MONTHYEARML21162A1172021-06-11011 June 2021 E-mail to HDI: Acceptance Review - FOF Exemption ML21113A0742021-04-23023 April 2021 Acceptance Review Email - April 20, 2021 Oyster Creek Request for Exemption from 10 CFR Part 73 Requirements Due to Covid ML21064A2432021-03-0505 March 2021 Email from Z. Cruz to A. Sterdis Acceptance Review_ Oyster Creek Nuclear Generating Station - Request for Approval of Independent Spent Fuel Storage Installation Facility Only Emergency Plan and Emergency Action Level Scheme ML21011A1062021-01-12012 January 2021 Decommissioning International: Review and Acceptance of the Holtec Decommissioning International Fleet Decommisioning Quality Assurance Program ML20332A1472020-11-24024 November 2020 Acceptance Review: November 20 2020 Exemption Request from 10 CFR Part 73 Appendix B Requirements for Oyster Creek ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML17096A4022017-04-24024 April 2017 Acceptance Review Letter, License Amendment Request to Revise Cyber Security Plan Implementation Schedule for Milestone 8 and Associated License Condition ML17067A3742017-03-16016 March 2017 Acceptance Review Letter, Amendment Request to Revise the Site Emergency Plan for On-Shift and Emergency Response Organization Staffing for Permanently Defueled Condition ML17052A3062017-02-27027 February 2017 Acceptance Review Letter - License Amendment Request to Delete Decommissioning Trust Provisions from the Renewed Facility Operating License ML16231A3902016-09-0606 September 2016 Acceptance of Requested Licensing Action Request for Exemption Related to Security Measures in an Emergency or During Severe Weather (CAC MF8275 - MF8278) ML16217A2312016-08-30030 August 2016 Unit 1 - Acceptance of Requested Licensing Action License Amendment Request to Change Technical Specification to Reduce Steam Dome Pressure ML16152A1332016-06-24024 June 2016 Acceptance of Requested Licensing Action License Amendment Request to Change Technical Specification Section 6.0, Administrative Controls, for Permanently Defueled Condition ML16036A1692016-02-0808 February 2016 Acceptance of Requested Licensing Action Regarding Certified Fuel Handler Training Program ML14149A0752014-06-16016 June 2014 Acceptance of Requested Licensing Action License Amendment Request to Revise Snubber Surveillance Requirements (Tac No. MF4124) ML14072A1002014-03-24024 March 2014 Acceptance Letter Regarding License Amendment Request to Reactor Building Vital Area Access Control ML13354B6762014-01-0707 January 2014 Acceptance Letter Regarding License Amendment Request to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate 10 Hours Per Month, Using the Consolidated Line Item Improvement.. ML1134301022011-12-16016 December 2011 Acceptance Letter Regarding Relief Requests PR-01, VR-01, and VR-02 for Fifth Inservice Testing Interval ML1128501312011-10-12012 October 2011 E-mail, Miller to Gropp, Oyster Creek Schedular Exemption Acceptance Review ML1116804112011-06-17017 June 2011 Acceptance Review for Exelon Threshold Determination Request (TAC ME6269 - ME6287) ML1023100842010-08-19019 August 2010 E-mail Acceptance Review for Proposed Revision to Appendix B Environmental TSs LAR ML1008800852010-07-21021 July 2010 Fleet - Acceptance Review Implementation of Emergency Action Level Schemes Developed from NEI 99-01m Rev. 5 ML1020401092010-07-21021 July 2010 E-mail, Miller to Mascitelli, Acceptance Review: Inoperable EDG Action Statement Requirements ML1008200062010-03-23023 March 2010 E-mail, Miller, NRR, to Gropp, Exelon, Acceptance Review for Trunion Room LAR ML0907710512009-03-18018 March 2009 E-mail, Miller, NRR, to Stewart, Exelon, Acceptance Review for ME0756 2021-06-11
[Table view] Category:Letter
MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML22207B8382022-07-26026 July 2022 NRC Confirmatory Order EA-21-041 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22118A6122022-04-28028 April 2022 Annual Radioactive Environmental Operating Report for 2021 ML22118A5822022-04-28028 April 2022 Annual Radioactive Effluent Release Report for 2021 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22069A3762022-03-10010 March 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML22032A0582022-03-0808 March 2022 EA-21-139; EA-150: Oyster Creek Nuclear Generating Station - NRC Investigation Report Nos.. 1-2021-002 & 1-2021-014 ML22060A2202022-03-0202 March 2022 NRC Office of Investigations Case No. 1-2021-009 ML22049B2452022-02-19019 February 2022 Late Low Level Radwaste Shipment Report Pursuant to 10 CFR 20 Appendix G IR 05000219/20214022022-01-26026 January 2022 EA-21-041: Confirmatory Order Related to Oyster Greek Nuclear Generating Station - NRC Investigation Report I-2020-007; NRC Inspection Report Nos. 05000219/2021402 & 07200015/2021401 ML22025A3422022-01-25025 January 2022 and Big Rock Point - Changes to Site Organization ML22025A2182022-01-25025 January 2022 Late LLRW Shipments Investigation Report Pursuant to 10 CFR 20, Appendix G ML22021B5512022-01-21021 January 2022 Compensatory Measures Not Implemented Per Site'S Physical Security Plan Due to Multiplexer (Mux) Power Supply Failure L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations ML21349A5192021-12-15015 December 2021 Commitment Change Summary Report ML21285A1912021-11-30030 November 2021 Nrc'S Analysis of Holtec Decommissioning International'S Decommissioning Funding Status Report for Oyster Creek Nuclear Generating Station and Pilgrim Nuclear Power Station, Docket Nos 50-219 and 50-293 IR 05000219/20210032021-11-16016 November 2021 NRC Inspection Report No. 05000219/2021003 L-21-118, Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades2021-11-0909 November 2021 Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades IR 05000219/20214042021-08-26026 August 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200015/2021402 and Security Decommissioning Inspection Report 05000219/2021404 - (Public) 2024-01-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 24, 2014 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
OYSTER CREEK NUCLEAR GENERATING STATION -ACCEPTANCE LETTER REGARDING LICENSE AMENDMENT REQUEST RELATING TO REACTOR BUILDING VITAL AREA ACCESS CONTROL (TAC NO. MF3295)
Dear Mr. Pacilio:
By letter dated December 19, 2013 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML13358A245), as supplemented January 31, 2014 (ADAMS Accession No. ML14035A264), Exelon Nuclear submitted a license amendment request (LAR) to the facility operating license (FOL) for Oyster Creek Nuclear Generating Station (OCNGS).
This LAR contains safeguards information. The proposed LAR would revise Renewed FOL No. DPR-16 for OCNGS. Specifically, the proposed changes involve instituting additional protective measures strategies at OCNGS related to vitalization of certain portions of the Reactor Building. The proposed changes to implement the use of an "alternative measure" requires prior U.S. Nuclear Regulatory Commission (NRC) review and approval pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 73.55(r).
The purpose of this letter is to provide the results of the NRC staff's acceptance review of this amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.
The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with 10 CFR 50.90, an amendment to the license must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications.
Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment
M. Pacilio in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-3100 or by e-mail at John.Lamb@nrc.gov.
Sincerely, Meena K. Khanna, Chief Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-219 cc: Distribution via Listserv
ML14072A100 *via email OFFICE LPL 1-2/PM LPL 1-2/LA* LPL 1-2/BC NAME JLamb ABaxter MKhanna DATE 03/20/2014 03/18/2014 03/24/2014