|
---|
Category:E-Mail
MONTHYEARML24213A2602024-07-31031 July 2024 Request for Additional Information LAR to Support Implementation of Framatome Gaia Fuel ML24116A0112024-04-25025 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-13 Regarding Steam Generator Channel Head Drain Modification ML24115A2622024-04-24024 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-14 Regarding Pressurizer and Steam Generator Pressure-Retaining Welds and Full-Penetration Welded Nozzles ML24114A3192024-04-23023 April 2024 Acceptance Review Determination LAR to Extend Inspection Interval for Reactor Coolant Pump Flywheels (TSTF-421) Using the CLIIP ML24113A2502024-04-22022 April 2024 Request for Additional Information (e-mail 4/22/2024) License Renewal Commitment for Aging Management Program of Alloy 600 Components ML24092A1082024-04-0101 April 2024 3R22 RFO ISI Owners Activity Report Extension - NRC Staff Acknowledgement Email (4/1/2024) ML24065A3112024-03-0505 March 2024 Request for Additional Information (Redacted) (03/05/2025 E-mail from R. Guzman to S. Sinha) Framatome Gaia Fuel LOCA LAR ML24058A2322024-02-27027 February 2024 2/27/2024 E-mail from S. Sinha to R. Guzman P-8 Instrument Uncertainty in Support of LAR Framatome Gaia Fuel ML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staff'S Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22320A5752022-11-16016 November 2022 E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel ML22298A2052022-10-25025 October 2022 Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles ML22292A3212022-10-19019 October 2022 Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program ML22297A1802022-10-0707 October 2022 Email Acknowledgement to Dominion Energy Nuclear Decommissioning Trust Fund Disbursement 30 Day Notification for Millstone Power Station Unit 1: Docket No 50-245 ML22278A0932022-10-0505 October 2022 E-mail to File - Summary of September 7, 2022, Meeting with Dominion to Discuss Proposed Supplement to the Spent Fuel Pool Criticality Safety Analysis (EPID L-2022-LRM-0059 ML22272A0332022-09-29029 September 2022 Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration Nozzle ML22252A1772022-09-0909 September 2022 Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22123A0812022-05-0303 May 2022 Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints ML22069A7192022-03-10010 March 2022 E-mail from R. Guzman to S. Sinha - Millstone Unit 3 Steam Generator Outage Conference Call ML22020A4122022-01-11011 January 2022 1/11/2022 State Consultation E-mail, R. Guzman to J. Semancik Millstone Power Station, Unit 3 Planned Issuance of Amendment to Clarify Shutdown Bank TS and Add Alternate Control Rod Position Monitoring Requirements ML21348A7392021-12-14014 December 2021 E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping ML21347A9412021-12-13013 December 2021 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Safety Evaluation for Amendment No. 280 Measurement Uncertainy Recapture Power Uprate ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21297A0072021-10-19019 October 2021 E-mail from R. Guzman to S. Sinha - Acknowledgemnt of Error in SE for Millstone Power Station, Unit 3, Amendment No. 279 Addition of Analytical Methodology to the COLR for LBLOCA ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21200A2562021-07-19019 July 2021 7/19/2021 E-mail Pressurizer Steam Space Line Classification ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code 2024-07-31
[Table view] Category:Environmental Impact Statement
MONTHYEARML0513301372005-04-14014 April 2005 Email from Nancy Burton Millstone Relicensing ML0513301252005-04-0808 April 2005 e-mail from Nancy Burton Connecticut Coalition Against Millstone/Acrs Comments ML0513301192005-03-30030 March 2005 Email from Nancy Burton Cancer Survey - Seabreeze Drive, Waterford ML0513301132005-03-30030 March 2005 Millstone'S Degrading Conditions ML0513300902005-03-30030 March 2005 e-mail to Nancy Burton Millstone'S Degrading Conditions ML0513301072005-03-30030 March 2005 E-mail from Nancy Burton Millstone'S Degrading Conditions ML0513300792005-03-28028 March 2005 Jordan Cove Study ML0513300892005-03-28028 March 2005 e-mail from Nancy Burton Millstone Draft EIS ML0513301002005-03-28028 March 2005 DEP Waiver of Jurisdiction ML0513301032005-03-28028 March 2005 e-mail from Nancy Burton Strontium-90 ML0513300632005-03-28028 March 2005 E-mail to Nancy Burton Comment Period Closed ML0513300752005-03-27027 March 2005 Your Millstone Site Audit Summary ML0513300922005-03-21021 March 2005 E-mail from Nancy Burton Millstone - Notice of Intent to Sue ML0513300822005-03-16016 March 2005 e-mail from Nancy Burton Millstone SEIS - Ccam Written Comments ML0513300502005-03-15015 March 2005 E-mail from Richard Emch to Nancy Burton Regarding Millstone SEIS Reference ML0513300882005-03-14014 March 2005 E-mail from Nancy Burton Regarding Millstone Draft Environmental Impact Statement Comments ML0513300952005-03-13013 March 2005 E-mail from Nancy Burton Millstone SEIS Reference ML0513300972005-03-12012 March 2005 E-mail from Nancy Burton Boy'S Cancer Blamed on Millstone (Hartford Courant) ML0513301102005-03-11011 March 2005 E-mail from Nancy Burton Do Heed This Message and Circulate Widely within the NRC ML0513301182005-03-11011 March 2005 E-mail from Nancy Burton Boy'S Cancer Blamed on Millstone (Hartford Courant) ML0513301152005-03-11011 March 2005 E-mail from Nancy Burton Group: Plant Pollution May Have Sickened Boy (Norwich CT Bulletin) ML0513301322005-03-0909 March 2005 e-mail from Nancy Burton Millstone Draft Environmental Impact Statement ML0513301262005-03-0909 March 2005 E-mail from Nancy Burton You Are All Invited ML0513301432005-03-0909 March 2005 E-mail to Nancy Burton Millstone Draft Environmental Impact Statement ML0513300802005-03-0101 March 2005 e-mail to Nancy Burton Millstone Draft Environmental Impact Statement ML0513301352005-02-28028 February 2005 E-mail from Nancy Burton Millstone - Please Forward to Commissioners ML0513301382005-02-24024 February 2005 E-mail from Nancy Burton Millstone Draft EIS Comments ML0513300832005-02-24024 February 2005 e-mail to Nancy Burton Millstone Draft EIS Comments ML0513301412005-02-24024 February 2005 E-mail from Nancy Burton Millstone Draft EIS Comments ML0513303492005-02-24024 February 2005 Draft Environmental Impact Statement ML0513300772005-02-23023 February 2005 E-mail from Richard Emch to Nancy Burton Regarding Millstone Draft EIS - Correction ML0513303522005-02-21021 February 2005 E-mail from Nancy Burton ;Millstone Draft Environmental Impact Statement ML0513302862005-02-18018 February 2005 E-mail from Nancy Burton Millstone 1/11/05 Transcript ML0513300342005-02-18018 February 2005 01/11/05 Transcript ML0513302902005-02-15015 February 2005 E-mail from Nancy Burton Re Millstone Draft EIS ML0513302932005-02-10010 February 2005 E-Mail from Nancy Burton Re Millstone Draft EIS Inquiry ML0513302972005-02-10010 February 2005 E-Mail from Nancy Burton Re Millstone Draft EIS ML0513302852005-02-0808 February 2005 E-mail from Nancy Burton Millstone Draft Environmental Impact Statement ML0513302922005-02-0404 February 2005 E-mail from Nancy Burton Millstone EIS ML0513302962005-02-0202 February 2005 E-mail from Nancy Burton Re Millstone Draft EIS ML0513302982005-01-31031 January 2005 E-Mail from Nancy Burton Re Millstone Draft EIS ML0513303002005-01-23023 January 2005 E-Mail from Nancy Burton Re Millstone Draft Environmental Impact Statement ML0513303012005-01-11011 January 2005 RAIs ML0424005432004-08-27027 August 2004 Issuance of Environmental Scoping Summary Report Associated with Staff'S Review of Applications by Dominion Nuclear Connecticut, Inc. for Renewal of Operating Licenses for Millstone Power Station, Units 2 and 3 ML0336000692003-12-11011 December 2003 Excerpt from Final EIS, Chapter 2, 2.3.1.3 High-Level Radioactive Waste. 2005-04-08
[Table view] |
Text
Richard Emch - Re: Millstone 1/1 1/05 Transcipt Page From: Richard Emch To: NancyBurtonEsq~aol.com Date: 2/18/05 4:20PM
Subject:
Re: Millstone 1/11/05 Transcript Ms. Burton:
The corrected transcripts of the afternoon and evening sessions of the public meeting conducted on January 11, 2005, at the Waterford Town Hall regarding the draft Supplemental Environmental Impact Statement (SEIS) for Millstone license renewal are attached. We refer to them as corrected transcripts because we have read them and corrected them to say what was actually said at the meeting. For example, the transcripts said "affluence" instead of 'effluents" before we corrected them.
We are also sending you hard copies of all the attachments to the transcripts (documents that Gail Merrill and others handed to Chip Cameron to be made part of the transcripts) via FedEx. You should have them tomorrow or Monday. The transcripts and the attachments will be available in the PDR within the next few days.
In addition, I will be responding to your email request for information regarding radiation exposure issues dated February 10, 2005, within the next few days. Almost all of the information I will give you is already in the draft SEIS or in the PDR.
Our input to the response to your FOIA request dated January 23, 2005, was provided to our FOIA coordinator a few days ago. Hopefully, you receive the response soon. Almost all of the information in the response is already in the draft SEIS or in the PDR, but the response will probably make it easier for you find and access the information.
These actions should be helpful to you in the preparation of your comments on the draft SEIS. We do not plan to extend the comment period; however, as we said at the meeting, we will include and consider any comments received after March 2, 2005, to the extent that it is practicable to do so. In the past we have found it practicable to accept comments that were a few pages long up to a week or so after the due date.
Since I would not be surprised to receive extensive comments from you based on the level of interest you have already demonstrated, I want to encourage you to provide as many of your comments as possible by March 2. I would expect that the videotape you made of the meeting would help in that regard.
Rich Emch
>>> <NancyBurtonEsq@aol.com> 02/18/05 02:07PM >>>
Dear Mr. Emch:
The Connecticut Coalition Against Millstone intends to be guided in part by the transcript of the January 11, 2005 public meeting convened by the NRC in Waterford, Connecticut, on the draft EIS as it prepares its formal written comments due on or before March 2, 2005.
Unfortunately, the transcript has not yet been made available.
This is, therefore, a request that an additional 30-day comment period be allowed for formal written public comment, with the extension to commence on the date the transcript is posted on the NRC website.
Thank you for your assistance.
Sincerely, Nancy Burton Connecticut Coalition Against Millstone CC: Andrew Kugler; Ann Hodgdon; Francis Cameron; Natalie Brown; Virginia Tharpe
c:\temP\GW)00001.TMP Page Page 11 1 c:\temp\GW]OQOO1 .TMP Mail Envelope Properties (42165C23.2F9: 13: 35320)
Subject:
Re: Millstone 1/11/05 Transcript Creation Date: 2/18/05 4:20PM From: Richard Emch Created By: RLE@nrc.gov Recipients Action Date & Time aol.com Transferred 02/18/05 04:21PM NancyBurtonEsq (NancyBurtonEsq@aol.com) nrc.gov owf4_po.OWFNDO Delivered 02/18/05 04:20PM AJK1 CC (Andrew Kugler) Opened 02/23/05 09:44AM VLT CC (Virginia Tharpe) Opened 02/22/05 08:07AM nrc.gov owfSpo.OWFN-DO Delivered 02/18/05 04:20PM APH CC (Ann Hodgdon) Opened 02/18/05 04:45PM FXC CC (Francis Cameron) Opened 02/22/05 09:OOAM nrc.gov twf2_po.TWFNDO Delivered 02/18/05 04:20PM NOB CC (Natalie Brown) Opened 03/01/05 07:03AM Post Office Delivered Route aol.com owf4-po.0WFNDO 02/18/05 04:20PM nrc.gov owf5-po.OWFNDO 02/18/05 04:20PM nrc.gov twf2_po.TWFN_DO 02/18/05 04:20PM nrc.gov Files Size Date & Time MESSAGE 4229 02/18/05 04:20PM (CORRECTED) Millstone DSEIS Meeting Evening Transcript.wpd 299711 02/17/05 10:48AM (CORRECTED)Millstone DSEIS Meeting Afternoon Transcript.wpd 419680 02/17/05 11:32AM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard Reply Requested: No
c:\temD\GWlOOO0l1.TMP Paae 2 U
--- 3 Return Notification: None Concealed
Subject:
No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened