(One intermediate revision by the same user not shown) |
Line 1: |
Line 1: |
| {{Adams | | {{Adams |
| | number = ML20140A904 | | | number = ML20199L863 |
| | issue date = 06/03/1997 | | | issue date = 11/28/1997 |
| | title = Insp Repts 50-498/97-15 & 50-499-97-15 on 970505-09. Violations Noted.Major Areas Inspected:Routine,Announced Insp Focused Upon Specific Areas of Licensee Physical Security Program | | | title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/97-15 & 50-499/97-15 on 970603 |
| | author name = | | | author name = Murray B |
| | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| | addressee name = | | | addressee name = Cottle W |
| | addressee affiliation = | | | addressee affiliation = HOUSTON LIGHTING & POWER CO. |
| | docket = 05000498, 05000499 | | | docket = 05000498, 05000499 |
| | license number = | | | license number = |
| | contact person = | | | contact person = |
| | document report number = 50-498-97-15, 50-499-97-15, NUDOCS 9706050083 | | | document report number = 50-498-97-15, 50-499-97-15, NUDOCS 9712020138 |
| | package number = ML20140A879 | | | title reference date = 07-02-1997 |
| | document type = INSPECTION REPORT, NRC-GENERATED, TEXT-INSPECTION & AUDIT & I&E CIRCULARS | | | document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE |
| | page count = 11 | | | page count = 4 |
| }} | | }} |
|
| |
|
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:-. - . | | {{#Wiki_filter:-. - ., - - . . - . . - - - . - - . . - - . _ . - _ - - _ . - - - _ . |
| - | | ! |
| . l
| | *' LNettD 5tAf f 5 |
| .- j | | .g l |
| -
| | . / 5 NUC1.C AR REGUL ATORY COMMISSION j umoN iv |
| | ,6 (kM]/'[$ m nvaN e t an onivi soitt 4oo AnttNGTON. It x A% 760t18o64 |
| | ....... |
| | i November 28', 1997 William T. Cottle, Group Vice - |
| | President, Nuclear Houston Lighting & Power Company i |
| | P.O. Box 289 Wadsworth Texas 77483 SUBJECT: NRC INSPECTION REPORT 50-498/97-15; 50-499/9715 I |
| | |
| | ==Dear Mr. Cottle:== |
| | Thank you for your letter of July 2,1997, in response to our letter and Notice of Violation dated June 3,1997, We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective actions during a |
| | : |
| | future inspection to determine that full compliance has been achieved and will be maintained. |
| | |
| | Sincerely, |
| | }*p2 - |
| | ' |
| | Blaine Murray, Chief Plant Support Branch c Division of Reactor Safety Docket Nos.: 50-498;50-499 License Nos.: NPF 76; NPF-80 |
| | ' |
| | cc: |
| | Lawrence E. Martin, General Manager Nuclear Assurance & t.icensing Houston Lighting & Power Company ' |
| | P,0. Box 289 Wadsworth Texas 77483 [ |
| | Mr. J. C, Lanier/Mr. M. B. Lee City of Austin Electric Utility Department 721 Barton Springs Road Austin. Texas 78704 |
| | , |
| | * |
| | DR ;,, |
| | ! |
| | ! |
| i | | i |
| '
| | ' |
| . | | - . - . , .,..-. . . - . , - . , - - |
| l ENCLOSURE 2 ! | | |
| | - _ . _ - . _. .. . _ _ _. . _ _ __ _ . ._ . . _ __ __-_ . _. |
| | |
| | l |
| | , j l |
| | ' |
| | Houston Lighting & Powst Company . 2 |
| | , |
| | Mr. K. J. Fiedler/Mr. M. T. Hardt City l-ublic Fervice Board ! |
| | P.O. Box 1771 San Antonio, Texas 78296 , |
| | Jack R. Newman, Esq. ; |
| | ; |
| | Morgan, Lewis & Bocklus-1800 M. Street, N.W. |
|
| |
|
| U.S. NUCLEAR REGULATORY COMMISSION i
| | Washington, D.C. 20036 5869- , |
| | , |
| | Mr. G. E. Vaughn/Mr. C. A. Johnson . |
| | . Central Power & Light Company - |
| | P.O. Box 289 MailCode: N5012 |
| | ' Wadsworth, Texas 77483 |
|
| |
|
| ==REGION IV==
| | INPO Records Center < |
| Docket Nos.: 50-498 50-499 License Nos.: NPF-76 NPF-80 Report No.: 50-498/97-15 50-499/97-15 Licensee: Houston Lighting & Power Company Facility: South Texas Project Electric Generating Station, Units 1 and 2 Location: FM 521 - 8 miles west of Wadsworth Wadsworth, Texas Dates: May 5-9,1997 Inspector: Thomas W. Dexter, Senior Physical Security Specialist j Plant Support Branch !
| | 700 Galleria Parkway Atlanta, Georgia 30339 5957 |
| l Approved: Blaine Murray, Chief, Plant Support Branch Division of Reactor Safety l
| | ' |
| ATTACHMENT: Supplemental Information l
| | Dr. Bertram Wolfe |
| | .15453 Via Vaquero Monte Sereno, California 95030 Bureau of Radiation Control State of Texas ' |
| | 1100 West 49th Street Austin, Texas 78756 Mr. Glenn W. Dishong Texas Public Utility Commission 7800 Shoal Creek Blvd. |
|
| |
|
| i i
| | Suite 400N Austin, Texas 787571024 John Howard, Director Environmental and Natural Resources Policy Office of the Governor P.O. Box 12428 Austin, Texas 78711 Judge, Matagorda County l Matagorda County Courthouse 1700 Seventh Street Bay City, Texas 77414 n |
| | L |
| | . |
| | w- w n- y w , w ,< , a -w e m m- - - n-se--eN ,-ar-w.- e---n '.w-+ r = -s--e-em-- s , n-s- r ++-,- -r e v- |
|
| |
|
| i j
| | _ . _ _ _ _ - _ . _ - _ _ _ _ _ . _ . _ . _ _ _ . . - _ . . _ _ . . - -- _ . _ _ _ _- . . . ... _ |
| !
| |
| 9/06050083 970603 PDR ADOCK 05000498 G PDR .-.
| |
|
| |
|
| -. - - - - . .- . . _-.
| | ; |
| .
| |
| [
| |
| . | | . |
| *
| | , |
| <
| | |
| | 1 |
| . | | . |
| .
| | ' Houston Lighting & Power Company. - - 3-Licensing Representative -' |
| ! | | ! |
| -2-l EXECUTIVE SUMMARY South Texas Project Electric Gererating Station, Units 1 and 2 ,
| | Houston Lighting & Power Company-Suite 610 l Three Metro Center 1 Bethesda, Maryland 20814 Rufus S. Scott, Associate General Counsel i Houston Lighting & Power Company l P.O. Box 61867 |
| NRC Inspection Report 50-498/97-15;50-499/97-15 This routine, announced inspection focused upon specific areas of the licensee's physical security program. These areas included review of records and reports, testing and maintenance, detection aids - protected area, compensatory measures, access control of personnel and packages, management support, and review of previous inspection finding Plant Sucoort
| | ' |
| * Two violations were identified involving (1) the failure to secure a vital area door and (2) failure to revoke a badge following the failure of a fitness-for-duty test. The security staff was correctly reporting security events. A very good records and reports program was in place (Section S1.1).
| | Houston, Texas 77208 - ; |
| | Joseph R. Egan, Esq. ; |
| | Egan & Associates, P.C. : |
| | ~ 2300 N Street, N.W. |
|
| |
|
| *
| | Washington,- D.C. 20037 - |
| Security personnel had an excellent knowledge of testing procedures concerning the access control equipment. All access control equipment functioned as required (Section S2.1).
| | , |
| | i |
| | ? |
| | ! |
|
| |
|
| * Very good progress had been accomplished in completing the installation of their new perimeter intrusion detection system (Section S2.2).
| | , |
| | ! |
| | i I |
| | r i |
| | t h |
| | ? |
| | t J |
| | ! |
| | t e |
| | - . |
|
| |
|
| * The compensatory measure program was effectively implemented. Security personnel were well trained on the prograrn requirements (Section S4.1).
| | w --,y -,-w,-.-+--- - - - - - w-- w-m v,.,,mmm -..w,- -e v,.+--.., - 2--em -,--r-mw. gy,, s |
|
| |
|
| * A very good prograrn for searching personnel and vehicles was maintained (Section S4.2)
| | _ |
| * An effective security training program had been implemented. Medical examinations for security officers were thorough and well documented. Facilities and firing range were excellent (Section 5.1). | | . |
|
| |
|
| * Senior managernent support for the security organization was strong. The security program was implemented by a well trained and highly qualified staff. The morale of the security officers was very good (Section 6.1).
| | Houston Lighting & Power Company -4-Distribution w/coov of licensee's letter dated July 2.1997: |
| | DCD (IE04) |
| | Regional Administrator South Texas Resident inspector DRS Director DRS Deputy Director . |
| | ' |
| | DRP Director DRS PSB Branch Chief (DRP/A) l Project Engineer (DRP/A) |
| | Branch Chief (DRP/TSS) l Elaine Koup, NRR/DRPM/PSGB (MS: OWFN 11 E22) l Leah Tremper, OC/DAF/LFARB (MS: TWFN 9 E10) l MIS System ; |
| | RIV File l R. Bachmann, OGC (MS: 15 B-18) |
| | PSB File (Hodges) |
| | DOCUMENT NAME: G:\ REPORTS \ST715AK.TWD To receive copy of document indicate in boa:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:DRS 7th E C:DRS/P$ll TWDexter:nh' BMurray%(/ |
| | l ' |
| | 11(f/97 11b/97 OFFICIAL RECORD COPY i |
| | i l |
| | . |
|
| |
|
| . . _ _ _ _ _ _ _ . _ _ . . _ _ _ _ _ _ _ . _ _ , _ _ _ . _ _ _ .. _ _ _ | | __ _ _ . . __ __ _ . . _ . __ . _ _ _ _ . _ _ . _ . _ . _ . _ _ _ _ . _ . . - - . |
| *
| | - |
| | , |
| | ' |
| | . |
| | .., |
| . | | . |
| * *
| | Houston Lighting & Power Company -4 i Qiginbution w/ cony of licensee's letter dated July 2.199L DCD (IE04) |
| ' | | Regional Administrator South Texas Resident inspector DRS Director DRS Deputy Director DRP Director DRS-PSB Branch Chief (DRP/A) |
| .* $
| | Project Engineer (DRP/A) |
| !. j
| | Branch Chief (DRP/TSS) |
| .- l
| | Elaine Koup, NRR/DRPM/PSGB (MS: OWFN 11 E22) |
| !
| | Leah Tremper, OC/DAF/LFARB (ME; TWFN 9 E10) |
| -3- i i
| | < |
| ;
| | MIS System , |
| i Report Details
| | RIV File R. Bachmann, OGC (MS: 15 B-18) |
| !
| | PSB File (Hodges) |
| ,
| | t |
| ;
| | , |
| ;
| | [' |
| IV. Plant Support i
| | . |
| :
| | DOCUMENT NAME G:\ REPORTS \ST715AK.TWD , |
| S1 Conduct of Security and Safeguards Activities l t
| | To receive copy of document. Indicate in box:"C" Ogy without enclosures "E" = Copy with enclosures "N" = No copy RIV:DRS '7tf) E C:DRS/FM] |
| S Records and Reports (81700-02.01) .
| | l- TWDexter:nh' BMurray%Q . |
| I Inspection Scope i
| | ' |
| The inspector reviewed safeguards event logs and security program condition i reports to determine compliance with the requirements of 10 CFR 73.21(b) and (c), ,
| | l 116(/97 11 6/97 OFFICIAL RECORD COPY l , |
| 10 CFR 26.73, and the physical security plan, j l
| | . |
| J Observations and Findinas j l
| | l |
| The inspector reviewed the security event logs and security program condition )
| | - |
| reports from October 1,1996, through April 30,1997. The records were available ]
| | - . _ _ . . . _ . _ |
| for review and maintained for the time required by regulations. The i. spector :
| |
| determined that the licensee conformed to the regulatory requirements regarding the l reporting of security events. The logs and condition reports were organizeri in j numerical sequence and easy to audit. The following two events were specifically l reviewed in detail, j
| |
| !
| |
| * Uncompensated Vital Area Door in Access Mode l
| |
| '
| |
| l Licensee Condition Repo'rt 97-6585 identified that on April 2,1997, at approximately 6:44 a.m. an alarm station operator d;scovered that a vital area door had been left in the access mode (the lock alarm and the balance magnetic switch alarm were taken out-of service) without being controlled by the security system or by an armed security officer referencing an access authorization list. The door alarm had been inactivated at 7:06 a.m. on April 1,1997, so it could be blocked open for painting work in the vital are A compensatory officer was posted at the door. At 5:08 p.m. the workers left the area. The compensatory officer secured the door and called the central alarm station operator to reactivate the alarm on the door. The officer claims he receised an acknowledgement from the station operator, . | |
| carded out from the area and waited to ensure there were no alarms on the door. When he did not hear a call for an alarm on the door he departed the area. However, it appears that the alarm station operator did not place the vital area door back in the alarm mod .- . . - -
| |
|
| |
|
| - | | . - _ _ . . ~ _ _-- . _ . _ - . ___ _ . . _ _ . _ - . _ . _ . _ _ _ _ _ _ . _ _ |
| .
| | i |
| | ! |
| . | | . |
| | . 4 Houston Lighting & Power Company. - 4-l Distribution w/cooy of licensee's !stier dated Jutv 2.1997: |
| | ' |
| | DCD (IE04) |
| | Regional Administrator |
| | ' South Texas Resident inspector DRS Director DRS Deputy Director |
| | ' |
| | DRP Director DRS PSB - |
| | Branch Chief (DRP/A) ! |
| | ' |
| | Project Engineer (DRP/A) |
| | Branch Chief (DRP/TSS) |
| | Elaine Koup, NRR/DRPM/PSGB (MS: OWFN 11 E22) |
| | Leah Tremper, OC/DAF/LFARB (MS: TWFN 9 E10) l MIS System ! |
| | RIV File R. Bachmann, OGC (MS: -15-B-18) |
| | PSB File (Hodges) ; |
| | o i |
| | r |
| | |
| | , |
| | l. |
| | |
| | ? |
| | DOCUMENT NAME: G:\ REPORTS \ST715AK.TWD To receive copy of document, Indicate in boa:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:DRS 'Ith - 'I - C:DRS/Fl@f f i TWDexter:nh' BMurray%$- |
| | ' |
| | 11/f!97 11h/97 OFFICIAL RECORD COPY l |
| | l |
| | ~ |
| .. | | .. |
| , .
| | _ |
| ! .
| | -W-h' '-- +- C-' * P |
| l-4-l The licensee's immediate compensatory actions were io search the vital area ;
| |
| for any fore;gn materials or objects and then test and secure the door alar However, the licensee had not developed long-term corrective actions.
| |
|
| |
|
| ,
| | _ _ _ _ _ _ _ _ _ _ _ _ _ - |
| South Texas Project Physical Security Plan, Revision 7A, dated January 14, 1997, Chapter 4, paragraph 4.4, " Vital Area Access - Personnel," states, in part, " Access to Vital Areas shall be controlled by the security system or by an armed security officer referencing an access authorization list. Personnel , | | |
| entry / exit is documented for all vital area access except the control room." +
| | d |
| The licensee's failure to control a vital area door in the access mode, between the i afternoon of April 1,1997, and the morning of April 2,1997, is a violation of its I security plan (50-498;-499/9715-01).
| | . |
| | Houston Lighting & Power Company -4-Distribution w/cooy oljicensee's letter dated July 2.1997: |
| | DCD (IE04) |
| | Regional Administrator South Texas Resident inspector DRS Director DRS Deputy Director DRP Director DRS PSB Branch Chief (DRP/A) |
| | Project Engineer (DRP/A) |
| | Branch Chief (DRP/TSS) |
| | Elaine Koup, NRR/DRPM/PSGB (MS: OWFN 11 E22) |
| | Leah Tremper, OC/DAF/LFARB (MS: TWFN 9 E10) |
| | MIS System RIV File R. Bachmann, OGC (MS: 15 B 18) |
| | PSB File (Hodges) |
| | DOCUMENT NAME G:\ REPORTS \ST715AK.TWD To receive copy of document. Ind6cate in box:"C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy RIV:DRS 'ith E C:DRS/@ f TWDexter:nh' BMurrayEf |
| | * |
| | 11/f/97 11b/97 OFFICIAL RECORD COPY |
| | ! |
|
| |
|
| i
| | - _ |
| * Failure to inactivate Badae - Fitness-For-Duty Failure !
| |
| !
| |
| Licensee Condition Report 97-0165 identified that on February 5,1997, i while a licensee fitness-for-duty department employee was imputing drug l test results into a computer data when the individual noted that a contract ,
| |
| employee, who had failed a for-cause alcohol test on February 3,1997, had I not had his badge revoked. The department employee completed a condition l report and notified security to revoke the badge in the security compute !
| |
| l The licensee's investigation determined that the employee's supervisor had maintained control of the empicyee's security badge and that the employee had not entered the protected are j i
| |
| The licensee's corrective action involved the project engineering supervisor i discussing the importance of the line of communication and the procedure requirements for badge transactions. However, the inspector determined ,
| |
| that the following licensee's security plan and procedures were not l
| |
| '
| |
| implemented:
| |
| South Texas Project Physical Security Plan, Revision 7A, dated January 14, 1997, Chapter 4, paragraph 4.2, states, in part, "If a person is terminated ,
| |
| for-cause, that individual's access is revoked and his/her assigned badge is j deactivated through the security computer system prior to or simultaneously i with notification of termination." l l
| |
| l | | l |
| !
| |
|
| |
|
| | _. . . - . |
| | 9.- O O - |
| | .' |
| | f. . ya |
| . | | . |
| _. -. . . _ . _ _ . . _ _ _ _ . _ _ . _ _ _ _ _ _ _
| |
| \
| |
| - '
| |
| .
| |
| *
| |
| .. l
| |
| , | | , |
| 9 F
| | f .,. The Light x ydT c o mp any teeth inas Prs)eet Ilectrit GeserstM statnee P.ot set att M odrworth.Trias 774&J Nemetoa IJghtlag h Power. |
| #
| | |
| 5-
| | July 2,1997 ST Ill-AE 5683 ' |
| ! | | - |
| l 1 i
| | File No.: G02.04.02 ' |
| South Texas Project Procedure OPGP09-ZA-0002, " Fitness For Duty Program," Revision 7, dated October 24,1996, paragraph 6.11, " Confirmed | | 10CFR2.201 . |
| ,
| | STI 30326871 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington,DC 20555 South Texas Project Units I and 2 Docket Nos. STN 50-498 and STN 50-499 Reply to Notice of Violation 97.1102 South Texas Project has reviewed Notice of Violation 9715 02, dated June 3,1997, and submits the attached reply. The events described in the Notice of Violation did not have an adverse effect on the health and safety of the public, if there are any questions regarding these replies, please contact Mr. S. M. licad at (512) |
| Positive Test Results," states, in part, "A ' Confirmed Positive' notification l l letter (Form 2) is delivered to the department manager, or designee, notifying )
| | 972 7136 or me at ($12) 972 8757. |
| l them the individual is denied site access. The HL&P employee will be !
| |
| terminated . . . Notification of the above positive test results shall be made l using the guidelines contained in OPGP03-ZX-0002, Condition Reporting i Process."
| |
|
| |
|
| l
| | / |
| | 7 ( |
| | J. J. Sheppard Assistant to Executive Vice President and General Manager, Nuclear |
| ' | | ' |
| South Texas Project Procedure OPGP03-ZX-0002, " Condition Reporting Process," Revision 13, dated September 12,1996, paragraph 4.1,
| | WEM/wem g Attachment: Reply to Notice of Violation 9715 02 |
| " Condition identification," states, in part, "For conditions where security concerns are obvious or perceived, contact Plant Protection immediately and deliver the CR form to Plant Protection, or if database. entry was made, promptly in form the Security Force Supervisor of the Condition Report number." | | $$ I 4M709037M70702~ \\,hhh , |
| | PDR ADOCK 0S000490 0 YDR |
| | - ._ _ _- -- __- _ |
| | -. |
| | |
| | - - . . . - - --_ . - . . - .- - - . . - .. _. . - _ _- - . . |
| | n.a . ; 1 9 .8 ? .e& ',* |
| | . |
| | .4 : . .. - .. -Q,. c ... p |
| | , |
| | bie r Iseoste IJghung h Power company '.. ST.llt AE.$683 Mi seeth Tenu Projoet metete o.eerouas staues rise No.: 002.04.02 |
| | .NSf - |
| | Page 2 |
| | ,, ,a Ellis W.Merschoff Rufus S. Scott Regional Administrator, Region IV Associate General Counsel .l,iy U. S. Nuclear Regulatory Commission llouston Lighting & Power Company < |
| | 611 Ryan Plaza Drive, Suite 400 P. O. Box 61067 . , ;. , |
| | Arlington.TX 76011 8064 Ilouston. TX 77208 'f |
| | 'ihomas W. Alexion Institute of Nuclear Power Project Manager, Mail Code 13113 Operations Records Center U.S. Nuclear Regulatory Commission 700 Galleria Parkway Washington, DC 20555-0001 Atlanta, G A 30339 5957 David P. Loveless Dr. Dertram Wolfe Sr. Resident inspector 15453 Vh Vaquero c/o U. S. Nuclear Regulttory Commission Monte Sereno,CA 95030 P. O. Box 910 Day City TX 77404 0910 Richard A.Ratliff Dureau of Radiation Control J. R. Newman, Esquire Texas Department ofIlealth Morgan, Lewis & Dockius 1100 West 49th Street 1800 M. Street, N.W. Austin, TX 78756-3189 Washington, DC 200V,.5869 ' |
| | J. R. Egan, Esquire H. T. liardt/W. C. Gunst Egan & Associates, P.C. |
| | |
| | City Public Service 2300 N. Street, N.W. |
|
| |
|
| The failure to initiate a proper condition report and a Form 2 is a violation of the security plan and implementing procedures (50-498;-499/9715-02). Conclusions Two violations were identified concerning (1) the failure to secure a vital area door and (2) failure to revoke a badge following the failure of a fitness-for-duty test. The security staff was correctly reporting security events. A very good records and reports program was in plac i S2 Status of Security Facilities and Equipment S2.1 Testina and Maintenance (81700-02.07) insoection Scooe The inspe tor reviewed the testing program for the access control equipment, Observations and Findinas The inspector observed the licensee conducted testing of the explosive and metal detectors and the x-ray machines at the east and west protected area access ;
| | P. O. Box 1771 Washington,DC 20037 San Antonio,TX 78296 U.S. Nuclear Regulatory Commission J. C. Lanier/M. D. Lee Attention: Document Control Desk City of Austin Washington, DC 20555-0001 Electric titility Department 721 Darton Springs Road Austin,TX 78704 Central Power and Light Company ATIN: G. E. Vaughn/C. A. Johnson P. O. Box 289, Mall Code: N5012 Wadsworth,TX 77483 |
| facilities. A security person working at each facility tested the equipment. Both j personnel were knowledgeable of the testing procedures and both conducted the ;
| | ; |
| tests in a similar rnanner. All equipment tested satisfactoril ,
| | D |
| i l
| | _ . - . . . , -_ . . - . . _ , . . . , - - -. . . . . - - . |
| _, _ _ _ . _ . . _ , _ _ _ . , , _ | |
|
| |
|
| . - . - .,~.-..--- - - -.- -. .. --. .-.- . - . - . - - - . . ~ - - -
| | - o |
| -
| | ;, g |
| l .
| | - U |
| -
| | . |
| l ,
| | Attachment i ST llL AE 5683 |
| ,
| | .- |
| -
| | * Page I of 3 , |
| ,
| | nu4 1. Statement of Violation: 9* |
| '
| | License Condition 2.F of the South Texas Project Unit I, Operating License NPF 76 and Unit 2, Operating License NPF 80, dated March 22, 1988, requires that the licensee l'ully implement and maintain in effect the Commission approved physical security plan, including amendments and changes made purssnt to the authority of 10 CFR 50.54(p). |
|
| |
|
| t
| | + |
| 'I-6- ,
| | South Texas Project Physical Security Plan, Revision 7A, c~ted January 14.1997, Chapter 4, , |
| ;
| | paragraph 4.2, states,in part *lf a person is terminated for cause, that individual's access is revoked and his/her assigned badge is deactivated through the security computer system prior to or simultaneously with notificatic n of termination." |
| '
| |
| .
| |
| I c .' Conclusions Security personnel had an excellent knowledge of testing procedures concerning the ;
| |
| .
| |
| access control equipment. All access control equipment functioned as require )
| |
| :
| |
| I
| |
| '
| |
| &
| |
| S2.2 Detection Aids - Protected Area (81700-02.04) Inspection Scoce
| |
|
| |
|
| 1 The inspector reviewed the protected area detection aid syste l Observations and Findinos l
| | South Texas Project Procedure OPGPO9 ZA-0002," Fitness For Duty Program," Revision 7 dated October 24,1996, paragraph 6.11,' Confirmed Positive Test Results,' states,in part,"A |
| :
| | ' Confirmed Positive' noti 0 cation letter (Form 2) is delivered to the department manager, or designee, notifying them the individual is denied site access, The llL&P employee will be terminated... Notification of the above positive test results shall be made using the guidelines contained in OPGPO3 ZX 0002, Condition Reporting Process." |
| The licensee was in the process of replacing the entire protected area detection aid l system. The detection systems' capabilities, zoning of the alarm systems, detection !
| |
| ''
| |
| system security, and types of detection aids have been changed signific'antl The inspector discussed with members of the security system engineering and !
| |
| ' installation group the estimated completion time for the perimeter microwave l
| |
| . system. The licensee expects to have the system tested and turned over to i security before the end of June 1997. The inspector observed portions of the ;
| |
| installed system on May 7,1997. The detection systems appeared to be well f designed and should detect an intruder attempting to enter the protected are Conclusions The licensee was making very good progress toward the completion of the installation of their new perimeter intrusion detection aid S4 Security and Safeguards Staff Knowledge and Performance S4.1 Compensatorv Measures (81700-02.07) Inspection Scope *s
| |
| .
| |
| The inspector reviewed the licensee's compensatory rneasures program. The areas inspected included deployment of compensatory measures and the effectiveness of those measure l l Observations and Findinas The inspector confirmed through a review of condition reports and security event logs.that the licensee deployed compensatory measures in a manner consistent with the requirements in the security plan. The inspector determined through interviews j of security personnel that the security personnel available for assignment to compensatory security posts were properly trained for those duties. The inspector
| |
| !
| |
| .
| |
| . . ~
| |
| ,,a . , -~,,.,e c -.m, - . . - , , - -
| |
|
| |
|
| _ . .. _ _
| | South Texas Project Procedure OPGPO3 7X0002," Condition Reporting Process," Revision 13, dated September 12,1996, paragraph 4.1, " Condition identification," states, in part, "For conditions where security concems are obvious or perceived, contact Plant Protection immediately and deliver the CR form to Plant Protection, or if database entry was made, promptly inform the Security Force Supervisor of the Condition Report number." |
| , | |
| l .
| |
| ,
| |
| -
| |
| i
| |
| .*
| |
| 1 -
| |
| ! -
| |
|
| |
|
| i-7-l also observed security personnel posted on several compensatory posts around the perimeter of the protected area. Personnel appeared to be observant and those that the inspectors interviewed were knowledgeable of their duties and responsibilities, Conclusions The compensatory measures program was effectively implemented. The observed compensatory measures met the requirements in the security plan. Security personnel were well trained on the program requirement S4.2 Access Control of Personnel and Vehicles (81700-02.05) Insoection Scone The access control program for personnel and vehicles was inspecte Observations and Findinas
| | Contrary to the above, on May 7,1997, the inspector discovered that the licens c had failed to comply with their procedures on February 3,1997,conceming a positive for cause 6tness for-duty test. Specifically, the inspector identified that a condition report and Form 2 were not properly initiated on Febmary 3,1997. |
| '
| |
| Access control activities were observed at the both security building entrances and at the vehicle positive se feral times during the inspection. Tha licensee properly controlled personnel access to the protected area. The protected area access control equipment was inspected and found to be functionai and well maintained, Conclusions i
| |
| A very good program for narching personnel and vehicles was maintaine l S5 Security and Safeguards StaH Training and Qualification SS.1 Personnel Trainina and Qualification (81700-02.08) ]_nspection n Scope The inspector reviewed the licensee's security training and qualification progra Observations and Findinas The security organization conducted all required training in accordance with its approved security, training, and contingency plans. The inspector confirmed, by a review n' .he composite security training records, that the required training was 1 conducted every 12 month The inspector observed security officers during the performance of their duties. All security officers displayed excellent conduct and knowledge of the procedural l requirements.
| |
|
| |
|
| l l
| | This la a Severity Level IV violation (Supplement !!!)(50-498:499/9715 02). |
| i l
| |
|
| |
|
| -. _ _ .- _ - . - _ _ _- .. ..
| | !!. South Texas Project Position: |
| .
| | South Texas Project concurs that the violation occurred. |
| ..
| |
| .
| |
| .
| |
| -8
| |
| * Medical Examinations Medical examination records for 10 armed security officers were reviewe The medical records were complete and indicated that the required annual
| |
| ,
| |
| medical examinations were thorough and conducted in a timely manner. The results of the medical examinations were properly documente * Trainina Records Training records for 10 armed security officers were reviewed. The records were complete and all required training was current and conducted within every 12-month period.
| |
|
| |
|
| * Trainina Aids and Facilities The inspector verified that the security contractor was providing training videos covering numerous security subjects. The training facility was excellent it was located in a permanent type building adjacent to tha protected area and convenient for personnel to use. The licensee's rebuilt firing range was excellen Conclusions An effective security training program had been implemented. Medical examinations for security officers were thorough and well documented. Facilities and firing range were excellent.
| | 111. Reason for the Violation: |
| | The reason for this violation was a procedure deficiency that did not specify a time requirement to revoke the badge. In addition, the programmatic requirements in effect were not properly integrated. |
|
| |
|
| ~
| | - - -_ - - - - _ _ _ - _ - - . - _ . _ - - _ _ - _ - |
| S6 Security Organization and Administration a
| | w: . O O |
| S6.1 Manaaement Suocort (81700-02.01) Inspection Scope The effectiveness and adequacy of management support was inspected to determine the degree of management support for the physical security progra *
| | ..s. |
| I l
| |
| ; ;
| |
| .-
| |
| * | |
| l
| |
| ! .
| |
| I
| |
| .g.
| |
|
| |
|
| ' Observations and Findinas l | | Attachment i ST IIL AE 5683 r, |
| | , |
| | .. .- Page 2 of 3 . |
| | During the last tefueling outage on Unit Two an individual wu preparing to get access to the plant for work. De individual had completed the badging process and retumed to the Central Processing Facility. A station staff employee noticed the smell of what might be alcohol on the worker's breath in accordance with the plant Continual Behavioral Observation Program the worker was taken to Fitness For Duty for a "For Cause Test." nl: test showed an unneceptable level of alcohol present. De worker's Project Menger and Badge Coordinator were notified of the failure, ne Badge Coordinator maintained the worker's access badge in her possession and the worker's employment wu terminated. Contrary to procedural requirements the worker's manager did not complete the required Badge Transaction Form while processing the worker off site. Approximately 36 hours ifler the Fitness For Duty failure, a review of the Fitness for Duty records revealed that the involved worker's badge wu still in an active status. Security wu informed and the badge was revoked. |
|
| |
|
| The inspector determined by discussions with security force personnel that the j security program received strong support from senior management. The inspector determined that the security program was imp lemented by a well trained and highly qualified security staff. All members of the security organization had a clear , | | The Fitness for Duty Procedure required that a Condition Report be written only if the failure was reportable under 10CFR50.26. His event was not reportable under 10CFR$0.26. De Condition Reporting Procedure only required Security be notified if a Condition Report described a Security related event. The involved individuals did not recogae this as a Security related event. ne existing procedural guidance relied upon the process ng of the Badge Transaction Form to result in Security being notified of the Fitness for Duty fal;ure. |
| understanding of their duties and responsibilities and the morale of the secunty ;
| |
| officers was very goo j l Conclusions ;
| |
| j Senior management support for the security organization was strong. The security !
| |
| program was implemented by a well trained and highly qualified staff. The morale of the security officers was very goo S8 Miscellaneous Security and Safeguards issues (92904) ;
| |
| i l
| |
| S8.1 (Closed) Unresolved item 498:499/9616-01: Failure to Verifv Criminal History of i Foreian Nationals During the access authorization inspection the inspectors identified two individuals who appeared not to have had their criminal histories checked in their countries of origin. Guidance received from the Office of Nuclear Regulatory Regulation was i that it was expected that licensees would conduct criminal history checks with foreign countries. During this inspection the inspector, with the licensee determined that one of the individuals, although born in Mexico was a United States citize The second individual was a citizen of Mexico and was in the United States on a visa. During the background check the validity of the visa was not checke Subsequent investigation by the licensee determined that the individual has been in the United States for 20 years and learned through the Department of Immigration and Naturalization Services that the visa was valid and current. The licensee had cumpleted all other background screening including a FBI criminal history check prior to granting unescorted access to the individual. This unresolved item is considered close V. Manaaement Meetinas X1 Exit Meeting Summary The inspector presented the inspection results to members of licensee management at the conclusion of the inspection on May 9,1997. The licensee acknowledged the findings presente i
| |
|
| |
|
| ~ . _ . _ . . . ._._._____ _._,__.__.__ ._._ _ ___ _..____. <
| | IV. Corrective Actions: |
| .
| | e Security personnel pmmptly placed the employce's badge on hold when notified the employee um on the denial list. Security personnel revoked the badge about an hour after it was placed on hold. |
| '
| |
| ... !
| |
| !- l
| |
| >
| |
| l- .
| |
| l'
| |
| '
| |
| l
| |
| '
| |
| ATTACHMENT t
| |
| SUPPLEMENTAL INFORMATION [
| |
| :
| |
| i PARTIAL LIST OF PERSONS CONTACTED l
| |
| '
| |
| ;
| |
| i !
| |
| l I l Licensee W. Cottle, Executive Vice President and General Manager, Nuclear ;
| |
| i J. Groth, Vice President, Nuclear Operation P. Arrington, Assistant Licensing Specialist l
| |
| J. Drymiller, Supervisor, Security !
| |
| l M. Hall, Senior Operations Coordinator, Security j l S. Head, Licensing Supervisor J. Hinson, Manager, Employee Relations A. Keating, Electrical / Instrumentation and Controls Manager T. Koser, Licensing Engineer L. Martin, General Manager, Nuclear Assurance and Licensing ;
| |
| M. McBurnett, Licensing Director
| |
| '
| |
| J. Northrop, Security System Engineer ,
| |
| R. Piggott, Senior Quality Assurance Specialist l A. Rodriguez, Senior Coordinator, Security l C. Sanders, Lead Training instructor :
| |
| '
| |
| D. Sheesley, Security Systems Supervisor J. Sheppard, Assistant to Executive Vice President l
| |
| '
| |
| M. Smith, Administrator, Plant Support Quality Fi Timmons, Manager Plant Protection Department P. Travis, System Engineer Supervisor INSPECTION PROCEDURES USED IP 81700 Physical Security Program for Power Reactors IP 92904 Followup - Plant Support LIST OF ITEMS OPENED AND CLOSED Ooen 50-498;499/9715-01 NOV Failure to Properly Secure Vital Area Door 50-498:499/9715-02 NOV Failure to inactivate Badge For Fitness-For-Duty Failure i Closed 50-498:499/9616-01 URI Failure to Verify Criminal History of Foreign National
| |
| !
| |
| l l
| |
| l l
| |
| l
| |
| - , . ._ _ !
| |
|
| |
|
| ~ . .. .
| | e ne Fitness For Duty Program procedure was revised to instruct the Industrial Safety |
| .
| | & ilealth Division hianager, or designec, to have an individual's access revoked upon verification the individual has a positive Fitness For Duty test result. His change requires the first individual aware of the failure to notify Security prior to any delays, e ne Fitness for Duty Pmgram pmeedure wu revised to instruct the Industrial Safety |
| . . -. - .. . .
| | & Ilealth Division Manager, or designee, to initiate a Condition Report as a result of a Fitness for Duty failure. The Condition Report would insure that Securay reviewed the event to determine if 10CFR50.73 was app!! cable. |
| ,
| |
| ;
| |
| . ,
| |
| .
| |
| ; -
| |
| .
| |
| -
| |
|
| |
|
| ,
| | * Fitness For Duty personnel have been trained on the procedure revisions to the Fitness For Duty Program. |
| -2-
| |
| ; i l
| |
| l
| |
| '
| |
| LIST OF DOCUMENTS REVIEWED South Texas Project Physical Security Plan, Revision 7A, January 14,1997 l l
| |
| j Security event logs from October 1,1996, through April 30,1997 condition reports for the I i same period.
| |
|
| |
|
| *
| | V, Dste of Full Compliance: |
| | ne South Texas project is in full compliance. |
|
| |
|
| ;
| |
| South Texas Project Procedure OPGP09-ZA-0002, Fitness For Duty Prcgram, Revision 7, I dated October 24,1996
| |
| ,
| |
| South Texas Project Procedure OPGP03-ZX-0002, Condition Reporting Process, 4 Revision 13, dated September 12,1996
| |
| !
| |
| , | | , |
| Security Officer Training Records (composite listing)
| | - - . _ |
| | , |
|
| |
|
| Background invest;gation (file) records for two individuals granted unescorted access authorization to the protected area
| | _ . _ . _ _ _ _ _ . _ _.._. ._ _ _ _ __ _ ___ _ .. _ _ -_. _-_. _- __. _ _ _ |
| ' | | ' |
| Medical Records for ten members of the security organization
| | - - |
| '
| | .. |
| 31-Day Access Review Records for January and February 1997 3
| | - |
| )
| | O '- |
| !
| | O :- |
| i
| |
|
| |
|
| )
| | - . |
| i | | i |
| | .: . |
| | " ' |
| | Attachment ! |
| | ST IR AE46W3 o' ** Page 3 of 3 VI. AdditionalInformation |
| | - |
| | Although the employee's badge had been 1: sued, it was never given to the employee. .m j . =. |
| | The employte's hedge was in custody of the employce's Badge Coordinator from the |
| | ,) |
| | J ;,,.ng4 |
| | '~ |
| | time it was issued until the employee's access was revoked. |
|
| |
|
| i | | . |
| ; ;
| | 6% |
| .
| | .i |
| | | .f l |
| .
| | l r i |
| * | | i l |
| - , | | , |
| | | '. |
| J
| | .f sQ |
| | . |
| | f |
| | _ _ - _ . _ _ _ . - -. - ,. . ,- .- - - - _ _ _ _ _ _ . ., - .,. , |
| }} | | }} |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999 Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses ML20210D9011999-07-23023 July 1999 Forwards Safety Evaluation Re Inservice Testing Plan Request for Relief RR-5 Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210C2111999-07-21021 July 1999 Forwards Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626.Two Severity Level IV Violations Occurred & Being Treated as Noncited Violations ML20209H9231999-07-16016 July 1999 Discusses South Texas Project,Units 1 & 2 Updated Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity. Staff Revised Info for Plant in Rvid & Being Released as Rvid Version 2 ML20207H6261999-07-0808 July 1999 Responds to Re 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546, Alternative Requirements for Qualification of VT-2 Exam Personnel,Section Xi,Division 1.Forwards SE ML20195J6731999-06-17017 June 1999 Responds to Re Request for Relief from ASME Code, Section Xi,Requirement to Perform VT-1 Visual Exam on Accessible Surfaces of RPV Flange Inserts (Bushings). Safety Evaluation Encl ML20195F7561999-06-10010 June 1999 Forwards Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515 at South Texas Project Electric Generating Station,Units 1 & 2.No Violations Were Identified ML20207H0031999-06-0909 June 1999 Discusses 990419 Meeting in Region IV Ofc Re South Texas Project EP Program Status,Including Initiatives in EP Program,Future Revs to EP & Dept Performance Indicators. Meeting Attendance List & Licensee Presentation Encl ML20195G3241999-06-0909 June 1999 Ack Receipt of Re Changes to Plant Emergency Plan Change Notice 18-2.No Violations of 10CFR50.54(q) Were Identified ML20207D7371999-05-28028 May 1999 Discusses Re Process for Reclassification of non- Risk Significant Components.Forwards Concerns & Cautions for Consideration Based on Limited Review of Reclassification Process Overview That Was Provided IR 05000498/19980151999-05-28028 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/98-15 & 50-499/98-15.Corrective Actions Reviewed & Found to Be Responsive to Issues Raised ML20207E1961999-05-25025 May 1999 Forwards Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Primary Focus of Insp to Review Operational Status of Emergency Preparedness Program ML20207A8771999-05-25025 May 1999 Forwards RAI Re Licensee 960213 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Plant,Units 1 & 2.Response Requested within 120 Days from Date of Ltr IR 05000498/19990061999-05-12012 May 1999 Submits Corrected First Page of Cover Ltr Re Insp Repts 50-498/99-06 & 50-499/99-06 Conducted on 990221-0403.Subj Line Was Corrected ML20206S3201999-05-12012 May 1999 Forwards Corrected First Page of Cover Ltr,Which Forwarded Insp Repts 50-498/99-06 & 50-499/99-06,issued on 990505. Subj Line Indicated on NOV Was Incorrect ML20206N5481999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Ra Gramm Will Be Section Chief for South Texas Project.Organization Chart Encl ML20206J4321999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key Encl for Info.Without Encl ML20206J4211999-05-0606 May 1999 Ack Receipt of in Response to & Insp Repts 50-498/99-04 & 50-499/99-04,confirming Commitments as Stated in 990225 Exit Meeting ML20206H6201999-05-0505 May 1999 Forwards Insp Repts 50-498/99-06 & 50-499/99-06 on 990221- 0403.Three Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20206H3811999-05-0505 May 1999 Responds to STP Nuclear Operating Co Which Provided Update to TS Bases Pages B 3/4 2-6.Revised TS Bases B 3/4 2-6 That NRC Staff Will Use to Update Copy of STP Bases Encl ML20206H2001999-05-0404 May 1999 Forwards Exemption from Requirements of 10CFR50.60, Acceptance Criteria for Fracture Prevention Measures for Lightwater Nuclear Power Reactors for Normal Operation ML20206B6091999-04-22022 April 1999 Forwards Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted ML20206B3281999-04-22022 April 1999 Forwards Insp Repts 50-498/99-07 & 50-499/99-07 on 990405- 09.Insp Focused on Radiological Controls in Place During Unit Refueling Outage.Violations Identified Involving Failure to Follow Radiation Work Permit Instructions ML20205Q8151999-04-16016 April 1999 Forwards Request for Addl Info Re Proposed Amends on Operator Action for small-break-LOCA,dtd 980728.Response Requested within 45 Days of Ltr Date ML20205P5821999-04-15015 April 1999 Advises That Version of Application & Affidavit Dtd 990127, Executed by Ha Sepp,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended 1999-09-09
[Table view] |
Text
-. - ., - - . . - . . - - - . - - . . - - . _ . - _ - - _ . - - - _ .
!
.g l
. / 5 NUC1.C AR REGUL ATORY COMMISSION j umoN iv
,6 (kM]/'[$ m nvaN e t an onivi soitt 4oo AnttNGTON. It x A% 760t18o64
.......
i November 28', 1997 William T. Cottle, Group Vice -
President, Nuclear Houston Lighting & Power Company i
P.O. Box 289 Wadsworth Texas 77483 SUBJECT: NRC INSPECTION REPORT 50-498/97-15; 50-499/9715 I
Dear Mr. Cottle:
Thank you for your letter of July 2,1997, in response to our letter and Notice of Violation dated June 3,1997, We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective actions during a
future inspection to determine that full compliance has been achieved and will be maintained.
Sincerely,
}*p2 -
'
Blaine Murray, Chief Plant Support Branch c Division of Reactor Safety Docket Nos.: 50-498;50-499 License Nos.: NPF 76; NPF-80
'
cc:
Lawrence E. Martin, General Manager Nuclear Assurance & t.icensing Houston Lighting & Power Company '
P,0. Box 289 Wadsworth Texas 77483 [
Mr. J. C, Lanier/Mr. M. B. Lee City of Austin Electric Utility Department 721 Barton Springs Road Austin. Texas 78704
,
DR ;,,
!
!
i
'
- . - . , .,..-. . . - . , - . , - -
- _ . _ - . _. .. . _ _ _. . _ _ __ _ . ._ . . _ __ __-_ . _.
l
, j l
'
Houston Lighting & Powst Company . 2
,
Mr. K. J. Fiedler/Mr. M. T. Hardt City l-ublic Fervice Board !
P.O. Box 1771 San Antonio, Texas 78296 ,
Jack R. Newman, Esq. ;
Morgan, Lewis & Bocklus-1800 M. Street, N.W.
Washington, D.C. 20036 5869- ,
,
Mr. G. E. Vaughn/Mr. C. A. Johnson .
. Central Power & Light Company -
P.O. Box 289 MailCode: N5012
' Wadsworth, Texas 77483
INPO Records Center <
700 Galleria Parkway Atlanta, Georgia 30339 5957
'
Dr. Bertram Wolfe
.15453 Via Vaquero Monte Sereno, California 95030 Bureau of Radiation Control State of Texas '
1100 West 49th Street Austin, Texas 78756 Mr. Glenn W. Dishong Texas Public Utility Commission 7800 Shoal Creek Blvd.
Suite 400N Austin, Texas 787571024 John Howard, Director Environmental and Natural Resources Policy Office of the Governor P.O. Box 12428 Austin, Texas 78711 Judge, Matagorda County l Matagorda County Courthouse 1700 Seventh Street Bay City, Texas 77414 n
L
.
w- w n- y w , w ,< , a -w e m m- - - n-se--eN ,-ar-w.- e---n '.w-+ r = -s--e-em-- s , n-s- r ++-,- -r e v-
_ . _ _ _ _ - _ . _ - _ _ _ _ _ . _ . _ . _ _ _ . . - _ . . _ _ . . - -- _ . _ _ _ _- . . . ... _
.
,
1
.
' Houston Lighting & Power Company. - - 3-Licensing Representative -'
!
Houston Lighting & Power Company-Suite 610 l Three Metro Center 1 Bethesda, Maryland 20814 Rufus S. Scott, Associate General Counsel i Houston Lighting & Power Company l P.O. Box 61867
'
Houston, Texas 77208 - ;
Joseph R. Egan, Esq. ;
Egan & Associates, P.C. :
~ 2300 N Street, N.W.
Washington,- D.C. 20037 -
,
i
?
!
,
!
i I
r i
t h
?
t J
!
t e
- .
w --,y -,-w,-.-+--- - - - - - w-- w-m v,.,,mmm -..w,- -e v,.+--.., - 2--em -,--r-mw. gy,, s
_
.
Houston Lighting & Power Company -4-Distribution w/coov of licensee's letter dated July 2.1997:
DCD (IE04)
Regional Administrator South Texas Resident inspector DRS Director DRS Deputy Director .
'
DRP Director DRS PSB Branch Chief (DRP/A) l Project Engineer (DRP/A)
Branch Chief (DRP/TSS) l Elaine Koup, NRR/DRPM/PSGB (MS: OWFN 11 E22) l Leah Tremper, OC/DAF/LFARB (MS: TWFN 9 E10) l MIS System ;
RIV File l R. Bachmann, OGC (MS: 15 B-18)
PSB File (Hodges)
DOCUMENT NAME: G:\ REPORTS \ST715AK.TWD To receive copy of document indicate in boa:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:DRS 7th E C:DRS/P$ll TWDexter:nh' BMurray%(/
l '
11(f/97 11b/97 OFFICIAL RECORD COPY i
i l
.
__ _ _ . . __ __ _ . . _ . __ . _ _ _ _ . _ _ . _ . _ . _ . _ _ _ _ . _ . . - - .
-
,
'
.
..,
.
Houston Lighting & Power Company -4 i Qiginbution w/ cony of licensee's letter dated July 2.199L DCD (IE04)
Regional Administrator South Texas Resident inspector DRS Director DRS Deputy Director DRP Director DRS-PSB Branch Chief (DRP/A)
Project Engineer (DRP/A)
Branch Chief (DRP/TSS)
Elaine Koup, NRR/DRPM/PSGB (MS: OWFN 11 E22)
Leah Tremper, OC/DAF/LFARB (ME; TWFN 9 E10)
<
MIS System ,
RIV File R. Bachmann, OGC (MS: 15 B-18)
PSB File (Hodges)
t
,
['
.
DOCUMENT NAME G:\ REPORTS \ST715AK.TWD ,
To receive copy of document. Indicate in box:"C" Ogy without enclosures "E" = Copy with enclosures "N" = No copy RIV:DRS '7tf) E C:DRS/FM]
l- TWDexter:nh' BMurray%Q .
'
l 116(/97 11 6/97 OFFICIAL RECORD COPY l ,
.
l
-
- . _ _ . . . _ . _
. - _ _ . . ~ _ _-- . _ . _ - . ___ _ . . _ _ . _ - . _ . _ . _ _ _ _ _ _ . _ _
i
!
.
. 4 Houston Lighting & Power Company. - 4-l Distribution w/cooy of licensee's !stier dated Jutv 2.1997:
'
DCD (IE04)
Regional Administrator
' South Texas Resident inspector DRS Director DRS Deputy Director
'
DRP Director DRS PSB -
Branch Chief (DRP/A) !
'
Project Engineer (DRP/A)
Branch Chief (DRP/TSS)
Elaine Koup, NRR/DRPM/PSGB (MS: OWFN 11 E22)
Leah Tremper, OC/DAF/LFARB (MS: TWFN 9 E10) l MIS System !
RIV File R. Bachmann, OGC (MS: -15-B-18)
PSB File (Hodges) ;
o i
r
,
l.
?
DOCUMENT NAME: G:\ REPORTS \ST715AK.TWD To receive copy of document, Indicate in boa:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:DRS 'Ith - 'I - C:DRS/Fl@f f i TWDexter:nh' BMurray%$-
'
11/f!97 11h/97 OFFICIAL RECORD COPY l
l
~
..
_
-W-h' '-- +- C-' * P
_ _ _ _ _ _ _ _ _ _ _ _ _ -
d
.
Houston Lighting & Power Company -4-Distribution w/cooy oljicensee's letter dated July 2.1997:
DCD (IE04)
Regional Administrator South Texas Resident inspector DRS Director DRS Deputy Director DRP Director DRS PSB Branch Chief (DRP/A)
Project Engineer (DRP/A)
Branch Chief (DRP/TSS)
Elaine Koup, NRR/DRPM/PSGB (MS: OWFN 11 E22)
Leah Tremper, OC/DAF/LFARB (MS: TWFN 9 E10)
MIS System RIV File R. Bachmann, OGC (MS: 15 B 18)
PSB File (Hodges)
DOCUMENT NAME G:\ REPORTS \ST715AK.TWD To receive copy of document. Ind6cate in box:"C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy RIV:DRS 'ith E C:DRS/@ f TWDexter:nh' BMurrayEf
11/f/97 11b/97 OFFICIAL RECORD COPY
!
- _
l
_. . . - .
9.- O O -
.'
f. . ya
.
,
f .,. The Light x ydT c o mp any teeth inas Prs)eet Ilectrit GeserstM statnee P.ot set att M odrworth.Trias 774&J Nemetoa IJghtlag h Power.
July 2,1997 ST Ill-AE 5683 '
-
File No.: G02.04.02 '
10CFR2.201 .
STI 30326871 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington,DC 20555 South Texas Project Units I and 2 Docket Nos. STN 50-498 and STN 50-499 Reply to Notice of Violation 97.1102 South Texas Project has reviewed Notice of Violation 9715 02, dated June 3,1997, and submits the attached reply. The events described in the Notice of Violation did not have an adverse effect on the health and safety of the public, if there are any questions regarding these replies, please contact Mr. S. M. licad at (512)
972 7136 or me at ($12) 972 8757.
/
7 (
J. J. Sheppard Assistant to Executive Vice President and General Manager, Nuclear
'
WEM/wem g Attachment: Reply to Notice of Violation 9715 02
$$ I 4M709037M70702~ \\,hhh ,
PDR ADOCK 0S000490 0 YDR
- ._ _ _- -- __- _
-.
- - . . . - - --_ . - . . - .- - - . . - .. _. . - _ _- - . .
n.a . ; 1 9 .8 ? .e& ',*
.
.4 : . .. - .. -Q,. c ... p
,
bie r Iseoste IJghung h Power company '.. ST.llt AE.$683 Mi seeth Tenu Projoet metete o.eerouas staues rise No.: 002.04.02
.NSf -
Page 2
,, ,a Ellis W.Merschoff Rufus S. Scott Regional Administrator, Region IV Associate General Counsel .l,iy U. S. Nuclear Regulatory Commission llouston Lighting & Power Company <
611 Ryan Plaza Drive, Suite 400 P. O. Box 61067 . , ;. ,
Arlington.TX 76011 8064 Ilouston. TX 77208 'f
'ihomas W. Alexion Institute of Nuclear Power Project Manager, Mail Code 13113 Operations Records Center U.S. Nuclear Regulatory Commission 700 Galleria Parkway Washington, DC 20555-0001 Atlanta, G A 30339 5957 David P. Loveless Dr. Dertram Wolfe Sr. Resident inspector 15453 Vh Vaquero c/o U. S. Nuclear Regulttory Commission Monte Sereno,CA 95030 P. O. Box 910 Day City TX 77404 0910 Richard A.Ratliff Dureau of Radiation Control J. R. Newman, Esquire Texas Department ofIlealth Morgan, Lewis & Dockius 1100 West 49th Street 1800 M. Street, N.W. Austin, TX 78756-3189 Washington, DC 200V,.5869 '
J. R. Egan, Esquire H. T. liardt/W. C. Gunst Egan & Associates, P.C.
City Public Service 2300 N. Street, N.W.
P. O. Box 1771 Washington,DC 20037 San Antonio,TX 78296 U.S. Nuclear Regulatory Commission J. C. Lanier/M. D. Lee Attention: Document Control Desk City of Austin Washington, DC 20555-0001 Electric titility Department 721 Darton Springs Road Austin,TX 78704 Central Power and Light Company ATIN: G. E. Vaughn/C. A. Johnson P. O. Box 289, Mall Code: N5012 Wadsworth,TX 77483
D
_ . - . . . , -_ . . - . . _ , . . . , - - -. . . . . - - .
- o
- , g
- U
.
Attachment i ST llL AE 5683
.-
nu4 1. Statement of Violation: 9*
License Condition 2.F of the South Texas Project Unit I, Operating License NPF 76 and Unit 2, Operating License NPF 80, dated March 22, 1988, requires that the licensee l'ully implement and maintain in effect the Commission approved physical security plan, including amendments and changes made purssnt to the authority of 10 CFR 50.54(p).
+
South Texas Project Physical Security Plan, Revision 7A, c~ted January 14.1997, Chapter 4, ,
paragraph 4.2, states,in part *lf a person is terminated for cause, that individual's access is revoked and his/her assigned badge is deactivated through the security computer system prior to or simultaneously with notificatic n of termination."
South Texas Project Procedure OPGPO9 ZA-0002," Fitness For Duty Program," Revision 7 dated October 24,1996, paragraph 6.11,' Confirmed Positive Test Results,' states,in part,"A
' Confirmed Positive' noti 0 cation letter (Form 2) is delivered to the department manager, or designee, notifying them the individual is denied site access, The llL&P employee will be terminated... Notification of the above positive test results shall be made using the guidelines contained in OPGPO3 ZX 0002, Condition Reporting Process."
South Texas Project Procedure OPGPO3 7X0002," Condition Reporting Process," Revision 13, dated September 12,1996, paragraph 4.1, " Condition identification," states, in part, "For conditions where security concems are obvious or perceived, contact Plant Protection immediately and deliver the CR form to Plant Protection, or if database entry was made, promptly inform the Security Force Supervisor of the Condition Report number."
Contrary to the above, on May 7,1997, the inspector discovered that the licens c had failed to comply with their procedures on February 3,1997,conceming a positive for cause 6tness for-duty test. Specifically, the inspector identified that a condition report and Form 2 were not properly initiated on Febmary 3,1997.
This la a Severity Level IV violation (Supplement !!!)(50-498:499/9715 02).
!!. South Texas Project Position:
South Texas Project concurs that the violation occurred.
111. Reason for the Violation:
The reason for this violation was a procedure deficiency that did not specify a time requirement to revoke the badge. In addition, the programmatic requirements in effect were not properly integrated.
- - -_ - - - - _ _ _ - _ - - . - _ . _ - - _ _ - _ -
w: . O O
..s.
Attachment i ST IIL AE 5683 r,
,
.. .- Page 2 of 3 .
During the last tefueling outage on Unit Two an individual wu preparing to get access to the plant for work. De individual had completed the badging process and retumed to the Central Processing Facility. A station staff employee noticed the smell of what might be alcohol on the worker's breath in accordance with the plant Continual Behavioral Observation Program the worker was taken to Fitness For Duty for a "For Cause Test." nl: test showed an unneceptable level of alcohol present. De worker's Project Menger and Badge Coordinator were notified of the failure, ne Badge Coordinator maintained the worker's access badge in her possession and the worker's employment wu terminated. Contrary to procedural requirements the worker's manager did not complete the required Badge Transaction Form while processing the worker off site. Approximately 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> ifler the Fitness For Duty failure, a review of the Fitness for Duty records revealed that the involved worker's badge wu still in an active status. Security wu informed and the badge was revoked.
The Fitness for Duty Procedure required that a Condition Report be written only if the failure was reportable under 10CFR50.26. His event was not reportable under 10CFR$0.26. De Condition Reporting Procedure only required Security be notified if a Condition Report described a Security related event. The involved individuals did not recogae this as a Security related event. ne existing procedural guidance relied upon the process ng of the Badge Transaction Form to result in Security being notified of the Fitness for Duty fal;ure.
IV. Corrective Actions:
e Security personnel pmmptly placed the employce's badge on hold when notified the employee um on the denial list. Security personnel revoked the badge about an hour after it was placed on hold.
e ne Fitness For Duty Program procedure was revised to instruct the Industrial Safety
& ilealth Division hianager, or designec, to have an individual's access revoked upon verification the individual has a positive Fitness For Duty test result. His change requires the first individual aware of the failure to notify Security prior to any delays, e ne Fitness for Duty Pmgram pmeedure wu revised to instruct the Industrial Safety
& Ilealth Division Manager, or designee, to initiate a Condition Report as a result of a Fitness for Duty failure. The Condition Report would insure that Securay reviewed the event to determine if 10CFR50.73 was app!! cable.
V, Dste of Full Compliance:
ne South Texas project is in full compliance.
,
- - . _
,
_ . _ . _ _ _ _ _ . _ _.._. ._ _ _ _ __ _ ___ _ .. _ _ -_. _-_. _- __. _ _ _
'
- -
..
-
O '-
O :-
- .
i
.: .
" '
Attachment !
ST IR AE46W3 o' ** Page 3 of 3 VI. AdditionalInformation
-
Although the employee's badge had been 1: sued, it was never given to the employee. .m j . =.
The employte's hedge was in custody of the employce's Badge Coordinator from the
,)
J ;,,.ng4
'~
time it was issued until the employee's access was revoked.
.
6%
.i
.f l
l r i
i l
,
'.
.f sQ
.
f
_ _ - _ . _ _ _ . - -. - ,. . ,- .- - - - _ _ _ _ _ _ . ., - .,. ,