ML20070G886: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20070G886
| number = ML20070G886
| issue date = 03/01/1991
| issue date = 03/01/1991
| title = Responds to NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification.
| title = Responds to NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification
| author name = Nandy F
| author name = Nandy F
| author affiliation = SOUTHERN CALIFORNIA EDISON CO.
| author affiliation = SOUTHERN CALIFORNIA EDISON CO.

Latest revision as of 23:23, 23 May 2020

Responds to NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification
ML20070G886
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/01/1991
From: Nandy F
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-88-011, IEB-88-11, NUDOCS 9103130049
Download: ML20070G886 (2)


Text

-_ _ _ _ . _ _ _

Southem Califomia Edison Campany F3 l'A74K! H 64 f fit t i 15tVINE', C AL OF OFINI A tla*71 tl ifa8b,F5NF F 4 N ANtw

~~.<,,4 . . . m , ~ . ,~a March 1, 1991 " " ' " -

V. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Response to NRC Bulletin 88-11,

" Pressurizer Surge Line Thermal Stratification" San Onofre Nuclear Generating Station Units 2 and 3 Reference A: Letter from F. R. Nandy (SCE) To Document Control Desk (NRC) dated March 8, 1989, Sama Subject.

Reference B: Letter from L. W. Kokajko (NRC) to Messrs. Harold B. Ray (SCE) and G. D. Cotton (SDG&E) dated July 25, 1990,

" Evaluation of Combustion Engineering Owners Group Bounding Analysis."

Reference C: Letter from Edward C. Sterling (CE0G) to J. T. Larkins (NRC) dated October 24, 1990, " Evaluation of Combustion Ei,1ineering Owners Group Bounding Analysis Regarding NRC Bulletit 88-11,

' Pressurizer Surge Line Thermal Stratification.'"

NRC Bulletin 88-11 requested licensees to establish and implement a program to confirm pressurizer surge line integrity in view of the occurrence of thermal stratification and to inform the staff of the actions taken to resolve this isWo.

In SCC's initial response to NRC Bulletin 88-11 (Reference A), SCE stated that we would provide the NRC with the results of our plant specific analysis required by NRC Bulletin 88-11 by February 4, 1991. This letter also informed the NRC that SCE was participating in a CEOS program that would proside a generic bounding analysis upon which SCE's plant specific analysis would be based. By Reference B, the NRC acknowledged that it would be acceptable for SCE to work through the CE0G to address the issues discussed in Bulletin 88-11.

l 910313o049 9103o1 PDR ADOCK 05000361 Q PDR

d

+

i Document Control Desk March 1, 1991 During a meeting between the CE0G and the NRC on September 5, 1990, which was documented in Reference C, the NRC agreed to a new due date of July 30, 1991, for completion of the CEOG generic bounding analysis. During that September meeting, it was noted that each licensee would need to reschedule the due date for completion of their response to Bulletin 8811 with their NRC project manager.

Therefore, the purpose of this letter is to confirm that the original due date of February 4, 1991, was superseded by the September 5, 1990 meeting. SCE's new schedule for completing our plant specific analysis is December 30, 1991.

This change in due date was discussed with Lawrence E. Kokajko, the NRC Project Manager for San Onofre Units 2 and 3, during a phone conversation on Rbruary 6, 1991.

If yvi have any questions, please contact me,

, yours,

] ^

w~l ,

cc: J. B. Martin, Regional Administrator, NRC Region V C. Caldwell, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3 l

~ - -