ML20198S749: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20198S749
| number = ML20198S749
| issue date = 01/07/1999
| issue date = 01/07/1999
| title = Forwards SER Accepting Licensee 980327 Ltr,Suppl by 980424 & 1124 Ltrs Proposing Changes to Rev 49 of Calvert Cliffs Nuclear Power Plant Quality Assurance Program Description in Accordance with 10CFR50.54(a)(3)
| title = Forwards SER Accepting Licensee ,Suppl by 980424 & 1124 Ltrs Proposing Changes to Rev 49 of Calvert Cliffs Nuclear Power Plant Quality Assurance Program Description in Accordance with 10CFR50.54(a)(3)
| author name = Dromerick A
| author name = Dromerick A
| author affiliation = NRC (Affiliation Not Assigned)
| author affiliation = NRC (Affiliation Not Assigned)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = TAC-MA1474, TAC-MA1475, NUDOCS 9901110412
| document report number = TAC-MA1474, TAC-MA1475, NUDOCS 9901110412
| title reference date = 03-27-1998
| package number = ML20198S753
| package number = ML20198S753
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 4
| page count = 4
| project = TAC:MA1474, TAC:MA1475
| stage = Approval
}}
}}



Latest revision as of 08:12, 8 December 2021

Forwards SER Accepting Licensee ,Suppl by 980424 & 1124 Ltrs Proposing Changes to Rev 49 of Calvert Cliffs Nuclear Power Plant Quality Assurance Program Description in Accordance with 10CFR50.54(a)(3)
ML20198S749
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/07/1999
From: Dromerick A
NRC (Affiliation Not Assigned)
To: Cruse C
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20198S753 List:
References
TAC-MA1474, TAC-MA1475, NUDOCS 9901110412
Download: ML20198S749 (4)


Text

,

Mr. Cheri s H. Crusa .

January 7,1999 Vica PrIsid:nt- Nuclur Entrgy B:ltimora G:s cnd ElIctric Comprny Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

QUALITY ASSURANCE PROGP.AM CHANGES - CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS.1 AND 2 (TAC NOS. MA1474 AND MA1475)

Dear Mr. Cruse:

By letters dated March 27,1998, as supplemented April 21,1998, and November 24,1998,

- the Baltimore Gas and Electric Company (BGE) requested NRC approval of proposed changes to Revision 49 of the Calvert Cliffs Nuclear Power Plant (Calvert Cliffs) Quality Assurance Program Description (QAP) in accordance with 10 CFR 50.54(a)(3).

The submittal proposed changing previously approved provisions regarding the approval authority for procedures listed in Calvert Cliffs Technical Specification 5.4 and adding new requirements for processing editorial corrections to these procedures.

, We have reviewed your. submittal in accordance with 10 CFR 50.54(a), and have determined

- that the proposed QAP changes are acceptable in that the QAP continues to meet the requirements of Appendix P to 10 CFR Part 50. The enclosed safety evaluation contains our evaluation of your proposed changes.

If you have any questions regarding this matter, please ' contact me at (301) 415-3473.

Sincerely, Original signed by:

Alexander W Dromerick, Senior Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/II Office of Nuclear Reactor Reguiction Doc' ket Nos. 50-317 and 50-318

Enclosure:

Safety Evaluation

cc w/ encl: ' See next page 1.:BIRUTION

/

'I

=

NUCM , S. Little - OGC L. Campbell PDI-1 R/F. . A. Dromerick-- ACRS R. Gramm J. Zwolinski T. Harris (e-mail SE only to TLH3) A. Mendiola (w/o encl.) j S. Bajwa -- OGC C. Heht, RI- / (

L p DOCUMENT NAME: G:\CC1-2\QAPCHANG.WPD ETo recilve a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy L with atttchment/ enclosure - "N" = No copy 0FFICE PM PDI 1; . ; f/ l E LA P01 1 MV l D PDI 1 ~ _ ,_ l OC WQMO lE l NAME ADrope(i$ffsi W Slittle # ' $8ajwa M7 SOlack UCh DATE 01/(, /9IP 01/ 5 /99 01/ 7 /99 01/ L,/99- 01/ /99 Official Record Copy

~v.e,aq '

I.. M ** M V,& f17 '

a

P. PDR . _ ,

Mr. Charl2s H. Crus 2 January 7,1999

  • Vica Pr:sid2nt - Nucirr En:rgy Baltimors Gas cnd Elictric Comp:ny l " e, Cilv:rt Cliffs Nuclear Power Plant l

' 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

QUALITY ASSURANCE PROGRAM CHANGES - CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS.1 AND 2 (TAC NOS. MA1474 AND MA1475)

Dear Mr. Cruse:

l l

By letters dated March 27,1998, as supplemented April 21,1998, and November 24,1998, the Baltimore Gas and Electic Company (BGE) requested NRC approval of proposed changes i to Revision 49 of the Calvert Cliffs Nuclear Power Plant (Calvert Cliffs) Quality Assurance Program Description (QAP) in accordance with 10 CFR 50.54(a)(3).

l The submittal proposed changing previously approved provisions regarding the approval authority for procedures listed in Calvert Cliffs Technical Specification 5.4 and adding new requirements for processing editorial corrections to these procedures.

We have reviewed your submittalin accordance with 10 CFR 50.54(a), and have determined that the proposed QAP changes are acceptable in that the QAP continues to meet the requirements of Appendix B to 10 CFR Part 50. The enclosed safety evaluation contains our evaluation of your proposed changes.

If you have any questions regarding this matter, please contact me at (301) 415-3473.

Sincerely, i

Original signed by:

Alexander W. Dromerick, Senior Project Manager Project Directorate I-1 Division of Reactor Projects - 1/11 Offde of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318

Enclosure:

Safety Evaluation cc w/ encl: See next page DISTRIBUTION:

PUBLIC S. Little OGC L. Campbell PDl-1 R/F A. Dromerick ACRS R. Gramm J. Zwolinski T. Harris (. mail SE only to TLH3) A. Mendiola (w/o encl.) ,

S. Bajwa OGC C. Hehl, RI DOCUMENT NAME: G:\CC1-2\QAPCHANG.WPD

! To r2ceive a copy of this document, indicate in the box: "C" = Ccpy without attachment / enclosure "E" = Copy

with attachmont/ enclosure "N" = No copy l- 0FFICE PM
PDI 1, , ,//lEl LA:PDI 1 JW l 0PDI 1 _

,, l l BC:HQMB lE I NAME ADrome/iM//s1 F SLittle # ' SBajwa M 7 SBlack f(Gk l

DATE 01/ /. /99 01/ 5 /99 01/ 7 /99 01/ b /99 01/ /99 Official Record Copy

- . . ~ . . . n.. -

. _ . a. , ~ . . _ . . .-

p on  %

[ k UNITED S(ATES 1*  ;<

j' NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20665 4 001

..... January 7, 1999 Mr. Charles H. Cruse

, Vice President - Nuclear Energy Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant 1650 Calvart Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

QUALITY ASSURANCE PROGo^M CHANGES - CALVERT CUFFS NUCLEAR .

POWER PLANT, UNIT NOS.1 AND 2 (TAC NOS. MA1474 AND MA1475)

Dear Mr. Cruse:

By letters dated March 27,1998, as supplemented April 21,1998, and November 24,1998, the Baltimore Gas and Electric Company (BGE) requested NRC approval of proposed changes to Revision 49 of the Calvut Cliffs Nuc! ear Power Plant (Calvert Cliffs) Quality Assurance 1

Program Description (QAP) in accordance with 10 CFR 50.54(a)(3).

The submittal proposed changing previously approved provisions regarding the approval authority for procedures liste,d in Calvert Cliffs Technical Specification 5.4 and adding new i

requirements for processing editorial corrections to these procedures.

We nave reviewed your submittal in accordance with 10 CFR 50.54(a), and have determined

, , that the proposed QAP changes are acceptable in that the QAP continues to meet the

)

requirements of Appendix B to 10 CFR Part 50. The enclosed safety evaluation contains our  !

a'. ;iaation of your proposed changes.

if you have any questions regarding this matter, please contact me at (301) 415-3473.

Sincerely, i

!" Af Alexa er W. Dromerick, Senior Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Rer* Regulation

~ ~ ~

~ i~

Docket Nos. 50-317 and 50-318  ;

Enclosure:

Safety Evaluation cc w/ encl: See next page 4

L  ; -

t o. t p5t *-ce p3 . v e -=r + e* -

.,.;.....- . . - - - . . - ~ ~ . ~ - . - ~ . - . - - - . - . . - . . . . . . - - - -

1 o

Mr. Charles H. Cruse Baltimore Gas & Electric Company Calvert Cliffs Nuclear Power Plant

~

l cc
I President Mr. Joseph H. Walter, Chief Engineer - ,

Calvert County Board of Public Service Commission of  !

Commissioners Maryland l

[ 175 Main Street Engineering Division. l i- Prince Frederick, MD 20678 6 St. Paul Centre l l Baltimore, MD 21202-6806 James P. Bennett, Esquire Counsel Kristen A. Burger, Esquire l, Baltimore Gas and Electric Company Maryland People's Counsel P.O. Box 1475 6 St. Paul Centre Baltimore, MD 21203 Suite 2102 Baltimore, MD 21202-1631 l Jay E. Silberg, Esquire j

Shaw, Pittman, Potts, and Trowbridge Patricia T. Bimie, Esqu.te  ;

2300 N Street, NW Co-Director l Washington, DC 20037 Maryland Safe Energy Coalition P.O. Box 33111 Mr. Bruce S. Montgomery, Director Baltimore, MD 21218 j L NRM L Calvert Cliffs Nuclear Power Plant Mr. Loren F. Donatell  %

L 1650 Calvert Cliffs Parkway NRC Technical Training Center i Lusby, MD 20657-4702 5700 Brainerd Road Resident inspector U.S. Nuclear Regulatory Commission P.O. Box 287 I St. Leonard, MD 20685 i

Mr. Richard I. McLean, Manager Nuclear Programs

! Power Plant Research Program L Maryland Dept. of Natural Resources

' Tawes State Office Building, B3

' Annapolis, MD 21401 l Regional Administrator, Region I ,

I' U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 4

I a

-. -