|
---|
Category:Letter
MONTHYEARIR 07200051/20244022024-11-20020 November 2024 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200051/2024402 (Public) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24171A0122024-06-18018 June 2024 Reply to a Notice of Violation EA-24-037 ML24156A1162024-06-0404 June 2024 Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000003/20240052024-05-21021 May 2024 And 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation ML24128A0632024-05-0707 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24116A2412024-04-25025 April 2024 Annual Environmental Protection Plan Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) ML24080A1722024-03-20020 March 2024 Reply to a Notice of Violation EA-2024-010 ML24053A0642024-02-22022 February 2024 2023 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report IR 05000003/20230042024-02-22022 February 2024 NRC Inspection Report Nos. 05000003/2023004, 05000247/2023004, 05000286/2023004, and 07200051/2023004 and Notice of Violation ML24045A0882024-02-22022 February 2024 Correction to the Technical Specifications to Reflect Appropriate Pages Removed and Retained by Previous License Amendments ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC – NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks 2024-09-18
[Table view] |
See also: IR 05000003/2011008
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD
KING OF PRUSSIA, PENNSYLVANIA 19406-1415
October 11, 2011
Docket No. 05000003 License No. DPR-5
Joseph E. Pollock
Site Vice President
Entergy Nuclear Operations, Inc.
450 Broadway, GSB
P.O. Box 249
Buchanan, NY 10511-0249
SUBJECT: NRC INSPECTION REPORT NO. 05000003/201100B, ENTERGY NUCLEAR
OPERATIONS, INC., BUCHANAN, NEW YORK SITE - CORRECTED COPY
Dear Mr. Pollock:
On September 26,2011, the NRC issued inspection report, No. 05000003/201100B,
documenting an NRC inspection of an examination of your licensed activities as they relate to
radiation safety and to compliance with the Commission's regulations and the license conditions.
After the report was issued, errors were identified by your staff and reported to the NRC. The
errors were located in the 2nd paragraph of section B.b on page 5. Specifically, a comparison of
the groundwater data was not performed because the data for 2011 was not available during the
inspection. The dates reviewed for the groundwater monitoring program, related to the North
Curtain Drain (NCO) and the Sphere Foundation Drain (SFD) analytical sample results, were
from January 2010 through December 2010. Also, the levels of tritium ranged from 13,500
picoCuries per Liter (pCi/L) to 3,340 pCi/L for the NCO, rather than 13,500 picoCuries per Liter
(pCi/L) to 3 pCi/L for the NCO.
We have corrected this page and have enclosed the corrected copy of the page. Please replace
this page of the report with the enclosed page.
We apologize for any inconvenience or problems this error may have caused you.
~-' ~--v-v*-
dith A. Joust:' Ch~
ecommissioning Branch
Division of Nuclear Materials Safety
Enclosure: As Stated
cc:
Distribution via ListServ
State of New York
October 11, 2011
Docket No. 05000003 License No. DPR-5
Joseph E. Pollock
Site Vice President
Entergy Nuclear Operations, Inc.
450 Broadway, GSB
P.O. Box 249
Buchanan, NY 10511-0249
SUBJECT: NRC INSPECTION REPORT NO. 05000003/201100B, ENTERGY NUCLEAR OPERATIONS,
INC., BUCHANAN, NEW YORK SITE - CORRECTED COpy
Dear Mr. Pollock:
On September 26, 2011, the NRC issued inspection report, No. 05000003/2011 OOB, documenting an NRC
inspection of an examination of your licensed activities as they relate to radiation safety and to compliance with
the Commission's regulations and the license conditions.
After the report was issued, errors were identified by your staff and reported to the NRC. The errors were
located in the 2nd paragraph of section B.b on page 5. Specifically, a comparison of the groundwater data was
not performed because the data for 2011 was not available during the inspection. The dates reviewed for the
groundwater monitoring program, related to the North Curtain Drain (NCO) and the Sphere Foundation Drain
(SFD) analytical sample results, were from January 2010 through December 2010. Also, the levels of tritium
ranged from 13,500 picoCuries per Liter (pCilL) to 3,340 pCi/L for the NCO, rather than 13,500 picoCuries per
Liter (pCi/L) to 3 pCi/L for the NCO.
We have corrected this page and have enclosed the corrected copy of the page. Please replace this page of
the report with the enclosed page.
We apologize for any inconvenience or problems this error may have caused you.
Sincerely,
Original signed by Judith A. Joustra
Judith A. Joustra, Chief
Decommissioning Branch
Division of Nuclear Materials Safety
Enclosure: As Stated
cc:
Distribution via ListServ
State of New YorkDistribution w/encl:
W. Dean, RA (R10RAMAIL RESOURCE) S. McCarver, DRP M. Ferdas, DNMS
D. Lew, ORA (R10RAMAIL RESOURCE) M. Jennerich, DRP L. Kauffman, DNMS
D. Roberts, DRP (R1DRPMAIL RESOURCE) M. Catts, SRI B. Watson, FSME
D. Ayres, DRP (R1DRPMAIL RESOURCE) A. Ayegbusi, RI S. Giebel, FSME
C. Miller, DRS (R1DRSMAIL RESOURCE) P. Cataldo, SRI D. Hochmuth, DRP
P. Wilson, DRS (R1DRSMAIL RESOURCE) M. Halter, RI RidsNrrPMlndianPoint Resource
J. McHale, RI OEDO R. Lorson, DNMS RidsNrrDorlLpl1-1 Resource
M. Gray, DRP D. Collins, DNMS ROPreport Resource@nrc
B. Bickett, DRP J. Joustra, DNMS
DOCUMENT NAME: G:\WordDocs\Current\lnsp Letter\LDPR-5.2011 OOa.Corrected Copy. doc
SUNSI Review Complete: LKauffman After declaring this document "An Official Agency Record" it will be released to the Public.
=
To receive a cop of this document, Indicate in the box: "C" Copy w/o attach/encl "E" Copy w/ attach/end "N" No copy ML 112840284 - Ltr; ML112840312 - Rpt
OFFICE DNMS/RI
LKauffman/lak*
IN DNMS/RI
JJoustra.JAJ
I I J
NAME
DATE 09/30/11 10/11/11
8.0 Effluent and Environmental Monitoring Programs
a. Inspection Scope (IP 84750)
The inspector evaluated the radioactive effluent control and the site radiological
environmental monitoring programs. The evaluation included a review of the annual
radioactive effluent release report for 2010, the annual radiological environmental
operating report for 2010, and the associated analytical results for each program. The
inspection also included a review of the Unit 1 TS and the ODCM. The inspector
reviewed the associated radioactive liquid release permits, the analytical sample results,
and the projected doses to the public associated with the groundwater in-leakage into the
North Curtain Drain (NCO) and Sphere Foundation Drain (SFD) sumps. The inspector
also reviewed the gaseous effluent results, the projected doses to the public associated
with the stack vent, and the radiological environmental monitoring program, including the
analytical results associated with samples of shoreline sediment, fish, and water from
January 2011 through August 2011.
b. Observations and Findings
The annual effluent and environmental monitoring reports demonstrated that the
calculated doses were well below regulatory dose criteria of 10 CFR 50, Appendix I. The
radioactive liquid effluent release permits were completed in accordance with the ODCM.
From a review of the analytical data, the inspector verified that the projected doses to the
public from the liquid and gaseous effluent from Unit 1 were below TS limits and were
performed in accordance with the ODCM and the Code of Federal Regulations
(10 CFR 50.36a) for maintaining doses to the public from radioactive effluents as low as
is reasonably achievable. The inspector verified that the licensee collected and analyzed
the stack vent samples, NCO and SFD sump samples, and the liquid discharge monitor
samples within the required frequencies and that the sample collection was conducted in
accordance with applicable procedures.
The inspector reviewed the analytical water sample results related to the groundwater
monitoring program, specifically the NCO and SFD analytical sample results from
January 2010 through December 2010. The levels of tritium ranged from 13,500
picoCuries per Liter (pCilL) to 3,340 pCilL for the NCO and from 642 pCilL to 480 pCi/L
for the SFD. The licensee informed the inspector that the levels of radioactivity appear to
be trending downward. The inspector's review of this data confirmed the licensee's
conclusion.
The inspector reviewed the analytical results for shoreline sediment, fish, and water from
January 2011 through August 2011 for the radiological environmental monitoring
program and noted that the results indicated that no significant radioactivity was
identified in fish and the environment.
c. Conclusions
The licensee effectively implemented and maintained the radioactive effluent controls
program, the groundwater monitoring program, and the radiological monitoring program.
No safety concerns or violations were identified.
5