{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION | {{#Wiki_filter:UNITED STATES | ||
REGION II SAM NUNN ATLANTA FEDERAL CENTER | NUCLEAR REGULATORY COMMISSION | ||
REGION II | |||
SAM NUNN ATLANTA FEDERAL CENTER | |||
61 FORSYTH STREET, SW, SUITE 23T85 | |||
Nuclear and Chief Nuclear Officer P. O. Box 14000 | ATLANTA, GEORGIA 30303-8931 | ||
Juno Beach, FL 33408-0420 | March 3, 2008 | ||
Florida Power and Light Company | |||
ATTN: Mr. J. A. Stall, Senior Vice President | |||
Dear Mr. Stall: | Nuclear and Chief Nuclear Officer | ||
P. O. Box 14000 | |||
Juno Beach, FL 33408-0420 | |||
SUBJECT: ANNUAL ASSESSMENT LETTER - TURKEY POINT NUCLEAR PLANT | |||
(NRC INSPECTION REPORT 05000250/2008001 AND 05000251/2008001) | |||
Dear Mr. Stall: | |||
On February 7, 2008, the NRC staff completed its performance review of the Turkey Point | |||
Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent | |||
quarter and inspection results for the period from January 1 through December 31, 2007. The | |||
purpose of this letter is to inform you of our assessment of your safety performance during this | |||
period and our plans for future inspections at your facility. | |||
This performance review and enclosed inspection plan do not include security information. A | |||
separate letter designated and marked as "Official Use Only--Security Information" will include | |||
the security cornerstone review and resultant inspection plan. | |||
Overall, Turkey Point Units 3 and 4 operated in a manner that preserved public health and | |||
safety and fully met all cornerstone objectives. Plant performance for Turkey Point Unit 3 was | |||
within the Licensee Response Column of the NRC Action Matrix for the last two quarters of CY | |||
2007 and within the Regulatory Response Column for the first two quarters of CY 2007, | |||
because of a single White inspection finding in the Initiating Events cornerstone, originally | |||
identified during the third quarter of 2006. This White finding was associated with a loss of | |||
decay heat removal capability during a period of reduced reactor coolant inventory which | |||
reflected performance at a level requiring increased regulatory response. Therefore, in addition | |||
to the reactor oversight process baseline inspection program, a Supplemental Inspection using | |||
Inspection Procedure (IP) 95001, Inspection for One or Two White Inputs In a Strategic | |||
Performance Area, was conducted during the week of April 9, 2007, and no findings of | |||
significance were identified. | |||
FP&L 2 | |||
Plant performance for Turkey Point Unit 4 for the most recent quarter as well as the previous | |||
three quarters was within the Licensee Response Column of the NRCs Action Matrix, based on | |||
all inspection findings being classified as having very low safety significance (Green) and all PIs | |||
indicating performance at a level requiring no additional NRC oversight (Green). | |||
Additionally, in our mid-cycle assessment letter dated August 31, 2007, we advised you of the | |||
continuation of a substantive cross-cutting issue in the problem identification and resolution area | |||
involving weaknesses in the thorough evaluation of identified problems (P.1.c). The end-of- | |||
FP&L 2 | |||
three quarters was within the Licensee Response Column of the | |||
all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). | |||
Additionally, in our mid-cycle assessment letter dated August 31, 2007 | |||
, we advised you of the continuation of a substantive cross-cutting issue in the problem identification and resolution area involving weaknesses in the thorough evaluation of identified problems (P.1.c). | |||
cycle assessment of this cross-cutting issue included a review of inspection results over the 12- | cycle assessment of this cross-cutting issue included a review of inspection results over the 12- | ||
month period from January 1 through December 31, 2007. | month period from January 1 through December 31, 2007. | ||
During this period, the inspectors reviewed licensee improvement initiatives and noted some | |||
improvements. A focused inspection to evaluate the effectiveness of your corrective action | |||
activities such as the addition of a new CAP improvement management team in January 2008 | program (CAP) improvement initiatives was completed on December 17, 2007. There were no | ||
and the planned conversion of your work processes to the Passport System in 2009. | new inspection findings identified during this review. The inspection team noted that you had | ||
recently implemented a pilot process, in November 2007, to aid in reducing the backlog and | |||
The inspection team also documented five | improving the timeliness and quality of condition reports (CR). The team also found that you | ||
had completed your analysis of the most recent safety conscious work environment (SCWE) | |||
associated with CR 2006-25531, which addressed the substantive cross-cutting issue identified in 2006. | and site culture surveys, had identified areas needing improvement, and had scoped and | ||
the Turkey Point | planned actions to address these identified issues. The team also highlighted key planned | ||
actions to address the PI&R substantive cross-cutting issue from 2006. | activities such as the addition of a new CAP improvement management team in January 2008 | ||
and the planned conversion of your work processes to the Passport System in 2009. These | |||
new initiatives were recognized as positive moves to address the identified weaknesses. | |||
The inspection team also documented five examples where important corrective actions to | |||
prevent recurrence (CAPRs) had not been fully implemented to address weaknesses | |||
associated with CR 2006-25531, which addressed the substantive cross-cutting issue identified | |||
in 2006. These corrective actions had not been completed, partly due to the large number of | |||
changes made to the CAP improvement plan and the Turkey Point Road to Excellence Plan | |||
which appeared to place more emphasis on CAP backlog reduction and not the corrective | |||
actions to address the PI&R substantive cross-cutting issue from 2006. | |||
In one instance, the team identified that required periodic reviews of trend reports by the newly | |||
established condition report oversight group (CROG) had not been performed during 2nd and 3rd | |||
quarter 2007, resulting in a missed opportunity for the CROG to identify that certain department | |||
level performance monitoring groups (Corrective Action Review Boards - CARBs) had failed to | |||
submit completed trend reports because of competing priorities and other routine job activities | |||
(especially, the impact of a 3rd quarter refueling outage). | |||
In a second instance, it was noted that considerable turnover within the initial group of corrective | |||
action program coordinators (CAPCOs). Only thirteen of the initial twenty-three CAPCOs | |||
remained. CAPCOs are assigned to effectively monitor the CAP expectations for the | |||
departments and carry out specific duties aimed at reducing the backlog of work orders and | |||
condition reports. The inspectors noted multiple examples where selected CAPCOs had not | |||
completed formal training qualifications and, in other cases, the CROG had not completed a | |||
timely review and approval process for several recently qualified CAPCOs that were actively | |||
attending and participating in meetings and perform certain condition report evaluations. While | |||
most of these CAPCOS had numerous years of nuclear industry experience, most had little | |||
FP&L 3 | |||
familiarity with Turkey Point plant specific operation or knowledge of its programs and operating | |||
history before being assigned. | |||
FP&L | |||
history before being assigned. | |||
The NRC has also identified more than three Green inspection findings with documented cross- | The NRC has also identified more than three Green inspection findings with documented cross- | ||
cutting aspects in problem identification and resolution and an increasing trend in the cross- | cutting aspects in problem identification and resolution and an increasing trend in the cross- | ||
cutting theme of appropriate and timely corrective action (P.1.d). | cutting theme of appropriate and timely corrective action (P.1.d). This increasing trend indicates | ||
that the underlying weaknesses within the PI&R cross-cutting area may not yet have been addressed or fully understood to assure consistent and sustainable future performance. | that the underlying weaknesses within the PI&R cross-cutting area may not yet have been | ||
strong management involvement given the number of findings in the problem identification and | addressed or fully understood to assure consistent and sustainable future performance. Based | ||
resolution | on these observations, the staff noted that sustained licensee progress will require continued | ||
strong management involvement given the number of findings in the problem identification and | |||
resolution area. Therefore, this cross-cutting issue will remain open. | |||
cutting issue, the NRC would normally request that you conduct a safety culture assessment. However, we are aware that a safety culture survey was already completed at Turkey Point | Since this is the fourth consecutive assessment letter identifying the same substantive cross- | ||
during this assessment period. | cutting issue, the NRC would normally request that you conduct a safety culture assessment. | ||
assessment of the effectiveness of your implementation of key CAPRs and the causes behind the failure to complete required training for key individuals assigned responsibility to assess and recommend actions to resolve backlogged, longstanding issues at Turkey Point. | However, we are aware that a safety culture survey was already completed at Turkey Point | ||
independent assessment should be conducted by individuals that are not associated with the | during this assessment period. Therefore, we request that you conduct an independent | ||
CAP at Turkey Point Nuclear Station or the FP&L corporate office. | assessment of the effectiveness of your implementation of key CAPRs and the causes behind | ||
provide the regional office with a schedule for completion of this evaluation, so that we may plan | the failure to complete required training for key individuals assigned responsibility to assess and | ||
and schedule a follow-up visit to evaluate the scope and results of your review. The NRC will also conduct additional onsite | recommend actions to resolve backlogged, longstanding issues at Turkey Point. This | ||
independent assessment should be conducted by individuals that are not associated with the | |||
CAP at Turkey Point Nuclear Station or the FP&L corporate office. We also request that you | |||
provide the regional office with a schedule for completion of this evaluation, so that we may plan | |||
and schedule a follow-up visit to evaluate the scope and results of your review. | |||
The NRC will also conduct additional onsite reviews within the upcoming assessment period to | |||
continue to evaluate the overall effectiveness of the newly implemented programs. These | |||
evaluations will be conducted mainly during planned inspections scheduled for March and June | |||
2008. | |||
The enclosed inspection plan details the inspections, less those related to physical protection | |||
scheduled through September 30, 2009. In addition to the ROP baseline inspections, we plan | |||
to conduct several non-ROP inspections which include TI 2515/171, Verification of Site Specific | |||
(B.5.b) Phase 2 and 3 Mitigation Strategies*- and TI 2515/172, Reactor Coolant System | |||
Dissimilar Metal. | |||
The inspection plan is provided to allow for the resolution of any scheduling conflicts and | |||
personnel availability issues well in advance of inspector arrival onsite. Routine resident | |||
inspections are not listed due to their ongoing and continuous nature. The inspections in the | |||
last nine months of the inspection plan are tentative and may be revised at the mid-cycle review. | |||
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its | |||
enclosure will be made available electronically for public inspection in the NRC Public | |||
Document Room or from the Publicly Available Records (PARS) component of NRC's document | |||
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading- | |||
rm/adams.html (the Public Electronic Reading Room). | |||
FP&L 4 | |||
If circumstances arise which cause us to change this inspection plan, we will contact you to | |||
discuss the change as soon as possible. Please contact Marvin Sykes at (404) 562-4629 with | |||
any questions you may have regarding this letter or the inspection plan. | |||
Sincerely, | |||
/RA By H. Christensen For/ | |||
Joseph W. Shea, Acting Director | |||
Division of Reactor Projects | |||
Docket Nos. 50-250, 50-251 | |||
License Nos. DPR-31, DPR-41 | |||
Enclosure: Turkey Point Inspection/Activity Plan (03/01/08 - 09/30/09) | |||
cc w/encl: (See page 3) | |||
_________________________ | |||
OFFICE RII:DRP RII:DRP RII:DRP RII:DRP | |||
SIGNATURE /RA/ /RA By MSykes /RA/ /RA/ | |||
For/ | |||
NAME MSykes JHamman HChristensen JShea | |||
DATE 3/3/08 3/3/08 3/3/08 3/3/08 | |||
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO | |||
FP&L 5 | |||
cc w/encl: Rajiv S. Kundalkar | |||
William Jefferson, Jr. Vice President | |||
Senior Vice President Nuclear Technical Services | |||
Turkey Point Nuclear Plant Florida Power & Light Company | |||
Florida Power and Light Company Electronic Mail Distribution | |||
Electronic Mail Distribution | |||
M. S. Ross | |||
James Connolly Managing Attorney | |||
Licensing Manager Florida Power & Light Company | |||
Turkey Point Nuclear Plant Electronic Mail Distribution | |||
Florida Power and Light Company | |||
Electronic Mail Distribution Marjan Mashhadi | |||
Senior Attorney | |||
Don E. Grissette Florida Power & Light Company | |||
Vice President Electronic Mail Distribution | |||
Nuclear Training and Performance | |||
Improvement William A. Passetti | |||
Florida Power & Light Company Bureau of Radiation Control | |||
Electronic Mail Distribution Department of Health | |||
Electronic Mail Distribution | |||
Michael O. Pearce | |||
Plant General Manager Alejandro Sera | |||
Turkey Point Nuclear Plant Emergency Management Coordinator | |||
Florida Power and Light Company Miami-Dade County | |||
Electronic Mail Distribution Electronic Mail Distribution | |||
Mark Warner Craig Fugate | |||
Vice President Director | |||
Nuclear Operations Support Division of Emergency Preparedness | |||
Florida Power & Light Company Department of Community Affairs | |||
Electronic Mail Distribution Electronic Mail Distribution | |||
Mano Nazar | |||
Senior Vice President | |||
and Nuclear Chief Operating Officer | |||
Florida Power & Light Company | |||
Electronic Mail Distribution | |||
FP&L 6 | |||
Letter to J. A. Stall from Joseph W. Shea dated March 3, 2008 | |||
SUBJECT: TURKEY POINT - NRC INTEGRATED INSPECTION REPORT 05000250/2008 | |||
AND 05000251/2008 | |||
Distribution w/encl: | |||
C. Evans, RII (Part 72 Only) | |||
L. Slack, RII | |||
OE Mail (email address if applicable) | |||
RIDSNRRDIRS | |||
INPO | |||
ROP Reports | |||
PUBLIC | |||
B. Mozafari, NRR | |||
Page 1 of 2 Turkey Point | |||
03/03/2008 17:35:09 Inspection / Activity Plan | |||
Report 22 | |||
03/03/2008 - 09/30/2009 | |||
Unit No. of Staff Planned Dates Inspection | |||
Number Inspection Activity Title on Site Start End Type | |||
EB3-ISI - U4 INSERVICE INSPECTION 1 | |||
4 IP 7111108P Inservice Inspection Activities - PWR 04/14/2008 04/18/2008 Baseline Inspections | |||
PI&R - PREP TRIP-PROBLEM ID AND RESOL 1 | |||
3, 4 IP 71152B Identification and Resolution of Problems 04/28/2008 05/02/2008 Baseline Inspections | |||
PSB1-RP - RADIATION PROTECTION-ACCESS CONTROLS 1 | |||
3, 4 IP 7112101 Access Control to Radiologically Significant Areas 04/28/2008 05/02/2008 Baseline Inspections | |||
3, 4 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 04/28/2008 05/02/2008 Baseline Inspections | |||
EB1-SUMP - TI 2515/166 CONTAINMENT SUMP INSPECTION 1 | |||
4 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 05/05/2008 05/09/2008 Safety Issues | |||
PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 6 | |||
3, 4 IP 71152B Identification and Resolution of Problems 06/09/2008 06/13/2008 Baseline Inspections | |||
3, 4 IP 71152B Identification and Resolution of Problems 06/23/2008 06/27/2008 Baseline Inspections | |||
EB3TI172 - TI-172 2 | |||
3, 4 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 06/16/2008 06/20/2008 Generic Safety Inspectio | |||
TI-171 - B.5.B PHASE 2&3 3 | |||
3, 4 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 07/28/2008 08/01/2008 Generic Safety Inspectio | |||
EB1-CDBI - COMPONENT DESIGN BASIS INSPECTION 9 | |||
3, 4 IP 7111121 Component Design Bases Inspection 08/25/2008 08/29/2008 Baseline Inspections | |||
3, 4 IP 7111121 Component Design Bases Inspection 09/08/2008 09/12/2008 Baseline Inspections | |||
3, 4 IP 7111121 Component Design Bases Inspection 09/22/2008 09/26/2008 Baseline Inspections | |||
3, 4 IP 7111121 Component Design Bases Inspection 10/06/2008 10/10/2008 Baseline Inspections | |||
OL EXAM - INITIAL EXAM PREP 3 | |||
3 V23299 TURKEY POINT/FEBRUARY 2009 EXAM AT POWER FACILITIES 02/02/2009 02/06/2009 Not Applicable | |||
PSB1EP - EP EXERCISE 3 | |||
3, 4 IP 7111401 Exercise Evaluation 02/16/2009 02/20/2009 EP Baseline Inspection | |||
3, 4 IP 7111404 Emergency Action Level and Emergency Plan Changes 02/16/2009 02/20/2009 EP Baseline Inspection | |||
3, 4 IP 71151-EP01 Drill/Exercise Performance 02/16/2009 02/20/2009 Baseline Inspections | |||
3, 4 IP 71151-EP02 ERO Drill Participation 02/16/2009 02/20/2009 Baseline Inspections | |||
3, 4 IP 71151-EP03 Alert & Notification System 02/16/2009 02/20/2009 Baseline Inspections | |||
OL EXAM - INITIAL EXAM 3 | |||
3 V23299 TURKEY POINT/FEBRUARY 2009 EXAM AT POWER FACILITIES 02/23/2009 03/06/2009 Not Applicable | |||
EB3ISI - UNIT 3 ISI 1 | |||
3 IP 7111108P Inservice Inspection Activities - PWR 03/16/2009 03/20/2009 Baseline Inspections | |||
PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 | |||
3 IP 71152B Identification and Resolution of Problems 05/18/2009 05/22/2009 Baseline Inspections | |||
This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Page 2 of 2 Turkey Point | |||
03/03/2008 17:35:09 Inspection / Activity Plan | |||
Report 22 | |||
03/03/2008 - 09/30/2009 | |||
Unit No. of Staff Planned Dates Inspection | |||
Number Inspection Activity Title on Site Start End Type | |||
PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 | |||
3 IP 71152B Identification and Resolution of Problems 06/01/2009 06/05/2009 Baseline Inspections | |||
OL EXAM - INITIAL EXAM PREP 3 | |||
3 V23313 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES 07/27/2009 07/31/2009 Not Applicable | |||
OL EXAM - INITIAL EXAM - WEEK 1 3 | |||
3 V23313 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES 08/17/2009 08/21/2009 Not Applicable | |||
OL EXAM - INITIAL EXAM - WEEK 2 3 | |||
03/03/2008 | 3 V23313 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES 08/31/2009 09/04/2009 Not Applicable | ||
17:35:09 | OL EXAM - INITIAL EXAM - WEEK 3 3 | ||
3 V23313 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES 09/14/2009 09/18/2009 Not Applicable | |||
This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
03/03/2008 | |||
-09/30/2009 | |||
No. of Staff | |||
on Site | |||
Identification and Resolution of Problems | |||
06/01/2009 | |||
06/05/2009 | |||
TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES | |||
07/27/2009 | |||
07/31/2009 | |||
TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES | |||
08/17/2009 | |||
08/21/2009 | |||
TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES | |||
08/31/2009 | |||
09/04/2009 | |||
TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES | |||
09/14/2009 | |||
09/18/2009 | |||
}} | }} |
Latest revision as of 13:19, 22 March 2020
ML080630669 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 03/03/2008 |
From: | James Shea Division Reactor Projects II |
To: | Stall J Florida Power & Light Co |
References | |
IR-08-001 | |
Download: ML080630669 (9) | |
See also: IR 05000251/2008001
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
SAM NUNN ATLANTA FEDERAL CENTER
61 FORSYTH STREET, SW, SUITE 23T85
ATLANTA, GEORGIA 30303-8931
March 3, 2008
Florida Power and Light Company
ATTN: Mr. J. A. Stall, Senior Vice President
Nuclear and Chief Nuclear Officer
P. O. Box 14000
Juno Beach, FL 33408-0420
SUBJECT: ANNUAL ASSESSMENT LETTER - TURKEY POINT NUCLEAR PLANT
(NRC INSPECTION REPORT 05000250/2008001 AND 05000251/2008001)
Dear Mr. Stall:
On February 7, 2008, the NRC staff completed its performance review of the Turkey Point
Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent
quarter and inspection results for the period from January 1 through December 31, 2007. The
purpose of this letter is to inform you of our assessment of your safety performance during this
period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A
separate letter designated and marked as "Official Use Only--Security Information" will include
the security cornerstone review and resultant inspection plan.
Overall, Turkey Point Units 3 and 4 operated in a manner that preserved public health and
safety and fully met all cornerstone objectives. Plant performance for Turkey Point Unit 3 was
within the Licensee Response Column of the NRC Action Matrix for the last two quarters of CY
2007 and within the Regulatory Response Column for the first two quarters of CY 2007,
because of a single White inspection finding in the Initiating Events cornerstone, originally
identified during the third quarter of 2006. This White finding was associated with a loss of
decay heat removal capability during a period of reduced reactor coolant inventory which
reflected performance at a level requiring increased regulatory response. Therefore, in addition
to the reactor oversight process baseline inspection program, a Supplemental Inspection using
Inspection Procedure (IP) 95001, Inspection for One or Two White Inputs In a Strategic
Performance Area, was conducted during the week of April 9, 2007, and no findings of
significance were identified.
FP&L 2
Plant performance for Turkey Point Unit 4 for the most recent quarter as well as the previous
three quarters was within the Licensee Response Column of the NRCs Action Matrix, based on
all inspection findings being classified as having very low safety significance (Green) and all PIs
indicating performance at a level requiring no additional NRC oversight (Green).
Additionally, in our mid-cycle assessment letter dated August 31, 2007, we advised you of the
continuation of a substantive cross-cutting issue in the problem identification and resolution area
involving weaknesses in the thorough evaluation of identified problems (P.1.c). The end-of-
cycle assessment of this cross-cutting issue included a review of inspection results over the 12-
month period from January 1 through December 31, 2007.
During this period, the inspectors reviewed licensee improvement initiatives and noted some
improvements. A focused inspection to evaluate the effectiveness of your corrective action
program (CAP) improvement initiatives was completed on December 17, 2007. There were no
new inspection findings identified during this review. The inspection team noted that you had
recently implemented a pilot process, in November 2007, to aid in reducing the backlog and
improving the timeliness and quality of condition reports (CR). The team also found that you
had completed your analysis of the most recent safety conscious work environment (SCWE)
and site culture surveys, had identified areas needing improvement, and had scoped and
planned actions to address these identified issues. The team also highlighted key planned
activities such as the addition of a new CAP improvement management team in January 2008
and the planned conversion of your work processes to the Passport System in 2009. These
new initiatives were recognized as positive moves to address the identified weaknesses.
The inspection team also documented five examples where important corrective actions to
prevent recurrence (CAPRs) had not been fully implemented to address weaknesses
associated with CR 2006-25531, which addressed the substantive cross-cutting issue identified
in 2006. These corrective actions had not been completed, partly due to the large number of
changes made to the CAP improvement plan and the Turkey Point Road to Excellence Plan
which appeared to place more emphasis on CAP backlog reduction and not the corrective
actions to address the PI&R substantive cross-cutting issue from 2006.
In one instance, the team identified that required periodic reviews of trend reports by the newly
established condition report oversight group (CROG) had not been performed during 2nd and 3rd
quarter 2007, resulting in a missed opportunity for the CROG to identify that certain department
level performance monitoring groups (Corrective Action Review Boards - CARBs) had failed to
submit completed trend reports because of competing priorities and other routine job activities
(especially, the impact of a 3rd quarter refueling outage).
In a second instance, it was noted that considerable turnover within the initial group of corrective
action program coordinators (CAPCOs). Only thirteen of the initial twenty-three CAPCOs
remained. CAPCOs are assigned to effectively monitor the CAP expectations for the
departments and carry out specific duties aimed at reducing the backlog of work orders and
condition reports. The inspectors noted multiple examples where selected CAPCOs had not
completed formal training qualifications and, in other cases, the CROG had not completed a
timely review and approval process for several recently qualified CAPCOs that were actively
attending and participating in meetings and perform certain condition report evaluations. While
most of these CAPCOS had numerous years of nuclear industry experience, most had little
FP&L 3
familiarity with Turkey Point plant specific operation or knowledge of its programs and operating
history before being assigned.
The NRC has also identified more than three Green inspection findings with documented cross-
cutting aspects in problem identification and resolution and an increasing trend in the cross-
cutting theme of appropriate and timely corrective action (P.1.d). This increasing trend indicates
that the underlying weaknesses within the PI&R cross-cutting area may not yet have been
addressed or fully understood to assure consistent and sustainable future performance. Based
on these observations, the staff noted that sustained licensee progress will require continued
strong management involvement given the number of findings in the problem identification and
resolution area. Therefore, this cross-cutting issue will remain open.
Since this is the fourth consecutive assessment letter identifying the same substantive cross-
cutting issue, the NRC would normally request that you conduct a safety culture assessment.
However, we are aware that a safety culture survey was already completed at Turkey Point
during this assessment period. Therefore, we request that you conduct an independent
assessment of the effectiveness of your implementation of key CAPRs and the causes behind
the failure to complete required training for key individuals assigned responsibility to assess and
recommend actions to resolve backlogged, longstanding issues at Turkey Point. This
independent assessment should be conducted by individuals that are not associated with the
CAP at Turkey Point Nuclear Station or the FP&L corporate office. We also request that you
provide the regional office with a schedule for completion of this evaluation, so that we may plan
and schedule a follow-up visit to evaluate the scope and results of your review.
The NRC will also conduct additional onsite reviews within the upcoming assessment period to
continue to evaluate the overall effectiveness of the newly implemented programs. These
evaluations will be conducted mainly during planned inspections scheduled for March and June
2008.
The enclosed inspection plan details the inspections, less those related to physical protection
scheduled through September 30, 2009. In addition to the ROP baseline inspections, we plan
to conduct several non-ROP inspections which include TI 2515/171, Verification of Site Specific
(B.5.b) Phase 2 and 3 Mitigation Strategies*- and TI 2515/172, Reactor Coolant System
Dissimilar Metal.
The inspection plan is provided to allow for the resolution of any scheduling conflicts and
personnel availability issues well in advance of inspector arrival onsite. Routine resident
inspections are not listed due to their ongoing and continuous nature. The inspections in the
last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's document
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
FP&L 4
If circumstances arise which cause us to change this inspection plan, we will contact you to
discuss the change as soon as possible. Please contact Marvin Sykes at (404) 562-4629 with
any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA By H. Christensen For/
Joseph W. Shea, Acting Director
Division of Reactor Projects
Docket Nos. 50-250, 50-251
Enclosure: Turkey Point Inspection/Activity Plan (03/01/08 - 09/30/09)
cc w/encl: (See page 3)
_________________________
OFFICE RII:DRP RII:DRP RII:DRP RII:DRP
SIGNATURE /RA/ /RA By MSykes /RA/ /RA/
For/
NAME MSykes JHamman HChristensen JShea
DATE 3/3/08 3/3/08 3/3/08 3/3/08
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
FP&L 5
cc w/encl: Rajiv S. Kundalkar
William Jefferson, Jr. Vice President
Senior Vice President Nuclear Technical Services
Turkey Point Nuclear Plant Florida Power & Light Company
Florida Power and Light Company Electronic Mail Distribution
Electronic Mail Distribution
M. S. Ross
James Connolly Managing Attorney
Licensing Manager Florida Power & Light Company
Turkey Point Nuclear Plant Electronic Mail Distribution
Florida Power and Light Company
Electronic Mail Distribution Marjan Mashhadi
Senior Attorney
Don E. Grissette Florida Power & Light Company
Vice President Electronic Mail Distribution
Nuclear Training and Performance
Improvement William A. Passetti
Florida Power & Light Company Bureau of Radiation Control
Electronic Mail Distribution Department of Health
Electronic Mail Distribution
Michael O. Pearce
Plant General Manager Alejandro Sera
Turkey Point Nuclear Plant Emergency Management Coordinator
Florida Power and Light Company Miami-Dade County
Electronic Mail Distribution Electronic Mail Distribution
Mark Warner Craig Fugate
Vice President Director
Nuclear Operations Support Division of Emergency Preparedness
Florida Power & Light Company Department of Community Affairs
Electronic Mail Distribution Electronic Mail Distribution
Mano Nazar
Senior Vice President
and Nuclear Chief Operating Officer
Florida Power & Light Company
Electronic Mail Distribution
FP&L 6
Letter to J. A. Stall from Joseph W. Shea dated March 3, 2008
SUBJECT: TURKEY POINT - NRC INTEGRATED INSPECTION REPORT 05000250/2008
AND 05000251/2008
Distribution w/encl:
C. Evans, RII (Part 72 Only)
L. Slack, RII
OE Mail (email address if applicable)
RIDSNRRDIRS
ROP Reports
PUBLIC
B. Mozafari, NRR
Page 1 of 2 Turkey Point
03/03/2008 17:35:09 Inspection / Activity Plan
Report 22
03/03/2008 - 09/30/2009
Unit No. of Staff Planned Dates Inspection
Number Inspection Activity Title on Site Start End Type
EB3-ISI - U4 INSERVICE INSPECTION 1
4 IP 7111108P Inservice Inspection Activities - PWR 04/14/2008 04/18/2008 Baseline Inspections
PI&R - PREP TRIP-PROBLEM ID AND RESOL 1
3, 4 IP 71152B Identification and Resolution of Problems 04/28/2008 05/02/2008 Baseline Inspections
PSB1-RP - RADIATION PROTECTION-ACCESS CONTROLS 1
3, 4 IP 7112101 Access Control to Radiologically Significant Areas 04/28/2008 05/02/2008 Baseline Inspections
3, 4 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 04/28/2008 05/02/2008 Baseline Inspections
EB1-SUMP - TI 2515/166 CONTAINMENT SUMP INSPECTION 1
4 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 05/05/2008 05/09/2008 Safety Issues
PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 6
3, 4 IP 71152B Identification and Resolution of Problems 06/09/2008 06/13/2008 Baseline Inspections
3, 4 IP 71152B Identification and Resolution of Problems 06/23/2008 06/27/2008 Baseline Inspections
EB3TI172 - TI-172 2
3, 4 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 06/16/2008 06/20/2008 Generic Safety Inspectio
TI-171 - B.5.B PHASE 2&3 3
3, 4 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 07/28/2008 08/01/2008 Generic Safety Inspectio
EB1-CDBI - COMPONENT DESIGN BASIS INSPECTION 9
3, 4 IP 7111121 Component Design Bases Inspection 08/25/2008 08/29/2008 Baseline Inspections
3, 4 IP 7111121 Component Design Bases Inspection 09/08/2008 09/12/2008 Baseline Inspections
3, 4 IP 7111121 Component Design Bases Inspection 09/22/2008 09/26/2008 Baseline Inspections
3, 4 IP 7111121 Component Design Bases Inspection 10/06/2008 10/10/2008 Baseline Inspections
OL EXAM - INITIAL EXAM PREP 3
3 V23299 TURKEY POINT/FEBRUARY 2009 EXAM AT POWER FACILITIES 02/02/2009 02/06/2009 Not Applicable
PSB1EP - EP EXERCISE 3
3, 4 IP 7111401 Exercise Evaluation 02/16/2009 02/20/2009 EP Baseline Inspection
3, 4 IP 7111404 Emergency Action Level and Emergency Plan Changes 02/16/2009 02/20/2009 EP Baseline Inspection
3, 4 IP 71151-EP01 Drill/Exercise Performance 02/16/2009 02/20/2009 Baseline Inspections
3, 4 IP 71151-EP02 ERO Drill Participation 02/16/2009 02/20/2009 Baseline Inspections
3, 4 IP 71151-EP03 Alert & Notification System 02/16/2009 02/20/2009 Baseline Inspections
OL EXAM - INITIAL EXAM 3
3 V23299 TURKEY POINT/FEBRUARY 2009 EXAM AT POWER FACILITIES 02/23/2009 03/06/2009 Not Applicable
EB3ISI - UNIT 3 ISI 1
3 IP 7111108P Inservice Inspection Activities - PWR 03/16/2009 03/20/2009 Baseline Inspections
PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5
3 IP 71152B Identification and Resolution of Problems 05/18/2009 05/22/2009 Baseline Inspections
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Turkey Point
03/03/2008 17:35:09 Inspection / Activity Plan
Report 22
03/03/2008 - 09/30/2009
Unit No. of Staff Planned Dates Inspection
Number Inspection Activity Title on Site Start End Type
PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5
3 IP 71152B Identification and Resolution of Problems 06/01/2009 06/05/2009 Baseline Inspections
OL EXAM - INITIAL EXAM PREP 3
3 V23313 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES 07/27/2009 07/31/2009 Not Applicable
OL EXAM - INITIAL EXAM - WEEK 1 3
3 V23313 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES 08/17/2009 08/21/2009 Not Applicable
OL EXAM - INITIAL EXAM - WEEK 2 3
3 V23313 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES 08/31/2009 09/04/2009 Not Applicable
OL EXAM - INITIAL EXAM - WEEK 3 3
3 V23313 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES 09/14/2009 09/18/2009 Not Applicable
This report does not include INPO and OUTAGE activities.