ML20078M978
| ML20078M978 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 10/14/1983 |
| From: | Jones G TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8310250360 | |
| Download: ML20078M978 (1) | |
Text
.
L5 2 831014 899 NUC P'R ARMS, 1520 CST 2-C xc:
E. A. Belvin, MPB-MS (If radioactive material released)
TELECOPY TO NRC T. G. Campbell, 1760 CST 2-C October 14, 1983 T. L. Chinn, EFNP J. F. Cox, W11B85C-K U. S. Nuclear Regulatory g g n C. W. Crawford, 670 CST 2-C iiN P. Duncan, W11C127C-K Region II 3
101 Marietta m
, NW - Suite 3100 S. Goldman, E124AC-K Atlanta, Georgia 30303 G. R. Hall, 6204 MIB-K Receptionist, Plt Supt Office BFRO-50-260/83063 R. L. Lumpkin, Jr., 401 UBB-C L. M. Mills, 400 CST 2-C Reported under Technical Specifications 6.7.2. Ad.1)Paulk, NRC Shift Engineer Telecony:
Date - 10/14/83 F. A. Szczepanski, 220 401B-C Telenhone:
Date - 10/14/83 Time - 1400 l
Person Contacted:
Date of Occurrence:
10/14/83 Time of occurrence:
1330 Unit: 2 Technical Specification Involved: 3 1.A Conditions Prior to Occurrence:
10/14/83 - unit 2 was operating at 1005 and units 1 artd 3 in refueling outage.
Identification and Descrintion of Occurrence:
On 10/13/83, during routine analysis of-the 10/07/83 unit 2 scram, it.was observed that 2-LT-85-45A apparently did not initiate a trip when the level in the SDIV exceeded 50 gallons. This raised questions concerning the response of the transmitter and an investigation began. All other instruments on SDIV responded as expected.
On 10/14/83, testing of the transmitter revealed slow and erratic response to measured variable.
Annarent Canma of Occurrence:
l The Rosemount differential pressure transmitter model 1153 - DB4N0005 had a slow and erratic response to measured variable. A problem inside the i
sealed transmitter is indicated.
Other Related Events:
1 None i
Corrective Action Taken or Plannad:
Scram channel "A" was tripped at 1405 on 10/13/83 A replacement transmitter was installed, calibrated, response checked, functionally tested, and returned to service at 0134 on 10/14/63 An investigation into the slow and erratic response will continue.
n [a *s
'8-)
G. T ms Po Plant Superintendent Browns Ferry Nuclear Plant DICIAL Chriyl g j c9 g g 8310250360 831014 t
gDRADDCK05000