(One intermediate revision by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML071290362 | | | number = ML071290362 |
| | issue date = 05/17/2007 | | | issue date = 05/17/2007 |
| | title = 02/22/2007 Summary of Category 1 Meeting with Nrg Energy Inc., Regarding an Intended Future Application for a Combined License for Two Units at the South Texas Project Site | | | title = Summary of Category 1 Meeting with Nrg Energy Inc., Regarding an Intended Future Application for a Combined License for Two Units at the South Texas Project Site |
| | author name = Wunder G | | | author name = Wunder G |
| | author affiliation = NRC/NRO/DNRL/EPB1 | | | author affiliation = NRC/NRO/DNRL/EPB1 |
Line 22: |
Line 22: |
| REGARDING AN INTENDED FUTURE APPLICATION FOR A COMBINED LICENSE FOR TWO UNITS AT THE SOUTH TEXAS PROJECT SITE On February 22, 2007, the staff met with representatives of NRG Energy, Inc. (NRG) and the South Texas Project Nuclear Operating Company (STPNOC) to continue discussing NRCs and STPNOCs (the applicants) plans to apply for a combined license (COL) for the construction and operation of two Advanced Boiling Water Reactors (ABWRs) at the South Texas Project site, southwest of Houston, Texas. The applicants refer to these future units as STP Units 3 and 4. The meeting covered aspects of the proposed security plan so a detailed summary will not be provided. A list of those in attendance is provided as Enclosure 1. | | REGARDING AN INTENDED FUTURE APPLICATION FOR A COMBINED LICENSE FOR TWO UNITS AT THE SOUTH TEXAS PROJECT SITE On February 22, 2007, the staff met with representatives of NRG Energy, Inc. (NRG) and the South Texas Project Nuclear Operating Company (STPNOC) to continue discussing NRCs and STPNOCs (the applicants) plans to apply for a combined license (COL) for the construction and operation of two Advanced Boiling Water Reactors (ABWRs) at the South Texas Project site, southwest of Houston, Texas. The applicants refer to these future units as STP Units 3 and 4. The meeting covered aspects of the proposed security plan so a detailed summary will not be provided. A list of those in attendance is provided as Enclosure 1. |
| The applicants presentation slides, which are not sensitive, are included as Enclosure 2. | | The applicants presentation slides, which are not sensitive, are included as Enclosure 2. |
| These slides can be accessed through the Agencywide Documents Access and Management System (ADAMS). This system provides text and image files of NRCs public documents. The handouts mentioned above may be accessed through the ADAMS system under Accession No. | | These slides can be accessed through the Agencywide Documents Access and Management System (ADAMS). This system provides text and image files of NRCs public documents. The handouts mentioned above may be accessed through the ADAMS system under Accession No. ML071290343. If you do not have access to ADAMS or if there are problems in accessing the handouts located in ADAMS, contact the NRC Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737 or by e-mail to pdr@nrc.gov. |
| ML071290343. If you do not have access to ADAMS or if there are problems in accessing the handouts located in ADAMS, contact the NRC Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737 or by e-mail to pdr@nrc.gov. | |
| Sincerely, | | Sincerely, |
| /RA/ | | /RA/ |
Line 38: |
Line 37: |
| REGARDING AN INTENDED FUTURE APPLICATION FOR A COMBINED LICENSE FOR T--WO UNITS AT THE SOUTH TEXAS PROJECT SITE On February 22, 2007, the staff met with representatives of NRG Energy, Inc. (NRG) and the South Texas Project Nuclear Operating Company (STPNOC) to continue discussing NRCs and STPNOCs (the applicants) plans to apply for a combined license (COL) for the construction and operation of two Advanced Boiling Water Reactors (ABWRs) at the South Texas Project site, southwest of Houston, Texas. The applicants refer to these future units as STP Units 3 and 4. The meeting covered aspects of the proposed security plan so a detailed summary will not be provided. A list of those in attendance is provided as Enclosure 1. | | REGARDING AN INTENDED FUTURE APPLICATION FOR A COMBINED LICENSE FOR T--WO UNITS AT THE SOUTH TEXAS PROJECT SITE On February 22, 2007, the staff met with representatives of NRG Energy, Inc. (NRG) and the South Texas Project Nuclear Operating Company (STPNOC) to continue discussing NRCs and STPNOCs (the applicants) plans to apply for a combined license (COL) for the construction and operation of two Advanced Boiling Water Reactors (ABWRs) at the South Texas Project site, southwest of Houston, Texas. The applicants refer to these future units as STP Units 3 and 4. The meeting covered aspects of the proposed security plan so a detailed summary will not be provided. A list of those in attendance is provided as Enclosure 1. |
| The applicants presentation slides, which are not sensitive, are included as Enclosure 2. | | The applicants presentation slides, which are not sensitive, are included as Enclosure 2. |
| These slides can be accessed through the Agencywide Documents Access and Management System (ADAMS). This system provides text and image files of NRCs public documents. The handouts mentioned above may be accessed through the ADAMS system under Accession No. | | These slides can be accessed through the Agencywide Documents Access and Management System (ADAMS). This system provides text and image files of NRCs public documents. The handouts mentioned above may be accessed through the ADAMS system under Accession No. ML07071290343. If you do not have access to ADAMS or if there are problems in accessing the handouts located in ADAMS, contact the NRC Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737 or by e-mail to pdr@nrc.gov. |
| ML07071290343. If you do not have access to ADAMS or if there are problems in accessing the handouts located in ADAMS, contact the NRC Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737 or by e-mail to pdr@nrc.gov. | |
| Sincerely, | | Sincerely, |
| /RA/ | | /RA/ |
|
---|
Category:Letter
MONTHYEARML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal 05000499/LER-2024-001, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators IR 05000498/20243012024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 NOC-AE-240040, Application for Order Consenting to Direct Transfer of Licenses2024-07-31031 July 2024 Application for Order Consenting to Direct Transfer of Licenses ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24184C0832024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24183A1742024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump ML24179A3412024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24171A0112024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function IR 05000498/20244042024-06-0303 June 2024 Cyber Security Inspection Report 05000498/2024404 (Cover Letter) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24116A3172024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 ML24092A1902024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update NOC-AE-240040, Financial Assurance for Decommissioning - 2024 Update2024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 ML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML24050A0082024-02-19019 February 2024 Evidence of Financial Protection ML24045A0922024-02-16016 February 2024 Response to STP FOF Move Letter (2024) ML24017A2972024-02-15015 February 2024 Project Manager Assignment ML24039A1602024-02-0808 February 2024 Unit L & 2, Supplement to Modify the Implementation Date for License Amendment Request to Revise Alternate Source Term Dose Calculation ML24039A1112024-02-0808 February 2024 Operator Licensing Examination Schedule Revision 2 ML24038A3342024-02-0707 February 2024 Change to South Texas Project Electric Generating Station (Stepgs) Emergency Plan ML24033A3002024-02-0707 February 2024 Summary of Regulatory Audit Regarding a Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ML24029A2752024-01-29029 January 2024 Request to Reschedule Evaluated Force-on-Force Drill IR 05000498/20230042024-01-29029 January 2024 – Integrated Inspection Report 05000498/2023004 and 05000499/2023004 ML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information 2024-09-11
[Table view] Category:Meeting Summary
MONTHYEARML24120A2362024-05-0606 May 2024 Summary of March 25, 2024, Presubmittal Teleconference with STP Nuclear Operating Company to Discuss Changes to the Quality Assurance Plan for South Texas Project, Units 1 and 2 ML22252A0432022-09-12012 September 2022 Summary of August 31, 2022, Webinar with STP Nuclear Operating Company to Discuss a Proposed LAR to Revise the Dose Consequence Analysis for Main Steam Line Break and Locked Rotor Analysis Events for STP, Units 1 & 2 ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML21236A3082021-09-10010 September 2021 Regulatory Audit Summary Regarding License Amendment Request to Revise Moderator Temperature Coefficient Surveillance Requirements ML21222A1192021-08-12012 August 2021 Summary of Meeting with STP Nuclear Operating Company Regarding the License Amendment Request to Revise the Moderator Temperature Coefficient Surveillance Requirements for South Texas Project, Units 1 and 2 ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML20279A8152020-10-20020 October 2020 Summary of September 14, 2020, Presubmittal Teleconference with STP Nuclear Operating Company Regarding the Proposed LAR to Revise the Moderator Temperature Coefficient Surveillance Requirement for South Texas Project, Units 1 and 2 (EPID L ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML20163A5522020-06-12012 June 2020 Summary of April 21, 2020, Teleconference with STP Nuclear Operating Company to Discuss the License Amendment Request to Revise the Emergency Plan for South Texas Project, Units 1 and 2 ML20140A2612020-05-27027 May 2020 May 5, 2020, Summary of Teleconference with STP Nuclear Operating Company to Discuss a Proposed Exigent License Amendment Request to Revise the Pressure of the Safety Injection Accumulators for South Texas Project, Unit 1 ML20107J5482020-04-15015 April 2020 Teleconference Regarding NRC Observations on the March 30, 2020, License Amendment Request to Revise the Emergency Plan STP Nuclear Operation Company South Texas Project, Units 1 and 2, Dockets 50-498 and 50-499 ML20049A0572020-02-26026 February 2020 Summary of February 6, 2020, Meeting with STP Nuclear Operating Company to Discuss a Proposed License Amendment Request to Revise the Emergency Plan for South Texas Project, Units 1 and 2 (EPID L- 2020-LRM-0004) ML19350C5902019-12-17017 December 2019 12/3/19, Summary of Teleconference with STP Nuclear Operating Company to Discuss a Proposed License Amendment Request to Revise the Emergency Plan for South Texas Project, Units 1 and 2, ML19102A0162019-04-16016 April 2019 4/10/2019 Summary of Public Teleconference Regarding Potential Submission of a Relief Request to Allow Use of Carbon Fiber Reinforced Polymer for Selected Piping Repairs at South Texas, Units 1 and 2 ML17005A1002017-01-18018 January 2017 January 4, 2017, Summary of Meeting to Discussion Stp'S Response to Request for Additional Information the Revised Aluminum Bronze Selective Leaching Aging Management Program for All Potentially Susceptible Welds Throughout the Facility ML16279A3312016-10-27027 October 2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) ML16272A4362016-10-14014 October 2016 Summary of Public Preapplication Meeting with STP Nuclear Operating Company to Discuss Possible License Amendment Request to Modify Emergency Response Organization for South Texas Project, Units 1 and 2 ML16246A0222016-10-0505 October 2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items Related to Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400 - MF2409) ML16238A5272016-09-0101 September 2016 Summary of 7/28/16, Public Meeting with STP Nuclear Operating Company to Discuss the License Amendment and Exemption Requests to Use a Risk-Informed Approach to the Resolution of GSI-191 (CAC Nos. MF2400 - MF2409) ML16218A3672016-08-30030 August 2016 07/21/2016 Summary of Public Teleconference Meeting with STP Nuclear Operating Company Discussing Revisions to License Renewal Application Aluminum Bronze Selective Leaching Aging Management Program and Background Document ML16236A3042016-08-23023 August 2016 08/11/2016 Summary of Conference Call Between NRC and STP Nuclear Operating Company Concerning the 2016 Annual Update to the South Texas Project License Renewal Application ML16236A0322016-08-23023 August 2016 08/18/2016 Summary of Conference Call With STP Nuclear Operating Company Concerning the Aluminum Bronze Selective Leaching Aging Management Program in the South Texas Project, License Renewal Application ML16180A0142016-07-25025 July 2016 Summary of Meeting Discussion Between South Texas Project, Units 1 and 2, and NRC Staff Regarding the Revised Aluminum Bronze Selective Leaching Aging Management Program for All Potentially Susceptible Welds Throughout the Facility ML16190A0082016-07-13013 July 2016 Summary of 6/22/2016 Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) ML16188A0092016-07-0707 July 2016 Summary of Telecon Held on July 5, 2016 with STP Nuclear Operating Company, Concerning Additional Information Pertaining to the STP, License Renewal Application (Tac. Nos. ME4936, ME4937) - Enclosure 1 ML16188A0112016-07-0707 July 2016 Summary of Telecon Held on July 5, 2016 With STP Nuclear Operating Company, Concerning Additional Information Pertaining to the STP, License Renewal Application (TAC Nos. ME4936, ME4937) ML16188A0072016-07-0707 July 2016 Summary of Telecon Held on July 5, 2016 With STP Nuclear Operating Company, Concerning Additional Information Pertaining to the STP, License Renewal Application (TAC. Nos. ME4936, ME4937) ML16175A1082016-06-24024 June 2016 Summary of 4/21/2016 Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 ML16166A0272016-06-14014 June 2016 Summary of Telephone Conference Call Held on 06/08/2016, Between the USNRC and STP Nuclear Operating Company Response to Request for Additional Information B2.1.18-6 Pertaining to the South Texas Project License Renewal Application ML16092A0852016-04-13013 April 2016 3/17/2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2401-MF2409) ML16092A0442016-04-11011 April 2016 Summary of 3/3/2016 Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) ML16088A2432016-04-0101 April 2016 2/18/2016, Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) ML16081A2052016-03-24024 March 2016 Summary of Meeting with STP Nuclear Operating Company to Discuss Potential License Amendment Request for South Texas Project, Unit 1 Regarding Permanent Operation with 56 Control Rods ML16074A0412016-03-14014 March 2016 Summary of a Call Held on March 10, 2016, between USNRC and STPNOC, Concerning the Staff's Upcoming Audit Regarding the Amp for the Loss Of Material Due to Selective of Al-Br Welds in the ECW System for the STP LRA (TAC Nos. ME4936 And ME4937) ML16060A1272016-03-0707 March 2016 February 23, 2016, Summary of Conference Calls Held between NRC and STP Concerning Staff's Review of Submerged Closure Bolting Portion of 2014 Annual Update for STP License Renewal Application (TAC ME4936 And ME4937) ML16028A1522016-02-18018 February 2016 1/14/2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Modifications to the Licensee'S Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML16011A0612016-02-0202 February 2016 Summary of 10/1/15 Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (CAC MF ML16011A0702016-01-28028 January 2016 Summary of Preapplication Meeting with STP Nuclear Operating Company to Discuss Exigent License Amendment Request to Operate Following Removal of a D6 Control Rod at South Texas Project, Unit 1 ML16033A0072016-01-19019 January 2016 January 19, 2016, Summary of Public Meeting with STP to Discuss the Plant-Specific Aging Management Program, Selective Leaching of Aluminum Bronze, Associated with STP's License Renewal Application ML16013A0662016-01-14014 January 2016 Summary of 11/9 and 12/30/15 Conference Calls with STP Nuclear Operating Company to Discuss the Fall 2015 Steam Generator Tube Inspection Activities (CAC No. A11018) ML15308A0112015-11-30030 November 2015 Record of Conference Call on STP Request for Additional Information Set 34 ML15201A0032015-07-30030 July 2015 7/2/15 Summary of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas, Units 1 and 2 ML15177A1042015-07-21021 July 2015 4/22/2015 Summary of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas, Units 1 and 2 (TAC MF2400 t ML15177A2742015-07-21021 July 2015 5/6/2015 Summary of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas, Units 1 and 2 (TAC Nos. MF24 ML15180A2732015-07-15015 July 2015 6/3/2015 Summary of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas, Units 1 and 2 (TAC MF2400 to ML15139A3442015-06-11011 June 2015 Summary of Telephone Conference Call Held on May 12, 2015 Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Concerning Request for Additional Information, Set 31, Pertaining to the South Texas Project, Licens ML15103A0022015-05-13013 May 2015 Summary of 4/8/15 Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas, Units 1 and 2 ML15084A0032015-04-0606 April 2015 2/4/15 Summary of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas, Units 1 and 2 (TAC MF2400-MF24 ML15084A0042015-04-0101 April 2015 2/5/2015 Summary of Presubmittal Meeting with STP Nuclear Operating Company to Discuss Integrated Leak Rate Testing Program License Amendment Request for South Texas, Units 1 and 2 2024-05-06
[Table view] |
Text
May 17, 2007 APPLICANT: NRG Energy, Inc.
SUBJECT:
FEBRUARY 22, 2007, CATEGORY 1 MEETING WITH NRG ENERGY INC.
REGARDING AN INTENDED FUTURE APPLICATION FOR A COMBINED LICENSE FOR TWO UNITS AT THE SOUTH TEXAS PROJECT SITE On February 22, 2007, the staff met with representatives of NRG Energy, Inc. (NRG) and the South Texas Project Nuclear Operating Company (STPNOC) to continue discussing NRCs and STPNOCs (the applicants) plans to apply for a combined license (COL) for the construction and operation of two Advanced Boiling Water Reactors (ABWRs) at the South Texas Project site, southwest of Houston, Texas. The applicants refer to these future units as STP Units 3 and 4. The meeting covered aspects of the proposed security plan so a detailed summary will not be provided. A list of those in attendance is provided as Enclosure 1.
The applicants presentation slides, which are not sensitive, are included as Enclosure 2.
These slides can be accessed through the Agencywide Documents Access and Management System (ADAMS). This system provides text and image files of NRCs public documents. The handouts mentioned above may be accessed through the ADAMS system under Accession No. ML071290343. If you do not have access to ADAMS or if there are problems in accessing the handouts located in ADAMS, contact the NRC Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737 or by e-mail to pdr@nrc.gov.
Sincerely,
/RA/
George F. Wunder, Senior Project Manager ESBWR/ABWR Projects Branch 1 Division of New Reactor Licensing Office of New Reactors Project No. 749
Enclosures:
- 1. Attendance List
- 2. NRG/STPNOC Slides cc w/encls: See next page
APPLICANT: NRG Energy, Inc.
SUBJECT:
FEBRUARY 22, 2007, CATEGORY 1 MEETING WITH NRG ENERGY INC.
REGARDING AN INTENDED FUTURE APPLICATION FOR A COMBINED LICENSE FOR T--WO UNITS AT THE SOUTH TEXAS PROJECT SITE On February 22, 2007, the staff met with representatives of NRG Energy, Inc. (NRG) and the South Texas Project Nuclear Operating Company (STPNOC) to continue discussing NRCs and STPNOCs (the applicants) plans to apply for a combined license (COL) for the construction and operation of two Advanced Boiling Water Reactors (ABWRs) at the South Texas Project site, southwest of Houston, Texas. The applicants refer to these future units as STP Units 3 and 4. The meeting covered aspects of the proposed security plan so a detailed summary will not be provided. A list of those in attendance is provided as Enclosure 1.
The applicants presentation slides, which are not sensitive, are included as Enclosure 2.
These slides can be accessed through the Agencywide Documents Access and Management System (ADAMS). This system provides text and image files of NRCs public documents. The handouts mentioned above may be accessed through the ADAMS system under Accession No. ML07071290343. If you do not have access to ADAMS or if there are problems in accessing the handouts located in ADAMS, contact the NRC Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737 or by e-mail to pdr@nrc.gov.
Sincerely,
/RA/
George F. Wunder, Senior Project Manager ESBWR/ABWR Projects Branch 1 Division of New Reactor Licensing Office of New Reactors Project No. 749
Enclosures:
- 1. Attendance List
- 2. NRG/STPNOC Slides cc w/encls: See next page Distribution:
Hard Copy NGE1 R/F MShuaibi GWunder E-mail PUBLIC OGC ADAMS ACCESSION NO. ML071290362 PKG: ML071290343 OFFICE PM:NGE1 BC:NGE1 NAME GWunder MShuaibi DATE 05/ 09 /2007 05/ 17 /2007 OFFICIAL RECORD COPY
MEETING WITH NRG ENERGY, INC.
REGARDING INTENDED FUTURE APPLICATION FOR A COL FOR TWO UNITS AT THE STP SITE ATTENDANCE LIST Name Organization G. Gibson STP W. Mookhoek STP F. Puleo STP D. Huyck NSIR W. Smith NSIR J. McKirgan NSIR J. Wilson NRO G. Wunder NRO Enclosure 1
ENCLOSURE 2 NRG / STPNOC SLIDES (ML071290309)
COL STP Nuclear - South Texas Mailing List List #6 cc:
Mr. Brian Almon Mr. Marvin Fertel Public Utility Commission Senior Vice President William B. Travis Building and Chief Nuclear Officer PO Box 13326 Nuclear Energy Institute 1701 North Congress Avenue 1776 I Street, NW Austin, TX 78701-3326 Suite 400 Washington, DC 20006-3708 Ms. Michele Boyd Legislative Director Ms. Susan M. Jablonski Energy Program Office of Permitting, Remediation Public Citizens Critical Mass Energy and Registration and Environmental Program Texas Comm. on Env. Quality 215 Pennsylvania Avenue, SE MC-122 Washington, DC 20003 P.O. Box 13087 Austin, TX 78711-3087 C. M. Canady City of Austin Judge Electric Utility Department Matagorda County 721 Barton Springs Road Matagorda County Courthouse Austin, TX 78704 1700 Seventh Street Bay City, TX 77414 Director Division of Compliance & Inspection C. Kierksey Bureau of Radiation Control City of Austin Texas Department of State Health Services Electric Utility Department 1100 West 49th Street 721 Barton Springs Road Austin, TX 78756-3189 Austin, TX 78704 Mr. Ted Enos Dr. Gail H. Marcus 4200 South Hulen U.S. Department of Energy Suite 630 Room 5A-143 Ft. Worth, TX 76109 1000 Independence Avenue, SW Washington, DC 20585 M. A. McBurnett Manager, Nuclear Safety Assurance STP Nuclear Operating Company P.O. Box 289, Mail Code N5014 Wadsworth, TX 77483
COL STP Nuclear - South Texas Mailing List Mr. Terry Parks Winston & Strawn Chief Inspector 1400 L. Street, NW - 12th Floor Texas Department of Licensing Washington, DC 20005-3502 and Regulation Boiler Division Mr. Jon C. Wood P.O. Box 12157 Cox, Smith, & Matthews Austinm, TX 78711 112 East Pecan, Suite 1800 San Antonio, TX 78205 Policy Director Environmental and Natural Resources P. O. Box 12428 Austin, TX 78711-3189 Mr. Frank M. Quinn 8 Oak Avenue Gaithersburg, MD 20877-2705 Regional Administrator Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive Suite 400 Arlington, TX 76011-8064 J. J. Sheppard President & CEO STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483 Mr. Robert E. Sweeney IBEX ESI 4641 Montgomery Avenue Suite 350 Bethesda, MD 20814 Mr. Steve Winn NRG Texas LLC 1301 McKinney, Suite 2300 Houston, TX 77010
COL STP Nuclear - South Texas Mailing List Email APH@NEI.org (Adrian Heymer) awc@nei.org (Anne W. Cottingham) bob.brown@ge.com (Robert E. Brown)
BrinkmCB@westinghouse.com (Charles Brinkman) chris.maslak@ge.com (Chris Maslak) cwaltman@roe.com (C. Waltman) david.lewis@pillsburylaw.com (David Lewis) dlochbaum@UCSUSA.org (David Lochbaum) dwoodla1@txu.com (Donald Woodlan) erg-xl@cox.net (Eddie R. Grant) frankq@hursttech.com (Frank Quinn) george.stramback@gene.ge.com (George Stramback) greshaja@westinghouse.com (James Gresham) gzinke@entergy.com (George Alan Zinke) jgutierrez@morganlewis.com (Jay M. Gutierrez) jim.riccio@wdc.greenpeace.org (James Riccio)
JJNesrsta@cpsenergy.com (James J. Nesrsta) john.o'neil@pillsburylaw.com (John O'Neil)
Joseph.savage@ge.com (Joseph Savage)
Joseph_Hegner@dom.com (Joseph Hegner) junichi_uchiyama@mhi.co.jp (Junichi Uchiyama)
KSutton@morganlewis.com (Kathryn M. Sutton) lynchs@gao.gov (Sarah Lynch - Meeting Notices Only) maria.webb@pillsburylaw.com (Maria Webb) mark.beaumont@wsms.com (Mark Beaumont) matias.travieso-diaz@pillsburylaw.com (Matias Travieso-Diaz) media@nei.org (Scott Peterson) mike_moran@fpl.com (Mike Moran) mwl@nei.org (Melanie Lyons) patriciaL.campbell@ge.com (Patricia L. Campbell) paul.gaukler@pillsburylaw.com (Paul Gaukler)
PGunter@NIRS.org (Paul Gunter) phinnen@entergy.com (Paul Hinnenkamp) pshastings@duke-energy.com (Peter Hastings)
RJB@NEI.org (Russell Bell)
RKTemple@cpsenergy.com (R.K. Temple) roberta.swain@ge.com (Roberta Swain) ronald.hagen@eia.doe.gov (Ronald Hagen) sandra.sloan@areva.com (Sandra Sloan) seitz@id.doe.gov sfrantz@morganlewis.com (Stephen P. Frantz)
Tansel.Selekler@nuclear.energy.gov (Tansel Selekler) tom.miller@hq.doe.gov (Tom Miller) tom.miller@nuclear.energy.gov (Thomas P. Miller) trsmith@winston.com (Tyson Smith) waraksre@westinghouse.com (Rosemarie E. Waraks) wayne.marquino@ge.com (Wayne Marquino)
C:\FileNet\ML071290362.wpd (Revised 5/8/07)