ML15078A005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15078A005
| number = ML15078A005
| issue date = 03/25/2015
| issue date = 03/25/2015
| title = Summary of 2/18/2015 Preapplication Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3 on TSTF-505, Risk-Informed Technical Specifications (TAC No. MF5559, MF5560, and MF5561)
| title = Summary of 2/18/2015 Preapplication Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3 on TSTF-505, Risk-Informed Technical Specifications
| author name = Singal B K
| author name = Singal B
| author affiliation = NRC/NRR/DORL/LPLIV-1
| author affiliation = NRC/NRR/DORL/LPLIV-1
| addressee name = Edington R K
| addressee name = Edington R
| addressee affiliation = Arizona Public Service Co
| addressee affiliation = Arizona Public Service Co
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
| license number = NPF-041, NPF-051, NPF-074
| license number = NPF-041, NPF-051, NPF-074
| contact person = Watford M M
| contact person = Watford M
| case reference number = TAC MF5559, TAC MF5560, TAC MF5561, TSTF-505
| case reference number = TAC MF5559, TAC MF5560, TAC MF5561, TSTF-505
| document type = Meeting Summary
| document type = Meeting Summary
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:LICENSEE: FACILITY:  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 25, 2015 LICENSEE:       Arizona Public Service Company FACILITY:       Palo Verde Nuclear Generating Station, Units 1, 2, and 3


==SUBJECT:==
==SUBJECT:==
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 25, 2015 Arizona Public Service Company Palo Verde Nuclear Generating Station, Units 1, 2, and 3 SUMMARY OF FEBRUARY 18, 2015, MEETING WITH ARIZONA PUBLIC SERVICE COMPANY TO DISCUSS UPCOMING LICENSE AMENDMENT REQUEST REGARDING IMPLEMENTATION OF RISK-INFORMED TSTF-505, REVISION 1, FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (TAC NOS. MF5559, MF5560, AND MF5561) On February 18, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff hosted a Category 1 public meeting with staff from Arizona Public Service Company (the licensee) at NRC Headquarters, Three White Flint North, 11601 Landsdown Street, North Bethesda, Maryland. The public meeting was originally scheduled for February 17, 2015, but due to the inclement weather, the meeting was rescheduled to February 18, 2015. The purpose of the meeting was to discuss the licensee's upcoming license amendment request (LAR) to adopt Technical Specifications Task Force (TSTF)-505, Revision 1, "Provide Risk-Informed Extended Completion Times -RITSTF [Risk-Informed TSTF] Initiative 4b," for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Palo Verde). The availability of the model safety evaluation for TSTF-505 was published by the NRC staff in the Federal Register on March 15, 2012 (77 FR 15399), for referencing in license amendment applications. The meeting notice and agenda, dated February 4, 2015, are available in Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 15048A037. The licensee provided presentation slides, which are available at ADAMS Accession No. ML 15070A252. The Enclosure contains the meeting attendance list. The licensee presented an overview of its plan to submit the TSTF-505 LAR for Palo Verde and discussed its planned LAR scope and submittal schedule. The licensee also discussed an upcoming LAR to adopt TSTF-439-A, Revision 2, "Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO [Limiting Condition for Operation]" (ADAMS Accession No. ML051860296). The TSTF-439-A LAR is a prerequisite to the TSTF-505 LAR. The licensee stated that the TSTF-439 LAR would possibly be submitted in February 2015 and the TSTF-505 LAR in June 2015. The licensee indicated that it will be requesting approval within 1 year for from the 'date of submittal. The NRC staff mentioned that because of current resource challenges, the NRC might not be able to complete its review within the requested timeframe. The licensee indicated that it plans to implement the LAR in late 2016 if it receives the NRC staff approval in time. The licensee plans to use TSTF-505 and Nuclear Energy Institute (NEI) 06-09, Revision 0-A, "Risk-Informed Technical *Specifications Initiative 4b: Risk-Managed Technical Specifications (RMTS) Guidelines" (ADAMS Accession No. ML 122860402), for the LAR. The licensee plans to address the variances from TSTF-505 in the LAR, including the addition of two LCOs, Technical Specification (TS) 3.4.12, "Pressurizer Vents," and TS 3. 7 .3, "Main Feedwater   Isolation Valves (MFIVs)," and several variances noted ori Slide 15 of the licensee's presentation. The licensee commented that although TSTF-505 addresses Combustion Engineering Standard Technical Specifications (STS), many of these variances are because Palo Verde has unique plant features. The licensee also discussed its probabilistic risk assessment (PRA) models, specifically internal events, internal flood, internal fire, and seismic PRA models. The licensee stated each PRA model listed above had been developed and peer reviewed. The licensee mentioned that all PRA models have been evaluated against Regulatory Guide (RG) 1.200, Revision 2, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities," dated March 2009 (ADAMS Accession No. ML090410014). The licensee stated that the baseline total core damage frequency and large early release frequency for Palo Verde meets the risk acceptance guidelines in RG 1.17 4, Revision 2, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis," dated May 2011 (ADAMS Accession No. ML 100910006). The NRC questioned the implementation of TSTF-505 for instrumentation and controls. The NRC staff suggested that the licensee review the NRC request for additional information (RAI) letter sent to Diablo Canyon Power Plant on TSTF-505 LAR dated February 18, 2015 (ADAMS Accession No. ML 15050A 195). NRC staff discussed the option of setting up a monthly status call between the licensee and NRC staff to discuss the review schedule of the TSTF-505 submittal. Four members of the public attended the meeting via telephone. Two comments were made; however, they were out of the scope of the public meeting. The NRC did not receive any public meeting feedback forms. If you have any questions, please contact me at (301) 415-3016 or via e-mail at Balwant. Singal@nrc.gov. Docket Nos. STN 50-528, STN 50-529, and STN 50-530  
 
==SUMMARY==
OF FEBRUARY 18, 2015, MEETING WITH ARIZONA PUBLIC SERVICE COMPANY TO DISCUSS UPCOMING LICENSE AMENDMENT REQUEST REGARDING IMPLEMENTATION OF RISK-INFORMED TSTF-505, REVISION 1, FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (TAC NOS. MF5559, MF5560, AND MF5561)
On February 18, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff hosted a Category 1 public meeting with staff from Arizona Public Service Company (the licensee) at NRC Headquarters, Three White Flint North, 11601 Landsdown Street, North Bethesda, Maryland. The public meeting was originally scheduled for February 17, 2015, but due to the inclement weather, the meeting was rescheduled to February 18, 2015. The purpose of the meeting was to discuss the licensee's upcoming license amendment request (LAR) to adopt Technical Specifications Task Force (TSTF)-505, Revision 1, "Provide Risk-Informed Extended Completion Times - RITSTF [Risk-Informed TSTF] Initiative 4b," for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Palo Verde). The availability of the model safety evaluation for TSTF-505 was published by the NRC staff in the Federal Register on March 15, 2012 (77 FR 15399), for referencing in license amendment applications. The meeting notice and agenda, dated February 4, 2015, are available in Agencywide Documents Access and Management System (ADAMS) at Accession No. ML15048A037. The licensee provided presentation slides, which are available at ADAMS Accession No. ML15070A252. The Enclosure contains the meeting attendance list.
The licensee presented an overview of its plan to submit the TSTF-505 LAR for Palo Verde and discussed its planned LAR scope and submittal schedule. The licensee also discussed an upcoming LAR to adopt TSTF-439-A, Revision 2, "Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO [Limiting Condition for Operation]" (ADAMS Accession No. ML051860296). The TSTF-439-A LAR is a prerequisite to the TSTF-505 LAR.
The licensee stated that the TSTF-439 LAR would possibly be submitted in February 2015 and the TSTF-505 LAR in June 2015. The licensee indicated that it will be requesting approval within 1 year for from the 'date of submittal. The NRC staff mentioned that because of current resource challenges, the NRC might not be able to complete its review within the requested timeframe. The licensee indicated that it plans to implement the LAR in late 2016 if it receives the NRC staff approval in time.
The licensee plans to use TSTF-505 and Nuclear Energy Institute (NEI) 06-09, Revision 0-A, "Risk-Informed Technical *Specifications Initiative 4b: Risk-Managed Technical Specifications (RMTS) Guidelines" (ADAMS Accession No. ML122860402), for the LAR. The licensee plans to address the variances from TSTF-505 in the LAR, including the addition of two LCOs, Technical Specification (TS) 3.4.12, "Pressurizer Vents," and TS 3. 7 .3, "Main Feedwater
 
Isolation Valves (MFIVs)," and several variances noted ori Slide 15 of the licensee's presentation. The licensee commented that although TSTF-505 addresses Combustion Engineering Standard Technical Specifications (STS), many of these variances are because Palo Verde has unique plant features.
The licensee also discussed its probabilistic risk assessment (PRA) models, specifically internal events, internal flood, internal fire, and seismic PRA models. The licensee stated each PRA model listed above had been developed and peer reviewed. The licensee mentioned that all PRA models have been evaluated against Regulatory Guide (RG) 1.200, Revision 2, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities," dated March 2009 (ADAMS Accession No. ML090410014). The licensee stated that the baseline total core damage frequency and large early release frequency for Palo Verde meets the risk acceptance guidelines in RG 1.174, Revision 2, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis," dated May 2011 (ADAMS Accession No. ML100910006).
The NRC questioned the implementation of TSTF-505 for instrumentation and controls. The NRC staff suggested that the licensee review the NRC request for additional information (RAI) letter sent to Diablo Canyon Power Plant on TSTF-505 LAR dated February 18, 2015 (ADAMS Accession No. ML15050A195).
NRC staff discussed the option of setting up a monthly status call between the licensee and NRC staff to discuss the review schedule of the TSTF-505 submittal.
Four members of the public attended the meeting via telephone. Two comments were made; however, they were out of the scope of the public meeting. The NRC did not receive any public meeting feedback forms.
 
If you have any questions, please contact me at (301) 415-3016 or via e-mail at Balwant. Singal@nrc.gov.
Sincerely,
_Q_~ a:.s,~~~
sMant K. Singal, Senior Project Manager Plant Licensing Branch IV-1 .
Division of Operating Reactor Lice.nsing Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529, and STN 50-530


==Enclosure:==
==Enclosure:==
List of Attendees cc w/encl: Distribution via Listserv Sincerely, sMant K. Singal, Senior Project Manager Plant Licensing Branch IV-1 . Division of Operating Reactor Lice.nsing Office of Nuclear Reactor Regulation LIST OF ATTENGEES FEBRUARY 18, 2015, PUBLIC MEETING WITH ARIZONA PUBLIC SERVICE COMPANY REGARDING PROPOSED PALO VERDE. UNITS 1, 2. AND 3 TSTF-505 AMENDMENTS Name Affiliation Margaret Watford NRC Eric Oesterle NRC David Gennardo NRC Dan O'Neal NRC Norbert Carte NRC Ravi Grover NRC Hang Vu NRC Thomas Weber APS Thomas Romay APS Everett DePue APS Thomas Hook APS Bryan Thiele APS Del Elkington APS Michael Dilorenzo* APS John Conly* APS Jorge Rodriguez* APS Carl Stephenson* APS Doug Woody* Duke Energy Marvin Lewis* Public Donna Gilmore* Public Mr. Hoffman* Public *participated via phone Enclosure 


Meeting Notice ML 15048A037; Meeting Summary ML 15078A005; Slides ML 15070A252 *via email OFFICE NRR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1 /PM N RR/DORL/LPL4-1 /LA NAME MWatford BSingal EOesterle JBurkhardt* DATE 3/19/2015 3/24/15 3/24/15 3/19/15 OFFICE NRR/DE/EICB/BC NRR/DRA/APLA/BC NRR/DORL/LPL4-1/BC NRR/DORL/LPL4-1 /PM NAME JThorp HHamzehee (RGallucci for) MMarkley BSingal DATE 3/26/15 3/26/15 3/25/15 3/25/15}}
List of Attendees cc w/encl: Distribution via Listserv
 
LIST OF ATTENGEES FEBRUARY 18, 2015, PUBLIC MEETING WITH ARIZONA PUBLIC SERVICE COMPANY REGARDING PROPOSED PALO VERDE. UNITS 1, 2. AND 3 TSTF-505 AMENDMENTS Name                        Affiliation Margaret Watford                      NRC Eric Oesterle                      NRC David Gennardo                      NRC Dan O'Neal                        NRC Norbert Carte                      NRC Ravi Grover                        NRC Hang Vu                          NRC Thomas Weber                        APS Thomas Romay                        APS Everett DePue                      APS Thomas Hook                        APS Bryan Thiele                      APS Del Elkington                      APS Michael Dilorenzo*                    APS John Conly*                        APS Jorge Rodriguez*                      APS Carl Stephenson*                      APS Doug Woody*                    Duke Energy Marvin Lewis*                      Public Donna Gilmore*                      Public Mr. Hoffman*                      Public
                              *participated via phone Enclosure
 
Meeting Notice ML15048A037; Meeting Summary ML15078A005; Slides ML15070A252
                                                                  *via email OFFICE   NRR/DORL/LPL4-1 /PM   NRR/DORL/LPL4-1 /PM       NRR/DORL/LPL4-1 /PM N RR/DORL/LPL4-1 /LA NAME     MWatford             BSingal                   EOesterle           JBurkhardt*
DATE     3/19/2015             3/24/15                   3/24/15             3/19/15 OFFICE   NRR/DE/EICB/BC       NRR/DRA/APLA/BC           NRR/DORL/LPL4-1/BC NRR/DORL/LPL4-1 /PM NAME     JThorp               HHamzehee (RGallucci for) MMarkley           BSingal DATE     3/26/15               3/26/15                   3/25/15             3/25/15}}

Latest revision as of 14:05, 19 March 2020

Summary of 2/18/2015 Preapplication Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3 on TSTF-505, Risk-Informed Technical Specifications
ML15078A005
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/25/2015
From: Balwant Singal
Plant Licensing Branch IV
To: Edington R
Arizona Public Service Co
Watford M
References
TAC MF5559, TAC MF5560, TAC MF5561, TSTF-505
Download: ML15078A005 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 25, 2015 LICENSEE: Arizona Public Service Company FACILITY: Palo Verde Nuclear Generating Station, Units 1, 2, and 3

SUBJECT:

SUMMARY

OF FEBRUARY 18, 2015, MEETING WITH ARIZONA PUBLIC SERVICE COMPANY TO DISCUSS UPCOMING LICENSE AMENDMENT REQUEST REGARDING IMPLEMENTATION OF RISK-INFORMED TSTF-505, REVISION 1, FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (TAC NOS. MF5559, MF5560, AND MF5561)

On February 18, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff hosted a Category 1 public meeting with staff from Arizona Public Service Company (the licensee) at NRC Headquarters, Three White Flint North, 11601 Landsdown Street, North Bethesda, Maryland. The public meeting was originally scheduled for February 17, 2015, but due to the inclement weather, the meeting was rescheduled to February 18, 2015. The purpose of the meeting was to discuss the licensee's upcoming license amendment request (LAR) to adopt Technical Specifications Task Force (TSTF)-505, Revision 1, "Provide Risk-Informed Extended Completion Times - RITSTF [Risk-Informed TSTF] Initiative 4b," for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Palo Verde). The availability of the model safety evaluation for TSTF-505 was published by the NRC staff in the Federal Register on March 15, 2012 (77 FR 15399), for referencing in license amendment applications. The meeting notice and agenda, dated February 4, 2015, are available in Agencywide Documents Access and Management System (ADAMS) at Accession No. ML15048A037. The licensee provided presentation slides, which are available at ADAMS Accession No. ML15070A252. The Enclosure contains the meeting attendance list.

The licensee presented an overview of its plan to submit the TSTF-505 LAR for Palo Verde and discussed its planned LAR scope and submittal schedule. The licensee also discussed an upcoming LAR to adopt TSTF-439-A, Revision 2, "Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO [Limiting Condition for Operation]" (ADAMS Accession No. ML051860296). The TSTF-439-A LAR is a prerequisite to the TSTF-505 LAR.

The licensee stated that the TSTF-439 LAR would possibly be submitted in February 2015 and the TSTF-505 LAR in June 2015. The licensee indicated that it will be requesting approval within 1 year for from the 'date of submittal. The NRC staff mentioned that because of current resource challenges, the NRC might not be able to complete its review within the requested timeframe. The licensee indicated that it plans to implement the LAR in late 2016 if it receives the NRC staff approval in time.

The licensee plans to use TSTF-505 and Nuclear Energy Institute (NEI) 06-09, Revision 0-A, "Risk-Informed Technical *Specifications Initiative 4b: Risk-Managed Technical Specifications (RMTS) Guidelines" (ADAMS Accession No. ML122860402), for the LAR. The licensee plans to address the variances from TSTF-505 in the LAR, including the addition of two LCOs, Technical Specification (TS) 3.4.12, "Pressurizer Vents," and TS 3. 7 .3, "Main Feedwater

Isolation Valves (MFIVs)," and several variances noted ori Slide 15 of the licensee's presentation. The licensee commented that although TSTF-505 addresses Combustion Engineering Standard Technical Specifications (STS), many of these variances are because Palo Verde has unique plant features.

The licensee also discussed its probabilistic risk assessment (PRA) models, specifically internal events, internal flood, internal fire, and seismic PRA models. The licensee stated each PRA model listed above had been developed and peer reviewed. The licensee mentioned that all PRA models have been evaluated against Regulatory Guide (RG) 1.200, Revision 2, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities," dated March 2009 (ADAMS Accession No. ML090410014). The licensee stated that the baseline total core damage frequency and large early release frequency for Palo Verde meets the risk acceptance guidelines in RG 1.174, Revision 2, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis," dated May 2011 (ADAMS Accession No. ML100910006).

The NRC questioned the implementation of TSTF-505 for instrumentation and controls. The NRC staff suggested that the licensee review the NRC request for additional information (RAI) letter sent to Diablo Canyon Power Plant on TSTF-505 LAR dated February 18, 2015 (ADAMS Accession No. ML15050A195).

NRC staff discussed the option of setting up a monthly status call between the licensee and NRC staff to discuss the review schedule of the TSTF-505 submittal.

Four members of the public attended the meeting via telephone. Two comments were made; however, they were out of the scope of the public meeting. The NRC did not receive any public meeting feedback forms.

If you have any questions, please contact me at (301) 415-3016 or via e-mail at Balwant. Singal@nrc.gov.

Sincerely,

_Q_~ a:.s,~~~

sMant K. Singal, Senior Project Manager Plant Licensing Branch IV-1 .

Division of Operating Reactor Lice.nsing Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529, and STN 50-530

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv

LIST OF ATTENGEES FEBRUARY 18, 2015, PUBLIC MEETING WITH ARIZONA PUBLIC SERVICE COMPANY REGARDING PROPOSED PALO VERDE. UNITS 1, 2. AND 3 TSTF-505 AMENDMENTS Name Affiliation Margaret Watford NRC Eric Oesterle NRC David Gennardo NRC Dan O'Neal NRC Norbert Carte NRC Ravi Grover NRC Hang Vu NRC Thomas Weber APS Thomas Romay APS Everett DePue APS Thomas Hook APS Bryan Thiele APS Del Elkington APS Michael Dilorenzo* APS John Conly* APS Jorge Rodriguez* APS Carl Stephenson* APS Doug Woody* Duke Energy Marvin Lewis* Public Donna Gilmore* Public Mr. Hoffman* Public

  • participated via phone Enclosure

Meeting Notice ML15048A037; Meeting Summary ML15078A005; Slides ML15070A252

  • via email OFFICE NRR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1 /PM N RR/DORL/LPL4-1 /LA NAME MWatford BSingal EOesterle JBurkhardt*

DATE 3/19/2015 3/24/15 3/24/15 3/19/15 OFFICE NRR/DE/EICB/BC NRR/DRA/APLA/BC NRR/DORL/LPL4-1/BC NRR/DORL/LPL4-1 /PM NAME JThorp HHamzehee (RGallucci for) MMarkley BSingal DATE 3/26/15 3/26/15 3/25/15 3/25/15