ML20196C976: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:._ | ||
Arkansas Nuclear One - Administrative Senices | |||
;- ENTERGY OPS, INC 1448 SR 333 Russellville, AR 72801 Document Control | |||
, 11/2498 Controlled Document Transmittal COPYHOLDER NO: 102 TO: NRC DOCUMENT CONTROL WASIIINGTON, D.C. | |||
DOCUMENT TITLE: UNIT II TECIINICAL REQUIREMENT MANUAL REV/ AMEND /CHG NO: APPROVED REV 01 | |||
==SUBJECT:== | |||
EFFECTIVE DATE 11/23/98 f this box is checked, please sign, date, and return transmittal in O envelope provided. / | |||
ANO-1 Docket 50-313 A | |||
<%v/ | |||
7ANO-2 Docket 50-368 Signature Date | |||
~ | |||
9812020128 981124 PDR ADOCK0500g8 I | |||
I | |||
, l ATTACHMENT TO REVISION NO. "1" i~ FOR ANO- 2 i | |||
TECHNICAL REOUIREMENTS MANUAL (TRhD l | |||
j-. | |||
Revise the following pages of the TRM for ANO-2 with the attached pages. The revised pages | |||
; are identified by Revision number and contain vertical lines indicating the area of change. | |||
i l INSERT PAGES REMOVE PAGES i 3.3-8 3.3-8 i | |||
) i i | |||
J l | |||
i lO | |||
: l i | |||
0 I | |||
1 l l | |||
1 l | |||
i l | |||
O i | |||
I | |||
] | |||
4 . | |||
INSTRUMENTATION | |||
!' 3/4.3.4 TURBINE OVERSPEED PROTECTION LIMITING CONDITION FOR OPERATION 3.3.4.1 - At least one turt>ine overspeed protection system shall be OPERABLE. | |||
4 f | |||
APPLICABILITY: MODES 1,2 and 3. | |||
ACTION: | |||
i 2 | |||
: a. With one stop valve and/or one control valve inoperable, and/or one reheat stop j' | |||
~ | |||
valve and/or one intercept valve inoperable, restore the inoperable valve (s) to OPERABLE status within 72 hours, or close the inoperable valve (s) or isolate the i | |||
[ turbine from the steam supply within the next 12 hours. | |||
t i b. With the above required turt>ine overspeed pret.ction system otherwise inoperable, j i within 24 hours isolate the turbbe from the steam supply. ' | |||
t l j SURVEILLANCE REQUIREMENTS j | |||
, 4.3.4.1.1 The provisions of Technical Specificabon 4.0.4 are not applicable. | |||
j ; | |||
4.3.4.1.2 The above required turt>ine overspeed protection system shall be demonstrated j OPERABLE: | |||
i | |||
: a. At least once per 92 days | |||
* by direct observation of the movement of each of the l ; | |||
j foliowing valves through at least one complete cycle from the running position: l, | |||
! 1. Four high pressure turbine stop valves. ' | |||
4 i | |||
: 2. Four high pressure turbine control valves. . | |||
l 1 | |||
l 3. Four low pressure turbine reheat stop and intercept valves. l j b. At least once per 18 months by performance of a CHANNEL CAUBRATION on the i turbine overspeed protection systems. ! | |||
l l c. At lemt once per 40 months by disassembling at least one of each of the above | |||
; valves and performing a visual and surface inspechon of valve seats, disks and | |||
; stems and verifying no unacceptable flaws or corrosion. | |||
l , | |||
i i | |||
! l 1 | |||
i i | |||
l m The 92 day frequency may be extended on a case by case basis for the high pressure , | |||
. turbine control valves with an approved ER evaluation that has been evalua'.sd under 50.59. l ANO-2 TRM 3.3-8 Rev. 1 1 i | |||
j | |||
,}} |
Latest revision as of 05:31, 13 November 2020
ML20196C976 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 11/24/1998 |
From: | ENTERGY OPERATIONS, INC. |
To: | |
References | |
PROC-981124, NUDOCS 9812020128 | |
Download: ML20196C976 (3) | |
Text
._
Arkansas Nuclear One - Administrative Senices
, 11/2498 Controlled Document Transmittal COPYHOLDER NO: 102 TO: NRC DOCUMENT CONTROL WASIIINGTON, D.C.
DOCUMENT TITLE: UNIT II TECIINICAL REQUIREMENT MANUAL REV/ AMEND /CHG NO: APPROVED REV 01
SUBJECT:
EFFECTIVE DATE 11/23/98 f this box is checked, please sign, date, and return transmittal in O envelope provided. /
ANO-1 Docket 50-313 A
<%v/
7ANO-2 Docket 50-368 Signature Date
~
9812020128 981124 PDR ADOCK0500g8 I
I
, l ATTACHMENT TO REVISION NO. "1" i~ FOR ANO- 2 i
TECHNICAL REOUIREMENTS MANUAL (TRhD l
j-.
Revise the following pages of the TRM for ANO-2 with the attached pages. The revised pages
- are identified by Revision number and contain vertical lines indicating the area of change.
i l INSERT PAGES REMOVE PAGES i 3.3-8 3.3-8 i
) i i
J l
i lO
- l i
0 I
1 l l
1 l
i l
O i
I
]
4 .
INSTRUMENTATION
!' 3/4.3.4 TURBINE OVERSPEED PROTECTION LIMITING CONDITION FOR OPERATION 3.3.4.1 - At least one turt>ine overspeed protection system shall be OPERABLE.
4 f
APPLICABILITY: MODES 1,2 and 3.
ACTION:
i 2
- a. With one stop valve and/or one control valve inoperable, and/or one reheat stop j'
~
valve and/or one intercept valve inoperable, restore the inoperable valve (s) to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or close the inoperable valve (s) or isolate the i
[ turbine from the steam supply within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
t i b. With the above required turt>ine overspeed pret.ction system otherwise inoperable, j i within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> isolate the turbbe from the steam supply. '
t l j SURVEILLANCE REQUIREMENTS j
, 4.3.4.1.1 The provisions of Technical Specificabon 4.0.4 are not applicable.
j ;
4.3.4.1.2 The above required turt>ine overspeed protection system shall be demonstrated j OPERABLE:
i
- a. At least once per 92 days
- by direct observation of the movement of each of the l ;
j foliowing valves through at least one complete cycle from the running position: l,
! 1. Four high pressure turbine stop valves. '
4 i
- 2. Four high pressure turbine control valves. .
l 1
l 3. Four low pressure turbine reheat stop and intercept valves. l j b. At least once per 18 months by performance of a CHANNEL CAUBRATION on the i turbine overspeed protection systems. !
l l c. At lemt once per 40 months by disassembling at least one of each of the above
- valves and performing a visual and surface inspechon of valve seats, disks and
- stems and verifying no unacceptable flaws or corrosion.
l ,
i i
! l 1
i i
l m The 92 day frequency may be extended on a case by case basis for the high pressure ,
. turbine control valves with an approved ER evaluation that has been evalua'.sd under 50.59. l ANO-2 TRM 3.3-8 Rev. 1 1 i
j
,