| number = ML100251433
| number = ML100251433
| issue date = 01/27/2010
| issue date = 01/27/2010
| title = and Byron Station, Unit Nos. 1 and 2, Request for Additional Information, Upper Cable Spreading Room Fire Protections Requirements (TAC Nos. ME0971, ME0973, and ME0974)
| title = Request for Additional Information, Upper Cable Spreading Room Fire Protections Requirements
| author name = David M J
| author name = David M
| author affiliation = NRC/NRR/DORL/LPLIII-2
| author affiliation = NRC/NRR/DORL/LPLIII-2
| addressee name = Pardee C G
| addressee name = Pardee C
| addressee affiliation = Exelon Nuclear
| addressee affiliation = Exelon Nuclear
| docket = 05000454, 05000455, 05000456, 05000457
| docket = 05000454, 05000455, 05000456, 05000457
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 January 2010 Mr. Charles G. Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 BRAIDWOOD STATION, UNITS 1 AND 2, AND BYRON STATION, UNIT NOS. 1 AND 2 -REQUEST FOR ADDITIONAL INFORMATION RELATED TO UPPER CABLE SPREADING ROOM FIRE PROTECTION REQUIREMENTS (TAC NOS. ME0971, IVlE0972, ME0973, AND ME0974)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 27, 2010 Mr. Charles G. Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
 
==SUBJECT:==
BRAIDWOOD STATION, UNITS 1 AND 2, AND BYRON STATION, UNIT NOS. 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO UPPER CABLE SPREADING ROOM FIRE PROTECTION REQUIREMENTS (TAC NOS. ME0971, IVlE0972, ME0973, AND ME0974)


==Dear Mr. Pardee:==
==Dear Mr. Pardee:==
By letter to the Nuclear Regulatory Commission (NRC) dated March 26, 2009, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090861 015), as supplemented by letter dated September 10, 2009 (ADAMS Accession No. ML092540075), Exelon Generation Company, LLC (the licensee), submitted a license amendment request (LAR) to revise the fire protection program to eliminate the requirement for the backup manual carbon dioxide fire suppression system in the upper cable spreading rooms. The NRC staff is reviewing your LAR, and has determined that additional information is required to complete its review. The specific information requested is addressed in the enclosed Request for Additional Information (RAI). Your staff on has agreed to provide a response to this RAI within 45 days after the date of this letter. The NRC staff considers that timely responses to RAls help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources.
 
If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1547.
By letter to the Nuclear Regulatory Commission (NRC) dated March 26, 2009, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090861015), as supplemented by letter dated September 10, 2009 (ADAMS Accession No. ML092540075),
Sincerely, Sen r Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN-456, STN-457, STN 50-454, and STN 50-455 Request for Additional cc w/encls: Distribution via REQUEST FOR ADDITIONAL INFORMATION BRAIDWOOD STATION. UNITS 1 AND 2 AND BYRON STATION. UNIT NOS. 1 AND 2 DOCKET NOS. STN 50-456. STN 50-457 STN 50-454, AND STN 50-455 The Nuclear Regulatory Commission (NRC) staff is reviewing Exelon Generation Company, LLC's (the licensee's) letter dated March 26, 2009, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090861015), as supplemented by letter dated September 10, 2009 (ADAMS Accession No. ML092540075), which requested a license amendment concerning a change to the fire protection program requirements for Braidwood Station (Braidwood), Units 1 and 2, and Byron Station (Byron), Unit Nos. 1 and 2. The license amendment request (LAR) relates to the removal of the backup manually-actuated carbon dioxide fire suppression systems for the upper cable spreading rooms (UCSRs) at Braidwood and Byron. In addition to the LAR, the NRC staff has reviewed the applicable licensing and regulatory documents, i.e., Braidwood's and Byron's Fire Protection Report (FPR), related safety evaluation reports, and Updated Final Safety Analysis Report. The NRC staff is continuing its review, and has determined that the following additional information is required to complete its review. The numbering, below, represents a continuation in the numbering in the NRC staffs previous request for additional information (July 22, 2009, ADAMS Accession No. IVIL091970079).  
Exelon Generation Company, LLC (the licensee), submitted a license amendment request (LAR) to revise the fire protection program to eliminate the requirement for the backup manual carbon dioxide fire suppression system in the upper cable spreading rooms.
: 8. Your letter dated March 26, 2009. Attachment Page 2, states that, It ***Each of the upper cable spreading rooms has an automatically actuated Halon fire suppression system that is designed and tested to provide sufficient Halon 1301 gas to suppress a surface or deep seated cable fire in any of the upper cable spreading rooms. Each of these upper cable spreading rooms is a separate fire area and has been designed and constructed with three-hour fire rated barriers ... " Further, your letter dated March 26, 2009, Attachment Pages 6 and 7, states that, It, **In the event of a design basis fire, the fire would not spread out of the room because of the substantial construction of the walls, floor, and ceiling and penetrations and openings are sealed, except as noted in the fire barrier description within Section 2.3.3 of the Fire Protection Report ... " " ... The upper cable spreading rooms are designed and constructed such that they are bounded on al/ sides, floor and ceiling by three-hour fire rated construction  
The NRC staff is reviewing your LAR, and has determined that additional information is required to complete its review. The specific information requested is addressed in the enclosed Request for Additional Information (RAI). Your staff on has agreed to provide a response to this RAI within 45 days after the date of this letter.
... t!
The NRC staff considers that timely responses to RAls help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1547.
-2 The NRC staff notes that FPR Section 2.3.3.17, "Upper Cable Spreading Area (Fire Zone 3.3B-2)," FPR Section 2.3.3.18, "Unit 1 Upper Cable Spreading Area (Fire Zone 3.3C-1)," and FPR Section 2.3.3.20, "Unit 1 Upper Cable Spreading Area 0 (Fire Zone 3.30-1)," discuss details of nonrated penetration seals at Braidwood and Byron. Fire barriers with nonrated penetration seals in the UCSRs could be viewed as compromising depth (DID) involving fires in the UCSRs. Section II, "General Requirements," of Appendix R to Title 10 of the Code of Federal Regulations, Part 50, states, in part, that the fire protection program shall extend the DID concept of fire protection in fire areas that are important to safety, with the following objectives:  
Sincerely,
(1) Prevent fire from starting.  
                                        ~~~~                        Sen r Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN-456, STN-457, STN 50-454, and STN 50-455
(2) Rapidly detect, control, and extinguish.  
 
(3) Protect structures, systems, and components that are important to safety so that a fire that is not promptly extinguished by the fire suppression activities will not prevent the safe-shutdown of the plant. The third objective of the DID concept involves spatial separation of combustible materials or isolation of combustible materials by fire-resistant barriers.
==Enclosure:==
In particular, rated horizontal and vertical barriers will limit fire spreading from one fire area to another fire area. The NRC staff requests that the licensee provide a discussion on how the required third objective of fire protection DID will be maintained with nonrated penetration seals in the UCSRs, including an explanation of how spreading of the fire beyond the UCSR would be prevented by the nonrated penetration seals. Provide details of any potential fire propagation paths in the UCSRs. Also in the response, address the expectation that nonrated penetration seals would not result in Halon 1301 leakage from the area after actuation of the Halon 1301 fire suppression system.
 
January 27,2010 Mr. Charles G. Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 BRAIDWOOD STATION, UNITS 1 AND 2, AND BYRON STATION, UNIT NOS. 1 AND 2 -REQUEST FOR ADDITIONAL INFORMATION RELATED TO UPPER CABLE SPREADING ROOM FIRE PROTECTION REQUIREMENTS (TAC NOS. ME0971, ME0972, ME0973, AND ME0974)  
Request for Additional Information cc w/encls: Distribution via Listserv
 
REQUEST FOR ADDITIONAL INFORMATION BRAIDWOOD STATION. UNITS 1 AND 2 AND BYRON STATION. UNIT NOS. 1 AND 2 DOCKET NOS. STN 50-456. STN 50-457 STN 50-454, AND STN 50-455 The Nuclear Regulatory Commission (NRC) staff is reviewing Exelon Generation Company, LLC's (the licensee's) letter dated March 26, 2009, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090861015), as supplemented by letter dated September 10, 2009 (ADAMS Accession No. ML092540075), which requested a license amendment concerning a change to the fire protection program requirements for Braidwood Station (Braidwood), Units 1 and 2, and Byron Station (Byron), Unit Nos. 1 and 2. The license amendment request (LAR) relates to the removal of the backup manually-actuated carbon dioxide fire suppression systems for the upper cable spreading rooms (UCSRs) at Braidwood and Byron. In addition to the LAR, the NRC staff has reviewed the applicable licensing and regulatory documents, i.e., Braidwood's and Byron's Fire Protection Report (FPR), related safety evaluation reports, and Updated Final Safety Analysis Report.
The NRC staff is continuing its review, and has determined that the following additional information is required to complete its review. The numbering, below, represents a continuation in the numbering in the NRC staffs previous request for additional information (July 22, 2009, ADAMS Accession No. IVIL091970079).
: 8.     Your letter dated March 26, 2009. Attachment Page 2, states that, It *** Each of the upper cable spreading rooms has an automatically actuated Halon fire suppression system that is designed and tested to provide sufficient Halon 1301 gas to suppress a surface or deep seated cable fire in any of the upper cable spreading rooms.
Each of these upper cable spreading rooms is a separate fire area and has been designed and constructed with three-hour fire rated barriers ... "
Further, your letter dated March 26, 2009, Attachment Pages 6 and 7, states that, It, ** In the event of a design basis fire, the fire would not spread out of the room because of the substantial construction of the walls, floor, and ceiling and penetrations and openings are sealed, except as noted in the fire barrier description within Section 2.3.3 of the Fire Protection Report ... "
        "... The upper cable spreading rooms are designed and constructed such that they are bounded on al/ sides, floor and ceiling by three-hour fire rated construction ... t!
ENCLOSURE
 
                                          -2 The NRC staff notes that FPR Section 2.3.3.17, "Upper Cable Spreading Area (Fire Zone 3.3B-2)," FPR Section 2.3.3.18, "Unit 1 Upper Cable Spreading Area (Fire Zone 3.3C-1),"
and FPR Section 2.3.3.20, "Unit 1 Upper Cable Spreading Area 0 (Fire Zone 3.30-1),"
discuss details of nonrated penetration seals at Braidwood and Byron. Fire barriers with nonrated penetration seals in the UCSRs could be viewed as compromising defense-in depth (DID) involving fires in the UCSRs.
Section II, "General Requirements," of Appendix R to Title 10 of the Code of Federal Regulations, Part 50, states, in part, that the fire protection program shall extend the DID concept of fire protection in fire areas that are important to safety, with the following objectives:
(1) Prevent fire from starting.
(2) Rapidly detect, control, and extinguish.
(3) Protect structures, systems, and components that are important to safety so that a fire that is not promptly extinguished by the fire suppression activities will not prevent the safe-shutdown of the plant.
The third objective of the DID concept involves spatial separation of combustible materials or isolation of combustible materials by fire-resistant barriers. In particular, fire rated horizontal and vertical barriers will limit fire spreading from one fire area to another fire area.
The NRC staff requests that the licensee provide a discussion on how the required third objective of fire protection DID will be maintained with nonrated penetration seals in the UCSRs, including an explanation of how spreading of the fire beyond the UCSR would be prevented by the nonrated penetration seals. Provide details of any potential fire propagation paths in the UCSRs.
Also in the response, address the expectation that nonrated penetration seals would not result in Halon 1301 leakage from the area after actuation of the Halon 1301 fire suppression system.
 
January 27,2010 Mr. Charles G. Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
 
==SUBJECT:==
BRAIDWOOD STATION, UNITS 1 AND 2, AND BYRON STATION, UNIT NOS. 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO UPPER CABLE SPREADING ROOM FIRE PROTECTION REQUIREMENTS (TAC NOS. ME0971, ME0972, ME0973, AND ME0974)


==Dear Mr. Pardee:==
==Dear Mr. Pardee:==
By letter to the Nuclear Regulatory Commission (NRC) dated March 26, 2009, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090861015), as supplemented by letter dated September 10, 2009 (ADAMS Accession No. ML092540075), Exelon Generation Company, LLC (the licensee), submitted a license amendment request (LAR) to revise the fire protection program to eliminate the requirement for the backup manual carbon dioxide fire suppression system in the upper cable spreading rooms. The NRC staff is reviewing your LAR, and has determined that additional information is required to complete its review. The specific information requested is addressed in the enclosed Request for Additional Information (RAI). Your staff on has agreed to provide a response to this RAI within 45 days after the date of this letter. The NRC staff considers that timely responses to RAls help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources.
 
If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1547.
By letter to the Nuclear Regulatory Commission (NRC) dated March 26, 2009, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090861015), as supplemented by letter dated September 10, 2009 (ADAMS Accession No. ML092540075),
Sincerely, IRA! Marshall J. David, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN-456, STN-457, STN 50-454, and STN 50-455 Request for Additional cc w/encls: Distribution via DISTRIBUTION:
Exelon Generation Company, LLC (the licensee), submitted a license amendment request (LAR) to revise the fire protection program to eliminate the requirement for the backup manual carbon dioxide fire suppression system in the upper cable spreading rooms.
PUBLIC RidsNrrPMByron Resource RidsNrrDraAfpb Resource LPL3-2 RfF RidsNrrPMBraidwood Resource RidsOgcRp Resource RidsNrrDorlLpl3-2 Resource RidsAcrsAcnw MailCTR Resource Nlqbal, NRR RidsNrrLA THarris Resource RidsRgn3MailCenter Resource RidsNrrDorlDpr Resource ADAMS Accession No.: ML 100251433
The NRC staff is reviewing your LAR, and has determined that additional information is required to complete its review. The specific information requested is addressed in the enclosed Request for Additional Information (RAI). Your staff on has agreed to provide a response to this RAI within 45 days after the date of this letter.
* Date of e-mail NRR-088 OFFICE LPL3-2/PM LPL3-2/LA DRAlAFPB/BC LPL3-2/BC MDavid THarris SCampbell 1/27/10 1/26/10 21/10 1127/10 OFFICIAL RECORD COpy}}
The NRC staff considers that timely responses to RAls help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1547.
Sincerely, IRA!
Marshall J. David, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN-456, STN-457, STN 50-454, and STN 50-455
 
==Enclosure:==
 
Request for Additional Information cc w/encls: Distribution via Listserv DISTRIBUTION:
PUBLIC                             RidsNrrPMByron Resource             RidsNrrDraAfpb Resource LPL3-2 RfF                         RidsNrrPMBraidwood Resource         RidsOgcRp Resource RidsNrrDorlLpl3-2 Resource         RidsAcrsAcnw MailCTR Resource       Nlqbal, NRR RidsNrrLATHarris Resource           RidsRgn3MailCenter Resource RidsNrrDorlDpr Resource ADAMS Accession No.: ML100251433
* Date of e-mail       NRR-088 OFFICE             LPL3-2/PM             LPL3-2/LA               DRAlAFPB/BC           LPL3-2/BC MDavid               THarris                                         SCampbell 1/27/10               1/26/10               21/10                   1127/10 OFFICIAL RECORD COpy}}

Latest revision as of 20:39, 21 March 2020

Request for Additional Information, Upper Cable Spreading Room Fire Protections Requirements
ML100251433
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 01/27/2010
From: David M
Plant Licensing Branch III
To: Pardee C
Exelon Nuclear
David, Marshall - DORL 415-1547
References
TAC ME0971, TAC ME0972, TAC ME0973, TAC ME0974
Download: ML100251433 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 27, 2010 Mr. Charles G. Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2, AND BYRON STATION, UNIT NOS. 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO UPPER CABLE SPREADING ROOM FIRE PROTECTION REQUIREMENTS (TAC NOS. ME0971, IVlE0972, ME0973, AND ME0974)

Dear Mr. Pardee:

By letter to the Nuclear Regulatory Commission (NRC) dated March 26, 2009, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090861015), as supplemented by letter dated September 10, 2009 (ADAMS Accession No. ML092540075),

Exelon Generation Company, LLC (the licensee), submitted a license amendment request (LAR) to revise the fire protection program to eliminate the requirement for the backup manual carbon dioxide fire suppression system in the upper cable spreading rooms.

The NRC staff is reviewing your LAR, and has determined that additional information is required to complete its review. The specific information requested is addressed in the enclosed Request for Additional Information (RAI). Your staff on has agreed to provide a response to this RAI within 45 days after the date of this letter.

The NRC staff considers that timely responses to RAls help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1547.

Sincerely,

~~~~ Sen r Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN-456, STN-457, STN 50-454, and STN 50-455

Enclosure:

Request for Additional Information cc w/encls: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION BRAIDWOOD STATION. UNITS 1 AND 2 AND BYRON STATION. UNIT NOS. 1 AND 2 DOCKET NOS. STN 50-456. STN 50-457 STN 50-454, AND STN 50-455 The Nuclear Regulatory Commission (NRC) staff is reviewing Exelon Generation Company, LLC's (the licensee's) letter dated March 26, 2009, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090861015), as supplemented by letter dated September 10, 2009 (ADAMS Accession No. ML092540075), which requested a license amendment concerning a change to the fire protection program requirements for Braidwood Station (Braidwood), Units 1 and 2, and Byron Station (Byron), Unit Nos. 1 and 2. The license amendment request (LAR) relates to the removal of the backup manually-actuated carbon dioxide fire suppression systems for the upper cable spreading rooms (UCSRs) at Braidwood and Byron. In addition to the LAR, the NRC staff has reviewed the applicable licensing and regulatory documents, i.e., Braidwood's and Byron's Fire Protection Report (FPR), related safety evaluation reports, and Updated Final Safety Analysis Report.

The NRC staff is continuing its review, and has determined that the following additional information is required to complete its review. The numbering, below, represents a continuation in the numbering in the NRC staffs previous request for additional information (July 22, 2009, ADAMS Accession No. IVIL091970079).

8. Your letter dated March 26, 2009. Attachment Page 2, states that, It *** Each of the upper cable spreading rooms has an automatically actuated Halon fire suppression system that is designed and tested to provide sufficient Halon 1301 gas to suppress a surface or deep seated cable fire in any of the upper cable spreading rooms.

Each of these upper cable spreading rooms is a separate fire area and has been designed and constructed with three-hour fire rated barriers ... "

Further, your letter dated March 26, 2009, Attachment Pages 6 and 7, states that, It, ** In the event of a design basis fire, the fire would not spread out of the room because of the substantial construction of the walls, floor, and ceiling and penetrations and openings are sealed, except as noted in the fire barrier description within Section 2.3.3 of the Fire Protection Report ... "

"... The upper cable spreading rooms are designed and constructed such that they are bounded on al/ sides, floor and ceiling by three-hour fire rated construction ... t!

ENCLOSURE

-2 The NRC staff notes that FPR Section 2.3.3.17, "Upper Cable Spreading Area (Fire Zone 3.3B-2)," FPR Section 2.3.3.18, "Unit 1 Upper Cable Spreading Area (Fire Zone 3.3C-1),"

and FPR Section 2.3.3.20, "Unit 1 Upper Cable Spreading Area 0 (Fire Zone 3.30-1),"

discuss details of nonrated penetration seals at Braidwood and Byron. Fire barriers with nonrated penetration seals in the UCSRs could be viewed as compromising defense-in depth (DID) involving fires in the UCSRs.

Section II, "General Requirements," of Appendix R to Title 10 of the Code of Federal Regulations, Part 50, states, in part, that the fire protection program shall extend the DID concept of fire protection in fire areas that are important to safety, with the following objectives:

(1) Prevent fire from starting.

(2) Rapidly detect, control, and extinguish.

(3) Protect structures, systems, and components that are important to safety so that a fire that is not promptly extinguished by the fire suppression activities will not prevent the safe-shutdown of the plant.

The third objective of the DID concept involves spatial separation of combustible materials or isolation of combustible materials by fire-resistant barriers. In particular, fire rated horizontal and vertical barriers will limit fire spreading from one fire area to another fire area.

The NRC staff requests that the licensee provide a discussion on how the required third objective of fire protection DID will be maintained with nonrated penetration seals in the UCSRs, including an explanation of how spreading of the fire beyond the UCSR would be prevented by the nonrated penetration seals. Provide details of any potential fire propagation paths in the UCSRs.

Also in the response, address the expectation that nonrated penetration seals would not result in Halon 1301 leakage from the area after actuation of the Halon 1301 fire suppression system.

January 27,2010 Mr. Charles G. Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2, AND BYRON STATION, UNIT NOS. 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO UPPER CABLE SPREADING ROOM FIRE PROTECTION REQUIREMENTS (TAC NOS. ME0971, ME0972, ME0973, AND ME0974)

Dear Mr. Pardee:

By letter to the Nuclear Regulatory Commission (NRC) dated March 26, 2009, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090861015), as supplemented by letter dated September 10, 2009 (ADAMS Accession No. ML092540075),

Exelon Generation Company, LLC (the licensee), submitted a license amendment request (LAR) to revise the fire protection program to eliminate the requirement for the backup manual carbon dioxide fire suppression system in the upper cable spreading rooms.

The NRC staff is reviewing your LAR, and has determined that additional information is required to complete its review. The specific information requested is addressed in the enclosed Request for Additional Information (RAI). Your staff on has agreed to provide a response to this RAI within 45 days after the date of this letter.

The NRC staff considers that timely responses to RAls help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1547.

Sincerely, IRA!

Marshall J. David, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN-456, STN-457, STN 50-454, and STN 50-455

Enclosure:

Request for Additional Information cc w/encls: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrPMByron Resource RidsNrrDraAfpb Resource LPL3-2 RfF RidsNrrPMBraidwood Resource RidsOgcRp Resource RidsNrrDorlLpl3-2 Resource RidsAcrsAcnw MailCTR Resource Nlqbal, NRR RidsNrrLATHarris Resource RidsRgn3MailCenter Resource RidsNrrDorlDpr Resource ADAMS Accession No.: ML100251433

  • Date of e-mail NRR-088 OFFICE LPL3-2/PM LPL3-2/LA DRAlAFPB/BC LPL3-2/BC MDavid THarris SCampbell 1/27/10 1/26/10 21/10 1127/10 OFFICIAL RECORD COpy