OPERATING DATA REPORT

~

DOCKET NO. 50-298 DATE December 2, 1981 COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811 OPERATING STATUS Cooper Nuclear Station Notes'

1. Unit Name:
2. Reporting Period: November 1981 2381
3. Licened Thermal Power (MWt):

836

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): 778
6. Maximum Dependable Capacity (Gross MWe):

787 764

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe): None
10. Reasons For Restrictions,If Any: None This Month Yr. to Date Cumulative
11. Hours in Reporting Period 720.0 8,016.0 65,041.0 594.2 5,553.0 53,142.4 -
12. Number Of Hours Reactor Was Critical
  • 0.0 0.0 'O.0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 567.1 _

5.495.7 52,213.5

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 1,229,448.0 12,161,904.0 101,944,014.0 .
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 402.131.,0., 3,418,117.0 31,895,131.0
18. Net Electrical Energy Generated (MWH) 1RR 9SR n 1 ?Ra RA6.n an 711 176.n
19. Unit Service Factor 78.8 68.6 80.3
20. Unit Availability Factor 78.8 68.6 80.3
21. Unit Capacity Factor (Using MDC Net) 70.6 53.6 61.8 .
22. Unit Capacity Factor (Using DER Net)
  • 69.L 52.7 60.7_
23. Unit Forced Outage Rate 0.0 2.2 4.1
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:

Refueline. May 1. 1982. 4 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICA LITY INITIA L ELECTRICITY COMMERCIAL OPERATION ,

~'

8211110268 811202 PDR ADOCK 05000298 N 73 R PM ,

4  %

AVERAGE DAILY UNIT POWER LEVEL .

DOCKET NO. 50-298 UNIT Cooper Nuclear Station-December 2, 1981 DATE P. L. Ballinger COMPLETED BY TELEPHONE 402-825-3811 MONTM Mmr owh o r DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 g7 768 2 O gg 767 3 0 39 764 4 0 20 768 5 0 23 767 6 0 22 744 7

71 23 767 349 767 8 24 9 490 25 768 .

511 765 10 26 11 660 27 732 12 716 28 740 705 748 13 29 14 706 30 778 637 ---

-15 31 16 767_ .

INSTRUCTIONS On this format. list th'e average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

9

~ '

DOCKET NO.

UNITSilUIDOWNS AND' POWER REDUCTIONS UNIT NAM E Connor hclone Station DATE December 2, 1981 COMPLETED BY P. L. Ballinster REPORT MONTig November TELEPHONE 402-825-3811

,. jg Y Licensee ,E t,  % Cause A Corrective No. Date R 38 5 _E y 5 Event 3,7 g'5j Actiim to mU U H

f= 5 j;gg Report e g Prevent Recurrence 6

81-7 810912 S 152.9 B 1 N/A N/A N/A Turbine rotor maintenance outage completion.

I 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1. Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C. Refueling 3 Automatic Scram. Event Report (LER) File (NURI.G-D Regulatory Restriction 4 Osher (Explain) 0161)

E-Operator Trainint;& License Examination F Administrative '5 .

G-Oper::tional Error (Explain) Exhibit 1 Same Source p)/77) Il-Other (Explain)

OPERATIONS NARRATIVE Cooper Nuclear Station November 1981 .

The turbine rotor maintenance outage ended on November 6, 1981 with completion of the low pressure turbine rotor replacement. The reactor was taken critical at 1450 hours0.0168 days <br />0.403 hours <br />0.0024 weeks <br />5.51725e-4 months <br />, November 6,1981 and the generator was synchronized to the grid at 0343 hours0.00397 days <br />0.0953 hours <br />5.671296e-4 weeks <br />1.305115e-4 months <br />, November 7, 1981. The generator was tripped off line at 1700, November 7,1981 for overspeed trip testing and to balance the new low pressure rotors and was re-synchronized to the grid at 2201, November.7, 1981. The plant increased power to rated conditions and operated at steady state power for the remainder of the month.

9

.=e O

,-e