| : 4. Operators did not adequately consider the effects of small oil leaks on high head safety injection pumps at Unit 3; | | : 4. Operators did not adequately consider the effects of small oil leaks on high head safety injection pumps at Unit 3; |
|
| |
|
| 1Richard Emch - Millstone's Degrading Conditions .Page 31 I Richard Emch Millstone's Degrading Conditions | | 1Richard Emch - Millstone's Degrading Conditions .Page 31 I Richard Emch Millstone's Degrading Conditions Page 3 ii |
| -
| |
| Page 3 ii | |
| : 5. Operators and engineers at Unit 2 determined compensatory cooling measures installed in a direct current switchgear room at Unit 2 would ensure the availability of the switchgear, while existing technical evaluation stated just the opposite. | | : 5. Operators and engineers at Unit 2 determined compensatory cooling measures installed in a direct current switchgear room at Unit 2 would ensure the availability of the switchgear, while existing technical evaluation stated just the opposite. |
| NRC inspectors concluded that during the year 2004, they "found a lack of rigor by Dominion related to both the understanding of the effects of degraded conditions and the technical bases used to evaluate degraded conditions | | NRC inspectors concluded that during the year 2004, they "found a lack of rigor by Dominion related to both the understanding of the effects of degraded conditions and the technical bases used to evaluate degraded conditions |
|
---|
Category:E-Mail
MONTHYEARML24213A2602024-07-31031 July 2024 Request for Additional Information LAR to Support Implementation of Framatome Gaia Fuel ML24116A0112024-04-25025 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-13 Regarding Steam Generator Channel Head Drain Modification ML24115A2622024-04-24024 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-14 Regarding Pressurizer and Steam Generator Pressure-Retaining Welds and Full-Penetration Welded Nozzles ML24114A3192024-04-23023 April 2024 Acceptance Review Determination LAR to Extend Inspection Interval for Reactor Coolant Pump Flywheels (TSTF-421) Using the CLIIP ML24113A2502024-04-22022 April 2024 Request for Additional Information (e-mail 4/22/2024) License Renewal Commitment for Aging Management Program of Alloy 600 Components ML24092A1082024-04-0101 April 2024 3R22 RFO ISI Owners Activity Report Extension - NRC Staff Acknowledgement Email (4/1/2024) ML24065A3112024-03-0505 March 2024 Request for Additional Information (Redacted) (03/05/2025 E-mail from R. Guzman to S. Sinha) Framatome Gaia Fuel LOCA LAR ML24058A2322024-02-27027 February 2024 2/27/2024 E-mail from S. Sinha to R. Guzman P-8 Instrument Uncertainty in Support of LAR Framatome Gaia Fuel ML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staff'S Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22320A5752022-11-16016 November 2022 E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel ML22298A2052022-10-25025 October 2022 Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles ML22292A3212022-10-19019 October 2022 Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program ML22297A1802022-10-0707 October 2022 Email Acknowledgement to Dominion Energy Nuclear Decommissioning Trust Fund Disbursement 30 Day Notification for Millstone Power Station Unit 1: Docket No 50-245 ML22278A0932022-10-0505 October 2022 E-mail to File - Summary of September 7, 2022, Meeting with Dominion to Discuss Proposed Supplement to the Spent Fuel Pool Criticality Safety Analysis (EPID L-2022-LRM-0059 ML22272A0332022-09-29029 September 2022 Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration Nozzle ML22252A1772022-09-0909 September 2022 Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22123A0812022-05-0303 May 2022 Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints ML22069A7192022-03-10010 March 2022 E-mail from R. Guzman to S. Sinha - Millstone Unit 3 Steam Generator Outage Conference Call ML22020A4122022-01-11011 January 2022 1/11/2022 State Consultation E-mail, R. Guzman to J. Semancik Millstone Power Station, Unit 3 Planned Issuance of Amendment to Clarify Shutdown Bank TS and Add Alternate Control Rod Position Monitoring Requirements ML21348A7392021-12-14014 December 2021 E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping ML21347A9412021-12-13013 December 2021 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Safety Evaluation for Amendment No. 280 Measurement Uncertainy Recapture Power Uprate ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21297A0072021-10-19019 October 2021 E-mail from R. Guzman to S. Sinha - Acknowledgemnt of Error in SE for Millstone Power Station, Unit 3, Amendment No. 279 Addition of Analytical Methodology to the COLR for LBLOCA ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21200A2562021-07-19019 July 2021 7/19/2021 E-mail Pressurizer Steam Space Line Classification ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code 2024-07-31
[Table view] Category:Environmental Impact Statement
MONTHYEARML0513301372005-04-14014 April 2005 Email from Nancy Burton Millstone Relicensing ML0513301252005-04-0808 April 2005 e-mail from Nancy Burton Connecticut Coalition Against Millstone/Acrs Comments ML0513301192005-03-30030 March 2005 Email from Nancy Burton Cancer Survey - Seabreeze Drive, Waterford ML0513301132005-03-30030 March 2005 Millstone'S Degrading Conditions ML0513300902005-03-30030 March 2005 e-mail to Nancy Burton Millstone'S Degrading Conditions ML0513301072005-03-30030 March 2005 E-mail from Nancy Burton Millstone'S Degrading Conditions ML0513300792005-03-28028 March 2005 Jordan Cove Study ML0513300892005-03-28028 March 2005 e-mail from Nancy Burton Millstone Draft EIS ML0513301002005-03-28028 March 2005 DEP Waiver of Jurisdiction ML0513301032005-03-28028 March 2005 e-mail from Nancy Burton Strontium-90 ML0513300632005-03-28028 March 2005 E-mail to Nancy Burton Comment Period Closed ML0513300752005-03-27027 March 2005 Your Millstone Site Audit Summary ML0513300922005-03-21021 March 2005 E-mail from Nancy Burton Millstone - Notice of Intent to Sue ML0513300822005-03-16016 March 2005 e-mail from Nancy Burton Millstone SEIS - Ccam Written Comments ML0513300502005-03-15015 March 2005 E-mail from Richard Emch to Nancy Burton Regarding Millstone SEIS Reference ML0513300882005-03-14014 March 2005 E-mail from Nancy Burton Regarding Millstone Draft Environmental Impact Statement Comments ML0513300952005-03-13013 March 2005 E-mail from Nancy Burton Millstone SEIS Reference ML0513300972005-03-12012 March 2005 E-mail from Nancy Burton Boy'S Cancer Blamed on Millstone (Hartford Courant) ML0513301102005-03-11011 March 2005 E-mail from Nancy Burton Do Heed This Message and Circulate Widely within the NRC ML0513301182005-03-11011 March 2005 E-mail from Nancy Burton Boy'S Cancer Blamed on Millstone (Hartford Courant) ML0513301152005-03-11011 March 2005 E-mail from Nancy Burton Group: Plant Pollution May Have Sickened Boy (Norwich CT Bulletin) ML0513301322005-03-0909 March 2005 e-mail from Nancy Burton Millstone Draft Environmental Impact Statement ML0513301262005-03-0909 March 2005 E-mail from Nancy Burton You Are All Invited ML0513301432005-03-0909 March 2005 E-mail to Nancy Burton Millstone Draft Environmental Impact Statement ML0513300802005-03-0101 March 2005 e-mail to Nancy Burton Millstone Draft Environmental Impact Statement ML0513301352005-02-28028 February 2005 E-mail from Nancy Burton Millstone - Please Forward to Commissioners ML0513301382005-02-24024 February 2005 E-mail from Nancy Burton Millstone Draft EIS Comments ML0513300832005-02-24024 February 2005 e-mail to Nancy Burton Millstone Draft EIS Comments ML0513301412005-02-24024 February 2005 E-mail from Nancy Burton Millstone Draft EIS Comments ML0513303492005-02-24024 February 2005 Draft Environmental Impact Statement ML0513300772005-02-23023 February 2005 E-mail from Richard Emch to Nancy Burton Regarding Millstone Draft EIS - Correction ML0513303522005-02-21021 February 2005 E-mail from Nancy Burton ;Millstone Draft Environmental Impact Statement ML0513302862005-02-18018 February 2005 E-mail from Nancy Burton Millstone 1/11/05 Transcript ML0513300342005-02-18018 February 2005 01/11/05 Transcript ML0513302902005-02-15015 February 2005 E-mail from Nancy Burton Re Millstone Draft EIS ML0513302932005-02-10010 February 2005 E-Mail from Nancy Burton Re Millstone Draft EIS Inquiry ML0513302972005-02-10010 February 2005 E-Mail from Nancy Burton Re Millstone Draft EIS ML0513302852005-02-0808 February 2005 E-mail from Nancy Burton Millstone Draft Environmental Impact Statement ML0513302922005-02-0404 February 2005 E-mail from Nancy Burton Millstone EIS ML0513302962005-02-0202 February 2005 E-mail from Nancy Burton Re Millstone Draft EIS ML0513302982005-01-31031 January 2005 E-Mail from Nancy Burton Re Millstone Draft EIS ML0513303002005-01-23023 January 2005 E-Mail from Nancy Burton Re Millstone Draft Environmental Impact Statement ML0513303012005-01-11011 January 2005 RAIs ML0424005432004-08-27027 August 2004 Issuance of Environmental Scoping Summary Report Associated with Staff'S Review of Applications by Dominion Nuclear Connecticut, Inc. for Renewal of Operating Licenses for Millstone Power Station, Units 2 and 3 ML0336000692003-12-11011 December 2003 Excerpt from Final EIS, Chapter 2, 2.3.1.3 High-Level Radioactive Waste. 2005-04-08
[Table view] |
Text
Richard Emch - Millstone's Degrading Conditions Page 1 From: <NancyBurtonEs @ aol.com>
To: <rle~nrc.gov>
Date: Wed, Mar 30, 2005 12:07 PM
Subject:
Millstone's Degrading Conditions CONNECTICUT COALITION AGAINST MILLSTONE
_www.mothballmillstone.org- (http://www.mothballmillstone.org)
March 30, 2005
Dear Mr. Emch:
Please include the letter which appears below and which we have submitted to The New London Day for publication, in the record of your proceedings involving the Millstone Environmental Impact Statement for Millstone relicensing.
Thank you for your assistance.
Sincerely, Nancy Burton Tel. 203-938-3952 CONNECTICUT COALITION AGAINST MILLSTONE
_www.mothballmillstone.org- (http://www.mothballmillstone.org)
March 30, 2005 To The Editors:
We must give The New London Day a "thumbs-down" for keeping the community in the dark about degrading conditions at the Millstone Nuclear Power Station which endanger the public.
Did we attend the same meeting as your reporter who wrote the article entitled "NRC Gives Millstone a Thumbs Up for Safety" (March 30, 2005)?
At a meeting on March 29, the Connecticut Coalition Against Millstone shared the scathing reviews the U.S. Nuclear Regulatory Commission has given of Millstone's performance during the year 2004.
Space limitations require us to cite only a few specific examples below.
Please go to our website, _www.mothballmillstone.org-(http://www.mothballmillstone.org) for an expose of Dominion's safety breaches committed during the year 2004
- A spent nuclear fuel rod broke at Unit 2 on August 5 while operators were inspecting fuel assembly failures. The lethal rod fragmented and it took a week for Dominion to recover all the pieces.
- During a draindown of the vital reactor coolant system at Unit 3, the worker assigned to monitoring the refuel pool level left his assignment before completion and the critical draindown occurred in his absence for 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.
Operators were left to rely on the remote camera indication of the refuel pool level - and they read it incorrectly. The NRC correctly called this safety breach "more than minor" because it "affected the likelihood of causing a loss of reactor water inventory to the point that shutdown cooling could be lost."
- Millstone Unit 3 suffered repetitive failures of leakage tests for vital water systems. Over a span of eight years - including three years of Dominion operations - the same known failure mechanism resulted in a 50 per cent failure rate for critical check valves.
- Unit 2's reactor trip breaker failed to shut remotely. This is alarming, given Unit 2's unusual propensity to suffer unexpected and dangerous spontaneous "trips" or shutdowns.
Page 2J
>,Richard Emch -- Millstone's Degrading Conditions Millstone's Degrading Conditions ' - . .Page 21
- Unit 2 suffered four reactor"trips" during the inspection period due to equipment failures or personnel error.
- Dominion allowed Millstone's "high-range" radiation monitor - key to measuring radiation doses to the public - to become seriously degraded.
- On April 4, while Dominion was preparing to remove the reactor vessel head at Unit 3, an overhead crane malfunctioned, causing significant damage to a critical lifting rig and damaging personnel safety equipment.
- On April 14, workers discovered that a fuel assembly "had moved several inches upon coming out of the core and would not travel into the mast without causing an overload condition."
- Unit 2 used materials from an unqualified vendor.
- The Unit 2 spent fuel pool ventilation system was allowed to become degraded.
- Inspectors discovered a critical modification was made to the Unit 2 spent fuel pool water level indicator without documentation.
- Dominion repeatedly violated Technical Specifications (its formal licensing conditions) throughout 2004. These "Tech Specs" are legal requirements the public has a right to expect will be carried out and enforced.
- NRC inspectors discovered boric-acid buildup on the Unit 3 reactor vessel head worse than what was reported by Dominion.
- Dominion violated its Technical Specifications when an electrical system failure required it to stop reactivity additions to the Unit 3 nuclear reactor; contrarily, operators increased reactivity and heat buildup.
- The emergency building filtration system at Unit 2 was allowed to degrade.
- A thermal performance test of a vital system at Unit 3 was terminated prior to completion.
- Inspectors discovered that modifications to Unit 2's charging system were not supported by calculations or test data.
- Dominion's failure to properly employ engineering controls led to serious radiation exposures to two workers who handled contaminated air filters at Unit 2 on September 29.
- Unit 2 suffered "excessive leakage" in the radioactive cooling system because of a pump failure.
- The Unit 2 intake structures suffered degrading conditions on November 5, potentially jeopardizing the critical reactor cooling system, due to high winds and high seas.
In their inspection reports of 2004, NRC's inspectors concluded that Dominion has failed to address degraded conditions at Millstone. NRC inspectors gave these examples:
- 1. Operators did not recognize the significance of several steam generator code "safeties" that had lifted subsequent to reactor trips at Unit 2;
- 2. Operators did not recognize that a failure of a vital inverter made the electrical train credited, as required by the Technical Specifications, inoperable at Unit 3;
- 3. Operators did not understand the potential significance of air found in the discharge piping of the RHR (residual heat removal) system at Unit 3 and their evaluation was not technically supported;
- 4. Operators did not adequately consider the effects of small oil leaks on high head safety injection pumps at Unit 3;
1Richard Emch - Millstone's Degrading Conditions .Page 31 I Richard Emch Millstone's Degrading Conditions Page 3 ii
- 5. Operators and engineers at Unit 2 determined compensatory cooling measures installed in a direct current switchgear room at Unit 2 would ensure the availability of the switchgear, while existing technical evaluation stated just the opposite.
NRC inspectors concluded that during the year 2004, they "found a lack of rigor by Dominion related to both the understanding of the effects of degraded conditions and the technical bases used to evaluate degraded conditions
... resulting in violations [of Millstone's licensing requirements]."
The blistering NRC inspection reports demonstrate that Dominion is routinely operating Millstone in violation of its legal requirements and endangering the public on a daily basis.
Astonishingly, when the NRC inspectors presented their review of Millstone's 2004 performance history on March 29 at a public meeting, they stated that Dominion's good performance during 2004 warranted reduced NRC inspections.
The NRC's conduct is disturbing, especially in light of the following:
On December 31, 2004, the NRC completed a special inspection of Dominion
's fire protection system. The NRC inspectors randomly chose six areas to inspect at Unit 2. One was the turbine building. The NRC reported: "No findings of significance were identified."
On January 14, 2005, just two weeks later, a fire broke out in the Unit 2 turbine building. That fire caused an unprecedented all-site evacuation by non-emergency personnel. That fire also disabled Millstone site security: as a result of the January 14 fire, Dominion lost control over its perimeter fence and lost its ability to exclude intruders and keep track of personnel movement within the nuclear plant.
Dominion operated Millstone in the year 2004 as though no one was watching.
When the NRC inspectors announced they will reduce their inspections at Millstone during the next year because of Dominion's "good performance" in 2004, the NRC was really telling Dominion it has carte blanche to disregard its licensing requirements Does the NRC think no one is watching?
Sincerely, Nancy Burton Nancy Burton is a founder of the Connecticut Coalition Against Millstone.
Richard Emch - Millstone's Degrading Conditions Paqe 411 CC: <ajkl @nrc.gov>
c.\temp\GW}00001 .TMP Page Page 11 In 1 c:\temp\GW}OOOQ1 .TMP Mail Envelope Properties (424ADCB4.FCD: 0: 32717)
Subject:
Millstone's Degrading Conditions Creation Date: Wed, Mar 30, 2005 12:06 PM From: <NancyBurtonEsq@aol.com>
Created By: NancyBurtonEsq@aol.com Recipients nrc.gov OWGWPO02.HQGWDO01 RLE (Richard Emch) nrc.gov owf4_po.OWFNDO AJK1 CC (Andrew Kugler)
Post Office Route OWGWPO02.HQGWDO01 nrc.gov owf4.po.OWFNDO nrc.gov Files Size Date & Time MESSAGE 8436 Wednesday, March 30, 2005 12:06 PM TEXT.htm 10319 Mime.822 1 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard