Category:E-Mail
MONTHYEARML24213A2602024-07-31031 July 2024 Request for Additional Information LAR to Support Implementation of Framatome Gaia Fuel ML24116A0112024-04-25025 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-13 Regarding Steam Generator Channel Head Drain Modification ML24115A2622024-04-24024 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-14 Regarding Pressurizer and Steam Generator Pressure-Retaining Welds and Full-Penetration Welded Nozzles ML24114A3192024-04-23023 April 2024 Acceptance Review Determination LAR to Extend Inspection Interval for Reactor Coolant Pump Flywheels (TSTF-421) Using the CLIIP ML24113A2502024-04-22022 April 2024 Request for Additional Information (e-mail 4/22/2024) License Renewal Commitment for Aging Management Program of Alloy 600 Components ML24092A1082024-04-0101 April 2024 3R22 RFO ISI Owners Activity Report Extension - NRC Staff Acknowledgement Email (4/1/2024) ML24065A3112024-03-0505 March 2024 Request for Additional Information (Redacted) (03/05/2025 E-mail from R. Guzman to S. Sinha) Framatome Gaia Fuel LOCA LAR ML24058A2322024-02-27027 February 2024 2/27/2024 E-mail from S. Sinha to R. Guzman P-8 Instrument Uncertainty in Support of LAR Framatome Gaia Fuel ML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staffs Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22320A5752022-11-16016 November 2022 E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel ML22298A2052022-10-25025 October 2022 Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles ML22292A3212022-10-19019 October 2022 Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program ML22297A1802022-10-0707 October 2022 Email Acknowledgement to Dominion Energy Nuclear Decommissioning Trust Fund Disbursement 30 Day Notification for Millstone Power Station Unit 1: Docket No 50-245 ML22278A0932022-10-0505 October 2022 E-mail to File - Summary of September 7, 2022, Meeting with Dominion to Discuss Proposed Supplement to the Spent Fuel Pool Criticality Safety Analysis (EPID L-2022-LRM-0059 ML22272A0332022-09-29029 September 2022 Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration Nozzle ML22252A1772022-09-0909 September 2022 Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22123A0812022-05-0303 May 2022 Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints ML22069A7192022-03-10010 March 2022 E-mail from R. Guzman to S. Sinha - Millstone Unit 3 Steam Generator Outage Conference Call ML22020A4122022-01-11011 January 2022 1/11/2022 State Consultation E-mail, R. Guzman to J. Semancik Millstone Power Station, Unit 3 Planned Issuance of Amendment to Clarify Shutdown Bank TS and Add Alternate Control Rod Position Monitoring Requirements ML21348A7392021-12-14014 December 2021 E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping ML21347A9412021-12-13013 December 2021 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Safety Evaluation for Amendment No. 280 Measurement Uncertainy Recapture Power Uprate ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21297A0072021-10-19019 October 2021 E-mail from R. Guzman to S. Sinha - Acknowledgemnt of Error in SE for Millstone Power Station, Unit 3, Amendment No. 279 Addition of Analytical Methodology to the COLR for LBLOCA ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21200A2562021-07-19019 July 2021 7/19/2021 E-mail Pressurizer Steam Space Line Classification ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code 2024-07-31
[Table view] Category:Environmental Impact Statement
MONTHYEARML0513301372005-04-14014 April 2005 Email from Nancy Burton Millstone Relicensing ML0513301252005-04-0808 April 2005 e-mail from Nancy Burton Connecticut Coalition Against Millstone/Acrs Comments ML0513301192005-03-30030 March 2005 Email from Nancy Burton Cancer Survey - Seabreeze Drive, Waterford ML0513301132005-03-30030 March 2005 Millstone'S Degrading Conditions ML0513300902005-03-30030 March 2005 e-mail to Nancy Burton Millstone'S Degrading Conditions ML0513301072005-03-30030 March 2005 E-mail from Nancy Burton Millstone'S Degrading Conditions ML0513300792005-03-28028 March 2005 Jordan Cove Study ML0513300892005-03-28028 March 2005 e-mail from Nancy Burton Millstone Draft EIS ML0513301002005-03-28028 March 2005 DEP Waiver of Jurisdiction ML0513301032005-03-28028 March 2005 e-mail from Nancy Burton Strontium-90 ML0513300632005-03-28028 March 2005 E-mail to Nancy Burton Comment Period Closed ML0513300752005-03-27027 March 2005 Your Millstone Site Audit Summary ML0513300922005-03-21021 March 2005 E-mail from Nancy Burton Millstone - Notice of Intent to Sue ML0513300822005-03-16016 March 2005 e-mail from Nancy Burton Millstone SEIS - Ccam Written Comments ML0513300502005-03-15015 March 2005 E-mail from Richard Emch to Nancy Burton Regarding Millstone SEIS Reference ML0513300882005-03-14014 March 2005 E-mail from Nancy Burton Regarding Millstone Draft Environmental Impact Statement Comments ML0513300952005-03-13013 March 2005 E-mail from Nancy Burton Millstone SEIS Reference ML0513300972005-03-12012 March 2005 E-mail from Nancy Burton Boy'S Cancer Blamed on Millstone (Hartford Courant) ML0513301102005-03-11011 March 2005 E-mail from Nancy Burton Do Heed This Message and Circulate Widely within the NRC ML0513301182005-03-11011 March 2005 E-mail from Nancy Burton Boy'S Cancer Blamed on Millstone (Hartford Courant) ML0513301152005-03-11011 March 2005 E-mail from Nancy Burton Group: Plant Pollution May Have Sickened Boy (Norwich CT Bulletin) ML0513301322005-03-0909 March 2005 e-mail from Nancy Burton Millstone Draft Environmental Impact Statement ML0513301262005-03-0909 March 2005 E-mail from Nancy Burton You Are All Invited ML0513301432005-03-0909 March 2005 E-mail to Nancy Burton Millstone Draft Environmental Impact Statement ML0513300802005-03-0101 March 2005 e-mail to Nancy Burton Millstone Draft Environmental Impact Statement ML0513301352005-02-28028 February 2005 E-mail from Nancy Burton Millstone - Please Forward to Commissioners ML0513301382005-02-24024 February 2005 E-mail from Nancy Burton Millstone Draft EIS Comments ML0513300832005-02-24024 February 2005 e-mail to Nancy Burton Millstone Draft EIS Comments ML0513301412005-02-24024 February 2005 E-mail from Nancy Burton Millstone Draft EIS Comments ML0513303492005-02-24024 February 2005 Draft Environmental Impact Statement ML0513300772005-02-23023 February 2005 E-mail from Richard Emch to Nancy Burton Regarding Millstone Draft EIS - Correction ML0513303522005-02-21021 February 2005 E-mail from Nancy Burton ;Millstone Draft Environmental Impact Statement ML0513302862005-02-18018 February 2005 E-mail from Nancy Burton Millstone 1/11/05 Transcript ML0513300342005-02-18018 February 2005 01/11/05 Transcript ML0513302902005-02-15015 February 2005 E-mail from Nancy Burton Re Millstone Draft EIS ML0513302932005-02-10010 February 2005 E-Mail from Nancy Burton Re Millstone Draft EIS Inquiry ML0513302972005-02-10010 February 2005 E-Mail from Nancy Burton Re Millstone Draft EIS ML0513302852005-02-0808 February 2005 E-mail from Nancy Burton Millstone Draft Environmental Impact Statement ML0513302922005-02-0404 February 2005 E-mail from Nancy Burton Millstone EIS ML0513302962005-02-0202 February 2005 E-mail from Nancy Burton Re Millstone Draft EIS ML0513302982005-01-31031 January 2005 E-Mail from Nancy Burton Re Millstone Draft EIS ML0513303002005-01-23023 January 2005 E-Mail from Nancy Burton Re Millstone Draft Environmental Impact Statement ML0513303012005-01-11011 January 2005 RAIs ML0424005432004-08-27027 August 2004 Issuance of Environmental Scoping Summary Report Associated with Staff'S Review of Applications by Dominion Nuclear Connecticut, Inc. for Renewal of Operating Licenses for Millstone Power Station, Units 2 and 3 ML0336000692003-12-11011 December 2003 Excerpt from Final EIS, Chapter 2, 2.3.1.3 High-Level Radioactive Waste. 2005-04-08
[Table view] Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 ML24289A0152024-10-21021 October 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report 05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24176A1782024-06-20020 June 2024 Update to the Final Safety Analysis Report ML24176A2622024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) 05000336/LER-2024-001, Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications2024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report 05000423/LER-2023-006-01, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 05000423/LER-2023-006, Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24103A0202024-04-22022 April 2024 Summary of Regulatory Audit in Support of License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24106A2032024-04-15015 April 2024 2023 Annual Environmental Operating Report ML24088A3302024-04-0404 April 2024 Regulatory Audit Plan in Support of License Amendment Request to Implement Framatome Gaia Fuel ML24093A2162024-04-0101 April 2024 Response to Request for Additional Information Regarding License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits 2024-09-04
[Table view] |
Text
Richard Emch - Millstone - Please forward to Commissioners Page 1.
From: <NancyBurtonEsq @aol.com>
To: <secy~nrc.gov>
Date: Mon, Feb 28, 2005 7:26 AM
Subject:
Millstone - Please forward to Commissioners
Dear Mr. Secretary:
Please forward the attached communication to the NRC Commissioners.
Thank you for your assistance.
Nancy Burton
Pag 1 Page 1..1 .
1,c:\temp\GW)00001.TMP c:trpGIOO .TM Mail Envelope Properties (4223199A.218: 5: 37400)
Subject:
Fwd: Millstone - Please forward to Commissioners - FYI Creation Date: Mon, Feb 28, 2005 8:15 AM From: <NancyBurtonEsq@aol.com>
Created By: NancyBurtonEsq@aol.com Recipients nrc.gov owf4_po.OWFNDO AJK1 (Andrew Kugler) nrc.gov OWGWP002.HQGWDOOI RLE CC (Richard Emch)
Post Office Route owf4-po.OWFNDO nrc.gov OWGWP002.HQGWDOO1 nrc.gov Files Size Date & Time MESSAGE 2 Monday, February 28, 2005 8:15 AM TEXT.htm 441 Mail Mime.822 1 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard
,Richard Emch - MillstoneEISCCAMExtentionCommissioners22805.doc Page 1 11 Richard Ernch MillstoneElSCCAMExtentionCommissioners22805.doc Page 1 il CONNECTICUT COALITION AGAINST MILLSTONE www.mothballmillstone.orc February 28, 2005 Hon. Nils J. Diaz, Chairman Hon. Edward McGaffigan, Jr.
Hon. Jeffrey S. Merrifield Hon. Gregory B. Jaczko Hon. Peter B. Lyons Commissioners U.S. Regulatory Commission Washington DC 20005-0001 Re: Millstone Draft Supplemental Environmental Impact Statement
Dear Commissioners:
I write on behalf of the Connecticut Coalition Against Millstone to request that you grant a 30-day extension of time for submission of public written comments on the NRC's draft Supplemental Environmental Impact Statement ("SEIS')
prepared in support of Millstone relicensing. The present deadline set by the NRC is March 2, 2005. We request that the public comment period be extended for 30 days from the date either of the following events occurs, whichever is later:
(1) The Coalition receives a substantive response to its January 24, 2005 query to Richard L. Emch, Jr. (see copy below) or (2) The NRC posts on its official website the official transcript of the January 11, 2005 meeting conducted by the NRC in Waterford, Connecticut, on the draft SEIS and makes the "uncorrected" transcript publicly available.
Please be advised that the Coalition communicated a similar request to Andrew J. Kugler, Chief of the Environmental Review Section of the NRC's Office of Nuclear Reactor Regulation on February 21, 2005. To date, Mr. Kugler has communicated only the fact that he was on the West Coast when he received the emailed letter and that he would eventually respond to the request.
As the March 2, 2005 deadline is imminent, and as we have not received a further reply from Mr. Kugler as to our request for an extension of time, we submit our request to you directly.
Thank you for your prompt attention to this communication.
Sincerely, Nancy Burton Please respond to: nancvburtonesn@aol.com Mailing address: 147 Cross Highway, Redding Ridge CT 06876
1Richard Emch - MillstoneEISCCAMExtentionCommissioners22805.doc Page 2 11 Richard Emch MillstoneElSCCAMExtentionCommissioners228O5.doc Page 2 II CONNECTICUT COALITION AGAINST MILLSTONE www.mothballmillstone.org February 21, 2005 Andrew J. Kugler Chief Environmental Review Section Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington DC 20005-1110 Re: Millstone Draft Environmental Impact Statement
Dear Mr. Kugler:
As Chief of the Environmental Review Section at the U.S. Nuclear Regulatory Commission, you are responsible for the environmental review for the application by Dominion Nuclear Connecticut, Inc. to extend the operating license of the Millstone Nuclear Power Plant an additional 20-year term, including preparation of the Environmental Impact Statement.
The Connecticut Coalition Against Millstone has actively participated in the Millstone relicensing proceedings. Coalition members attended and spoke at the January 11, 2005 public meeting which you conducted in Waterford to accept public comments on the draft Environmental Impact Statement which your office prepared in support of Millstone relicensing. At the outset of the meeting, the NRC's meeting facilitator established a limit of 5 minutes per person in making public comments. All were invited to submit more detailed written comments on or before March 2, 2005 in order to have their comments considered by you and your staff prior to issuance of the final Environmental Impact Statement.
The Coalition is gathering information to submit to you and your staff challenging many of the assumptions and conclusions appearing in the draft Environmental Impact Statement.
During the January 11, 2005 meeting, not one public official representing the people of the State of Connecticut appeared to comment on the draft Environmental Impact Statement, other than two representatives of the Town of Waterford, who spoke in favor of relicensing without addressing in any way the environmental consequences of relicensing for an additional 20-year term.
(Melodie Peters, a former state senator who joined the Dominion payroll to advocate in favor of relicensing while serving as co-chairman of the legislature's Energy and Technology Committee, also spoke in favor of relicensing although she did not acknowledge her paid status nor did she address the environmental
Richard Emch - MillstoneEISCCAMExtentionCommissioners228Q5.doc Page 3 consequences of relicensing.)
Therefore, we believe the Coalition is performing a critical role and a public service in the Millstone relicensing proceedings by endeavoring to provide substantive comments and documentation to assist the NRC in making appropriate corrections to the draft Environmental Impact Statement.
Unfortunately, the Coalition has been impeded in its efforts by your own staff and others within the NRC in the following ways:
(1) The Coalition submitted a request for further information to Richard L.
Emch, Senior Environmental Project Manager, on January 24, 2005. A copy is attached hereto. To date, the Coalition has received no substantive response to the request. Indeed, the Coalition understands that the NRC itself is withholding the documents responsive to the request. (Please refer to Mr. Emch's email of February 18, 2005, a copy of which is attached hereto.)
(2) The Coalition submitted a request for further information to Mr. Ench on February 10, 2005. A copy is attached hereto. To date, Mr. Emch has neglected to even acknowledge receipt of the request nor respond to it in any way.
(3) The NRC has withheld the transcript of the January 11, 2005 Waterford meeting from the public. It was only after the Coalition protested to Mr. Emch on February 18, 2005 that the transcript was suddenly made available to it, although as of February 21, 2005 it is still not posted to the NRC's website and thus is not available to the public. We would like to know for what period of time the NRC withheld the transcript from public disclosure after it was received. We also request the opportunity to review the "uncorrected" transcript to be sure that all "corrections" subsequently made were warranted.
In light of these facts and circumstances, we believe that the NRC itself is actively thwarting its legal responsibility to provide a meaningful opportunity for public comment on the draft Environmental Impact Statetment. Clearly, if prejudice has resulted, it has been prejudice to the public interest.
This therefore is a request that you extend the comment period on the draft Environmental Impact Statement for a period of 30 days, such period to commence upon the Coalition's receipt of the pertinent information requested of Mr. Emch in its January 24, 2005 and February 24, 2005 communications.
Thank you for your assistance.
Very truly yours, Nancy Burton cc: Hon. Joe Lieberman
Richard Emch - MillstoneEISCCAMExtentionCommnissioners22805.doc Page Pacie l 412 411 Richard Emch MillstoneElSCCAMExtentionCommissioners228O5.doc
.. . , , , . , ,E Hon. Chris Dodd Hon. Rob Simmons Commissioners, U.S. Nuclear Regulatory Commission CONNECTICUT COALITION AGAINST MILLSTONE P.O. Box Niantic CT 06357 www.mothballmillstone.orp
.. I Richard Emch - MillstoneEISCCAMExtentionCommissioners22805.doc : Page.51!
51 Richard Emch MillstoneElSCCAMExtentionCommissioners22805.doc Page January 24, 2005 Richard L. Emch, Jr.
Senior Environmental Project Manager U.S. Nuclear Regulatory Commission Washington DC 20044 Re: Millstone Nuclear Power Station/Environmental Impact Statement
Dear Mr. Emch:
This is a request for information pertaining to the Millstone license renewal application submitted pursuant to the provisions of the Freedom of Information Act. The information is urgently needed for review by the Connecticut Coalition Against Millstone for timely submission of comments on or before March 2, 2005.
Please provide the following:
(1) All Requests for Additional Information submitted by the NRC to the licensee and all reports, documents, emails and other correspondence generated and received therefrom.
(2) Please identify the names of all officials of the State of Connecticut whose input was received for the draft Environmental Impact Statement (DEIS) and please provide all correspondence between the NRC and such officials and all documents provided by such officials.
(3) Please identify the names of all individuals and their professional, business or governmental affiliations who provided input to the DEIS and please identify the specific contribution of each.
(4) Please identify all consulting contracts entered into with consultants on the DEIS, provide a copy of such contracts and the cost of each such service.
(5) Please identify with specificity what "other available information" was considered which led the staff to conclude "that there are no impacts of radiation exposures to the public during the renewal term beyond those discussed in the GEIS" and "that there are no impacts of occupational radiation exposures during the renewal term beyond those discussed in the GEIS." (DEIS at 4.3) Please further identify all sources considered.
(6) Please identify all refurbishment identified by the licensee other than "major" refurbishment and identify the methodology used by the NRC staff to evaluate this issue and whether the licensee's characterization of refurbishment issues as not "major" was accurate. (DEIS Section 3.0)
Please send all correspondence responsive to this request to 147 Cross Highway, Redding Ridge, Connecticut 06876, Tel. 203-938-3952.
Sincerely,
Richard Emch - MilistoneEISCCAMExtentionCommissioners22805.doc Page' 614 Richard Emch- MillstoneElSCCAMExtentionCommissioners228O5.doc Page 6I Nancy Burton CONNECTICUT COALITION AGAINST MILLSTONE www.mothballmillstone.org
Richard Emch - MillstoneEISCCAMExtentionCommissioners22805.doc Page 7t February 10, 2005 Richard L. Emch, Jr.
Senior Environmental Project Manager U.S. Nuclear Regulatory Commission Washington DC20555-0001 Re: Millstone Nuclear Power Station Relicensing
Dear Mr. Emch:
Your and your staff have invited public comment on the draft Environmental Impact Statement. You have set a deadline of March 2, 2005 for written comments.
The Connecticut Coalition Against Millstone is preparing its written comments and requests your further assistance in this regard.
Please identify the following:
(1) NRC documents, with titles, authors and dates, of all studies of health effects of exposure to radionuclides and chemicals present at Millstone upon persons who have worked at Millstone, either as employees or contractors or in any other capacity, since 1970.
(2) NRC documents, with titles, authors and dates of all studies of health effects observed, catalogued or studied in any way in the population of individuals identified in section (1) above after they have left service at Millstone and until their deaths.
(3) NRC documents, with titles, authors and dates of all studies of health effects of exposure to radionuclides and chemicals present at Millstone on persons who have worked at Millstone, either as employees or contractors or in any other capacity, since 1970, based on postmortem evaluation.
(4) NRC documents, with titles, authors and dates of all studies of health effects of exposure to radionuclides and chemicals, present at Millstone as well as discharged from Millstone, upon members of the public.
(5) Please provide citations to the statutes, regulations and other legal requirements which identify what information a nuclear licensee such as the Millstone Nuclear Power Station is required to provide to the NRC with regard to the following:
(a) Reporting data of worker exposure to radiation; (b) Reporting data of health effects of worker exposure to radiation and
Page Richard Emnch - MillstoneEISCCAMExtentionCommissioners22805.do-c Richard Emch MillstoneElSCCAMExtentionCommissioners22805.doc Page 8 81111 chemicals during their terms of employment or assignment; (c) Reporting data of health effects of worker exposure to radiation and chemicals, both among employees and contract workers, following their departure from the licensee; (d) Reporting data of cancer incidences among present and former workers; (e) Reporting data of cause of death among former workers.
(6) Please identify by title and date all information provided to the NRC by the owners and operators of the Millstone Nuclear Power Station since 1970 responsive to item (5) above.
(7)Please provide the titles of all records reviewed by you and your staff with regard to the draft EIS of the phenomenon of the incidences of brain tumors among workers in the former "site maintenance" department at Millstone c. 1994 as well as the incidence of cancer and other diseases among contract workers fulfilling the job requirements of the former "site maintenance" department after the "site maintenance" department was eliminated c. 1994 (8)Please provide the titles of all records reviewed by you and your staff with regard to the draft EIS of the phenomenon of the incidences of cancer and disease among persons who have worked as pipefitters at Millstone.
(9) Please provide the titles and dates of all records reviewed by you and your staff with regard to the draft EIS of the phenomenon of the incidences of cancer and disease among non-workers within 5-mile, 10-mile and 50-mile radii of the Millstone Nuclear Power Station.
(10) Please provide the dates and titles of all documents reviewed by you and your staff regarding radiological and chemical effluents discharged by the Millstone Nuclear Power Station since 1970.
(II) Please provide a list of the chemicals used and discharged at Millstone since 1970,as reviewed by yourself and your staff, and please provide the analysis applied in the draft EIS of how the environment would be affected if the Millstone Nuclear Power Station were to convert from an open to a closed cooling system, particularly as to how such conversion would reduce or eliminate the need for use and discharge of toxic chemicals to the environment.
(12) At pages 4 4-56 of the draft EIS, the following statements appear:
"CTDEP [Connecticut Department of Environmental Protection]
conducts its own radiological environmental monitoring program around Millstone.... CTDEP concluded that Millstone's radiological effluent and environmental monitoring data were accurate."
Richard Emch - MillstoneEISCCAMExtentionCommissioners22805.doc Page 99I pj Richard Emch MillstoneElSCCAMExtentionCommissioners228O5.doc Page With regard to such statements, please identify the names of all CTDEP individuals who provided such statements to you and your staff, the date(s) such statements were made, whether such statements were in writing or verbal (if in writing please provide a copy), and the dates, times, methods of analysis and monitoring referred to and the results of such monitoring as provided to you and your staff.
(13) Please identify and explain the methodology you and your staff applied in reconciling the CTDEP statements (see (12) above) with Northeast Nuclear Energy's Company's plea of guilty to committing environmental felonies during a period of time (c. 1990s) while CTDEP conducted onsite monitoring of Millstone effluent releases.
(14) At page 4-56 of the draft EIS, the following statement appears: -
"CTDEP also concluded that the reports cited above by CTDPH, CASE and the National Cancer Institute reports showed no evidence of a causal link between public exposure to Millstone's radiological effluents and cancer in Connecticut towns."
With regard to such statements, please identify the names of all CTDEP individuals who provided such statements to you and your staff, the date(s) such statements were made, and whether such statements were in writing or verbal (if in writing please provide a copy).
Further with regard to such statements, please state whether you and your staff requested such CTDEP personnel to review other documents asserting such a causal link as submitted to the NRC by the Connecticut Coalition Against Millstone, including affidavits of Dr. Ernest Sternglass, Joseph Mangano, Michael Steinberg and Cynthia Besade and, if not, please explain.
With regard to the above inquiries, when the term "staff" is employed, it is intended to encompass both NRC personnel and consultants engaged by the NRC with respect to the draft EIS.
Your prompt, complete and forthright response to this letter will help enable the Coalition to provide meaningful comments in this National Environmental Protection Act process.
Sincerely, Nancy Burton Please reply to:
Nancy Burton
Richard Emch - MillstoneEISCCAMExtentionCommissioners22805.doc : Page 10911 Richard Emch MillstoneElSCCAMExtentionCommissioners228O5.doc
- Page iQj 147 Cross Highway Redding Ridge CT 06876 Tel. 203-938-3952 Ms. Burton:
The corrected transcripts of the afternoon and evening sessions of the public meeting conducted on January 11, 2005, at the Waterford Town Hall regarding the draft Supplemental Environmental Impact Statement (SEIS) for Millstone
Richard Emch - MilistoneEISCCAMExtentionCommissioners22805.doc Page 11i license renewal are attached. We refer to them as corrected transcripts because we have read them and corrected them to say what was actually said at the meeting. For example, the transcripts said "affluence" instead of "effluents" before we corrected them.
We are also sending you hard copies of all the attachments to the transcripts (documents that Gail Merrill and others handed to Chip Cameron to be made part of the transcripts) via FedEx. You should have them tomorrow or Monday.
The transcripts and the attachments will be available in the PDR within the next few days.
In addition, I will be responding to your email request for information regarding radiation exposure issues dated February 10, 2005, within the next few days.
Almost all of the information I will give you is already in the draft SEIS or in the PDR.
Our input to the response to your FOIA request dated January 23, 2005, was provided to our FOIA coordinator a few days ago. Hopefully, you receive the response soon. Almost all of the information in the response is already in the draft SEIS or in the PDR, but the response will probably make it easier for you find and access the information.
These actions should be helpful to you in the preparation of your comments on the draft SEIS. We do not plan to extend the comment period; however, as we said at the meeting, we will include and consider any comments received after March 2, 2005, to the extent that it is practicable to do so. In the past we have found it practicable to accept comments that were a few pages long up to a week or so after the due date. Since I would not be surprised to receive extensive comments from you based on the level of interest you have already demonstrated, I want to encourage you to provide as many of your comments as possible by March 2. I would expect that the videotape you made of the meeting would help in that regard.
Rich Emch