attachment 1 Further Describes Proposed Change & Identifies Reason for Change1999-08-30030 August 1999 Forwards Proposed Change to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Attachment 1 Further Describes Proposed Change & Identifies Reason for Change L-99-012, Forwards Proposed Change to Bvps,Units 1 & 2,operations QA Program Description,Per 10CFR50.54(a)(3)(ii),including Description of Proposed Change,Reason for Change & Basis for Concluding Revised Program Satisfy 10CFR50,App B1999-08-30030 August 1999 Forwards Proposed Change to Bvps,Units 1 & 2,operations QA Program Description,Per 10CFR50.54(a)(3)(ii),including Description of Proposed Change,Reason for Change & Basis for Concluding Revised Program Satisfy 10CFR50,App B L-99-132, Forwards fitness-for-duty Program Six Month Rept for 990101-990630 for Bvps,Units 1 & 21999-08-26026 August 1999 Forwards fitness-for-duty Program Six Month Rept for 990101-990630 for Bvps,Units 1 & 2 05000412/LER-1999-007, Forwards LER 99-007-00, Forced Shutdown Due to Inoperable EDG, Per 10CFR50.73(a)(2)(i).Rept Is Delayed Due to Util Needing Addl Three Days to Address Event Issues on Reportability & Provide Addl Safety Implications Info1999-08-19019 August 1999 Forwards LER 99-007-00, Forced Shutdown Due to Inoperable EDG, Per 10CFR50.73(a)(2)(i).Rept Is Delayed Due to Util Needing Addl Three Days to Address Event Issues on Reportability & Provide Addl Safety Implications Info L-99-127, Provides Response to NRC Ltr Requesting Review & Comment of NRC Reactor Vessel Structural Integrity Database by 990901.Inconsistencies Noted in Way Data Characterizes Condition of Reactor Vessel1999-08-17017 August 1999 Provides Response to NRC Ltr Requesting Review & Comment of NRC Reactor Vessel Structural Integrity Database by 990901.Inconsistencies Noted in Way Data Characterizes Condition of Reactor Vessel L-99-124, Requests Withdrawal of Editorial Changes That Do Not Pertain to Transfer of Operating Authority or Plant Ownership That Are Proposed in LARs 269 & 144.Revised mark-up License Pages Reflecting Changes,Attached1999-07-30030 July 1999 Requests Withdrawal of Editorial Changes That Do Not Pertain to Transfer of Operating Authority or Plant Ownership That Are Proposed in LARs 269 & 144.Revised mark-up License Pages Reflecting Changes,Attached L-99-121, Submits Data Point Library (Dpl) Changes,Iaw Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394,rev 1,Section 3.6, Administrative Implementation Reqiurements1999-07-28028 July 1999 Submits Data Point Library (Dpl) Changes,Iaw Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394,rev 1,Section 3.6, Administrative Implementation Reqiurements L-99-118, Forwards Response to NRC AL 99-02,request for Info Re Estimate of Number of New Licensing Actions Expected to Be Submitted in Fy 2000 & 20011999-07-25025 July 1999 Forwards Response to NRC AL 99-02,request for Info Re Estimate of Number of New Licensing Actions Expected to Be Submitted in Fy 2000 & 2001 L-99-120, Forwards Annual Rept of Facility Changes,Tests & Experiments for BVPS Unit 1,IAW 10CFR50.59.Rept Provides Brief Description of Each Facility & Procedure Change & Summary of Safety Evaluations1999-07-22022 July 1999 Forwards Annual Rept of Facility Changes,Tests & Experiments for BVPS Unit 1,IAW 10CFR50.59.Rept Provides Brief Description of Each Facility & Procedure Change & Summary of Safety Evaluations L-99-119, Forwards Rev 17 to UFSAR for Beaver Power Station,Unit 1. Submittal Reflects Changes to Facility & Procedures as Described in UFSAR That Were Completed During Annual Reporting Period Endinig 9901221999-07-20020 July 1999 Forwards Rev 17 to UFSAR for Beaver Power Station,Unit 1. Submittal Reflects Changes to Facility & Procedures as Described in UFSAR That Were Completed During Annual Reporting Period Endinig 990122 L-99-111, Forwards Revised Final Typed Pages for LARs 109 & 115, Previously Submitted by 990615 & 28 Ltrs.Revised Pages Replace Those Previously Provided for LARs 109 & 115.With Summary of Editorial Changes1999-07-15015 July 1999 Forwards Revised Final Typed Pages for LARs 109 & 115, Previously Submitted by 990615 & 28 Ltrs.Revised Pages Replace Those Previously Provided for LARs 109 & 115.With Summary of Editorial Changes L-99-113, Forwards Final,Typed TS Pages for LARs 262 & 135,previously Submitted with Editorial Changes Identified by1999-07-15015 July 1999 Forwards Final,Typed TS Pages for LARs 262 & 135,previously Submitted with Editorial Changes Identified by L-99-112, Responds to NRC Questions Made During 990518 Meeting with Util Re LARs 220 & 88,for Bvps,Units 1 & 2.Copy of Ltr DLC-99-743,which Is non-proprietary Version of DLC-96-310 & Westinghouse Technical Bulletin ESBU-TB-96-07-R0 Also Encl1999-07-14014 July 1999 Responds to NRC Questions Made During 990518 Meeting with Util Re LARs 220 & 88,for Bvps,Units 1 & 2.Copy of Ltr DLC-99-743,which Is non-proprietary Version of DLC-96-310 & Westinghouse Technical Bulletin ESBU-TB-96-07-R0 Also Encl L-99-110, Forwards Changes to ERDS for Unit 1,IAW Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394,Rev 1,Section 3.61999-07-14014 July 1999 Forwards Changes to ERDS for Unit 1,IAW Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394,Rev 1,Section 3.6 L-99-105, Forwards Response to NRC 990420 RAI Re Previous Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves1999-07-0808 July 1999 Forwards Response to NRC 990420 RAI Re Previous Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves L-99-108, Requests Withdrawal of Change Proposed for TS Bases Page B 3/4 2-2 from LARs 1A-262 & 2A-135,originally Submitted by Licensee to NRC1999-07-0707 July 1999 Requests Withdrawal of Change Proposed for TS Bases Page B 3/4 2-2 from LARs 1A-262 & 2A-135,originally Submitted by Licensee to NRC L-99-109, Forwards Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999, IAW ASME Boiler & Pressure Vessel Code,Section Xi,Article IWA-62301999-07-0707 July 1999 Forwards Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999, IAW ASME Boiler & Pressure Vessel Code,Section Xi,Article IWA-6230 L-99-104, Responds to GL 98-01,Suppl 1, Y2K Readiness at Nuclear Power Plants. Disclosure Rept Encl1999-06-29029 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness at Nuclear Power Plants. Disclosure Rept Encl L-99-093, Provides Response to RAI on Proposed Change to Operations QA Program Description.Attachment 2 Provides Revised Markup for Proposed Changes to Affected UFSAR Section 17.2.51999-06-25025 June 1999 Provides Response to RAI on Proposed Change to Operations QA Program Description.Attachment 2 Provides Revised Markup for Proposed Changes to Affected UFSAR Section 17.2.5 L-99-102, Forwards Typed,Final TS Pages for LARs 259 & 131.Summary of Description of Plant Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages,Encl1999-06-22022 June 1999 Forwards Typed,Final TS Pages for LARs 259 & 131.Summary of Description of Plant Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages,Encl L-99-101, Submits Response to NRC Oral RAI Concerning Qualifications for Senior Nuclear Executive Ref in 10CFR50.80 Submittal1999-06-22022 June 1999 Submits Response to NRC Oral RAI Concerning Qualifications for Senior Nuclear Executive Ref in 10CFR50.80 Submittal L-99-062, Forwards Final TS Pages for LARs 262 & 135,including Summary Description of Plants Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages1999-06-17017 June 1999 Forwards Final TS Pages for LARs 262 & 135,including Summary Description of Plants Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 ML20195H4651999-06-16016 June 1999 Forwards for Filing Answer of Firstenergy Corp in Opposition to Petition for Leave to Intervene of Local 29, Intl Brotherhood of Electrical Workers. Copies of Answer Have Been Served Upon Parties & Petitioner by e-mail ML20195J5221999-06-16016 June 1999 Forwards Answer of Duquesne Light Co to Petition to Intervene of Local 29,International Brotherhood of Electrical Workers in Listed Matter.With Certificate of Svc L-99-100, Forwards Typed,Final TS Pages for LAR 109 Re Rcs.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages Is Provided in Attachment B-1091999-06-15015 June 1999 Forwards Typed,Final TS Pages for LAR 109 Re Rcs.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages Is Provided in Attachment B-109 L-99-095, Provides Addl Info to Support LARs 262 & 135,in Response to NRC 990527 Verbal Request.Info Describes Performance of Unit 1 Rod Position Indication Sys & Provides Some Background Info Re Normal Operation of Sys1999-06-15015 June 1999 Provides Addl Info to Support LARs 262 & 135,in Response to NRC 990527 Verbal Request.Info Describes Performance of Unit 1 Rod Position Indication Sys & Provides Some Background Info Re Normal Operation of Sys L-99-099, Requests Partial Withdrawal of LAR 120,which Requested Review of USQ Due to Increased Calculated Doses for Locked Rotor Event & Use of Unapproved Methodology for Evaluating Small Break LOCA Doses Involving W Natl Safety Advisory Ltr1999-06-14014 June 1999 Requests Partial Withdrawal of LAR 120,which Requested Review of USQ Due to Increased Calculated Doses for Locked Rotor Event & Use of Unapproved Methodology for Evaluating Small Break LOCA Doses Involving W Natl Safety Advisory Ltr ML20195H3731999-06-0303 June 1999 Forwards Petition to Intervene of Local 29,Intl Brotherhood of Electrical Workers in Matter of Firstenergy Nuclear Operating Co,For Filing L-99-090, Forwards Summary Review Completed to Verify Adequacy of Design Basis Accident Thermal Overpressure Protection for BVPS Unit 2 Containment Penetrations,Per Request1999-06-0202 June 1999 Forwards Summary Review Completed to Verify Adequacy of Design Basis Accident Thermal Overpressure Protection for BVPS Unit 2 Containment Penetrations,Per Request L-99-086, Forwards Bvps,Unit 2 SG Exam Rept for Aug 1998.Rept Provided to Document Results of SG Eddy Current Exams Performed in Aug 1998.Summary of Insps Provided in Encl 11999-05-28028 May 1999 Forwards Bvps,Unit 2 SG Exam Rept for Aug 1998.Rept Provided to Document Results of SG Eddy Current Exams Performed in Aug 1998.Summary of Insps Provided in Encl 1 L-99-089, Forwards Annual Financial Repts,Including Certified Financial Statements,Of Dqe,Firstenergy Corp,Ohio Edison Co,Pennsylvania Power Co,Cleveland Electric Illuminating Co & Toledo Edison Co,Iaw 10CFR50.71(b)1999-05-28028 May 1999 Forwards Annual Financial Repts,Including Certified Financial Statements,Of Dqe,Firstenergy Corp,Ohio Edison Co,Pennsylvania Power Co,Cleveland Electric Illuminating Co & Toledo Edison Co,Iaw 10CFR50.71(b) L-99-084, Forwards Revised marked-up TS & UFSAR Pages to 990303 LARs 259 & 131 Which Revised Qualifications for Operations Mgt & Incorporated Generic Position Titles in Ts.Encl Pages Incorporate NRC Requested Changes,Per Recent Telcon1999-05-27027 May 1999 Forwards Revised marked-up TS & UFSAR Pages to 990303 LARs 259 & 131 Which Revised Qualifications for Operations Mgt & Incorporated Generic Position Titles in Ts.Encl Pages Incorporate NRC Requested Changes,Per Recent Telcon L-99-082, Dockets Licensee Plan for Bvps,Unit 1,safety-related Small Bore Piping Evaluation Project Discussed in NRC 990311 Public Meeting at BVPS1999-05-17017 May 1999 Dockets Licensee Plan for Bvps,Unit 1,safety-related Small Bore Piping Evaluation Project Discussed in NRC 990311 Public Meeting at BVPS L-99-071, Notifies of License Withdrawal for J Scott,License SOP-11481,due to Resignation from Employment at BVPS1999-05-12012 May 1999 Notifies of License Withdrawal for J Scott,License SOP-11481,due to Resignation from Employment at BVPS 1999-09-03
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059L4271990-09-0707 September 1990 Requests Approval for Use of Steam Generator Tube Plugs for Both Mechanical & Welded Applications ML20059G0821990-09-0404 September 1990 Forwards Application for Amend to License DPR-66,consisting of License Change Request 180,changing Section 3.3.3.2 to Reduce Required Number of Operable Incore Detector Thimbles for Remainder of Cycle 8 ML20059F7551990-08-29029 August 1990 Responds to Unresolved Item 50-334/90-16-01 Noted in Insp Rept 50-334/90-16.Corrective Actions:Initial Training for Maint Group Personnel Responsible for Maintaining Supplied Air Respirators Will Be Supplemented W/Biennial Retraining ML20059F1501990-08-29029 August 1990 Advises That Permanent Replacement Chosen for Plant Independent Safety Evaluation Group.Position Will Be Staffed Effective 900829 ML20028G8731990-08-29029 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990,per 10CFR26.71 ML20059D3761990-08-24024 August 1990 Describes Cycle 3 Reload Design,Documents Util Review Per 10CFR50.59 & Provides Determination That No Tech Spec Changes or Unreviewed Safety Questions Involved.Reload Core Design Will Not Adversely Affect Safety of Plant ML20028G8881990-08-24024 August 1990 Withdraws Operator License SOP-10731 (55-60749) Issued to K Gilbert,Who Resigned 05000412/LER-1990-007, Responds to NRC Re Deviation 50-412/90-12-01 Noted in Insp Rept 50-412/90-12.Corrective Actions:Procedure OM 2.20-4.I Revised to Require Removal of Flanges Following Drain Operations & LER 90-007-00 Issued1990-08-23023 August 1990 Responds to NRC Re Deviation 50-412/90-12-01 Noted in Insp Rept 50-412/90-12.Corrective Actions:Procedure OM 2.20-4.I Revised to Require Removal of Flanges Following Drain Operations & LER 90-007-00 Issued ML20058P7651990-08-14014 August 1990 Provides Info on Acceptability of Rescheduling Response to Reg Guide 1.97 Ser,Item 4b, Neutron Flux Monitoring Instrumentation. Rescheduling of Util Response Will Be Determined on or Shortly After Meeting W/Nrc ML20059E0571990-08-10010 August 1990 Forwards Suppl 3 to Nonproprietary WCAP-12094 & Proprietary WCAP-12093, Evaluation of Pressurizer Surge Line Transients Exceeding 320 F for Beaver Valley Unit 2, for Review by 900901.Proprietary Rept Withheld (Ref 10CFR2.790(b)(4)) ML20059E7631990-08-0101 August 1990 Provides Results of Util Evaluation of Licensed Operator Requalification Exam Conducted During Wks of 900709 & 16. Crew That Failed to Meet Expected Performance Level Has Been Successfully Upgraded & re-evaluated to Be Satisfactory ML20059B8141990-08-0101 August 1990 Requests Exemption from 10CFR26 Re Fitness for Duty Program & 10CFR73 Re Physical Protection of Plants & Matls Concerning Unescorted Access Requirements for Nuclear Generating Stations ML20056A3471990-07-31031 July 1990 Responds to NRC Bulletin 90-001.Items 1 Through 5 of Requested Actions for Operating Reactors Completed ML20056A1841990-07-27027 July 1990 Forwards Revised Methodology for Achieving Alternate Ac for Plant,Per 900720 Telcon ML20055H2581990-07-25025 July 1990 Forwards Decommissioning Rept, Per 10CFR50.33(K) & 50.75(b) ML20055F7061990-07-0909 July 1990 Responds to NRC Re Dcrdr Requirements as Specified in Suppl 1 to NUREG-0737.DCRDR Corrective Actions Implemented & Mods Determined to Be Operational Prior to Startup Following Seventh Plant Refueling Outage ML20055D3871990-07-0202 July 1990 Provides Info Re long-term Solution to Action Item 3 of NRC Bulletin 88-008,per 890714 & s.Util Will Continue to Monitor Temp in Affected Lines & Evaluate Results ML20058K5031990-06-29029 June 1990 Discusses Use of Emergency Diesel Generators as Alternate Ac Source at multi-unit Sites,Per Licensee .Emergency Diesel Generator Load Mgt Methodology Evaluated to Meet Listed Criteria ML20044A3661990-06-21021 June 1990 Forwards Application for Amend to License NPF-73,consisting of Tech Spec Change Request 44,changing Stroke Time to 60 for Inside Containment Letdown Isolation Valves.Change Determined Safe & Involves No Unreviewed Safety Issue ML20043G6811990-06-14014 June 1990 Forwards Application for Amends to Licenses DPR-66 & NPF-73, Revising Tech Specs Re Electrical Power Sys - Shutdown & Ac & Dc Distribution - Shutdown ML20043H9341990-06-14014 June 1990 Forwards Issue 1 to Rev 4 to Inservice Testing Program for Pumps & Valves. Issue 1 Removes Relief Requests Requiring Prior NRC Approval & Adds Certain Program Changes Permitted by ASME XI & Generic Ltr 89-04 ML20043G5981990-06-12012 June 1990 Forwards Monthly Operating Repts for May 1990 for Beaver Valley Units 1 & 2 & Revised Rept for Apr 1990 for Beaver Valley Unit 1 ML20043G6851990-06-12012 June 1990 Forwards Application for Amend to License DPR-66,consisting of Proposed OL Change Request 176,revising Tech Specs to Replace Current Single Overpressure Protection Setpoint W/ Curve Based on Temp ML20043G7941990-06-12012 June 1990 Responds to NRC 900524 Request for Addl Info Re Proposed Operating License Change Request 156.Clarification of Magnitude of Confidence Level of Westinghouse Setpoint Methodology,As Specified in WCAP-11419,encl ML20043G8001990-06-11011 June 1990 Forwards Application for Amend to License NPF-73,consisting of Proposed Operating License Change Request 41.Amend Deletes Surveillance Requirement 4.4.9.3.1.d ML20043H0291990-06-11011 June 1990 Forwards Application for Amend to License NPF-73,consisting of Proposed OL Change Request 40,modifying Heatup & Cooldown Curves Applicable to 10 EFPYs Per WCAP-12406 Re Analysis of Capsule U from Radiation Surveillance Program ML20043F5251990-06-0707 June 1990 Requests Temporary Waiver of Compliance from Tech Spec Limiting Condition for Operation Re Operability of Containment Isolation Valves During Quarterly Slave Relay Testing.Evaluation to Support Request Encl ML20043F1361990-06-0404 June 1990 Advises That Chemistry Manual Chapter 5P1, Enhanced Primary to Secondary Leakrate Monitoring Program for Unit 1,per 880328 Request to Recommit to Item C.1 of NRC Bulletin 88-002 ML20043B5971990-05-18018 May 1990 Advises of Delay in Hiring Independent Safety Evaluation Group Replacement to Maintain Five Permanent Personnel Onsite,Per Tech Spec 6.2.3.2.Replacement Will Be Provided within 30 Days of Retirement of Engineer on 900531 ML20043B0511990-05-15015 May 1990 Responds to Telcon Request for Addl Info Re Elimination of Snubbers on Primary Component Supports.Probability of Case B/G Event Extremely Small & Does Not Represent Realisitic Scenario ML20043B1921990-05-11011 May 1990 Forwards Cycle 8 & Cycle 2 Core Operating Limits Rept,Per Tech Spec 6.9.1.14 ML20042G9761990-05-0808 May 1990 Responds to NRC 900226 Ltr Re Violations Noted in Insp Repts 50-334/89-80 & 50-412/89-80.Corrective Action:Maint Work Request Program Being Upgraded to Include Responsibilities of Nuclear Const Dept & Will Be Issued by 900601 ML20042G8541990-05-0303 May 1990 Forwards Technical Review,Audit Summary & Operability Assessments Re Potentially Invalid Leak Detection Tests Used as Alternative for Amse Section XI Hydrostatic Tests ML20042G9071990-05-0101 May 1990 Forwards Annual Financial Repts for Duquense Light Co,Ohio Edison Co,Pennsylvania Power Co,Centerior Energy Corp & Toledo Edison Co,Per 10CFR50-71(b) ML20042F1381990-04-30030 April 1990 Advises That Final SER for Implementation of USI A-46 Will Be Delayed Until Late 1990 ML20042F0991990-04-20020 April 1990 Forwards Response to Request for Addl Info Re Second 10 Yr ISI Program ML20012F5951990-04-10010 April 1990 Forwards Monthly Operating Repts for Mar 1990 & Revised Operating Data Rept & Unit Shutdown & Power Reductions Sheets for Jan 1990 ML20042E1471990-04-0404 April 1990 Forwards Application for Amends to Licenses DPR-66 & NPF-73, Consisting of License Change Request 174/36,updating Staff Titles to Reflect Nuclear Group Organization ML20012F6021990-03-30030 March 1990 Submits Supplemental Response to Station Blackout Rule for Plant,Per NUMARC 900104 Ltr.Summary of Changes to Condensate Inventory of Dhr,Effects of Loss of Ventilation, Control Room HVAC & Reactor Coolant Inventory Listed ML20012E3091990-03-23023 March 1990 Forwards Response to 900308 Request for Addl Info on Reg Guide 1.97 Re Variable for Steam Generator wide-range Level Instrumentation ML20012E3451990-03-23023 March 1990 Submits Addl Info for Exemption from General Design Criteria GDC-57,including Background Info Describing Sys Operation & Addl Bases for Exemption Request.Simplified Recirculation Spray Sys Drawings Encl ML20012D6491990-03-19019 March 1990 Requests Retroactive NRC Approval of Temporary Waiver of Compliance Re Tech Spec Limiting Condition for Operation 3.8.2.1 on Ac Vital Bus Operability.Sts Will Be Followed When Inverters Not Providing Power to Vital Bus ML20012E4091990-03-16016 March 1990 Forwards Inservice Insp 90-Day Rept,Beaver Valley Power Station Unit 1,Outage 7, for 880227-891221,per Section XI of ASME Boiler & Pressure Vessel Code 1983 Edition Through Summer 1983 Addenda,Section XI ML20012D6181990-03-15015 March 1990 Responds to NRC 900215 Ltr Re Violations Noted in Insp Repts 50-334/89-23 & 50-412/89-22.Corrective Actions:Safety Injection Signal Reset & Plant Returned to Presafety Injection Conditions & Crew Members Counseled ML20042D7401990-03-14014 March 1990 Forwards Corrected Annual Rept of Number of Personnel Receiving Greater than 100 Mrem & Associated Exposure by Work Function at Plant for CY89. ML20012D5801990-03-13013 March 1990 Forwards Correction to First 10-yr Inservice Insp Program, Rev 2 to Relief Request BV2-C6.10-1 Re Recirculation Spray Pump - Pump Casing Welds & Relief Request Index ML20012D6221990-03-13013 March 1990 Forwards Response to Generic Ltr 89-19, Resolution to USI A-47. Recommends All Westinghouse Plant Designs Provide Automatic Steam Generator Overfill Protection to Mitigate Main Feedwater Overfeed Events ML20012C1791990-03-0909 March 1990 Responds to NRC 900207 Ltr Re Deviations Noted in Insp Repts 50-334/89-25 & 50-412/89-23.Corrective Actions:Written Request Initiated to Identify Unit 2 post-accident Monitoring Recorders in Control Room & Recorders Labeled ML20012E0911990-03-0505 March 1990 Lists Max Primary Property Damage Insurance Coverages for Plant,Per 10CFR50.54(w)(2) ML20012B7051990-03-0202 March 1990 Responds to NRC 900131 Ltr Re Violations Noted in Insp Repts 50-334/90-05 & 50-412/90-04.Requests Withdrawal of Violation Re Stated Transport Problem & Reclassification as Noncompliance,Per 10CFR2,App C,Section G 1990-09-07
[Table view] |
Text
"
w e
O
'Af Telephone (412) 4564000 Nuclear Division
$7pp*n'p*o,,,
o ex iso 77 oco4 October 9,1984 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Washington, DC 20555
Reference:
Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 NUREG-0612, Supplemental Response to SER Gentlemen:
Attached is a supplemental response to our submittal dated April 26, 1982, which responded to your Safety Evaluation Report (SER) on the control of heavy loads at Beaver Valley Power Station, Unit No.1. That submittal identified two items for which additional work was necessary in order to address staff concerns. These are:
- 1. NUREG-0612; Section 5.1.1, Guideline 4 (Special Lifting Devices)
- 2. NUREG-0612; Section 5.3(1) Interim Protection Measure 1 (Technical Specification restriction on loads carried over the Spent Fuel Pool)
Item 1 above has been addressed and the results are documented in the Attachment to this submittal. These results include the evaluation of our special lifting devices with respect to specific sections of ANSI N14.6-1978.
Our special lifting devices were designed and built for Beaver Valley Unit 1, circa 1969-1973, by the Westinghouse Electric Corporation. They used the design criteria that the resulting stresses in the load carrying members, when subjected to the total combined lifting weight, should not exceed one fifth of the ultimate strength of the material. The comparison of our special lif ting devices, when compared to the criteria of ANSI N14.6, shows that they meet the intent of the ANSI document for design, fabrication and quality assurance. Although a specific design specification was not written, the assembly and detailed manufacturing drawings and purchase order documents contain the equivalent to the related ANSI criteria. A stress report has been prepared for these devices and the design criteria is considered satisfied.
These devices were manufactured under Westinghouse surveillance with identified hold points, procedure review and personnel qualification wnich adequately meet these related ANSI criteria.
1 e pp , 1 I \ l l
l
m o
Beavor Vallcy Power Station, Unit No. 1 Dick:t No. 50-334, License No. DPR-66 NUREG-0612, Supplemental Response to SER Page 2 These special lifting devices are not in strict agreement with the criteria of ANSI N14.6 for acceptance testing, maint.enance and verification of continuing compliance. Acceptance testing as defined in the ANSI standard was not performed, but an initial 125 percent load test was conducted on all three special lifting devices followed by non-destructive testing of critical welds.
Current maintenance and inspection procedures include a visual check of critical welds during lifting and also provide a method for documenting related maintenance activities. These activities are considered sufficient to demonstrate compliance with the intent of the ANSI criteria. Additional details are provided in the attachment.
Based on the information contained in the Attachment, we conclude that our special lifting devices meet the intent of NUREG-0612, Section 5.1.1, Guideline 4.
In regard to item 2 above, we have continued our investigation into the basis for our current technical specification limit of 3,000 pounds. During the site visit by NRC and FRC engineers on November 23 and 24,1981 and documented in your SER, it was stated that the current limit was based on the fuel handling accident reported in our Final Safety Analysis Report. However, a specific load could not be identified which would form the basis for the weight limit. As such, our st.bmittal of April 26, 1982, stated that we would change this limit to address the staff's concerns. Subsequent to that submittal, while preparing the safety evaluation in support of a technical specification change, relevant information was obtained in support of the existing 3000 pound limit.
The UFSAR, Section 9.12.4, describes the handling of failed fuel assemblies in the spent fuel pool. Any fuel assembly which is suspected to be defective may be placed in a damaged fuel storage container and sealed to prc ide an isolated chamber for testing for the presence of fission products.
There are two damaged fuel storage containers presently stored in the spent fuel pool. In the event it became necessary to utilize this container to transfer fuel to a fuel cask in the pool cask storage area, this container would be lifted and moved using the spent fuel handling tool. The total combined weight of a fuel assembly, the damage fuel storage container and the spent fuel handling tool is approximately 3000 pounds.
Additionally, the vertical lift range of the spent fuel hoist and the length of the spent fuel handling tool are designed to 1imit the maximum lift of a spent fuel assembly as well as the damaged fuel storage container. This is to assure a sufficient depth of water for safe shielding above the fuel being handled. As a result, the maximum distance between the bottom of the damaged fuel storage container and the top of the fuel storage racks is kept small (less than li feet). Normal handling of fuel in the spent fuel pool is below the upper most limit switch on the crane which further reduces the distance maintained between the container and the storage racks.
r-Beaver Valley Power Station, Unit No.1 Dock;t NJ. 50-334, Lic:nse No. DPR-66 NUREG-0612, Supplemental Response to SER Page 3 The spent fuel pool is divided into three areas; fuel transfer mechanism area, spent fuel storage area and the spent fuel cask laydown area. These areas are separated by concrete walls having slots (2) in them to permit transfer of fuel from one area to another. These slots can be closed using gate dams which are located on the fuel storage area side of the concrete dividing walls. The heaviest gate dam weighs approximately 3000 pounds and is used to isolate the fuel transfer area from the spent fuel storage area. The fuel handling crane is used to make this lift and install thr. gate dams in position when needed. It is not necessary, however, to travel over stored fuel assemblies to install the gate dam.
Based on this information, we will not submit a technical specification change request to decrease the under-hook weight limit on this crane. It should be noted that our current procedures restrict the handling of a heavy load in areas where fuel is located and where safety-related equipment is installed. As such, present administrative controls . exist which will accomplish the same task as would a change to our Technical Specifications.
Should you have any questions concerning this submittal, please contact my office.
Very truly yours,
)'
, AUlk>> r---
J. J. Carey Vice President, Nuclear cc: Mr. W. M. Troskoski, Resident Inspector U S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Comission c/o Document Management Branch Washington, DC 20555
O ATTACHMENT NUREG-612; Section 5.1.1, Guideline 4 Special Lifting Devices Supplemental Response to SER dated April 26, 1982 NOTE: The SER identified several specific sections of ANSI N14.6 to be addressed when evaluating special lifting devices. The following identifies those specific sections with support;ng information for our special lifting devices (head lift rig, internals lift rig, reactor coolant pump (RCP) motor lift sling spreader assembly).
ANSI N14.6 Section 3.1; Designers Responsibilities
- a. limitations on the use of the lifting device (3.1.1)
Response
The standard states that the designer of the lifting device is to prepare a design specification containing in part a definition of performance criteria, requirements for drawings and materials, inspection and testing to be performed and limitations on the use of the device with respect to temperature, corrosive environments, etc. At the time these devices were procured and fabricated, a requirement for a design specification did not exist and therefore one was not written by the designer, who in this case, is the Westinghouse Electric Corporation. However, assembly and detailed manufacturing drawings and purchasing documents contain the following information:
Material specification for most of the critical load path items' to ASTM, ASME specifications or special listed requirements.
Welding, weld procedures and welds to be in accordance with ASME Boiler and Pressure Vessel Code - Section IX.
Special NDT for specific critical load path items to be performed to written and approved procedures in accordance with ASTM or specified requirements.
All coatings to be performed to strict compliance with specified requirements.
Letters of compliance for materials and specifications were required for verification with original specifications.
No limitations were identified as to the use of these devices under specific environmental conditions. The conditions under which the lifting devices are stored and used were considered and accounted fer in their design and fabrication. This can be demonstrated by the use of protective coatings applied in accordance with the designers specified requirements.
Attachment ts letter dated 10/9/84 .
Pag 2
/
- b. identification of critical components and definition of critical characteristics (3.1.2)
Response
A critical items list of parts and welds has been prepared for the reactor vessel head lift rig, the reactor vessel internals lift rig and the RCP motor lift rig. The information contained on this list includes material identification and the applicable volumetric and surface inspections that were performed in the fabrication of these special lifting devices. In some instances, non-destructive testing was not specified since the material selection and strength result in very low tensile stresses and thus, non-destructive testing was not justified.
The material selection for most critical load path items was made to ASTM, ASME or special material requirements. However, the non-designed items of the RCP motor lift sling were selected based on their load carrying capabilities. These include "U" bolts, wire rope slings, shackles, turnbuckles and hooks. The material requirements were supplemented by Westinghouse imposed non-destructive testing, and/or special heat treating requirements for all of the critical items. Westinghouse required all welding, welders and weld procedures to be in accordance with ASME Boiler and Pressure Vessel Code Section IX for carbon steel welds. They also required a certificate, or letter of compliance that the materials and processes used by the manufacturer were in accordance with the purchase order and drawing requirements. Westinghouse also performed final inspections on these devices and issued quality releases.
- c. signed stress analyses which demonstrate. appropriate margins of safety (3.1.3).
Response
A stress analysis of the special lifting devices has been prepared by Westinghouse. This analysis documents the adequacy of our special lifting devices in that they can perform their function within appropriate margins of safety. The ANSI N14.6 criteria (3 and 5 for yield and ultimate strength, respectively) were demonstrated to have been met for tensile and shear stresses.
- d. indication for permissible repair procedures (3.1.4)
Response
The standard states that the designer should indicate what repair procedures and acceptance criteria for repair are permissible. The following guidance will be used for repairs to these devices. Any repair to these special lifting devices is considered to be in the form of welding. Should pins, bolts or other fasteners need repair, they should be replaced, in lieu of repair, in accordance with the original or equivalent requirements for material and non-destructive testing. Weld repairs and ext.minations will be performed in accordance with current plant procedures.
e Attachment t@ letter dated 10/9/84 Page 3 ANSI N14.6 Section 3.2; Design Critcria
- a. use of stress design factors of 3 for minimum yield strength and 5 for
!' ultimate strength (3 2.1)
Response
The load bearing members of the special lifting devices are capable of lifting three times the combined lifting weight of the design lift without generating a combined shear stress or maximum tensile stress within the lifting devke in excess of the corresponding minimum yield strength of the materials of construction. They also are capable of lifting five times that weight without exceeding the ultimate strength of these materials. This has been documented in the stress report prepared for our devices by Westinghouse. The ANSI N14.6 criteria (3 for yield, 5 for ultimate) has been met fcr tensile and shear stresses I
and other appropriate criteria for loading conditions that result in combined, bearing, and buckling stresses.
High strength materials were used in these devices. Although the fracture toughness was not tested, the materials used were selected based on their excellent fracture toughness characteristics. However, in lieu of a different stress design factor, the ANSI N14.6 stress design factors of 3 and 5 were used in the analysis and the resulting stresses are considered acceptable. NUREG-0612, Article 5.1.1 (4) further states that the stress design factor should be based on the combined maximum static and dynamic loads that could be imparted on the handling device based on the characteristics of the crane which will be used.
The dynamic characteristics of the crane would be based on the main hook and associated wire ropes holding the hook. Should the crane hook suddenly stop during lifting or lowering of a load, a shock load could be transmitted to the connected device. Because of the elasticity of the wire ropes, the dynamic factor for a typical containment crane is not much larger than 1.0. The maximum design factor that is recommended by most design texts is a factor of 2.0 for loads that are suddenly applied. The stress design factor of 3 for yield strength from the ANSI criteria certainly includes consideration of suddenly applied loads for
- cases where the dynamic impact factor may be as high as 2.0.
Additionally, when applying the criteria defined by the Franklin Research Center for determining a dynamic load factor (as stated in our submittal of April 26,1982), we have determined the dynamic load effect during the lifting of the reactor vessel head as being approximately 21 percent of the static load. This is in agreement with our earlier statement that this factor is not much larger than 1.0. Therefore, we conclude that the use of the design criteria in ANSI N14.6 satisfies the NUREG-0612 criteria.
- b. similar stress design factors for load bearing pins, links and adapters (3.2.4).
Response
The stress design factors of ANSI N14.6 Section 3.2.1 of 3 and 5 were used in the analysis and the resulting stresses are acceptable. This is documented in the stress report. Where necessary, the weight of pins was considered for handling.
k '
L-E i 1 W'* D Attachmentito lettirLdated .10/9/84 ^
[p: ( JPage,4 7 '
~
tc. .
slingsEused comply with ANSI B30.9 -11971- (3.2.5) -
fResponse- >
~~
M The wire rope used.on the RCP. Motor Lift. Sling complies with ANSI 1830.9 4 :1971. - This standard is applied to slings'used for liftinglheavy loads as described in' our. submittal of ~ April:26,11982..
' ^
- d. . 1 subjecting ,mateNals- to dead ' weight testinglor Charpy.' impactn testing
. (3.2.6) . . ;
f Response L ' Drop Jweight:. and .Charpy simpactr tests were not requiredL nori performed .;
except for the upper. and lower clevises' of the/ internals lift rig.- The?
e L applicable ~ material - specification . for these - xitems ;is . an . ASME'
" specification L which' require. Charpy- tests. (However, all, material- ,
selection was~ based on its1 excellent fracture toughness characteristics.
n : ANSI N14.6 Section 3.3; Design Considerations-ca.- consideration of problems' related to possible lamellar! tearing (3.3.1)
Response
' Lamellar tearing-was . considered;in the design- of the _ reactor _ vessel and t internals lift' rig slin non-destructive tests (g blocks by adding a stiffener. bolt and,requiringultrasonic, m the base material-and assembly welds.
j- b. design shall; assure even distribution of the load-(3.3.4)
Response
-These special lifting devices were designed to assure' evenLdistribution
! of the'_ load. ' *
. c. retainers fitted for load-carrying components which may 'become l inadvertently disengaged (3.3.5) j Response
[ -Locking plates, pins, etc. are used throughout these~ special- lifting
< devices.
- d. verification that .remnte actuating mechanisms securely engage or-
, disengage (3.3.6)_
,u L, . Response
[ Remote actuation is- only .used when engaging -the internals- lift rig with
~
the . internals. The reactor vessel -internals lift rig employs a long:
~
handled. tool to engage _the rig and the internals. The tool depresses a: '
spring: loaded tube and- turns the_ engaging screw into the internals. 'No.
' specific, position indication;is identified, except for. scribe'. marks on -
the - tool, and .the visual difference -in the1 top .of the spring. loaded tube. This is' considered sufficientiindications that the internals are -
engage'. d -
4 . 3 4 - ,,E_+...' _em, y.l . .y r,., .-....w , -c ,.m 9.- wie 7 -y <, v y. y, y v
iAttachment.toletterdatid.10/9/84~ ,
-Page 5
.r
' ANSI N14.6 Section'4.li Fabricator's Responsibilities.
.a. ierify selection and:use' of material:(4.1.3)
-Response The critical load carrying members of- these special lifting devices were designated by Westinghouse, the designer, as requiring letters of compliance-to document the use of the correct materials.
' b' . compliance with fabrication practices (4.1.4)
. Response; General good manufacturing processes.were-followed in the manufacture of these devices. Assembly _and detailed manufacturing drawings contained information 'regarding the fabrication of these- special lifting devices.
Westinghouse performed certain checks and inspections during various
~
steps of manufacturing to assure good practices were being followed.
- c. qualification of welders, procedures, and operators (4.1.5)
Response
The . manufacturer's welding procedures and non-destructive testing procedures, as well as personnel qualifications, were reviewed by.
Westinghouse.
- d. provisions for:a quality assurance program (4.1.6)
Response
A formal quality assurance program for the manufa'cturer was not required for all items. The assembly and detailed manufacturing tirawings and purchase order documents contain the equivalent- to the AN 1 criteria.
The manufacturers welding procedures and non-destructive testing-procedures were reviewed by Westinghouse prior to use.
- e. provisions for identification and certification of equipment (4.1.7)
Response
Most of the critical load carrying members require letters of compliance-for material requirements. In addition, Westinghouse performed certain checks and inspections during various steps of manufacturing to verify correctness of equipment and work practices.
- f. verification that materials or services are produced under appropriate
! controlsandqualifications(4.1.9)
Response
[
Westinghouse Quality Assurance personnel performed improcess and final irspections or. the materials, work and finished product. These devices a
1
[y *-
. Attachment ts letter dat d.10/9/84.
'Page:6 i
Response,(Continued) were manufa'ctured under' Westinghou'se surveillance which included ;
identified' hold - points._ _ Final" Westinghouse review includes . visual,
~
dimensional, procedural, cleanliness, qualifications of personnel and issuance of a quality release to ~ ensure conformance with drawing requirements.
ANSI N14.6 Section 5.1; Owner's Responsibilities a._ implementation of a periodic-testing schedule and a system to indicate' the date of expiration (5.1.3)
Response
The special' lifting devices at Beaver Valley Unit 1 .are used infrequently, normally only during refueling - outages . which will be occurring on a frequency of approximately 18 months. During refueling -
outages, these devices may only. be used- for 2 to 3 lifts each. . For this -
reason, it is considered impractical to implement- a . periodic testing schedule. The ANSI Standard was writt'en for special' lifting devices which could easily be :used at a much greater frequency,- therefore, . a periodic testing schedule would appear to be appropriate.
In order to verify our special lifting devices capability of reliability performing their function, our procedures require a visual check of critical welds. 'and parts prior , to use and as an initial step _ when -
performing a. lift.
- b. provisions for establishing operating procedures (5.1.4)
Response
Instructions on the use of our special lifting devices are contained.in plant refueling and maintenance procedures.
- c. identification of subassemblies which may be exchanged (5.-l.5) and,
- d. suitable markings (5.1.5)
Response
It is . obvious, from _their designs, that these rigs are specific lifting devices and can only be used for their intended purpose and parts are not . interchangeable. Therefore, labeling each special lifting device for its intended purpose is not necessary.
,e. maintaining a full record of history (5.1.6)
' Response A record of the history of the special lifting devices is maintained in accordance with current plant procedures. Records are available
g- ,
c :-
Attachment to letter. dated 10/9/84.-
Pages?
. documenting ~ the . inspections performed' on these devices, pre-lift .and during : lif t, as well as the completed procedures which .were- followed' tduring their use. 'If. maintenance is required - on these devices, -plant procedures provide for the documenting of the repairs performed.
.f. co'nditions for removal from service (5.1.7)
Response
~Any_ special lifting device which. has experienced any incident causing do bt as to its being able - to perform acceptably, or which has been damaged will be removed from service until it- is repaired or it has been demonstrated to be- capable of performing its intended function. These devices will not be used until the required visual inspections have been performed in accordance with plant procedures.
ANSI N14.6 Section 5.2; Acceptance Testing
- a. load test to 150% and appropriate inspections prior to initial use (5.2.1)
Response
All three special lifting devices were load tested after field assembly to 125% maximum load followed -by non-destructive testing of critical welds. Load testing to '125% is considered adequate in view of the safety factors designed into these devices.
- b. qualification of replacement parts (5.2.2)
Response
Replacement parts, should they be required, will _ be made of identical or equivalent material and inspected as originally required. Only pins, bolts, and nuts are considered replacement parts for the reactor vessel head and internals lift _ rigs. Some of the items comprising the reactor coolant pump motor lift sling are catalog items. Wire rope slings used to replace the' sling assembly will comply with ANSI B30.9-1971.
ANSI N14.6 Section 5.3; Testing to Verify Continuing Compliance i
- a. satisfying annual load test or inspection requirements (5.3.1)
Response
These special lifting devices are used during plant refueling which will
- be approximately every 18 months. During plant operation, these devices
~ are inaccessable since they are permanently installed and/or remain in i the containment. 'It is considered impractical to attempt to remove these devices from containment for load testing. Likewise, load testing to ' 150% of the total weight before each use would require special fixtures and is impractical to perform.
a Attachment to letter dated 10/9/84 Pag
In order to demonstrate continuing compliance, a visual examination by
_ qualified personnel of critical welds and parts will be conducted prior to lifting and at the initial lift prior to moving to full lift and movement for all three devices. This will be accomplished by raising the load slightly above its support and holding it for 10 minutes.
During this time, critical welds and parts will be visually inspected.
-If no problems are apparent, the lift will continue. Additionally, a non-destructive examination of major load-carrying welds will be performed as part of our ten-year inservice inspection outage. This testing interval is justified because of the low usage these special lifting devices receive during this period.
Non-destructive testing on an annual basis is not. considered practical for the following reasons:
Access to the welds for surface examination is difficult. These rigs are in containment and some radioactive contamination may be present.
All tensile and shear stresses in the welds are well within the allowable stresses.
The items that are welded remain assembled and cannot be misused for any other lift other than their intended function.
To perform non-destructive tests would require the following which from an ALARA standpoint is not justified.
- 1. Removal of paint around the area to be examined which is contaminated.
- 2. Performance of either magnetic particle inspection or liquid penetrant inspection and
- 3. Repainting after testing is completed.
- 4. Clean-up of contaminated items
- The frequency of use and, therefore, the wear on the special lifting devices is much lower than for shipping containers for which the Standard was written.
Performing non-destructive tests on these welds every refueling would increase the critica'. path refueling time. In the event major repairs would be necessary or it was determined that the critical welds and parts were damaged, additional examination would be justified.
Dimensional checking is not included since these structures are large and the results of dimensional checking would always be questionable.
Other checks on critical load path parts such as pins, are also not included since an examination of these items would require disassembly of the special lifting devices.
This ANSI standard was written for special lifting devices for shipping containers weighing 10,000 pounds or more. Lifting devices for this application are typically far less complicated in design and therefore,
m
- - Attachment to letter dated 10/9/84 Page 9 meeting this standard would be easily achieved. _ Application of this part of the standard to the special lifting devices at Beaver Valley is not considered practical. The activities as described in this response should meet the intent of the standard in determining that the lifting device is capable of performing its intended function safely.
- b. testingfollowingmajormaintenance(5.3.2)
Response
Any major maintenance _which may_ be needed on these special lifting devices is considered to be in the form of welding. Weld repairs will be performed in accordance with current plant procedures. The repaired area will be non-destructively examined to determine acceptability of the repairs, it will then be subjected to loading to the level expected to be carried within the repaired area and then another non-destructive examination will be performed,
- c. testing after application of substantial stresses (5.3.3)
Response
~
If during a prelift examination or it is observed on the load cell readout while making a lift that the load-bearing components of these special lifting devices have been subjected to stresses substantially in excess of those for which it was qualified, the following will be performed. Replaceable parts will be tested in accordance with approved procedures to determine if they are acceptable for continued use~or they will be replaced as described in our response to ANSI N14.6 Section 5.2.2. Welds will be non-destructively examined in accordance with plant procedures to determine if they are a'cceptable for continued use or they will be repaired and tested in accordance with our response to ANSI N14.6 Section 5.3.2.
- d. inspections by operating (5.3.6) and non-operating or maintenance personnel (5.3.7)
Response
Plant procedures require these special lifting devices to be visually inspected prior to use by maintenance personnel. These devices are also visually inspected at critical welds while under load by holding the load slightly above its support for 10 minutes.
For any lift of a heavy load with a special lift device, present procedures provide for a Quality Control Inspector to provide surveillance of the lift activity. This includes proper installation of rigging and a visual inspection of critical welds on these devices.
e a