ML14114A563: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY SECURITY RELATED INFORMATION Mr. Michael J. Pacilio UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 10, 2014 President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555  
{{#Wiki_filter:OFFICIAL USE ONLY           SECURITY RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 10, 2014 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
OYSTER CREEK NUCLEAR GENERATING STATION-REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST RELATED TO REACTOR BUILDING VITAL AREA ACCESS CONTROL (TAC NO. MF3295)  
OYSTER CREEK NUCLEAR GENERATING STATION- REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST RELATED TO REACTOR BUILDING VITAL AREA ACCESS CONTROL (TAC NO. MF3295)


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
By letter dated December 19, 2013 (Agencywide Documents Access and Management System Accession No. ML13358A245), Exelon Generation Company, LLC (Exelon or the licensee) submitted the Oyster Creek Nuclear Generating Station (OCNGS) license amendment request pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR), Section 50.90, to implement an alternative measure to satisfy the regulatory requirements of 10 CFR 73.55(e)(9) relating to controlling vital area access for certain portions of the reactor building at OCNGS. The attachment to the letter dated December 19, 2013, contained Safeguards Information and has been withheld from public disclosure.
By letter dated December 19, 2013 (Agencywide Documents Access and Management System Accession No. ML13358A245), Exelon Generation Company, LLC (Exelon or the licensee) submitted the Oyster Creek Nuclear Generating Station (OCNGS) license amendment request pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR), Section 50.90, to implement an alternative measure to satisfy the regulatory requirements of 10 CFR 73.55(e)(9) relating to controlling vital area access for certain portions of the reactor building at OCNGS. The attachment to the letter dated December 19, 2013, contained Safeguards Information and has been withheld from public disclosure.
In accordance with the requirements of 10 CFR 73.55(r), the U.S. Nuclear Regulatory Commission (NRC) may authorize an applicant or licensee to provide a measure for protection against radiological sabotage other than one required by 10 CFR 73.55, if the applicant or licensee demonstrates that the measure meets the same performance objectives, and requirements as specified in 10 CFR 73.55(b), and the proposed alternative measure provides a level of protection that is at least equal to that which would otherwise be provided by the specific requirement in 1 0 CFR 73.55. The NRC staff is currently reviewing the submittal and is enclosing a request for additional information (RAI) to support its review. A draft of these questions was previously sent to Mr. Richard Gropp of your staff on August 12, 2014, with an opportunity to have a teleconference to ensure that Exelon understood the questions and their regulatory basis, as well as to verify that the information was not previously docketed.
In accordance with the requirements of 10 CFR 73.55(r), the U.S. Nuclear Regulatory Commission (NRC) may authorize an applicant or licensee to provide a measure for protection against radiological sabotage other than one required by 10 CFR 73.55, if the applicant or licensee demonstrates that the measure meets the same performance objectives, and requirements as specified in 10 CFR 73.55(b), and the proposed alternative measure provides a level of protection that is at least equal to that which would otherwise be provided by the specific requirement in 10 CFR 73.55.
Enclosure 2 transmitted herewith contains Security-Related Information.
The NRC staff is currently reviewing the submittal and is enclosing a request for additional information (RAI) to support its review. A draft of these questions was previously sent to Mr.
When separated from Enclosure 2, this document is decontrolled.
Richard Gropp of your staff on August 12, 2014, with an opportunity to have a teleconference to ensure that Exelon understood the questions and their regulatory basis, as well as to verify that the information was not previously docketed.
OFFICIAL USE ONLY SECURITY RELATED INFORMATION OFFICIAL USE ONLY SECURITY RELATED INFORMATION M. Pacillo A call was held on August 27, 2014, and Mr. Gropp agreed that Exelon would respond to the RAI by November 5, 2014. Please note that if you do not respond to the RAI by November 5, 2014, the NRC staff may reject your license amendment request under the provisions of 1 0 CFR 2.1 08, "Denial of application for failure to supply information." If you have any questions regarding this letter, please feel free to contact me at (301) 415-3100 or by e-mail at John.Lamb@nrc.gov.
Enclosure 2 transmitted herewith contains Security-Related Information. When separated from Enclosure 2, this document is decontrolled.
Docket No. 50-219  
OFFICIAL USE ONLY         SECURITY RELATED INFORMATION
 
OFFICIAL USE ONLY         SECURITY RELATED INFORMATION M. Pacillo                                     A call was held on August 27, 2014, and Mr. Gropp agreed that Exelon would respond to the RAI by November 5, 2014. Please note that if you do not respond to the RAI by November 5, 2014, the NRC staff may reject your license amendment request under the provisions of 10 CFR 2.1 08, "Denial of application for failure to supply information."
If you have any questions regarding this letter, please feel free to contact me at (301) 415-3100 or by e-mail at John.Lamb@nrc.gov.
Sincerely,
                                                        . Lamb, Senior Project Manager PI    Licensing Branch 1-2 Di
* ion of Operating Reactor Licensing 0 1ce of Nuclear Reactor Regulation Docket No. 50-219


==Enclosures:==
==Enclosures:==
: 1. Request for Additional Information
: 1. Request for Additional Information
: 2. Request for Additional Information (Security-Related Information) cc w/encl 1: Distribution via Listserv Sincerely, . Lamb, Senior Project Manager PI Licensing Branch 1-2 Di
: 2. Request for Additional Information (Security-Related Information) cc w/encl 1: Distribution via Listserv OFFICIAL USE ONLY         SECURITY RELATED INFORMATION
* ion of Operating Reactor Licensing 0 1ce of Nuclear Reactor Regulation OFFICIAL USE ONLY SECURITY RELATED INFORMATION OFFICIAL US& ONLY SECURITY R&LAT&D INFORMATION REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST REGARDING THE REACTOR BUILDING VITAL AREA ACCESS CONTROL OYSTER CREEK NUCLEAR GENERATING STATION EXELON GENERATION COMPANY. LLC DOCKET NO. 50-219 Security-related information has been redacted from this document.
 
Redacted information is identified by blank space enclosed within double brackets as shown here [[ ]]. By letter dated December 19, 2013 (Agencywide Documents Access and Management System Accession No. ML13358A245), Exelon Generation Company, LLC (Exelon or the licensee) submitted the Oyster Creek Nuclear Generating Station (OCNGS) license amendment request pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR), Section 50.90 to implement an alternative measure to satisfy the regulatory requirements of 10 CFR 73.55(e)(9) relating to controlling vital area access at OCNGS. The enclosure to the letter contained Safeguards Information and has been withheld from public disclosure.
OFFICIAL US& ONLY         SECURITY R&LAT&D INFORMATION REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST REGARDING THE REACTOR BUILDING VITAL AREA ACCESS CONTROL OYSTER CREEK NUCLEAR GENERATING STATION EXELON GENERATION COMPANY. LLC DOCKET NO. 50-219 Security-related information has been redacted from this document.
In accordance with the requirements of 10 CFR 73.55(r), the U.S. Nuclear Regulatory Commission (NRC) may authorize an applicant or licensee to provide a measure for protection against radiological sabotage other than one required by 10 CFR 73.55, if the applicant or licensee demonstrates that the measure meets the same performance objectives and requirements as specified in 10 CFR 73.55(b), and the proposed alternative measure provides a level of protection that is at least equal to that which would otherwise be provided by the specific requirement in 10 CFR 73.55. The NRC staff is currently reviewing the submittal and has determined that the additional information requested below is needed to support its review. REGULA TORY BASIS The regulations in 10 CFR 73.55(e)(9)(i), state that "[v]ital equipment must be located only within vital areas, which must be located within a protected area so that access to vital equipment requires passage through at least two physical barriers, except as otherwise approved by the Commission and identified in the security plans." The regulations in 10 CFR 73.55(e)(9)(ii) state that "[t]he licensee shall protect all vital area access portals and vital area emergency exits with intrusion detection equipment and locking Enclosure 1 OFFICIAL USE ONLY SECURITY REbATED INFORMATION OFFICIAl USE! ONlY Si!CURITY Ri!bATE!D INFORMATION  devices that allow rapid egress during an emergency and satisfy the vital entry control requirements of this section." The regulation in 10 CFR 73.55(e)(9)(iii) states that, "[u]noccupied vital areas must be locked and alarmed." Consistent with 10 CFR 73.55(r)(3), the licensee shall submit a technical basis for each proposed alternative measure. The basis must include an analysis or assessment that demonstrates how the proposed alternative measure provides a level of protection that is at least equal to that which would otherwise be provided by the specific requirements of 10 CFR 73.55(e)(9)(i) through (iii). REQUEST FOR ADDITIONAL INFORMATION The following additional licensing basis information is needed to justify the need to apply 10 CFR 73.55(r) and to justify that the proposed alternative measures meet the performance requirements of 10 CFR 73.55(b).
Redacted information is identified by blank space enclosed within double brackets as shown here (( )).
[[ OFFICIAl USE! ONlY SECURITY REbATED INFORMATION OFFICIAL US& ONLY SliCURITY RlilATiiD INFORMATION  ]] OFFICIAL US& ONLY SECURITY REbATI5D INFORMATION OFFICIAL USE ONLY SECURITY RELATED INFORMATION M. Pacilio A call was held on August 27, 2014, and Mr. Gropp agreed that Exelon would respond to the RAI by November 5, 2014. Please note that if you do not respond to the RAJ by November 5, 2014, the NRC staff may reject your license amendment request under the provisions of 10 CFR 2.1 08, "Denial of application for failure to supply information." If you have any questions regarding this letter, please feel free to contact me at (301) 415-3100 or by e-mail at John.Lamb@nrc.gov.
By letter dated December 19, 2013 (Agencywide Documents Access and Management System Accession No. ML13358A245), Exelon Generation Company, LLC (Exelon or the licensee) submitted the Oyster Creek Nuclear Generating Station (OCNGS) license amendment request pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR), Section 50.90 to implement an alternative measure to satisfy the regulatory requirements of 10 CFR 73.55(e)(9) relating to controlling vital area access at OCNGS. The enclosure to the letter contained Safeguards Information and has been withheld from public disclosure.
Docket No. 50-219
In accordance with the requirements of 10 CFR 73.55(r), the U.S. Nuclear Regulatory Commission (NRC) may authorize an applicant or licensee to provide a measure for protection against radiological sabotage other than one required by 10 CFR 73.55, if the applicant or licensee demonstrates that the measure meets the same performance objectives and requirements as specified in 10 CFR 73.55(b), and the proposed alternative measure provides a level of protection that is at least equal to that which would otherwise be provided by the specific requirement in 10 CFR 73.55. The NRC staff is currently reviewing the submittal and has determined that the additional information requested below is needed to support its review.
REGULA TORY BASIS The regulations in 10 CFR 73.55(e)(9)(i), state that "[v]ital equipment must be located only within vital areas, which must be located within a protected area so that access to vital equipment requires passage through at least two physical barriers, except as otherwise approved by the Commission and identified in the security plans."
The regulations in 10 CFR 73.55(e)(9)(ii) state that "[t]he licensee shall protect all vital area access portals and vital area emergency exits with intrusion detection equipment and locking Enclosure 1 OFFICIAL USE ONLY         SECURITY REbATED INFORMATION


==Enclosures:==
OFFICIAl USE! ONlY        Si!CURITY Ri!bATE!D INFORMATION devices that allow rapid egress during an emergency and satisfy the vital entry control requirements of this section."
: 1. Request for Additional Information
The regulation in 10 CFR 73.55(e)(9)(iii) states that, "[u]noccupied vital areas must be locked and alarmed."
: 2. Request for Additional Information (Security-Related Information) cc w/encl 1: Distribution via Listserv DISTRIBUTION:
Consistent with 10 CFR 73.55(r)(3), the licensee shall submit a technical basis for each proposed alternative measure. The basis must include an analysis or assessment that demonstrates how the proposed alternative measure provides a level of protection that is at least equal to that which would otherwise be provided by the specific requirements of 10 CFR 73.55(e)(9)(i) through (iii).
PUBLIC RidsAcrsAcnw&mMaiiCenter Resource RidsNrrPMOysterCreek Resource RidsNrrDpr Resource LPL 1-2 R/F ADAMS Accession No ML14114A563 Sincerely, IRA/ John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsRgn1 Mail Center Resource RMathew, NRR RidsNrrLAABaxter Resource RidsNrrDorllpl1-2 Resource *via email OFFICE NRR/LPL 1-2/PM N RR/LPL 1-2/LA NSIR/BC NRR/LPL 1-2/BC(A)
REQUEST FOR ADDITIONAL INFORMATION The following additional licensing basis information is needed to justify the need to apply 10 CFR 73.55(r) and to justify that the proposed alternative measures meet the performance requirements of 10 CFR 73.55(b).
NRR/LPL 1-2/PM Jlamb A Baxter* DHuyck* RSchaaf Jlamb NAME w/comment DATE 08/24/14 09/05/14 09/08/14 9/10/14 9/10/14 OFFICIAL RECORD COPY OFFICIAL USE ONLY SECURITY RELATED INFORMATION}}
((
OFFICIAl USE! ONlY        SECURITY REbATED INFORMATION
 
OFFICIAL US& ONLY SliCURITY RlilATiiD INFORMATION
                                                        ))
OFFICIAL US& ONLY SECURITY REbATI5D INFORMATION
 
ML14114A563                                           *via email OFFICE     NRR/LPL1-2/PM     N RR/LPL 1-2/LA       NSIR/BC         NRR/LPL 1-2/BC(A) NRR/LPL 1-2/PM Jlamb           A Baxter*         DHuyck*             RSchaaf         Jlamb NAME                           w/comment DATE         08/24/14           09/05/14           09/08/14             9/10/14         9/10/14}}

Latest revision as of 22:22, 19 March 2020

Request for Additional Information Regarding License Amendment Request Related to Reactor Building Vital Area Access Control
ML14114A563
Person / Time
Site: Oyster Creek
Issue date: 09/10/2014
From: John Lamb
Plant Licensing Branch 1
To: Pacilio M
Exelon Nuclear
Lamb J, NRR/DORL/LPLI-2
References
TAC MF3295
Download: ML14114A563 (6)


Text

OFFICIAL USE ONLY SECURITY RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 10, 2014 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

OYSTER CREEK NUCLEAR GENERATING STATION- REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST RELATED TO REACTOR BUILDING VITAL AREA ACCESS CONTROL (TAC NO. MF3295)

Dear Mr. Pacilio:

By letter dated December 19, 2013 (Agencywide Documents Access and Management System Accession No. ML13358A245), Exelon Generation Company, LLC (Exelon or the licensee) submitted the Oyster Creek Nuclear Generating Station (OCNGS) license amendment request pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR), Section 50.90, to implement an alternative measure to satisfy the regulatory requirements of 10 CFR 73.55(e)(9) relating to controlling vital area access for certain portions of the reactor building at OCNGS. The attachment to the letter dated December 19, 2013, contained Safeguards Information and has been withheld from public disclosure.

In accordance with the requirements of 10 CFR 73.55(r), the U.S. Nuclear Regulatory Commission (NRC) may authorize an applicant or licensee to provide a measure for protection against radiological sabotage other than one required by 10 CFR 73.55, if the applicant or licensee demonstrates that the measure meets the same performance objectives, and requirements as specified in 10 CFR 73.55(b), and the proposed alternative measure provides a level of protection that is at least equal to that which would otherwise be provided by the specific requirement in 10 CFR 73.55.

The NRC staff is currently reviewing the submittal and is enclosing a request for additional information (RAI) to support its review. A draft of these questions was previously sent to Mr.

Richard Gropp of your staff on August 12, 2014, with an opportunity to have a teleconference to ensure that Exelon understood the questions and their regulatory basis, as well as to verify that the information was not previously docketed.

Enclosure 2 transmitted herewith contains Security-Related Information. When separated from Enclosure 2, this document is decontrolled.

OFFICIAL USE ONLY SECURITY RELATED INFORMATION

OFFICIAL USE ONLY SECURITY RELATED INFORMATION M. Pacillo A call was held on August 27, 2014, and Mr. Gropp agreed that Exelon would respond to the RAI by November 5, 2014. Please note that if you do not respond to the RAI by November 5, 2014, the NRC staff may reject your license amendment request under the provisions of 10 CFR 2.1 08, "Denial of application for failure to supply information."

If you have any questions regarding this letter, please feel free to contact me at (301) 415-3100 or by e-mail at John.Lamb@nrc.gov.

Sincerely,

. Lamb, Senior Project Manager PI Licensing Branch 1-2 Di

  • ion of Operating Reactor Licensing 0 1ce of Nuclear Reactor Regulation Docket No. 50-219

Enclosures:

1. Request for Additional Information
2. Request for Additional Information (Security-Related Information) cc w/encl 1: Distribution via Listserv OFFICIAL USE ONLY SECURITY RELATED INFORMATION

OFFICIAL US& ONLY SECURITY R&LAT&D INFORMATION REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST REGARDING THE REACTOR BUILDING VITAL AREA ACCESS CONTROL OYSTER CREEK NUCLEAR GENERATING STATION EXELON GENERATION COMPANY. LLC DOCKET NO. 50-219 Security-related information has been redacted from this document.

Redacted information is identified by blank space enclosed within double brackets as shown here (( )).

By letter dated December 19, 2013 (Agencywide Documents Access and Management System Accession No. ML13358A245), Exelon Generation Company, LLC (Exelon or the licensee) submitted the Oyster Creek Nuclear Generating Station (OCNGS) license amendment request pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR), Section 50.90 to implement an alternative measure to satisfy the regulatory requirements of 10 CFR 73.55(e)(9) relating to controlling vital area access at OCNGS. The enclosure to the letter contained Safeguards Information and has been withheld from public disclosure.

In accordance with the requirements of 10 CFR 73.55(r), the U.S. Nuclear Regulatory Commission (NRC) may authorize an applicant or licensee to provide a measure for protection against radiological sabotage other than one required by 10 CFR 73.55, if the applicant or licensee demonstrates that the measure meets the same performance objectives and requirements as specified in 10 CFR 73.55(b), and the proposed alternative measure provides a level of protection that is at least equal to that which would otherwise be provided by the specific requirement in 10 CFR 73.55. The NRC staff is currently reviewing the submittal and has determined that the additional information requested below is needed to support its review.

REGULA TORY BASIS The regulations in 10 CFR 73.55(e)(9)(i), state that "[v]ital equipment must be located only within vital areas, which must be located within a protected area so that access to vital equipment requires passage through at least two physical barriers, except as otherwise approved by the Commission and identified in the security plans."

The regulations in 10 CFR 73.55(e)(9)(ii) state that "[t]he licensee shall protect all vital area access portals and vital area emergency exits with intrusion detection equipment and locking Enclosure 1 OFFICIAL USE ONLY SECURITY REbATED INFORMATION

OFFICIAl USE! ONlY Si!CURITY Ri!bATE!D INFORMATION devices that allow rapid egress during an emergency and satisfy the vital entry control requirements of this section."

The regulation in 10 CFR 73.55(e)(9)(iii) states that, "[u]noccupied vital areas must be locked and alarmed."

Consistent with 10 CFR 73.55(r)(3), the licensee shall submit a technical basis for each proposed alternative measure. The basis must include an analysis or assessment that demonstrates how the proposed alternative measure provides a level of protection that is at least equal to that which would otherwise be provided by the specific requirements of 10 CFR 73.55(e)(9)(i) through (iii).

REQUEST FOR ADDITIONAL INFORMATION The following additional licensing basis information is needed to justify the need to apply 10 CFR 73.55(r) and to justify that the proposed alternative measures meet the performance requirements of 10 CFR 73.55(b).

((

OFFICIAl USE! ONlY SECURITY REbATED INFORMATION

OFFICIAL US& ONLY SliCURITY RlilATiiD INFORMATION

))

OFFICIAL US& ONLY SECURITY REbATI5D INFORMATION

ML14114A563 *via email OFFICE NRR/LPL1-2/PM N RR/LPL 1-2/LA NSIR/BC NRR/LPL 1-2/BC(A) NRR/LPL 1-2/PM Jlamb A Baxter* DHuyck* RSchaaf Jlamb NAME w/comment DATE 08/24/14 09/05/14 09/08/14 9/10/14 9/10/14