Telecopy RO 50-259/83073:on 831231,reactor Water Sample Indicated Chloride Concentration of 525 Ppb.Steam Flow Greater than 100,000 Lbm/H.Caused by Possible Resin Intrusion.Investigation in Progress
ML20086G597
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 01/03/1984
From: Jones G
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
RO-50-259-83073, NUDOCS 8401120297
Download: ML20086G597 (1)


Text

_ _

TutucoPr TO yng p',1, y p ., *l JGn. 3, 1984

m
  • 7 ~

U. S. Nuclear Regulatory' Commission Region II 101 Marietta Street, NW ama Suite 3100 is" e i u ru

. Person Contacted: Zudans Date of Occurrence: 12/31/83 Time of Occurrence: 0320 Unit 1 Technical Specification Involved: 3.6.B.3.b Conditions Prior to Occurrence Unit 1: Startup, approximately 230 Mwt Unit 2: 3276 Mwt Unit 3: Refuel outage Identification and Description of Occurrence At 0320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br /> on 12/31/83, a reactor water sample indicated a chloride concentration of 525 ppb (.5 ppm). Steam flow was greater than 100,000 lbm/hr. NRC (Zudans) was ntoified. After senior site management was notified, an orderly shutdown was initiated at 1220 hours0.0141 days <br />0.339 hours <br />0.00202 weeks <br />4.6421e-4 months <br /> on 12/31/83 Anoarent Cause of Occurrence :

Possible resin intrusion. Other plant parameters (offgas radiation level, Ph and conductivity) support this suspicion. -

Other Related Events :

None Corrective Action Taken~or Planned :

Initiated orderly unit shutdown and efforts to locate source. Orderly shutdown was terminated at 1435 hours0.0166 days <br />0.399 hours <br />0.00237 weeks <br />5.460175e-4 months <br /> after chloride concentration was confirmed to be within specification and the suspected source isolated.

An investigation is continuing into the cause and corrective action. A communication breakdown between the labratory and the shift engineer appears to have been the main contributor to the delayed action.

8401120297 840103 gDRADOCK 05000259 p PDR M. M G. T. es .

YC >

Power Plant Superintendent '{j. g TL i O Browns Ferry Nuclear Plant {