ML20204B850: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:_                                                        _ _  _  .-
r e
THIS DOCUMENT CONTAiNS            .
P00R QUALITY PAGES l
            , , . - . = , , , , , , -
suite 3100                                                -
7 Atlant.a. CA 30303
* ar20 50-259/7827 I;
Reperced under Technical Specifications 6,7,2,9                                                    e
                                                                                                                .i 1
Date of notification: September 16, 1978 Time of occurrence: 1703,                Dmit 1          ,;
Technical Speelfication involved:                                        f/13/78                ?;
3,5,3.14 J
Caediciosa Prior to occurrones; Unit operating at 950
* M 7dentification and Deveription of Oecurrence:      "L" recirculation loop now decrassed f rom approximately 41,000 spe to 33,000 gym with a correspoeding toermase in recircaelation pump del ta F.
4 Annar=e (f.,nse, cf occurreneet separation of the velve acca and valve disc
          ~                                                                                                    4 assembly is apparent. 21,c cause of thia separation is not haswn.
w, e a vr ro, s m inxen'5r Planned: riens are being rtmoulated to saelate the discharse valve and make rap 41re at necessery, At this (Lee it is anti-cipated that wel,= repe{c vt11 require vessel bead removal and the insertion of pluss into cne jet piampa,                                                                  '
o i9
              , c. Dewcase, Power Plant Superintendent                                                        $
seer Yelley Antbority                                                                      3 srn. v.m m r usaa                                                                                  m' ir t
a l
I H
                                                                                                            -t c4 lb u 4 i
y 781tG M 3
,}}

Latest revision as of 00:38, 31 December 2020

RO 50-259/7827:on 780913,recirculation Loop a Flow Decreased from 41,000 to 33,000 Cpm W/Corresponding Increase in Pump Delta F.Caused by Valve Stem Separating from Valve Disc
ML20204B850
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 09/14/1978
From: Dewease J
TENNESSEE VALLEY AUTHORITY
To:
References
RO-50-259-7827, NUDOCS 7811020362
Download: ML20204B850 (1)


Text

_ _ _ _ .-

r e

THIS DOCUMENT CONTAiNS .

P00R QUALITY PAGES l

, , . - . = , , , , , , -

suite 3100 -

7 Atlant.a. CA 30303

  • ar20 50-259/7827 I;

Reperced under Technical Specifications 6,7,2,9 e

.i 1

Date of notification: September 16, 1978 Time of occurrence: 1703, Dmit 1 ,;

Technical Speelfication involved: f/13/78  ?;

3,5,3.14 J

Caediciosa Prior to occurrones; Unit operating at 950

  • M 7dentification and Deveription of Oecurrence: "L" recirculation loop now decrassed f rom approximately 41,000 spe to 33,000 gym with a correspoeding toermase in recircaelation pump del ta F.

4 Annar=e (f.,nse, cf occurreneet separation of the velve acca and valve disc

~ 4 assembly is apparent. 21,c cause of thia separation is not haswn.

w, e a vr ro, s m inxen'5r Planned: riens are being rtmoulated to saelate the discharse valve and make rap 41re at necessery, At this (Lee it is anti-cipated that wel,= repe{c vt11 require vessel bead removal and the insertion of pluss into cne jet piampa, '

o i9

, c. Dewcase, Power Plant Superintendent $

seer Yelley Antbority 3 srn. v.m m r usaa m' ir t

a l

I H

-t c4 lb u 4 i

y 781tG M 3

,