OPERATING DATA REPORT
                                                                                                                                                                                      ~
DOCKET NO. 50-298 DATE December 2, 1981 COMPLETED BY    P. L. Ballinger TELEPHONE 402-825-3811 OPERATING STATUS Cooper Nuclear Station                                                                                                    Notes'
: 1. Unit Name:
: 2. Reporting Period:        November 1981 2381
: 3. Licened Thermal Power (MWt):
836
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):        778
: 6. Maximum Dependable Capacity (Gross MWe):
787 764
: 7. Maximum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 9. Power Level To Which Restricted,if Any (Net MWe):                                                                                    None
: 10. Reasons For Restrictions,If Any:        None This Month                            Yr. to Date        Cumulative
: 11. Hours in Reporting Period                                                                                                          720.0            8,016.0          65,041.0 594.2            5,553.0          53,142.4          -
: 12. Number Of Hours Reactor Was Critical
* 0.0                0.0                'O.0
: 13. Reactor Reserve Shutdown Hours
: 14. Hours Generator On.Line                                                                                                            567.1  _
5.495.7            52,213.5
: 15. Unit Reserve Shutdown Hours                                                                                                          0.0                0.0                  0.0 1,229,448.0                        12,161,904.0      101,944,014.0        .
: 16. Gross Thermal Energy Generated (MWH)
: 17. Gross Electrical Energy Generated (MWH)                                                                                      402.131.,0.,    3,418,117.0      31,895,131.0
: 18. Net Electrical Energy Generated (MWH)                                                                                          1RR 9SR n      1 ?Ra RA6.n      an 711 176.n
: 19. Unit Service Factor                                                                                                                  78.8                68.6                80.3
: 20. Unit Availability Factor                                                                                                            78.8                68.6                80.3
: 21. Unit Capacity Factor (Using MDC Net)                                                                                                70.6                53.6                61.8          .
: 22. Unit Capacity Factor (Using DER Net)
* 69.L                52.7                60.7_
: 23. Unit Forced Outage Rate                                                                                                                0.0                2.2                  4.1
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
Refueline. May 1. 1982. 4 weeks
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                                                                                            Forecast            Achiesed INITIA L CRITICA LITY INITIA L ELECTRICITY COMMERCIAL OPERATION                                                                                                                                            ,
                                                ~'
8211110268 811202 PDR ADOCK 05000298                                                                                                                                                                  N 73 R                          PM              ,
 
4      %
AVERAGE DAILY UNIT POWER LEVEL                                                    .
DOCKET NO.      50-298 UNIT    Cooper Nuclear Station-December 2, 1981 DATE P. L. Ballinger COMPLETED BY TELEPHONE      402-825-3811 MONTM      Mmr owh o r DAY        AVERAGE DAILY POWER LEVEL                              DAY    AVERAGE DAILY POWER LEVEL (MWe-Net)                                                  (MWe-Net) 1 0                                    g7                  768 2                          O                                    gg                  767 3                          0                                    39 764 4                          0                                  20 768 5                          0                                  23 767 6                          0                                  22 744 7
71                                    23 767 349                                                          767 8                                                              24 9                        490                                    25 768                                    .
511                                                          765 10                                                              26 11 660                                    27 732 12                        716                                    28 740 705                                                          748 13                                                              29 14 706                                  30                    778 637                                                          ---
      -15                                                              31 16                        767_                      .
INSTRUCTIONS On this format. list th'e average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
 
9
                                                                                                                                                                ~              '
DOCKET NO.
UNITSilUIDOWNS AND' POWER REDUCTIONS UNIT NAM E Connor hclone Station DATE December 2, 1981 COMPLETED BY        P. L. Ballinster REPORT MONTig November TELEPHONE 402-825-3811
                                                    ,.            jg            Y        Licensee    ,E t,        %                    Cause A Corrective No.                                  Date      R              38    5  _E y 5        Event    3,7        g'5j                        Actiim to mU          U H
f=    5    j;gg        Report e              g                      Prevent Recurrence 6
81-7                                    810912    S        152.9      B      1          N/A        N/A      N/A        Turbine rotor maintenance outage completion.
I                                                2                                                3                                  4 F: Forced                              Reason:                                          Method:                              Exhibit G. Instructions S: Scheduled                            A Equipment Failure (Explain)                      1. Manual                            for Preparation of Data B-Maintenance of Test                            2 Manual Scram.                      Entry Sheets for Licensee C. Refueling                                      3 Automatic Scram.                  Event Report (LER) File (NURI.G-D Regulatory Restriction                          4 Osher (Explain)                    0161)
E-Operator Trainint;& License Examination F Administrative                                                                '5                    .
G-Oper::tional Error (Explain)                                                        Exhibit 1 Same Source p)/77)                                            Il-Other (Explain)
 
OPERATIONS NARRATIVE Cooper Nuclear Station November 1981                      .
The turbine rotor maintenance outage ended on November 6, 1981 with completion of the low pressure turbine rotor replacement. The reactor was taken critical at 1450 hours, November 6,1981 and the generator was synchronized to the grid at 0343 hours, November 7, 1981. The generator was tripped off line at 1700, November 7,1981 for overspeed trip testing and to balance the new low pressure rotors and was re-synchronized to the grid at 2201, November.7, 1981. The plant increased power to rated conditions and operated at steady state power for the remainder of the month.
9
                                                                                              .=e O
                        ,-e}}

Latest revision as of 17:07, 21 December 2020

Monthly Operating Rept for Nov 1981
ML20066D291
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/02/1981
From: Ballinger P
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20066D274 List:
References
NUDOCS 8211110268
Download: ML20066D291 (4)


Text

_______ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _

OPERATING DATA REPORT

~

DOCKET NO. 50-298 DATE December 2, 1981 COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811 OPERATING STATUS Cooper Nuclear Station Notes'

1. Unit Name:
2. Reporting Period: November 1981 2381
3. Licened Thermal Power (MWt):

836

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): 778
6. Maximum Dependable Capacity (Gross MWe):

787 764

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe): None
10. Reasons For Restrictions,If Any: None This Month Yr. to Date Cumulative
11. Hours in Reporting Period 720.0 8,016.0 65,041.0 594.2 5,553.0 53,142.4 -
12. Number Of Hours Reactor Was Critical
  • 0.0 0.0 'O.0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 567.1 _

5.495.7 52,213.5

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 1,229,448.0 12,161,904.0 101,944,014.0 .
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 402.131.,0., 3,418,117.0 31,895,131.0
18. Net Electrical Energy Generated (MWH) 1RR 9SR n 1 ?Ra RA6.n an 711 176.n
19. Unit Service Factor 78.8 68.6 80.3
20. Unit Availability Factor 78.8 68.6 80.3
21. Unit Capacity Factor (Using MDC Net) 70.6 53.6 61.8 .
22. Unit Capacity Factor (Using DER Net)
  • 69.L 52.7 60.7_
23. Unit Forced Outage Rate 0.0 2.2 4.1
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:

Refueline. May 1. 1982. 4 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICA LITY INITIA L ELECTRICITY COMMERCIAL OPERATION ,

~'

8211110268 811202 PDR ADOCK 05000298 N 73 R PM ,

4  %

AVERAGE DAILY UNIT POWER LEVEL .

DOCKET NO. 50-298 UNIT Cooper Nuclear Station-December 2, 1981 DATE P. L. Ballinger COMPLETED BY TELEPHONE 402-825-3811 MONTM Mmr owh o r DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 g7 768 2 O gg 767 3 0 39 764 4 0 20 768 5 0 23 767 6 0 22 744 7

71 23 767 349 767 8 24 9 490 25 768 .

511 765 10 26 11 660 27 732 12 716 28 740 705 748 13 29 14 706 30 778 637 ---

-15 31 16 767_ .

INSTRUCTIONS On this format. list th'e average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

9

~ '

DOCKET NO.

UNITSilUIDOWNS AND' POWER REDUCTIONS UNIT NAM E Connor hclone Station DATE December 2, 1981 COMPLETED BY P. L. Ballinster REPORT MONTig November TELEPHONE 402-825-3811

,. jg Y Licensee ,E t,  % Cause A Corrective No. Date R 38 5 _E y 5 Event 3,7 g'5j Actiim to mU U H

f= 5 j;gg Report e g Prevent Recurrence 6

81-7 810912 S 152.9 B 1 N/A N/A N/A Turbine rotor maintenance outage completion.

I 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1. Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C. Refueling 3 Automatic Scram. Event Report (LER) File (NURI.G-D Regulatory Restriction 4 Osher (Explain) 0161)

E-Operator Trainint;& License Examination F Administrative '5 .

G-Oper::tional Error (Explain) Exhibit 1 Same Source p)/77) Il-Other (Explain)

OPERATIONS NARRATIVE Cooper Nuclear Station November 1981 .

The turbine rotor maintenance outage ended on November 6, 1981 with completion of the low pressure turbine rotor replacement. The reactor was taken critical at 1450 hours0.0168 days <br />0.403 hours <br />0.0024 weeks <br />5.51725e-4 months <br />, November 6,1981 and the generator was synchronized to the grid at 0343 hours0.00397 days <br />0.0953 hours <br />5.671296e-4 weeks <br />1.305115e-4 months <br />, November 7, 1981. The generator was tripped off line at 1700, November 7,1981 for overspeed trip testing and to balance the new low pressure rotors and was re-synchronized to the grid at 2201, November.7, 1981. The plant increased power to rated conditions and operated at steady state power for the remainder of the month.