| {{#Wiki_filter:}} | | {{#Wiki_filter:Turkey Point Unit 3 and Unit 4 Reactor Protection System Engineered Safety Feature Actuation System Nuclear Instrumentation System Replacements Safety System Replacement Project LAR NRC 5th Pre-submittal Meeting Telecon June 9th ,2021 CLOSED MEETING 1 Non-proprietary information suitable for public disclosure |
| | |
| | FRAMATOME INC. PROPRIETARY Proprietary information statement has been removed in this redacted file. |
| | 2 |
| | |
| | Agenda - Closed Portion |
| | * RPS/ESFAS/NIS LAR Outline/Attachments and Discussion on Commitments |
| | * D3 Overview of Progress to Completion |
| | * Technical Specification Surveillance Extension/Reduction |
| | * Project Lifecycle Schedule |
| | * Action Items/Follow-up 3 Non-proprietary information suitable for public disclosure |
| | |
| | RPS/ESFAS/LAR Updated Table of Contents Following the ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents |
| | * Intro/Justification/Safety Analysis |
| | * Detailed Description |
| | * Technical Evaluation |
| | - Existing Plant System Description (ISG-06 D1) |
| | - Existing and New Architecture (ISG-06 D2) |
| | - New Safety System Equipment |
| | - New System Functions (ISG-06 D2.3) |
| | - Functional Allocation (ISG-06 D2.4) |
| | - New Augmented Quality System Functions |
| | - System Interfaces (ISG-06 D2.5) |
| | - Defense-In-Depth and Diversity (D2.6) |
| | - Setpoint Methodology and Calculations (D2.7) |
| | - Response Time Performance 4 Non-proprietary information suitable for public disclosure |
| | |
| | RPS/ESFAS/LAR Updated Table of Contents Following the ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents (Cont.) |
| | * Technical Evaluation (Cont.) |
| | - Summary System Development Process (D.4) |
| | - Equipment Qualification (D.3) |
| | - Applying a Referenced Topical Report (D.5) |
| | - Tricon Plant Specific Action Items (D.5) |
| | - Human Factors Engineering (B.1.4) |
| | - Tests and Self Diagnostics |
| | - System Failure Analysis |
| | - Fundamental Design Principles in the new Architecture |
| | - Compliance with IEEE Std. 603-1991 and IEEE 7-4.3.2-2003 (D.6) |
| | - NRC ISG-04 Compliance Matrix |
| | - Reliability |
| | - Secure Development and Operational Environment (D.8) 5 Non-proprietary information suitable for public disclosure |
| | |
| | RPS/ESFAS/LAR Updated Table of Contents Following the ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents (Cont.) |
| | * Technical Evaluation (Cont.) |
| | - Summary of Vendor Oversight Plan (C2.2) |
| | - Technical Specification Surveillance Reduction (a non ISG-06 item) |
| | * Regulatory Evaluation Basis Turkey Point is a pre-IEEE 279-1971 plant and plans on maintaining its existing licensing basis. The new RPS\ESFAS\NIS system will be designed to more current RGs and Industry standards. There are too many to list, but key ones for discussion and feedback: |
| | - Key Regulatory Basis documents addressed in LAR RG 1.153 and IEEE 601-1991 RG 1.152, Rev 3 and IEEE 7-4.3.2-2003 Qualification - IEEE 323-1974, IEEE 344-1987, and RG 1.180, Rev 1 |
| | - Key NRC Review Guidance ISG-04 and ISG-06, Rev 2 NUREG 0800, BTP 7-19, Rev 8, and 7-17, Rev 6 6 Non-proprietary information suitable for public disclosure |
| | |
| | RPS/ESFAS/LAR Updated Table of Contents Following the ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents (Cont.) |
| | * ATTACHMENTS (Available thru Electronic Reading Room) |
| | - Markup Technical Specification Pages |
| | - Markup Technical Specification Bases (Information Only) |
| | - Qualification Summary Reports |
| | - Defense-In-Depth and Diversity Analysis (D3) |
| | - HFE Program Plan |
| | - RPS/ESFAS/NIS SyRS |
| | - Technical Specification Surveillance Reduction Report |
| | - Framatome Affidavit in support of Attachments |
| | - Listing of Regulatory Commitments 7 Non-proprietary information suitable for public disclosure |
| | |
| | PS/ESFAS/NIS LAR - Commitments Discussion |
| | * FPL does not anticipate any new Commitments. |
| | * Implementation Items discussion 8 Non-proprietary information suitable for public disclosure |
| | |
| | Plant Specific Action Items (PSAIs) |
| | * The Turkey Point LAR will address the 19 Tricon PSAIs following DI&C-ISG-06, Rev. 2, Section D.5.1.2, Resolution of Topical Report Plant-Specific Action Items states |
| | - Based on a topical report review in accordance with SRP BTP 7-14, some topical reports include plant-specific items stating that the NRC staff should review detailed design, implementation, testing and ongoing life cycle activities. For the Alternate Review Process, the licensee will provide oversight of the performance of these activities, in accordance with the licensees QA program and Vendor Oversight Plan. |
| | - 15 of the 19 Plant Specific Action Items were addressed for Turkey Point specifically as regards the validation of completion, in a similar manner that was done for Diablo Canyon, but specific to Turkey Point 3&4. The following four (4) PSAIs, not previously addressed for Diablo Canyon due to its specific application, will be addressed for Turkey Point: |
| | 9 Non-proprietary information suitable for public disclosure |
| | |
| | Plant Specific Action Items (Turkey Point Specific) |
| | * Tricon V10 PSAI 8 (Section 3.4.3, Diagnostic and Test Capabilities, of the Tricon V10 SE): The Turkey Point 3&4 LAR will provide the engineering basis for crediting the diagnostic and self-test capabilities of the Tricon for review by NRC and inclusion in the SER. |
| | * Tricon V10 PSAI 12 (Section 3.7.3.2, DI&C-ISG-04, Staff Position 2 - Command Prioritization, of the Tricon V10 SE): |
| | The Turkey Point 3&4 LAR will include the design of field device interface and the determination of means for command prioritization because the relay logic replacement scope is included in the LAR for NRC review. |
| | 10 Non-proprietary information suitable for public disclosure |
| | |
| | Plant Specific Action Items (Turkey Point Specific) |
| | * Tricon V10 PSAI 13 (Section 3.7.3.3, DI&C-ISG-04, Section 3 - |
| | Multidivisional Control and Display Stations, of the Tricon V10 SE). The Turkey Point 3&4 LAR will address the role of information displays and operator work stations for the determination of information sources and interconnections. |
| | This information will be included in the LAR; [ |
| | ] |
| | * Tricon V10 PSAI 18 (Section 3.7.1, Tricon-Based PPS Equipment Communications, of the Tricon V10 SE). The Turkey Point 3&4 LAR will include a description of the application-specific communication and functions for the SVDU including any testing and verification of the session announcement protocol library for control room interface. |
| | 11 Non-proprietary information suitable for public disclosure |
| | |
| | Overview of RPS/ESFAS/NIS Architecture (Scope of Replacement) 12 Non-proprietary information suitable for public disclosure |
| | |
| | RPS/ESFAS/NIS D3 Update Since Our Last Presentation on February 18, 2021 13 Non-proprietary information suitable for public disclosure |
| | |
| | ATWS Requirement 14 Non-proprietary information suitable for public disclosure |
| | |
| | Key D3 Assumptions 15 Non-proprietary information suitable for public disclosure |
| | |
| | D3 Assumptions (Continued) 16 Non-proprietary information suitable for public disclosure |
| | |
| | D3 Evaluation Process-Step 1 17 Non-proprietary information suitable for public disclosure |
| | |
| | Platform Diversity -Step 2 18 Non-proprietary information suitable for public disclosure |
| | |
| | D3 Block Selection Process-Step 3 19 Non-proprietary information suitable for public disclosure |
| | |
| | D3 Evaluation Process-Step 4 20 Non-proprietary information suitable for public disclosure |
| | |
| | D3 Validation Process after Initial Development of the D3 Report -- March - May, 2021 |
| | * Project Team retained Zachry Nuclear Engineering to perform |
| | [ ] quantitative analyses and [ ] detailed qualitative analyses to address verification of bounding analyses based on final selected automatic actuations. |
| | * Validation completed May 24, 2021 |
| | * Analyses included: |
| | 21 Non-proprietary information suitable for public disclosure |
| | |
| | DAS 22 Non-proprietary information suitable for public disclosure |
| | |
| | DAS automatic actuations-Step 5 Validated Results included in Final D3 Report 23 Non-proprietary information suitable for public disclosure |
| | |
| | D3 Conclusions |
| | * Turkey Point I&C upgrade architecture is designed with a high level of Quality, Diversity and Defense-In-Depth |
| | * The I&C Diversity and Defense-in-Depth qualitative methodology conforms with regulatory guidance and meets criteria with the addition of certain DAS functions 24 Non-proprietary information suitable for public disclosure |
| | |
| | Tech Spec Surveillance Test Extension/Reduction For RPS/ESFAS/NIS LAR - Re-review Turkey Points Plan forward for Surveillance Reduction |
| | * Continue to utilize the NEI 04-10 surveillance frequency control program to extend SR frequencies (not a part of this LAR). |
| | * FPL Upgrade Project is working in conjunction with the Turkey Point ITS project to ensure proper integration and implementation efficiency both internal and with the staff. |
| | 25 Non-proprietary information suitable for public disclosure |
| | |
| | Tech Spec Surveillance Test Extension/Reduction For RPS/ESFAS/NIS LAR - Implementation Key Areas for Implementation |
| | * Use of Triconex Approved Topical Report, 7286-545-1-A, Revision 4: Nuclear Qualification of Tricon V10 Triple Modular Redundant (TMR) PLC System, dated May 15, 2012, including U.S. Nuclear Regulatory Commission Safety Evaluation Report dated April 12, 2012 (ML120900889)). |
| | * LAR will address as plant-specific application-dependent issues as required by the NRC SER along with proposed Tech Spec changes and supporting documentation. |
| | * [ |
| | ] |
| | 26 Non-proprietary information suitable for public disclosure |
| | |
| | Tech Spec Surveillance Test Extension/Reduction For RPS/ESFAS/NIS LAR - Channel Check 27 Non-proprietary information suitable for public disclosure |
| | |
| | Tech Spec Surveillance Test Extension/Reduction For RPS/ESFAS/NIS LAR - Channel Check 28 Non-proprietary information suitable for public disclosure |
| | |
| | Tech Spec Surveillance Test Extension/Reduction For RPS/ESFAS/NIS LAR - COTs and ALTs Reduction 29 Non-proprietary information suitable for public disclosure |
| | |
| | Tech Spec Surveillance Test Extension/Reduction For RPS/ESFAS/NIS LAR - Surveillance Reduction Analysis 30 Non-proprietary information suitable for public disclosure |
| | |
| | Tech Spec Surveillance Test Extension/Reduction For RPS/ESFAS/NIS LAR - System Level FMEA 31 Non-proprietary information suitable for public disclosure |
| | |
| | Project LAR and Lifecycle Schedule |
| | * LAR Submittal target is September, 2021 |
| | * Design Phase |
| | - June thought November 2021 |
| | * Equipment Qualification Schedule |
| | - July 2021 through February 2022 |
| | * Implementation Phase |
| | - September through April 2022 |
| | * Factory Acceptant Testing |
| | - May through October 2022 |
| | * Human Factor Engineering (HFE) |
| | - April 2021 thru October 2022 32 Non-proprietary information suitable for public disclosure |
| | |
| | Action Items/Follow-Up |
| | * Future Meeting Subjects |
| | - Vendor Oversight Plan Update |
| | - Cyber Security Scope |
| | - Equipment Scope of Supply not covered by SER |
| | - Project Life Cycle Schedule |
| | - Remaining Open Issues 33 Non-proprietary information suitable for public disclosure |
| | |
| | Questions? |
| | 34 Non-proprietary information suitable for public disclosure |
| | |
| | Acronym List Actuation Logic Test ALT ATWS Mitigation System Actuation Circuitry AMSAC Alternate Review AR Anticipated Transient Without Scram ATWS Branch Technical Position BTP Channel Operational Test COT Diverse Actuation System DAS Digital Instrumentation and Control DI&C Defense-in-Depth and Diversity D3 Engineered Safety Features Actuation System ESFAS Failure Modes and Effects Analysis FMEA Failure Modes and Effects Diagnostic Analysis FMEDA Florida Power and Light FPL Feedwater Isolation FWI Human Factors engineering HFE Instrumentation and Control I&C 35 Non-proprietary information suitable for public disclosure |
| | |
| | Acronym List (continued) |
| | Institute of Electrical and Electronic engineers IEEE Interim Staff Guidance ISG International Organization for Standardization ISO Improved Technical Specifications ITS License Amendment Request LAR Main Control Board MCB Main Control Room MCR Nuclear Energy Institute NEI Nuclear Instrumentation System NIS Nuclear Regulatory Commission NRC NRC Publication for Knowledge and Guidance NUREG Programmable Logic Computer PLC Postulated Initiating Event PIE Plant Specific Action Items PSAI Regulatory Guide RG Quality Assurance QA Qualified Display Processing System QDPS 36 Non-proprietary information suitable for public disclosure |
| | |
| | Acronym List (continued) |
| | Reactor Protection System RPS Self-Diagnostics SD Safety Evaluation Report SER Safety Injection SI Safety Related SR Safety Requirements Memoranda SRM Standard Review Plan SRP Steam Generator STGR System Requirements Specification SyRS Safety Visual Display Unit SVDU Software Common Cause Failure SWCCF Passive Actuation Device Test TADOT Triple Modular Redundant TMR Turkey Point TP Vendor Oversight Program VOP 37 Non-proprietary information suitable for public disclosure |
| | |
| | Any reproduction, alteration, transmission to any third party or publication in whole or in part of this document and/or its content is prohibited unless Framatome has provided its prior and written consent. |
| | This document and any information it contains shall not be used for any other purpose than the one for which they were provided. Legal action may be taken against any infringer and/or any person breaching the aforementioned obligations 38}} |
Letter Sequence Meeting |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARPMNS20201328, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2020-12-0909 December 2020 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML20338A0472020-12-0909 December 2020 December 9, 2020 FPL Slides Rps/Esfas Nuclear Instrumentation Project stage: Request PMNS20201397, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2020-12-16016 December 2020 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21011A2382021-01-11011 January 2021 Slides for January 13, 2021 Presubmittal Meeting with NextEra Concerning Digital I&C Closed Non-Proprietary Project stage: Request ML21011A2232021-01-22022 January 2021 Requests for Withholding Information from Public Disclosure Project stage: Other PMNS20210136, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2021-02-0404 February 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21047A2102021-02-16016 February 2021 NRC Presubmittal Meeting Telecon February 18, 2021 Open Meeting - FPL Safety System Replacement Project LAR - Nonproprietary Project stage: Meeting PMNS20210305, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade at Turkey Point Nuclear Generating, Unit Nos. 3 and 42021-03-29029 March 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade at Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Project stage: Request ML21054A0012021-03-29029 March 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade Project stage: Meeting ML21096A0772021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification Project stage: Request ML21096A0612021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification - Open Project stage: Request ML21099A1052021-04-23023 April 2021 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance PMNS20210737, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2021-05-28028 May 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21159A1652021-06-0404 June 2021 Affidavit for Nextera Tricon Presentation for Turkey Point 5th Presubmittal Meeting Project stage: Meeting ML21159A1892021-06-0909 June 2021 Non-Proprietary - FPL NRC Presubmittal Meeting June 9th Closed Slides Project stage: Meeting ML21159A1712021-06-0909 June 2021 FPL NRC Presubmittal Meeting June 10th Week Open Session Project stage: Meeting ML21176A0102021-06-29029 June 2021 Summary of Drop-in Meeting with NextEra-Florida Power and Light to Discuss Pending Submittals Related to Digital Instrumentation and Controls and Improved Standard Technical Specifications for Turkey Point Nuclear Plant, Units 3 & 4 (EPID L Project stage: Meeting ML21172A2712021-06-29029 June 2021 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Withholding Request Acceptance PMNS20210933, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2021-07-12012 July 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21200A1472021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Closed Public Project stage: Request ML21200A1562021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Open Project stage: Request ML21190A1862021-08-0202 August 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point Units 3 and 4 Project stage: Meeting ML21232A0172021-08-20020 August 2021 Licensee'S Non-Proprietary Presentation (2 of 2) for August 23 and 25, 2021 Public Meeting Project stage: Meeting ML21279A0962021-08-20020 August 2021, 23 August 2021, 15 October 2021 Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade for Turkey Point, Units 3 and 4 Project stage: Request ML21235A0932021-08-23023 August 2021 Licensee'S Non-Proprietary Presentation (1 of 2) for August 23 and 25, 2021 Public Meeting Project stage: Meeting PMNS20211047, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control License Amendment Request for Turkey Point Nuclear Generating Unit Nos. 3 and 42021-08-23023 August 2021 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control License Amendment Request for Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Meeting ML21279A0432021-10-15015 October 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade for Turkey Point, Units 3 and 4 Project stage: Meeting ML21214A1192021-11-23023 November 2021 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Withholding Request Acceptance ML21246A0212021-11-23023 November 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point Units 3 and 4 Project stage: Meeting ML21302A0052021-12-23023 December 2021 Email to Nextera/Fpl Re Discussion of Availability of Human Factor Validation Information to Support the Planned Turkey Point Digital I&C License Amendment Request Project stage: Other PMNS20220162, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Units 3 and 42022-02-25025 February 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Units 3 and 4 Project stage: Meeting ML22063A4482022-03-0202 March 2022 Nextera/Fpl Affidavit for Proprietary Presentation for March 7, 2022, Public Meeting Project stage: Meeting ML22101A2042022-04-0606 April 2022 Nextera/Fpl Affidavit for Proprietary Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request Project stage: Meeting ML22101A2262022-04-11011 April 2022 NRC Staff Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request Project stage: Meeting ML22098A0902022-04-13013 April 2022 Nextera/Fpl Non-Proprietary Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request (EPID L-2021-LRM-0007) (Slides) Project stage: Meeting ML22098A0932022-04-13013 April 2022 Nextera/Fpl Redacted Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request (Public Version) Project stage: Meeting ML22129A1812022-05-11011 May 2022 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point, Units 3 and 4 Project stage: Meeting ML22137A2512022-05-19019 May 2022 Summary of Pre-Application Meeting with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point, Units 3 and 4 Project stage: Meeting 2021-06-29
[Table View] |
|
---|
Category:Meeting Agenda
MONTHYEARPMNS20230969, Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement2023-09-0707 September 2023 Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement PMNS20230973, Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement2023-09-0707 September 2023 Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement PMNS20230932, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-14014 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230879, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-0101 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230809, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-07-11011 July 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230775, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-30030 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230732, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle for Turkey Point Generating Unit Nos. 3 and 42023-06-26026 June 2023 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle for Turkey Point Generating Unit Nos. 3 and 4 PMNS20230718, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-12012 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230673, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-26026 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230599, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-15015 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230594, Annual Assessment Meeting2023-05-0404 May 2023 Annual Assessment Meeting PMNS20230447, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-20020 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230449, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-18018 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230409, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-11011 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230253, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-0707 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230278, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-0303 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230308, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-27027 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230226, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-03-0707 March 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230223, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0606 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230192, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0101 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230168, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-02-22022 February 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230134, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-22022 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230159, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-15015 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230049, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-01-27027 January 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-26026 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230060, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-18018 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230003, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-0505 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221243, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 32022-12-0202 December 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and PMNS20221177, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle Turkey Point Generating Unit Nos. 3 and 42022-11-22022 November 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle Turkey Point Generating Unit Nos. 3 and 4 PMNS20221132, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-31031 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-17017 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221057, Meeting Between the U.S. Nuclear Regulatory Commission and Florida Power & Light Company to Discuss Review of Digital Instrumentation and Controls License Amendment Requests for Turkey Point Nuclear Generating, Units 3 and 42022-10-11011 October 2022 Meeting Between the U.S. Nuclear Regulatory Commission and Florida Power & Light Company to Discuss Review of Digital Instrumentation and Controls License Amendment Requests for Turkey Point Nuclear Generating, Units 3 and 4 PMNS20220997, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-0303 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20220876, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Review of Defense-in-Depth and Diversity (D3) Evaluation for Turkey Point Nuclear Generating, Units 3 and 4 (Turkey Point)2022-09-22022 September 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Review of Defense-in-Depth and Diversity (D3) Evaluation for Turkey Point Nuclear Generating, Units 3 and 4 (Turkey Point) PMNS20220998, Notice of Meeting with Florida Power and Light Company (FPL) Regarding Turkey Point Setpoint Methodologies as It Relates to the Improved Technical Specification (ITS) Conversion License Amendment Request2022-09-22022 September 2022 Notice of Meeting with Florida Power and Light Company (FPL) Regarding Turkey Point Setpoint Methodologies as It Relates to the Improved Technical Specification (ITS) Conversion License Amendment Request PMNS20220935, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-09-0909 September 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220930, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request2022-09-0808 September 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request ML22227A1302022-08-17017 August 2022 License Amendment Request Reactor Trip Breaker Completion Time Extension - Public Meeting August 17, 2022 (EPID L-2022-LRM-0061) (Slides) PMNS20220832, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-16016 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220799, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and2022-08-16016 August 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and 4 PMNS20220748, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-0303 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220701, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-07-14014 July 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220683, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-28028 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request ML22172A2172022-06-22022 June 2022 LAR: Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) PMNS20220609, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-14014 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220582, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 42022-06-10010 June 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 4 PMNS20220592, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-0606 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request ML22144A3902022-05-24024 May 2022 RCP Seal Solutions - May 24 2022 Slide Material (Public) PMNS20220454, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-05-17017 May 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220478, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 42022-05-11011 May 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 4 2023-09-07
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML23258A0272023-09-15015 September 2023 September 2023 Dseis Public Meeting - Virtual Meeting Slides ML23258A0262023-09-15015 September 2023 September 2023 Dseis Public Meeting - In-person Meeting Slides ML23177A0812023-06-28028 June 2023 Nd Pre-Submittal Meeting Regarding License Amendment Requests for Transition to 24-Month Fuel Cycles ML23124A3412023-05-0404 May 2023 FPL 2022 Public Meeting Slides ML22336A0262022-12-0707 December 2022 December 7 2022 24-Month Fuel Cycle Public Meeting Licensee Slides ML22251A1732022-09-0808 September 2022 Staff Presentation Slides for Turkey Point Di&C LAR Acceptance Review Public Meeting, September 13, 2022 ML22227A1302022-08-17017 August 2022 License Amendment Request Reactor Trip Breaker Completion Time Extension - Public Meeting August 17, 2022 (EPID L-2022-LRM-0061) (Slides) ML22172A2172022-06-22022 June 2022 LAR: Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) ML22144A3902022-05-24024 May 2022 RCP Seal Solutions - May 24 2022 Slide Material (Public) ML22111A1782022-04-26026 April 2022 April 26, 2022 Public Meeting on Reactor Coolant Pump Seal Replacement - Florida Power and Light Slides ML22101A2262022-04-11011 April 2022 NRC Staff Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request ML22063A1262022-03-0404 March 2022 Nextera/Fpl Presentation for March 7, 2022 Public Meeting Between NRC and Florida Power & Light Company to Discuss Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Units 3 and 4 ML21320A2612021-11-17017 November 2021 Supporting Information for Turkey Point and St. Lucie Improved Technical Specifications November 17, 2021, Public Meeting - List of Topics ML21237A0092021-08-25025 August 2021 August 25, 2021 - Nextera/Fpl Presentation Slides for Public Meeting Concerning Proposed Alternative Repair to Unit 3 CCW Discharge Line ML21235A0932021-08-23023 August 2021 Licensee'S Non-Proprietary Presentation (1 of 2) for August 23 and 25, 2021 Public Meeting ML21232A0172021-08-20020 August 2021 Licensee'S Non-Proprietary Presentation (2 of 2) for August 23 and 25, 2021 Public Meeting ML21225A0012021-08-18018 August 2021 Preapplication Meeting Presentation Improved Technical Specifications Conversion ML21200A1472021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Closed Public ML21200A1562021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Open ML21159A1712021-06-0909 June 2021 FPL NRC Presubmittal Meeting June 10th Week Open Session ML21159A1892021-06-0909 June 2021 Non-Proprietary - FPL NRC Presubmittal Meeting June 9th Closed Slides ML21109A0052021-04-19019 April 2021 2020 - Stl - Tpn Combined EOC Presentation ML21096A0772021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification ML21096A0612021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification - Open ML21095A0162021-04-0505 April 2021 2021 RIC Session T12 - DOE-Sponsored Light Water Reactor Sustainability Program ML21047A2102021-02-16016 February 2021 NRC Presubmittal Meeting Telecon February 18, 2021 Open Meeting - FPL Safety System Replacement Project LAR - Nonproprietary ML21011A2382021-01-11011 January 2021 Slides for January 13, 2021 Presubmittal Meeting with NextEra Concerning Digital I&C Closed Non-Proprietary ML20338A0472020-12-0909 December 2020 December 9, 2020 FPL Slides Rps/Esfas Nuclear Instrumentation ML20266G2202020-09-15015 September 2020 Slide Presentation for September 15, 2020 Public Meeting Concerning CCW Headers ML20135F6652020-05-14014 May 2020 Stl - Tpn Combined EOC Presentation ML19116A2582019-05-0101 May 2019 Tp Dseis Meeting 05-01-19 Spanish Slides ML19116A2692019-05-0101 May 2019 Preliminary Results of the Environmental Review for Turkey Point Nuclear Generating Units 3 and 4 Subsequent License Renewal ML19056A1462019-02-25025 February 2019 SLRA RAIs 10, 12, 13 - Set 8 Rev. 0 Irradiated Concrete-Steel Responses ML18141A3072018-05-21021 May 2018 18 - SLR Status ML14174A4022014-06-24024 June 2014 6/24/2014, Pre-Submittal Meeting Slide for St. Lucie and Turkey Point Re. License Amendment Request Adoption of TSTF-505 Risk-Informed Completion Time ML13164A3122013-06-13013 June 2013 Summary of Category 3 Public Meeting - Annual Assessment - Turkey Point Nuclear Plant Units 3 and 4 ML12352A2042012-12-27027 December 2012 Dec 27 2012 Handout - Tropical Audubon Society ML12256A7462012-09-12012 September 2012 PRB Meeting with Saporito Petition Slides ML1205805322012-02-27027 February 2012 Public Meeting Summary - Turkey Point - Meeting Slides ML11178A0682011-06-23023 June 2011 Meeting Slides, Turkey Point Nuclear Plant, Units 3 and 4, Extended Power Uprate (Epu), NRC and FPL Public Meeting ML1114507462011-05-25025 May 2011 Annual Assessment Meeting - Presentation Slides ML1108907262011-03-31031 March 2011 Slides for Turkey Point, 3 and 4, Regarding Extended Power Uprate and Spent Fuel Criticality ML1107703492011-03-22022 March 2011 3/22/11 PRE-Application Meeting Slides Regarding NFPA 805 License Amendment Request ML1108206992011-03-22022 March 2011 3/22/11 Revised Pre-application Meeting Slides Regarding NFPA 805 License Amendment Request ML1102604062011-01-11011 January 2011 FPL Meeting Summary Presentation Handouts ML1030802102010-11-0404 November 2010 NRC Staff Response to NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 4 ML1030802322010-11-0404 November 2010 NRC Staff Response to NFPA 805 Transition Pilot Plant FAQ 07-0038, Revision 2 ML1023502322010-08-18018 August 2010 Extended Power Uprate (EPU) NRC Public Meeting ML1023104112010-07-22022 July 2010 Meeting with NRC Extended Power Uprate (EPU) ML1016704902010-06-0808 June 2010 Fire Protection OMA Screening Criteria (Turkey Point) 2023-09-15
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23258A0262023-09-15015 September 2023 September 2023 Dseis Public Meeting - In-person Meeting Slides ML23258A0272023-09-15015 September 2023 September 2023 Dseis Public Meeting - Virtual Meeting Slides ML23177A0812023-06-28028 June 2023 Nd Pre-Submittal Meeting Regarding License Amendment Requests for Transition to 24-Month Fuel Cycles ML23124A3412023-05-0404 May 2023 FPL 2022 Public Meeting Slides ML22336A0262022-12-0707 December 2022 December 7 2022 24-Month Fuel Cycle Public Meeting Licensee Slides ML22251A1732022-09-0808 September 2022 Staff Presentation Slides for Turkey Point Di&C LAR Acceptance Review Public Meeting, September 13, 2022 ML22227A1302022-08-17017 August 2022 License Amendment Request Reactor Trip Breaker Completion Time Extension - Public Meeting August 17, 2022 (EPID L-2022-LRM-0061) (Slides) ML22172A2172022-06-22022 June 2022 LAR: Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) ML22144A3902022-05-24024 May 2022 RCP Seal Solutions - May 24 2022 Slide Material (Public) ML22110A2172022-05-0303 May 2022 Annual Assessment Meeting ML22111A1782022-04-26026 April 2022 April 26, 2022 Public Meeting on Reactor Coolant Pump Seal Replacement - Florida Power and Light Slides ML22098A0932022-04-13013 April 2022 Nextera/Fpl Redacted Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request (Public Version) ML22098A0902022-04-13013 April 2022 Nextera/Fpl Non-Proprietary Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request (EPID L-2021-LRM-0007) (Slides) ML22101A2262022-04-11011 April 2022 NRC Staff Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request ML22063A1262022-03-0404 March 2022 Nextera/Fpl Presentation for March 7, 2022 Public Meeting Between NRC and Florida Power & Light Company to Discuss Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Units 3 and 4 ML22054A1662022-02-23023 February 2022 ITS Public Meeting Material - NRC - Expectations for Licensee'S Responses to ITS Conversion LAR and RAIs ML22046A0462022-02-15015 February 2022 Icw Relief Request 10 Public Meeting Licensee Presentation ML22032A0022022-02-0202 February 2022 2/2/22 Slides Considerations for the Potential Use of a Multi-Stage Validation Approach to Support to Nuclear Power Plant Control Room Modifications Discussion of Concepts and NRC Licensing Considerations ML21285A0412021-10-13013 October 2021 Summary of September 29, 2021 Meeting with the U.S. Fish and Wildlife Service Regarding Crocodile Monitoring at Turkey Point ML21237A0092021-08-25025 August 2021 August 25, 2021 - Nextera/Fpl Presentation Slides for Public Meeting Concerning Proposed Alternative Repair to Unit 3 CCW Discharge Line ML21235A0932021-08-23023 August 2021 Licensee'S Non-Proprietary Presentation (1 of 2) for August 23 and 25, 2021 Public Meeting ML21232A0172021-08-20020 August 2021 Licensee'S Non-Proprietary Presentation (2 of 2) for August 23 and 25, 2021 Public Meeting ML21225A0012021-08-18018 August 2021 Preapplication Meeting Presentation Improved Technical Specifications Conversion ML21200A1472021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Closed Public ML21200A1562021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Open ML21159A1892021-06-0909 June 2021 Non-Proprietary - FPL NRC Presubmittal Meeting June 9th Closed Slides ML21159A1712021-06-0909 June 2021 FPL NRC Presubmittal Meeting June 10th Week Open Session ML21109A0052021-04-19019 April 2021 2020 - Stl - Tpn Combined EOC Presentation ML21096A0772021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification ML21096A0612021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification - Open ML21076A6152021-03-22022 March 2021 NRC Pre-Submittal Meeting, St. Lucie and Turkey Point Nuclear Plants - Improved Technical Specification Conversion - March 22, 2021 (EPID L-2021-LRM-0032) (Presentation) ML21047A2102021-02-16016 February 2021 NRC Presubmittal Meeting Telecon February 18, 2021 Open Meeting - FPL Safety System Replacement Project LAR - Nonproprietary ML21011A2382021-01-11011 January 2021 Slides for January 13, 2021 Presubmittal Meeting with NextEra Concerning Digital I&C Closed Non-Proprietary ML20338A0472020-12-0909 December 2020 December 9, 2020 FPL Slides Rps/Esfas Nuclear Instrumentation ML20266G2202020-09-15015 September 2020 Slide Presentation for September 15, 2020 Public Meeting Concerning CCW Headers ML20135F6652020-05-14014 May 2020 Stl - Tpn Combined EOC Presentation ML19116A2582019-05-0101 May 2019 Tp Dseis Meeting 05-01-19 Spanish Slides L-2018-136, L-2018-136-Attachment 53 Enclosure 1 - Slides and Presentations2018-08-0808 August 2018 L-2018-136-Attachment 53 Enclosure 1 - Slides and Presentations ML18150A2402018-05-30030 May 2018 Slides for Turkey Point Public Scoping Meeting on May 31 2018 - English ML18144A1242018-05-24024 May 2018 Summary of Public Meeting Concerning Annual Assessment of Turkey Point Nuclear Generating Station Unit 3 and Unit 4, for Period of January 1, 2017 December 31, 2017 ML18141A3072018-05-21021 May 2018 18 - SLR Status ML17310B2322017-11-0707 November 2017 Presentation Slides - NextEra Energy/Fpl - GSI-191 Issue Resolution, Pre-submittal Meeting, September 20, 2017 ML14174A4022014-06-24024 June 2014 6/24/2014, Pre-Submittal Meeting Slide for St. Lucie and Turkey Point Re. License Amendment Request Adoption of TSTF-505 Risk-Informed Completion Time ML14156A2212014-06-0404 June 2014 Public Meeting Summary - Turkey Point Nuclear Generating Station Docket Nos. 50-250 and 50-251 ML13164A3122013-06-13013 June 2013 Summary of Category 3 Public Meeting - Annual Assessment - Turkey Point Nuclear Plant Units 3 and 4 ML1205805322012-02-27027 February 2012 Public Meeting Summary - Turkey Point - Meeting Slides ML11178A0682011-06-23023 June 2011 Meeting Slides, Turkey Point Nuclear Plant, Units 3 and 4, Extended Power Uprate (Epu), NRC and FPL Public Meeting ML1114507462011-05-25025 May 2011 Annual Assessment Meeting - Presentation Slides ML1108907262011-03-31031 March 2011 Slides for Turkey Point, 3 and 4, Regarding Extended Power Uprate and Spent Fuel Criticality ML1107703492011-03-22022 March 2011 3/22/11 PRE-Application Meeting Slides Regarding NFPA 805 License Amendment Request 2023-09-15
[Table view] |
Text
Turkey Point Unit 3 and Unit 4 Reactor Protection System Engineered Safety Feature Actuation System Nuclear Instrumentation System Replacements Safety System Replacement Project LAR NRC 5th Pre-submittal Meeting Telecon June 9th ,2021 CLOSED MEETING 1 Non-proprietary information suitable for public disclosure
FRAMATOME INC. PROPRIETARY Proprietary information statement has been removed in this redacted file.
2
Agenda - Closed Portion
- RPS/ESFAS/NIS LAR Outline/Attachments and Discussion on Commitments
- D3 Overview of Progress to Completion
- Technical Specification Surveillance Extension/Reduction
- Project Lifecycle Schedule
- Action Items/Follow-up 3 Non-proprietary information suitable for public disclosure
RPS/ESFAS/LAR Updated Table of Contents Following the ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents
- Intro/Justification/Safety Analysis
- Existing Plant System Description (ISG-06 D1)
- Existing and New Architecture (ISG-06 D2)
- New Safety System Equipment
- New System Functions (ISG-06 D2.3)
- Functional Allocation (ISG-06 D2.4)
- New Augmented Quality System Functions
- System Interfaces (ISG-06 D2.5)
- Defense-In-Depth and Diversity (D2.6)
- Setpoint Methodology and Calculations (D2.7)
- Response Time Performance 4 Non-proprietary information suitable for public disclosure
RPS/ESFAS/LAR Updated Table of Contents Following the ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents (Cont.)
- Technical Evaluation (Cont.)
- Summary System Development Process (D.4)
- Equipment Qualification (D.3)
- Applying a Referenced Topical Report (D.5)
- Tricon Plant Specific Action Items (D.5)
- Human Factors Engineering (B.1.4)
- Tests and Self Diagnostics
- System Failure Analysis
- Fundamental Design Principles in the new Architecture
- Compliance with IEEE Std. 603-1991 and IEEE 7-4.3.2-2003 (D.6)
- NRC ISG-04 Compliance Matrix
- Reliability
- Secure Development and Operational Environment (D.8) 5 Non-proprietary information suitable for public disclosure
RPS/ESFAS/LAR Updated Table of Contents Following the ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents (Cont.)
- Technical Evaluation (Cont.)
- Summary of Vendor Oversight Plan (C2.2)
- Technical Specification Surveillance Reduction (a non ISG-06 item)
- Regulatory Evaluation Basis Turkey Point is a pre-IEEE 279-1971 plant and plans on maintaining its existing licensing basis. The new RPS\ESFAS\NIS system will be designed to more current RGs and Industry standards. There are too many to list, but key ones for discussion and feedback:
- Key Regulatory Basis documents addressed in LAR RG 1.153 and IEEE 601-1991 RG 1.152, Rev 3 and IEEE 7-4.3.2-2003 Qualification - IEEE 323-1974, IEEE 344-1987, and RG 1.180, Rev 1
- Key NRC Review Guidance ISG-04 and ISG-06, Rev 2 NUREG 0800, BTP 7-19, Rev 8, and 7-17, Rev 6 6 Non-proprietary information suitable for public disclosure
RPS/ESFAS/LAR Updated Table of Contents Following the ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents (Cont.)
- ATTACHMENTS (Available thru Electronic Reading Room)
- Markup Technical Specification Pages
- Markup Technical Specification Bases (Information Only)
- Qualification Summary Reports
- Defense-In-Depth and Diversity Analysis (D3)
- HFE Program Plan
- RPS/ESFAS/NIS SyRS
- Technical Specification Surveillance Reduction Report
- Framatome Affidavit in support of Attachments
- Listing of Regulatory Commitments 7 Non-proprietary information suitable for public disclosure
PS/ESFAS/NIS LAR - Commitments Discussion
- FPL does not anticipate any new Commitments.
- Implementation Items discussion 8 Non-proprietary information suitable for public disclosure
Plant Specific Action Items (PSAIs)
- The Turkey Point LAR will address the 19 Tricon PSAIs following DI&C-ISG-06, Rev. 2, Section D.5.1.2, Resolution of Topical Report Plant-Specific Action Items states
- Based on a topical report review in accordance with SRP BTP 7-14, some topical reports include plant-specific items stating that the NRC staff should review detailed design, implementation, testing and ongoing life cycle activities. For the Alternate Review Process, the licensee will provide oversight of the performance of these activities, in accordance with the licensees QA program and Vendor Oversight Plan.
- 15 of the 19 Plant Specific Action Items were addressed for Turkey Point specifically as regards the validation of completion, in a similar manner that was done for Diablo Canyon, but specific to Turkey Point 3&4. The following four (4) PSAIs, not previously addressed for Diablo Canyon due to its specific application, will be addressed for Turkey Point:
9 Non-proprietary information suitable for public disclosure
Plant Specific Action Items (Turkey Point Specific)
- Tricon V10 PSAI 8 (Section 3.4.3, Diagnostic and Test Capabilities, of the Tricon V10 SE): The Turkey Point 3&4 LAR will provide the engineering basis for crediting the diagnostic and self-test capabilities of the Tricon for review by NRC and inclusion in the SER.
- Tricon V10 PSAI 12 (Section 3.7.3.2, DI&C-ISG-04, Staff Position 2 - Command Prioritization, of the Tricon V10 SE):
The Turkey Point 3&4 LAR will include the design of field device interface and the determination of means for command prioritization because the relay logic replacement scope is included in the LAR for NRC review.
10 Non-proprietary information suitable for public disclosure
Plant Specific Action Items (Turkey Point Specific)
- Tricon V10 PSAI 13 (Section 3.7.3.3, DI&C-ISG-04, Section 3 -
Multidivisional Control and Display Stations, of the Tricon V10 SE). The Turkey Point 3&4 LAR will address the role of information displays and operator work stations for the determination of information sources and interconnections.
This information will be included in the LAR; [
]
- Tricon V10 PSAI 18 (Section 3.7.1, Tricon-Based PPS Equipment Communications, of the Tricon V10 SE). The Turkey Point 3&4 LAR will include a description of the application-specific communication and functions for the SVDU including any testing and verification of the session announcement protocol library for control room interface.
11 Non-proprietary information suitable for public disclosure
Overview of RPS/ESFAS/NIS Architecture (Scope of Replacement) 12 Non-proprietary information suitable for public disclosure
RPS/ESFAS/NIS D3 Update Since Our Last Presentation on February 18, 2021 13 Non-proprietary information suitable for public disclosure
ATWS Requirement 14 Non-proprietary information suitable for public disclosure
Key D3 Assumptions 15 Non-proprietary information suitable for public disclosure
D3 Assumptions (Continued) 16 Non-proprietary information suitable for public disclosure
D3 Evaluation Process-Step 1 17 Non-proprietary information suitable for public disclosure
Platform Diversity -Step 2 18 Non-proprietary information suitable for public disclosure
D3 Block Selection Process-Step 3 19 Non-proprietary information suitable for public disclosure
D3 Evaluation Process-Step 4 20 Non-proprietary information suitable for public disclosure
D3 Validation Process after Initial Development of the D3 Report -- March - May, 2021
- Project Team retained Zachry Nuclear Engineering to perform
[ ] quantitative analyses and [ ] detailed qualitative analyses to address verification of bounding analyses based on final selected automatic actuations.
- Validation completed May 24, 2021
21 Non-proprietary information suitable for public disclosure
DAS 22 Non-proprietary information suitable for public disclosure
DAS automatic actuations-Step 5 Validated Results included in Final D3 Report 23 Non-proprietary information suitable for public disclosure
D3 Conclusions
- Turkey Point I&C upgrade architecture is designed with a high level of Quality, Diversity and Defense-In-Depth
- The I&C Diversity and Defense-in-Depth qualitative methodology conforms with regulatory guidance and meets criteria with the addition of certain DAS functions 24 Non-proprietary information suitable for public disclosure
Tech Spec Surveillance Test Extension/Reduction For RPS/ESFAS/NIS LAR - Re-review Turkey Points Plan forward for Surveillance Reduction
- FPL Upgrade Project is working in conjunction with the Turkey Point ITS project to ensure proper integration and implementation efficiency both internal and with the staff.
25 Non-proprietary information suitable for public disclosure
Tech Spec Surveillance Test Extension/Reduction For RPS/ESFAS/NIS LAR - Implementation Key Areas for Implementation
- Use of Triconex Approved Topical Report, 7286-545-1-A, Revision 4: Nuclear Qualification of Tricon V10 Triple Modular Redundant (TMR) PLC System, dated May 15, 2012, including U.S. Nuclear Regulatory Commission Safety Evaluation Report dated April 12, 2012 (ML120900889)).
- LAR will address as plant-specific application-dependent issues as required by the NRC SER along with proposed Tech Spec changes and supporting documentation.
]
26 Non-proprietary information suitable for public disclosure
Tech Spec Surveillance Test Extension/Reduction For RPS/ESFAS/NIS LAR - Channel Check 27 Non-proprietary information suitable for public disclosure
Tech Spec Surveillance Test Extension/Reduction For RPS/ESFAS/NIS LAR - Channel Check 28 Non-proprietary information suitable for public disclosure
Tech Spec Surveillance Test Extension/Reduction For RPS/ESFAS/NIS LAR - COTs and ALTs Reduction 29 Non-proprietary information suitable for public disclosure
Tech Spec Surveillance Test Extension/Reduction For RPS/ESFAS/NIS LAR - Surveillance Reduction Analysis 30 Non-proprietary information suitable for public disclosure
Tech Spec Surveillance Test Extension/Reduction For RPS/ESFAS/NIS LAR - System Level FMEA 31 Non-proprietary information suitable for public disclosure
Project LAR and Lifecycle Schedule
- LAR Submittal target is September, 2021
- June thought November 2021
- Equipment Qualification Schedule
- July 2021 through February 2022
- September through April 2022
- Factory Acceptant Testing
- May through October 2022
- Human Factor Engineering (HFE)
- April 2021 thru October 2022 32 Non-proprietary information suitable for public disclosure
Action Items/Follow-Up
- Vendor Oversight Plan Update
- Cyber Security Scope
- Equipment Scope of Supply not covered by SER
- Project Life Cycle Schedule
- Remaining Open Issues 33 Non-proprietary information suitable for public disclosure
Questions?
34 Non-proprietary information suitable for public disclosure
Acronym List Actuation Logic Test ALT ATWS Mitigation System Actuation Circuitry AMSAC Alternate Review AR Anticipated Transient Without Scram ATWS Branch Technical Position BTP Channel Operational Test COT Diverse Actuation System DAS Digital Instrumentation and Control DI&C Defense-in-Depth and Diversity D3 Engineered Safety Features Actuation System ESFAS Failure Modes and Effects Analysis FMEA Failure Modes and Effects Diagnostic Analysis FMEDA Florida Power and Light FPL Feedwater Isolation FWI Human Factors engineering HFE Instrumentation and Control I&C 35 Non-proprietary information suitable for public disclosure
Acronym List (continued)
Institute of Electrical and Electronic engineers IEEE Interim Staff Guidance ISG International Organization for Standardization ISO Improved Technical Specifications ITS License Amendment Request LAR Main Control Board MCB Main Control Room MCR Nuclear Energy Institute NEI Nuclear Instrumentation System NIS Nuclear Regulatory Commission NRC NRC Publication for Knowledge and Guidance NUREG Programmable Logic Computer PLC Postulated Initiating Event PIE Plant Specific Action Items PSAI Regulatory Guide RG Quality Assurance QA Qualified Display Processing System QDPS 36 Non-proprietary information suitable for public disclosure
Acronym List (continued)
Reactor Protection System RPS Self-Diagnostics SD Safety Evaluation Report SER Safety Injection SI Safety Related SR Safety Requirements Memoranda SRM Standard Review Plan SRP Steam Generator STGR System Requirements Specification SyRS Safety Visual Display Unit SVDU Software Common Cause Failure SWCCF Passive Actuation Device Test TADOT Triple Modular Redundant TMR Turkey Point TP Vendor Oversight Program VOP 37 Non-proprietary information suitable for public disclosure
Any reproduction, alteration, transmission to any third party or publication in whole or in part of this document and/or its content is prohibited unless Framatome has provided its prior and written consent.
This document and any information it contains shall not be used for any other purpose than the one for which they were provided. Legal action may be taken against any infringer and/or any person breaching the aforementioned obligations 38