Line 1: |
Line 1: |
| {{Adams | | {{Adams |
| | number = ML112840312 | | | number = ML112840284 |
| | issue date = 10/11/2011 | | | issue date = 10/11/2011 |
| | title = IR 05000003-11-008, on 09/01/11, Entergy Nuclear Operations, Inc., Buchanan, New York Site (Corrected Copy) | | | title = IR 05000003-11-008, on 09/01/11, Entergy Nuclear Operations, Inc., Buchanan, New York Site (Corrected Copy - Transmittal Letter) |
| | author name = Kauffman L | | | author name = Joustra J |
| | author affiliation = NRC/RGN-I/DNMS/DB | | | author affiliation = NRC/RGN-I/DNMS/DB |
| | addressee name = | | | addressee name = Pollock J |
| | addressee affiliation = Entergy Nuclear Operations, Inc | | | addressee affiliation = Entergy Nuclear Operations, Inc |
| | docket = 05000003 | | | docket = 05000003, 07200051 |
| | license number = DPR-005 | | | license number = DPR-005 |
| | contact person = | | | contact person = |
| | case reference number = FOIA/PA-2016-0148
| |
| | document report number = IR-11-008 | | | document report number = IR-11-008 |
| | document type = Inspection Report | | | document type = Letter |
| | page count = 10 | | | page count = 3 |
| }} | | }} |
|
| |
|
Line 19: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:U.S. NUCLEAR REGULATORY COMMISSION | | {{#Wiki_filter:UNITED STATES ber 11, 2011 |
|
| |
|
| ==REGION I== | | ==SUBJECT:== |
| INSPECTION REPORT Docket N License N DPR-5 Inspection N /2011008 Licensee: Entergy Nuclear Operations, Inc. | | NRC INSPECTION REPORT NO. 05000003/201100B, ENTERGY NUCLEAR OPERATIONS, INC., BUCHANAN, NEW YORK SITE - CORRECTED COPY |
|
| |
|
| Facility: Indian Point Energy Center (lPEC) Unit 1 Location: 450 Broadway Buchanan, New York 10511-0249 Inspection Dates: August 30 - September 1, 2011 Inspector: Laurie A. Kauffman Health Physicist Decommissioning Branch Division of Nuclear Materials Safety Approved By: Judith A. Joustra, Chief Decommissioning Branch Division of Nuclear Materials Safety Document Name: C:\MyFiles\Checkout\CORRECTED COpy RDPR-S.201100B.doc
| | ==Dear Mr. Pollock:== |
| | On September 26,2011, the NRC issued inspection report, No. 05000003/201100B, documenting an NRC inspection of an examination of your licensed activities as they relate to radiation safety and to compliance with the Commission's regulations and the license conditions. |
|
| |
|
| =EXECUTIVE SUMMARY=
| | After the report was issued, errors were identified by your staff and reported to the NRC. The errors were located in the 2nd paragraph of section B.b on page 5. Specifically, a comparison of the groundwater data was not performed because the data for 2011 was not available during the inspection. The dates reviewed for the groundwater monitoring program, related to the North Curtain Drain (NCO) and the Sphere Foundation Drain (SFD) analytical sample results, were from January 2010 through December 2010. Also, the levels of tritium ranged from 13,500 picoCuries per Liter (pCi/L) to 3,340 pCi/L for the NCO, rather than 13,500 picoCuries per Liter (pCi/L) to 3 pCi/L for the NCO. |
| Indian Point Energy Center Unit 1
| |
|
| |
|
| NRC Inspection Report No. 05000003/2011008 An announced routine safety inspection was conducted on August 30 - September 1, 2011, at Indian Point Energy Center (lPEC) Unit 1 (Unit 1) by a Region I inspector. The NRC's program for overseeing the safe operation of a shut-down nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561, Decommissioning Power Reactor Inspection Program. The inspection included a review of the programs associated with Unit 1 while in long-term safe storage (SAFSTOR)status. There are no ongoing decommissioning activities being conducted at Unit 1. Within the scope of this inspection, no safety concerns or violations were identified. A brief summary of each area inspected is described below.
| | We have corrected this page and have enclosed the corrected copy of the page. Please replace this page of the report with the enclosed page. |
|
| |
|
| Organization and Management Oversight The licensee's organization and management oversight was adequate to support Unit 1 activities.
| | We apologize for any inconvenience or problems this error may have caused you. |
|
| |
|
| The roles and responsibilities for the Unit 1 activities were consistent with the IPEC Site Management Manual, Control of Indian Point 1 and the Technical Specifications (TS).
| | ~-' ~--v-v*- |
| | dith A. Joust:' Ch~ |
| | ecommissioning Branch ber 11, 2011 |
|
| |
|
| Safety Reviews, Design Changes and Modifications There were no plant modifications since the previous inspection conducted in June 2010.
| | ==SUBJECT:== |
| | NRC INSPECTION REPORT NO. 05000003/201100B, ENTERGY NUCLEAR OPERATIONS, INC., BUCHANAN, NEW YORK SITE - CORRECTED COpy |
|
| |
|
| Audit and Corrective Action Programs The licensee maintained an adequate audit program and effectively utilized the established corrective action program to identify, evaluate, and correct issues and problems. Condition reports were appropriately prioritized and corrective actions were tracked in accordance with approved procedures.
| | ==Dear Mr. Pollock:== |
| | On September 26, 2011, the NRC issued inspection report, No. 05000003/2011 OOB, documenting an NRC inspection of an examination of your licensed activities as they relate to radiation safety and to compliance with the Commission's regulations and the license conditions. |
|
| |
|
| Decommissioning Performance and Status Reviews No dismantlement or decommissioning activities were performed since the previous inspection.
| | After the report was issued, errors were identified by your staff and reported to the NRC. The errors were located in the 2nd paragraph of section B.b on page 5. Specifically, a comparison of the groundwater data was not performed because the data for 2011 was not available during the inspection. The dates reviewed for the groundwater monitoring program, related to the North Curtain Drain (NCO) and the Sphere Foundation Drain (SFD) analytical sample results, were from January 2010 through December 2010. Also, the levels of tritium ranged from 13,500 picoCuries per Liter (pCilL) to 3,340 pCi/L for the NCO, rather than 13,500 picoCuries per Liter (pCi/L) to 3 pCi/L for the NCO. |
|
| |
|
| Maintenance and Surveillance The licensee effectively implemented the preventive maintenance and surveillance program and associated procedures in accordance with TS and Offsite Dose Calculation Manual (ODCM)requirements.
| | We have corrected this page and have enclosed the corrected copy of the page. Please replace this page of the report with the enclosed page. |
|
| |
|
| Occupational Radiation Exposure The licensee provided adequate controls to limit exposures of workers to external sources of radiation. Posting and labeling of radioactive materials and radiation areas were in compliance with regulatory requirements. Radiological controls and dose estimates associated with Unit 1 activities were effective to achieve dose goals. Implementation and oversight of the SAFSTOR program was effective for the safe storage of radioactive material.
| | We apologize for any inconvenience or problems this error may have caused you. |
|
| |
|
| Effluent, Environmental Monitoring and Radioactive Waste and Transportation The licensee effectively implemented and maintained the radioactive effluent controls program, the groundwater monitoring program related to Unit 1, the radiological monitoring program, and the radioactive waste management and transportation programs.
| | Sincerely, Original signed by Judith A. Joustra Judith A. Joustra, Chief Decommissioning Branch Division of Nuclear Materials Safety Enclosure: As Stated cc: |
| | Distribution via ListServ State of New YorkDistribution w/encl: |
| | W. Dean, RA (R10RAMAIL RESOURCE) S. McCarver, DRP M. Ferdas, DNMS D. Lew, ORA (R10RAMAIL RESOURCE) M. Jennerich, DRP L. Kauffman, DNMS D. Roberts, DRP (R1DRPMAIL RESOURCE) M. Catts, SRI B. Watson, FSME D. Ayres, DRP (R1DRPMAIL RESOURCE) A. Ayegbusi, RI S. Giebel, FSME C. Miller, DRS (R1DRSMAIL RESOURCE) P. Cataldo, SRI D. Hochmuth, DRP P. Wilson, DRS (R1DRSMAIL RESOURCE) M. Halter, RI RidsNrrPMlndianPoint Resource J. McHale, RI OEDO R. Lorson, DNMS RidsNrrDorlLpl1-1 Resource M. Gray, DRP D. Collins, DNMS ROPreport Resource@nrc B. Bickett, DRP J. Joustra, DNMS DOCUMENT NAME: G:\WordDocs\Current\lnsp Letter\LDPR-5.2011 OOa.Corrected Copy. doc SUNSI Review Complete: LKauffman After declaring this document "An Official Agency Record" it will be released to the Public. |
|
| |
|
| =REPORT DETAILS= | | = = = |
| | To receive a cop of this document, Indicate in the box: "C" Copy w/o attach/encl "E" Copy w/ attach/end "N" No copy ML112840284 - Ltr; ML112840312 - Rpt OFFICE DNMS/RI LKauffman/lak* |
| | IN DNMS/RI JJoustra.JAJ I I J NAME DATE 09/30/11 10/11/11 |
|
| |
|
| 1.0 Background Unit 1 is a pressurized water reactor that has been permanently shut down since October 31, 1974, and is being maintained in long-term storage (SAFSTOR). Units 1 and 2 are physically contiguous and share systems and facilities as well as a common operating organization. The Technical Specifications (TS) for Unit 1 recognize this commonality as well as the intended use of the Unit 1 facilities to support Indian Point Unit 2. The systems associated with Unit 1 are divided into three classifications:
| | 8.0 Effluent and Environmental Monitoring Programs a. Inspection Scope (IP 84750) |
| a) systems required per the Unit 1 TS that support the SAFSTOR condition of the unit; b) systems required to support the operating units (e.g. Liquid Waste Processing); and c) systems that are not required to support the TS, SAFSTOR condition, or the operating units. | | The inspector evaluated the radioactive effluent control and the site radiological environmental monitoring programs. The evaluation included a review of the annual radioactive effluent release report for 2010, the annual radiological environmental operating report for 2010, and the associated analytical results for each program. The inspection also included a review of the Unit 1 TS and the ODCM. The inspector reviewed the associated radioactive liquid release permits, the analytical sample results, and the projected doses to the public associated with the groundwater in-leakage into the North Curtain Drain (NCO) and Sphere Foundation Drain (SFD) sumps. The inspector also reviewed the gaseous effluent results, the projected doses to the public associated with the stack vent, and the radiological environmental monitoring program, including the analytical results associated with samples of shoreline sediment, fish, and water from January 2011 through August 2011. |
|
| |
|
| 2.0 Organization and Management Oversight
| | b. Observations and Findings The annual effluent and environmental monitoring reports demonstrated that the calculated doses were well below regulatory dose criteria of 10 CFR 50, Appendix I. The radioactive liquid effluent release permits were completed in accordance with the ODCM. |
|
| |
|
| ====a. Inspection Scope====
| | From a review of the analytical data, the inspector verified that the projected doses to the public from the liquid and gaseous effluent from Unit 1 were below TS limits and were performed in accordance with the ODCM and the Code of Federal Regulations (10 CFR 50.36a) for maintaining doses to the public from radioactive effluents as low as is reasonably achievable. The inspector verified that the licensee collected and analyzed the stack vent samples, NCO and SFD sump samples, and the liquid discharge monitor samples within the required frequencies and that the sample collection was conducted in accordance with applicable procedures. |
| (Inspection Procedure (IP) 36801)
| |
| The inspector reviewed procedure IP-SMM-DC-90S, IPEC Site Management Manual, Control of Indian Point 1, Revision 6 (IPEC-SMM), issued February 4,2010, regarding the roles and responsibilities for the operation, maintenance and control of Unit 1. The inspector discussed organization, management and/or staffing changes as outlined in TS, Sections 3.1 and 3.2, and in IPEC-SMM, Section S.O. The inspector also interviewed the personnel in the Employee Concerns Program (ECP).
| |
|
| |
|
| ====b. Observations and Findings====
| | The inspector reviewed the analytical water sample results related to the groundwater monitoring program, specifically the NCO and SFD analytical sample results from January 2010 through December 2010. The levels of tritium ranged from 13,500 picoCuries per Liter (pCilL) to 3,340 pCilL for the NCO and from 642 pCilL to 480 pCi/L for the SFD. The licensee informed the inspector that the levels of radioactivity appear to be trending downward. The inspector's review of this data confirmed the licensee's conclusion. |
| Procedure IP-SMM-DC-90S defines roles and assigns responsibility for the operation, maintenance and control of Unit 1. There were no organizational structure changes made by the licensee since the previous inspection. The inspector verified that procedure IP-SMM-DC-90S and associated implementing procedures were consistent with the TS. Implementation of the TS and the IPEC-SMM was adequate. ECP personnel provided the inspector with details regarding the licensee commitment to maintain a high level of awareness to safety.
| |
| | |
| ====c. Conclusions====
| |
| The licensee's organization and management oversight was adequate to support Unit 1 activities. The roles and responsibilities for the Unit 1 activities were consistent with the IPEC-SMM and the TS. No safety concerns or violations were identified.
| |
| | |
| 3.0 Safety Reviews, Design Changes, and Modifications
| |
| | |
| ====a. Inspection Scope====
| |
| (IP 37801)
| |
| Procedure IP-SMM-DC-90S, Rev. 6, provides guidance for modifying or working on Unit 1 structures, systems and components (SSCs) that have been "retired in place" and that remain in place to support the operation of Unit 2. The inspector discussed Engineering Change (EC) reports to determine if the licensee conducted safety reviews and engineering design change screening in accordance with the requirements of 10 CFR 50.59.
| |
| | |
| ====b. Observations and Findings====
| |
| There were no plant modifications since the previous inspection conducted in June 2010.
| |
| | |
| ====c. Conclusions====
| |
| No safety concerns or violations were identified.
| |
| 4.0 Audit and Corrective Action Program
| |
| | |
| ====a. Inspection Scope====
| |
| (IP 40801)
| |
| The inspector reviewed the quality assurance (QA) audit report QA-12/18-20 11-IP-1 ,
| |
| Operations/Technical Specifications, dated June 6-27, 2011 related to Unit 1 SAFSTOR activities. The inspector also reviewed selected condition reports (CRs) and any associated corrective actions to evaluate the licensee's ability to assess, identify, resolve, and prevent issues that could impact safety or the quality of SAFSTOR activities.
| |
| | |
| ====b. Observations and Findings====
| |
| The purpose of the audit was to evaluate the effectiveness of Operations, compliance with TS requirements and to evaluate selected elements of the Master Audit Plan for Operations and TS. The audit contained 10 scope elements including: Test Control; Inspection, Test and Operating Status; Limiting Conditions for Operations; Conduct of Operations; Operator Knowledge and Performance; Work Coordination and Control; Corrective Action; Self Assessment and Benchmarking; Instruction, Drawings and Procedures; and Leadership and Management. The audit was adequate and identified strengths and weaknesses related to the Unit 1 activities.
| |
| | |
| The priority for addressing CRs and implementation of corrective actions were appropriate based upon safety significance. Corrective actions were implemented to address identified issues, and were being tracked to closure using the licensee's corrective action program. The licensee did not identify any adverse trends or safety concerns.
| |
| | |
| ====c. Conclusions====
| |
| The licensee maintained an adequate audit program and effectively utilized the established corrective action program to identify, evaluate, and correct issues and problems. CRs were appropriately prioritized and corrective actions were tracked in accordance with approved procedures. No safety concerns or violations were identified.
| |
| | |
| 5.0 Decommissioning Performance and Status Reviews
| |
| | |
| ====a. Inspection Scope====
| |
| (IP 71801)
| |
| The inspector reviewed the licensee's current decommissioning status with respect to the Decommissioning Plan for Indian Point Unit 1, approved by the NRC in an Order dated January 31, 1996.
| |
| | |
| ====b. Observations and Findings====
| |
| Unit 1 is currently in the SAFSTOR condition. The licensee informed the inspector that they plan to actively decommission Unit 1 in parallel with the decommissioning of Unit 2 after that unit has been permanently shutdown.
| |
| | |
| ====c. Conclusions====
| |
| No dismantlement or decommissioning activities were performed since the previous inspection, conducted in June 2010. No safety concerns or violations were identified.
| |
| | |
| 6.0 Maintenance and Surveillance
| |
| | |
| ====a. Inspection Scope====
| |
| OP 62801)
| |
| The inspector evaluated the maintenance program, required by TS, Section 5.0 and described in the IPEC SSM, Section 6.0. The inspector reviewed the surveillance requirements for the Unit 1 radioactive effluent monitoring instrumentation, required by TS, Section 5.2 and the ODCM. The inspector examined the shift logs and the maintenance and calibration records for the liquid discharge monitor (R-54) and the stack vent noble gas monitor (R-60) for the period July 2010 through August 2011. The inspector conducted a plant tour, including the nuclear service building (NSB), the chemical systems building (CSB), the fuel handling building (FHB), the containment building, and containment sphere [Le. vapor containment (VC)]. The inspector also discussed the biennial SAFSTOR engineering and structural assessment inspection with the licensee.
| |
| | |
| ====b. Observations and Findings====
| |
| The inspector verified that the maintenance and surveillance program for selected systems and components had been conducted in accordance with TS, implementing procedures, and the ODCM. The inspector determined from a review of maintenance and calibration records that the preventative maintenance, routine surveillance, and calibration results were complete and the results were within acceptable limits. The inspector also determined that the radioactive effluent monitoring instrumentation were calibrated and that the set points were appropriate.
| |
| | |
| The biennial SAFSTOR engineering and structural assessment inspection will be conducted in November 2011. The inspector will review the engineering and structural assessment report during the next inspection.
| |
| | |
| ====c. Conclusions====
| |
| The licensee effectively implemented the preventive maintenance and surveillance program and associated procedures in accordance with TS and ODCM requirements.
| |
| | |
| No safety concerns or violations were identified.
| |
| | |
| 7.0 Occupational Radiation Exposure
| |
| | |
| ====a. Inspection Scope====
| |
| (IP 83750)
| |
| The inspector evaluated the licensee's implementation of the occupational radiation exposure program to determine the licensee's capability to monitor and control radiation exposure to employees, and to determine the adequacy of the radiation protection program. The inspector reviewed procedure EN-RO-101, Nuclear Management Manual, Access Control for Radiologically Controlled Areas, Rev. 6, issued June 23, 2011, RP-STD-17, Satellite RP Key Issuance and HRA, LHRA, and VHRA Boundary Verification, Rev. 10, issued May 17, 2010, and EN-RP-108, Radiation Protection Posting, Rev. 10, issued August 4, 2011. The inspector interviewed responsible individuals, reviewed radiological survey plans, survey maps of the radiologically controlled area, and conducted field observations of radiological postings. The inspector evaluated the radiation work permits (RWP) related to Unit 1, and the dose totals for 2010 and January 2011 through August 2011.
| |
| | |
| ====b. Observations and Findings====
| |
| The radiologically controlled areas were appropriately posted for radioactive material.
| |
| | |
| Radiological postings were readily visible, well-maintained, and reflected radiological conditions. The radiological survey maps and related information maintained at the Unit 1 access point were current. High radiation areas and technical specification locked high radiation areas were properly posted and locked as required. The RWPs were commensurate with the radiological significance of the tasks and included the appropriate exposure control measures for the safe implementation of the activities. The RWP dose totals were below the dose goal totals for 2010 and January 2011 through August 2011.
| |
| | |
| ====c. Conclusions====
| |
| The licensee provided adequate controls to limit exposures of workers to external sources of radiation. Posting of radioactive materials and radiation areas were in compliance with regulatory requirements. Radiological controls and dose estimates associated with Unit 1 activities were effective to achieve dose goals. Implementation and oversight of the SAFSTOR program were effective for the safe storage of radioactive material. No safety concerns or violations were identified.
| |
| | |
| ~-- ~--------~~------
| |
| 8.0 Effluent and Environmental Monitoring Programs
| |
| | |
| ====a. Inspection Scope====
| |
| (IP 84750)
| |
| The inspector evaluated the radioactive effluent control and the site radiological environmental monitoring programs. The evaluation included a review of the annual radioactive effluent release report for 2010, the annual radiological environmental operating report for 2010, and the associated analytical results for each program. The inspection also included a review of the Unit 1 TS and the ODCM. The inspector reviewed the associated radioactive liquid release permits, the analytical sample results, and the projected doses to the public associated with the groundwater in-leakage into the North Curtain Drain (NCD) and Sphere Foundation Drain (SFD) sumps. The inspector also reviewed the gaseous effluent results, the projected doses to the public associated with the stack vent, and the radiological environmental monitoring program, including the analytical results associated with samples of shoreline sediment, fish, and water from January 2011 through August 2011.
| |
| | |
| ====b. Observations and Findings====
| |
| The annual effluent and environmental monitoring reports demonstrated that the calculated doses were well below regulatory dose criteria of 10 CFR 50, Appendix I. The radioactive liquid effluent release permits were completed in accordance with the ODCM.
| |
| | |
| From a review of the analytical data, the inspector verified that the projected doses to the public from the liquid and gaseous effluent from Unit 1 were below TS limits and were performed in accordance with the ODCM and the Code of Federal Regulations (10 CFR 50.36a) for maintaining doses to the public from radioactive effluents as low as is reasonably achievable. The inspector verified that the licensee collected and analyzed the stack vent samples, NCD and SFD sump samples, and the liquid discharge monitor samples within the required frequencies and that the sample collection was conducted in accordance with applicable procedures.
| |
| | |
| The inspector reviewed the analytical water sample results related to the groundwater monitoring program, specifically the NCD and SFD analytical sample results from January 2010 through December 2010. The levels of tritium ranged from 13,500 picoCuries per Liter (pCi/L) to 3,340 pCi/L for the NCD and from 642 pCi/L to 480 pCi/L for the SFD. The licensee informed the inspector that the levels of radioactivity appear to be trending downward. The inspector's review of this data confirmed the licensee's conclusion. | |
|
| |
|
| The inspector reviewed the analytical results for shoreline sediment, fish, and water from January 2011 through August 2011 for the radiological environmental monitoring program and noted that the results indicated that no significant radioactivity was identified in fish and the environment. | | The inspector reviewed the analytical results for shoreline sediment, fish, and water from January 2011 through August 2011 for the radiological environmental monitoring program and noted that the results indicated that no significant radioactivity was identified in fish and the environment. |
|
| |
|
| ====c. Conclusions====
| | c. Conclusions The licensee effectively implemented and maintained the radioactive effluent controls program, the groundwater monitoring program, and the radiological monitoring program. |
| The licensee effectively implemented and maintained the radioactive effluent controls program, the groundwater monitoring program, and the radiological monitoring program. | |
|
| |
|
| No safety concerns or violations were identified. | | No safety concerns or violations were identified. |
|
| |
|
| Radioactive Waste Management and Transportation of Radioactive Materials
| | 5 |
| | |
| ====a. Inspection Scope====
| |
| (IP 86750)
| |
| The inspector evaluated and discussed the radioactive waste management and transportation programs to determine whether the licensee properly processed, packaged, stored, and shipped radioactive materials. The inspector also conducted a tour of the Unit 1 FHB.
| |
| | |
| ====b. Observations and Findings====
| |
| The inspector noted that there were no radioactive waste shipments since the previous inspection conducted in June 2010.
| |
| | |
| Additionally, the inspector determined from the Unit 1 FHB tour and discussions with individuals cognizant of the radioactive waste management and radioactive materials transportation programs that the Class B waste from the cleanup of the spent fuel pool is still being maintained in the Unit 1 FHB until an appropriate disposal option is available.
| |
| | |
| ====c. Conclusions====
| |
| The licensee effectively implemented the radioactive waste management and transportation programs. No safety concerns or violations were identified.
| |
| | |
| ===Exit Meeting Summary===
| |
| | |
| On September 1, 2011, the inspector presented the inspection results to Donald Mayer, Director, Unit 1, and other members of the licensee's staff. The inspector confirmed that proprietary information was not provided or examined during the inspection.
| |
| | |
| A-1
| |
| | |
| =SUPPLEMENTAL INFORMATION=
| |
| | |
| PARTIAL LIST OF PERSONS CONTACTED
| |
| Licensee
| |
| : [[contact::C. English]], Superintendant, Unit 1
| |
| : [[contact::J. Doroski]], Health Physics and Chemistry Specialist
| |
| : [[contact::W. Henries]], Senior Engineer Consultant, Unit 1
| |
| : [[contact::F. Inzirillo]], Quality Assurance Manager
| |
| : [[contact::D. Mayer]], Director, Unit 1
| |
| : [[contact::J. Michetti]], System Engineering Support - RMS
| |
| : [[contact::S. Sandike]], Senior Chemistry Engineer
| |
| : [[contact::W. Scholtens]], Radioactive Waste Engineer
| |
| : [[contact::D. Smith]], Health Physicist, Radiation Protection
| |
| : [[contact::G. Dahl]], Licensing Engineer
| |
| : [[contact::B. Taggart]], Employee Concerns Program
| |
| : [[contact::R. Tagliamante]], Radiation Protection Manager
| |
| INSPECTION PROCEDURES USED
| |
| 36801 Organization, Management, and Cost Controls at Permanently Shutdown
| |
| Reactors (PSRs)
| |
| 37801 Safety Reviews, Design Changes, and Modifications at PSRs
| |
| 40801 Self Assessment, Auditing, and Corrective Action at PSRs
| |
| 2801 Maintenance and Surveillance at PSRs
| |
| 71801 Decommissioning Performance and Status Reviews at PSRs
| |
| 83750 Occupational Radiation Exposure
| |
| 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring
| |
| 86750 Solid Radioactive Waste Management and Transportation of Radioactive
| |
| Materials
| |
| | |
| ITEMS OPEN, CLOSED, AND DISCUSSED
| |
| Opened, Closed and Discussed - None
| |
| LIST OF ACRONYMS USED
| |
| ADAMS Agencywide Documents Access and Management Systems
| |
| CFR Code of Federal Regulations
| |
| CR condition reports
| |
| CSB chemical systems building
| |
| EC Engineering Change
| |
| ECP Employee Concerns Program
| |
| FHB fuel handling building
| |
| IMC Inspection Manual Chapter
| |
| IP Inspection Procedure
| |
| IPEC Indian Point Energy Center
| |
| IPEC-SMM IPEC Site Management Manual, Control of Indian Point 1
| |
| NCD North Curtain Drain
| |
| NRC Nuclear Regulatory Commission
| |
| NSB nuclear service building
| |
| ODCM Offsite Dose Calculation Manual
| |
| PSRs Permanently Shutdown Reactors
| |
| QA quality assurance
| |
| RMS radiation monitoring system
| |
| RWP radiation work permits
| |
| SAFSTOR long-term safe storage
| |
| SFD Sphere Foundation Drain
| |
| SSCs structures, systems and components
| |
| TS technical specification
| |
| Unit 1 Indian Point Unit 1
| |
| Unit 2 Indian Point Unit 2
| |
| VC vapor containment (containment sphere)
| |
| Attachment
| |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24171A0122024-06-18018 June 2024 Reply to a Notice of Violation EA-24-037 ML24156A1162024-06-0404 June 2024 Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000003/20240052024-05-21021 May 2024 and 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation ML24128A0632024-05-0707 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24116A2412024-04-25025 April 2024 Annual Environmental Protection Plan Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24080A1722024-03-20020 March 2024 Reply to a Notice of Violation EA-2024-010 IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) ML24045A0882024-02-22022 February 2024 Correction to the Technical Specifications to Reflect Appropriate Pages Removed and Retained by Previous License Amendments ML24053A0642024-02-22022 February 2024 2023 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report IR 05000003/20230042024-02-22022 February 2024 NRC Inspection Report Nos. 05000003/2023004, 05000247/2023004, 05000286/2023004, and 07200051/2023004 and Notice of Violation ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River 2024-09-18
[Table view] |
Text
UNITED STATES ber 11, 2011
SUBJECT:
NRC INSPECTION REPORT NO. 05000003/201100B, ENTERGY NUCLEAR OPERATIONS, INC., BUCHANAN, NEW YORK SITE - CORRECTED COPY
Dear Mr. Pollock:
On September 26,2011, the NRC issued inspection report, No. 05000003/201100B, documenting an NRC inspection of an examination of your licensed activities as they relate to radiation safety and to compliance with the Commission's regulations and the license conditions.
After the report was issued, errors were identified by your staff and reported to the NRC. The errors were located in the 2nd paragraph of section B.b on page 5. Specifically, a comparison of the groundwater data was not performed because the data for 2011 was not available during the inspection. The dates reviewed for the groundwater monitoring program, related to the North Curtain Drain (NCO) and the Sphere Foundation Drain (SFD) analytical sample results, were from January 2010 through December 2010. Also, the levels of tritium ranged from 13,500 picoCuries per Liter (pCi/L) to 3,340 pCi/L for the NCO, rather than 13,500 picoCuries per Liter (pCi/L) to 3 pCi/L for the NCO.
We have corrected this page and have enclosed the corrected copy of the page. Please replace this page of the report with the enclosed page.
We apologize for any inconvenience or problems this error may have caused you.
~-' ~--v-v*-
dith A. Joust:' Ch~
ecommissioning Branch ber 11, 2011
SUBJECT:
NRC INSPECTION REPORT NO. 05000003/201100B, ENTERGY NUCLEAR OPERATIONS, INC., BUCHANAN, NEW YORK SITE - CORRECTED COpy
Dear Mr. Pollock:
On September 26, 2011, the NRC issued inspection report, No. 05000003/2011 OOB, documenting an NRC inspection of an examination of your licensed activities as they relate to radiation safety and to compliance with the Commission's regulations and the license conditions.
After the report was issued, errors were identified by your staff and reported to the NRC. The errors were located in the 2nd paragraph of section B.b on page 5. Specifically, a comparison of the groundwater data was not performed because the data for 2011 was not available during the inspection. The dates reviewed for the groundwater monitoring program, related to the North Curtain Drain (NCO) and the Sphere Foundation Drain (SFD) analytical sample results, were from January 2010 through December 2010. Also, the levels of tritium ranged from 13,500 picoCuries per Liter (pCilL) to 3,340 pCi/L for the NCO, rather than 13,500 picoCuries per Liter (pCi/L) to 3 pCi/L for the NCO.
We have corrected this page and have enclosed the corrected copy of the page. Please replace this page of the report with the enclosed page.
We apologize for any inconvenience or problems this error may have caused you.
Sincerely, Original signed by Judith A. Joustra Judith A. Joustra, Chief Decommissioning Branch Division of Nuclear Materials Safety Enclosure: As Stated cc:
Distribution via ListServ State of New YorkDistribution w/encl:
W. Dean, RA (R10RAMAIL RESOURCE) S. McCarver, DRP M. Ferdas, DNMS D. Lew, ORA (R10RAMAIL RESOURCE) M. Jennerich, DRP L. Kauffman, DNMS D. Roberts, DRP (R1DRPMAIL RESOURCE) M. Catts, SRI B. Watson, FSME D. Ayres, DRP (R1DRPMAIL RESOURCE) A. Ayegbusi, RI S. Giebel, FSME C. Miller, DRS (R1DRSMAIL RESOURCE) P. Cataldo, SRI D. Hochmuth, DRP P. Wilson, DRS (R1DRSMAIL RESOURCE) M. Halter, RI RidsNrrPMlndianPoint Resource J. McHale, RI OEDO R. Lorson, DNMS RidsNrrDorlLpl1-1 Resource M. Gray, DRP D. Collins, DNMS ROPreport Resource@nrc B. Bickett, DRP J. Joustra, DNMS DOCUMENT NAME: G:\WordDocs\Current\lnsp Letter\LDPR-5.2011 OOa.Corrected Copy. doc SUNSI Review Complete: LKauffman After declaring this document "An Official Agency Record" it will be released to the Public.
=
To receive a cop of this document, Indicate in the box: "C" Copy w/o attach/encl "E" Copy w/ attach/end "N" No copy ML112840284 - Ltr; ML112840312 - Rpt OFFICE DNMS/RI LKauffman/lak*
IN DNMS/RI JJoustra.JAJ I I J NAME DATE 09/30/11 10/11/11
8.0 Effluent and Environmental Monitoring Programs a. Inspection Scope (IP 84750)
The inspector evaluated the radioactive effluent control and the site radiological environmental monitoring programs. The evaluation included a review of the annual radioactive effluent release report for 2010, the annual radiological environmental operating report for 2010, and the associated analytical results for each program. The inspection also included a review of the Unit 1 TS and the ODCM. The inspector reviewed the associated radioactive liquid release permits, the analytical sample results, and the projected doses to the public associated with the groundwater in-leakage into the North Curtain Drain (NCO) and Sphere Foundation Drain (SFD) sumps. The inspector also reviewed the gaseous effluent results, the projected doses to the public associated with the stack vent, and the radiological environmental monitoring program, including the analytical results associated with samples of shoreline sediment, fish, and water from January 2011 through August 2011.
b. Observations and Findings The annual effluent and environmental monitoring reports demonstrated that the calculated doses were well below regulatory dose criteria of 10 CFR 50, Appendix I. The radioactive liquid effluent release permits were completed in accordance with the ODCM.
From a review of the analytical data, the inspector verified that the projected doses to the public from the liquid and gaseous effluent from Unit 1 were below TS limits and were performed in accordance with the ODCM and the Code of Federal Regulations (10 CFR 50.36a) for maintaining doses to the public from radioactive effluents as low as is reasonably achievable. The inspector verified that the licensee collected and analyzed the stack vent samples, NCO and SFD sump samples, and the liquid discharge monitor samples within the required frequencies and that the sample collection was conducted in accordance with applicable procedures.
The inspector reviewed the analytical water sample results related to the groundwater monitoring program, specifically the NCO and SFD analytical sample results from January 2010 through December 2010. The levels of tritium ranged from 13,500 picoCuries per Liter (pCilL) to 3,340 pCilL for the NCO and from 642 pCilL to 480 pCi/L for the SFD. The licensee informed the inspector that the levels of radioactivity appear to be trending downward. The inspector's review of this data confirmed the licensee's conclusion.
The inspector reviewed the analytical results for shoreline sediment, fish, and water from January 2011 through August 2011 for the radiological environmental monitoring program and noted that the results indicated that no significant radioactivity was identified in fish and the environment.
c. Conclusions The licensee effectively implemented and maintained the radioactive effluent controls program, the groundwater monitoring program, and the radiological monitoring program.
No safety concerns or violations were identified.
5